@ f.t!
p
't UNITED STATES g
j NUCLEAR REGULATORY COMMISSION WAsHMGTON, D.C. 204eH001 49.....
COMMONWEALTH EDISON COMPANY AND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-254 QUAD CITIES NUCLEAR POWER STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.186 License No. DPR-29 1.
The Nudsar Regulatog Commission (the Commission) has found that:
A.
The application for amendmerv jy Commonwealth Edison Ccmpany (the licensee) dated November 30,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reameble assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissior.'s regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Ac::ordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Facility
. Operating License No. DPR-29 is hereby amended to read as follows:
9904020198 990326 PDR ADOCK 05000254 p
. B.
Technical Sr,ecificetie,,s The Technical Specificatione. contained in Appendices A and B, as revised c
through Amendment No. 186 ', are hereby incorporated in the license. The I
licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effectic as of the date of its issuance and shall be f
implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION b
,+
Rcbert M. Pulsifer, Project Manager Project Directorate lll-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation Attschment:
Changes to the Technical Specifications
{
I Date of issuance: March 26, 1999 i
i
j gA ff!g g
i UNITED STATES
- 5 j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066 40f,1 49.....,o COMMONWEALTH EDISON COMPANY MIDAMERICAN ENERGY COMPANY DOCKET NO. 50.265 QUAD CITIES NUCLEAR POWER STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.183 License No. DPR-30 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Commonwealth Edison Company (the licensee) dated November 30,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; c
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of tne Commission; j
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the j
Commission's regulations-D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have bean satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Facility Operating License No. DPR-30 is hereby amended to read as follows:
i j
i l
l s
c l >
B.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.183, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This liceas.e amendment is effective as of the date of its issuance and shall be implemstited within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION-I I
Robert M. Pulsifer, Project Manager Project Directorate lil-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 26, 1999 i
I t
i I
I
ATTACHMENT TO LICENSE AMENDMENT NOS.186 AND 183 FACILITY OPERATING LICENSE NOS. DPR-29 ANC DPR-30 DOCKET NOS. 50-254 AND 50-265 i
Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.
REMOVE INSERT 3/4.8-24 3/4.8-24 B3/4.8-5 B3/4.8-5 l
a h
k -
PLANT SYSTEMS SSMP 3/4.8.J 3.8 LIMITING CONDITIONS FOR OPERATION 4.8 - SURVEILLANCE REQUIREMENTS J.
Safe Shutdown Makeup Pump J.
Safe Shutdown Makeup Pump i
The Safe Shutdown Makeup Pump (SSMP)
The SSMP system shall be demonstrated shall be OPERABLE.
OPERABLE:
l APPLICABILITY:
1.
At least once per 31 days by:
1 OPERATIONAL MODE (s) 1,2 and 3 with... -
a.
Verifying that each valve, manual, reactor steam dome pressure greater tfian power operated or automatic in the 150 psig.
~
flow path that is not locked, sealed or otherwise secured in position, is l
ACTION:
in its correct position.
I c,
1.
With the SSMP system inoperable, b.
Verifying that the pump flow restore the inoperable SSMP system to controller is in the correct position.
OPERABLE status within 14 days, or be in at least HOT SHUTDOWN within 2.
At least once per 92 days by verifying
(
the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD that the SSMP develops a flow of SHUTDOWN within the following 24 greater than or equal to 400 gpm hours.
against a system head corresponding to reactor vessel pressure of greater than 1120 psig.
I l
l l
l QUAD CITIES - UNITS 1 & 2 3/4.8-24 Amendment Nos. 186 & 183
PLANT SYSTEMS B 3/4.8 BASES i
header. The flow rate of the SSMP system is approximately equal to the reactor water boil-off I
rate 15 minutes after shutdown.
The SSMP system is required to be OPERABLE when either Unit 1 or Unit 2 is in OPERATIONAL MODE (s) 1,2 or 3 with reactor steam dome pressure greater than 150 psig. With the SSMP system inoperable, a 14-day allowable out-of-service (AOT) is provided to restore the inoperable system to OPERABLE status before the Unit (s) must be shut down.
The surveillance requirements provide adequate assurance that the SSMP system will be OPERABLE when required. A design flow test can be performed during plant operation using a full flow test return line to the CCST.
1 q
I i
i l
QUAD CITIES - UNITS 1 & 2 B 3/4.8-5 Amendment Nos.186 & 183