ML20205D938
| ML20205D938 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/07/1986 |
| From: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Garde B GOVERNMENT ACCOUNTABILITY PROJECT |
| References | |
| FOIA-86-182 NUDOCS 8608180211 | |
| Download: ML20205D938 (2) | |
See also: IR 05000445/1984032
Text
bR- Dl(p
.,
/
%g
UNITED STATES
.
8
NUCLEAR REGULATORY COMMISSION
g
$
p
WASHINGTON, D. C. 20555
,,,,,#
AUG
7 IN6
Hs, Billie Pirner Garde
Government Accountability Project
1555 Connecticut Avenue, NW, Suite 202
IN RESPONSE REFER
Washington, DC 20036
TO F01A-86-182
Dear Ms. Garde:
This is in regard to your letter dated March 6, 1986, which we treated as a
request, pursuant to the Freedom of Information Act (F0IA), for copies of the
six records denied by NRC's letter dated June 27, 1985, responding to your
request F01A-85-151 for all records regarding inspection report 50-445/84-32
and 50-446/84-11.
-
The staff has completed its review of the six denied records subject to
F01A-85-151 and has determined that these six records, identified on the
enclosed appendix, will continue to be withheld from public disclosure
pursuant to Exemption (5) of the F0IA (5 U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5)
of the Commission's regulations. These six documents (a draft letter to Texas
Utilities Electric Company, four drafts of inspection report 50-445/84-32 and
50-446/84-11, and input to this draft inspection report by an EG&G consultant)
are withheld in their entirety because they are predecisional, working drafts
of the staff of the Region IV office.
Release of these records could inhibit
the frank and candid exchange of information in the deliberative process.
Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined
that the information withheld is exempt from production or disclosure, and that
its production or disclosure is contrary to the public interest. The persons
responsible for denial of the information are the undersigned and
Mr. Robert D. Martin, Regional Administrator, Region IV.
This denial may be appealed to the NRC's Executive Director for Operations
within 30 days from the receipt of this letter. As provided in 10 CFR 9.11,
any such appeal must be in writing, addressed to the Executive Director for
Operations, U. S. Nuclear Regulatory Commission, Washington, DC 20555,
and should clearly state on the envelope and in the letter that it is an
" Appeal from an Initial F0IA Decision."
Sincerely,
[.,,, //N*d9
Donnie H. Grimsley, Director
Division of Rules and Records
Office of Administration
Enclosure: As stated
8608180211 860807
GARDE 86-182
F --
v
o.
e
APPENDIX
WITHHELD DOCUMENTS SUBJECT TO FOIA-86-182
1.
08/30/84
Handwritten document by Bert Freed, INEL, entitled "EG&G
Input" (36 pages).
2 '. Undated
Draft inspection reports 50-445/84-32 and 50-446/84-11
(52 pages).
3.
Undated
Draft inspection reports (computed typed) 50-446/84-32
and 50-446/84-11 (39 pages).
4.
Undated
Draft letter to M. D. Spence, TUGCO, from Dorwin R. Hunter,
Region IV, regarding TUGC0 letter of 03/11/85 in response
to NRC letter and Notice of Violation dated 02/15/85 (1 page).
5.
Undated
Draft inspection reports 50-445/84-32 and 50-446/84-11
(29 pages).
-
6.
Undated
Draft inspection reports 50-445/84-32 and 50-446/84-11
(28 pages).
-
l
!
!
!