Director, Office of Resource Management May Monthly Operating Report Page 1 June 11, 1986 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET N0. 50/395 UNIT V. C. SUMMER I DATE 06/11/86 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MONTH MAY 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(Mie-Net) 1.
895 17.
896 2.
894 18.
897 3.
895 19.
895 4.
896 20.
895 5.
896 21.
895 6.
895 22.
895 7.
894 23.
893 8.
894 24.
893 9.
894 25.
893 10.
894 26.
892 11.
895 27.
882 12.
894 28.
890 13.
894 29.
890 14.
895 30.
889 15.
895 31.
368 l
16.
896 8608180083 860531 DR ADOCK 0500 5
g Ifl i
Director, Office of Resource Management May Monthly Operating Report Page 2 June 11, 1986 ATTACHMENT II OPERATING DATA REPORT DOCKET N0.
50/395 UNIT V. C. SUMMER I DATE 06/11/86 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 OPERATING STATUS 1.
Reporting Period:
MAY 1986 Gross Hours in Reporting Period:
744 2.
Currently Authorized Power Level (MWt):
2775 Max. Depend. Capacity (MWe-Net):
885 Design Electrical Rating (MWe-Net):
900 3.
Power Level to which restricted (If Any)(MWe-Net):
N/A 4.
Reasons for Restrictions (If Any):
N/A THIS MONTH YR TO DATE CUMULATIVE 5.
Number of Hours Reactor Was Critical 730.4 3.554.2 15.547.5 6.
Reactor Reserve Shutdown Hours 0.0 0,0 0.0 7.
Hours Generator on Line 730.4 3.535.6 15.175.9 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross Thermal Energy Generated (MWh) 2.021.310 9.658.218 39.495.784
- 10. Gross Electrical Energy Generated (MWh) 679.570 3.236.170 13.166.829
- 11. Het Electrical Energy Generated (MWh) 652.538 3.105.093 12.527.731
- 12. Reactor Service Factor 98.2 98.1 73.5
- 13. Reactor Availability Factor 98.2 98.1 73.5
- 14. Unit Service Factor 98.2 97.6 71.7
- 15. Unit Availability Factor 98.2 97.6 71.7
- 16. Unit Capacity Factor (Using MOC) 99.1 96.8 66.9
- 17. Unit Capacity Factor (Using Design MWe) 97.5 95.2 65.8
- 18. Unit Forced Outage Rate 1.8 2.4 7.0
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NONE 20.
If Shut Down at End of Report Period, Estimated Date of Startup:
06/05/86
- 21. Units in Test Status (Prior to Commercial Operation):
N/A FORECAST ACHIEVED Initial Criticality N/A 10-22-82 Initial Electricity N/A 11-16/82 Connercial Operation N/A 01-01-84
.s Director, Office of Resource Management May Monthly Operating Report Page 3 June 11, 1986 ATTACHMENT III UNIT SHUTOOWNS AND POWER REDUCTIONS DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 06/11/86 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 Method of TYPE Shutting F or S Duration Down the Corrective Actions /
No.
Date Reason Forced or (Hours)
Reactor or Comments Scheduled Reducing Power 3
860531 F
13.6 G
3 Incorrect Power Range detector channel placed in test mode.
4 Director, Office of Resource Management May Monthly Operating Report Page 4 June 11, 1986 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 06/11/86 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 On May 1, 1986, the V. C. Summer Nuclear Station, Unit 1, was operating at approximately 100 percent power.
On May 31, 1986, at 1026 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.90393e-4 months <br />, the plant tripped from 100 percent power.
While testing was in progress on one power range detector channel, a separate channel was inadvertently placed in test causing a reactor trip. Subsequent to the trip, condensate system perturbations created water hammers which resulted in damage to feed heaters and condensate system piping supports.
---_-.n-
th na Electric & Gas Company n Nauman Columbia, SC 29218 Nuclear Operabons (803) 748-3513 SCE&G June 11, 1986 Director, Office of Resource Management U. S. Nuclear Regulatory Commission MNBB 7602 Washington, DC 20555 l
ATTN: Mr. Learned W. Barry
SUBJECT:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 May Monthly Operating Report
Dear Mr. Barry:
Please find enclosed the May 1986 Monthly Operating Report for the Virgil C.
Summer Nuclear Station Unit No. 1.
This submittal is made in accordance with the requirements of Technical Specification 6.9.1.10.
If there are any questions, please call us at your convenience.
Very truly ours, t%
. A. Nauman l
POL: GAL: DAN / led Attachment pc:
- 0. W. Dixon, Jr./T. C. Nichols, Jr.
R. M. Campbell E. H. Crews, Jr.
K. E. Nodland E. C. Roberts R. A. Stough J. G. Connelly, Jr.
G. O. Percival W. A. Williams, Jr.
R. L. Prevatte H. R. Denton J. B. Knotts, Jr.
J. Nelson Grace S. D. Hogge Group Managers INP0 Records Center
NPCF R. M. Campbell File h
--