4' GPU Nuclear Corporation Nuclear
"=ngs=8o Midd!etown. Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
(717) 948-8461 October 20, 1988 4410-88-L-0165/0332P US Nuclear Regulatory Comission ATTN: Document Control Desk Washington, DC 20555
Dear Sirs:
Three Mile Island Nuclear Station, Unit 2 (TMI-2)
Operating License No. DPR-73 Docket No. 50-320 Use of Polar Ciane Aux 111ary Hook for Defueling GPU Nuclear letter 4410-87-L-0168, dated November 4, 1987, reauested NRC approval for use of the Polar Crane Auxiliary Hook for defueling-related activities. This reauest was approved by the NRC on November 16, 1987, via NRC Letter NRC/TMI-87-082.
The refererced GP'J Nuclear letter states, "Tho raising of all loads in the Reactor Vessel using the auxiliary hook shall be performed in the slow speed (i.e., 4 Ir4hes/ minute) until the load clears all possible interferences below the Shielded Work Platform (SWP)." This restriction was also noted in the referenceC NRC letter. The purpose of this letter is to reouest NRC approval to use the Polar Crane Auxiliary Hook in the fast speed (i.e., 21 feet / minute) for defueling-related activities conditional upon installation of overload control devices as part of the rigging. Fast speed will be used shen raising loads through the SWP only if precautions are taken to prevent catching the loads on edges of the platform structure (i.e., if abrupt transitions are shielded from possible interference). The use of the Auxiliary Hook in fast speed instead of slow speed will reduce the amount of time reouired to remove loads f rom the Reactor Vessel thus irrproving defueling efficiency and reducing radiation exposure to personnel.
This proposal will limit loads on the Polar Crane Auxiliary Hook to 10,000 lbs. by installation of redundant hoist cable tension sensors (i.e.,
overload control devices) which prevent all crane motions except lowering.
This proposal is similar to the system that has been successfully used on the
)
Reactor Building Service Crane.
gotL
- 9 l
. } k0gl0'll 0
I 8310270002 881020
' 0 g
PDR ADOCK 00000320
/
P PDC GPU Nuc: car Corporahon is a subsidiary of the GeneralPubhc Utilities Corpotabon
Dbcument Control Desk' October 20, 1988 4410-88-L-0165 The Polar Crane Auxiliary Holst load limiters will be tested by applying a 10,000 lb, load to the auxiliary hoist and verifying that bridge, trolley, and auxiliary hoist up functions are defeated.
In the event the overload control devices are activated by an excessive load,' crane operators will be instructed to place the load in a safe condition and the cause of the event will be investigated. Based on the performance of the Reactor Building Service Crane overload sensor, the function of the auxiliary hoist overload sensor will be verified every 12 months as part of the Polar Crane preventive maintenance program. Additionally, an individual, seaarate from the crane operator, will be stationed in the Reactor Building, as is currently required, to interrupt power to the Polar Crane if load interference occurs.
When lifting capacities of greater than five (5) tons are needed, the overload sensors will be defeated.
In this case, the hoist speed will be limited to the slow speed while lifting loads in the Reactor Vessel and until the load clears all possible interferences below the SWP.
The overload control device provides an effective means of reacting to any potential load interference when using the Polar Crane Auxiliary Hook in the fast speed. Therefore, based on the above discussion and the evaluation in the referenced CPU Nuclear letter, CPU Nuclear believes that the propused use of the Polar Crane Auxiliary Hook in the fast speed for defueling as described above does not increase the probability or consecuences of an accident previously evaluated, create an accident of a different type than previously evaluated, or reduce the margin of safety of any Technical Specification.
In addition, this activity does not :eouire a change to the Plant's Technical l
Specification.
Per the reouirements of 10 CFR 170, an application fee of $150.00 is enclosed.
Sincerely, h h$
M. B. Roche Director, TMI-2 RDW/ emf Enclosed: GPU Nuclear Corp. Check No. '01T/10 cc:
R. J. Conte - Seniott Resident Inspector, THI W., T. Russell - Rep,lonal Administrator, Region 1 J. F. Stolz - Dire: tor, Plant Directorate IV l
L. H. Thonus - Project Manager, TMI Site i