Telephone (412) 393-6000 N."o.'*e'o'x 4 Shippingport, PA 15077-0004 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Inspection Report 87-02 Gentlemen:
In response to NRC correspondence dated February 18, 1987 and in accordance with 10 CFR 2.201, the attached reply addresses the Notice of violation which was included with the referenced report.
If there are any questions concerning this response, please contact my office.
Very truly yours, J. D.
Sieber Vice President, Nuclear cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission Regional Administrator Region 1 631 Park Avenue i
King of Prussia, PA 19406 0703300564 870320 0
PDR ADOCK 05000334 O
-1; Benv;r Vallcy Power Stntion, Unit No. 1 DocketLNo. 50-334, License No. DPR-66 Inspection Report 87-02 Page 2 cc: U. S. Nuclear Regulatory Commission
-Office of Inspection & Enforcement Attn:
Mr. Edward C. Wenzinger, Chief Project Branch No. 3 Region 1 631 Park Avenue King of Prussia, PA 19406 Director, Safety Evaluation & Control Virginia Electric & Power Company P.O. Box 26666 One James River Plaza Richmond, VA 23261
' -j DUQUESNE LIGHT COMPANY g
BEAVER VALLEY POWER' STATION UNIT NO. 1 Reply to Notice of Violation Inspection 87-02 Letter dated February 18, 1987-
-VIOLATION (Severity Level IV; Supplement I)
Description of Violation (87-02-01)
Technical Specification 4.3.1.1.1 and-Table 4.3-1,' Reactor Trip System Instrument Surveillance Requirements, specify that the Neutron Flux Power Range (PRM) Low Setpoint Channel Functional
- Test, be performed for each startup (if not performed in the previous seven days).
OST 1.2.1, Nuclear Power Range Channel Functional Test, provides specific instructions for checking that setpoint.
Contrary ~ to the above, the PRM low setpoint functional test was not performed per OST 1.2.1 during the reactor startup on January 11,
- 1987, and had not been performed within the seven previous days.
Corrective Action Taken 1.
Administrative controls including Special Operating Order 87-1, placement of caution tags on the power range channels, and entry on the NSS
- logs, were instituted to insure operability verification of OST 1.2.1 the next time the unit was placed in a
condition with reactor power below 10 percent.
2.
OST 1.2.1, including the portion to test the low power range trips, was completed on February 7, 1987.
Action Taken to Prevent Recurrence 1.
Startup Procedure J
of OM Chapter 50 was revised via Operating Manual Change Notice 87-009 to require verifi-cation that OST 1.2.1 was complete within 7 days of startup.
2.
Startup Checklist D
of OM Chapter 50 was revised via Operating Manual Change Notice 87-010 to require verifi-cation that OST 1.2.1 was complete within 7 days of startup.
d l
Date of Full Compliance l
We are in full compliance at this time.