ML20205C422
| ML20205C422 | |
| Person / Time | |
|---|---|
| Issue date: | 10/20/1988 |
| From: | Jordan E Committee To Review Generic Requirements |
| To: | Bernero R, Goldberg J, Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
| References | |
| 50---8-, NUDOCS 8810260486 | |
| Download: ML20205C422 (2) | |
Text
.
s-
.I m eerg
,,#[
k UNITED STATES y
.g NUCLEAR REGULATORY COMMISSION r.
j WASHINGTON, D. C. 20655 k.... #
Octocer 20, 1988
+
f1EMORANDUM FOR:
Robert M. Bernero, HMSS Jack R. Goldberg, OGC Carl J. paperiello, RIII Denwood F. Ross, RES James H. Sniezek, NRR FROM:
Edward L. Jordan Chairman Comittee to Review Generic Requirements
SUBJECT:
CRGR MEETING NO. 149 The Comittee to Review Generic Requirements (CRGR) will meet in the afternoon on Thursday, October 27, 1988 in Room 6507 MHBB from 1-4 pm. The agenda is as follows:
1-2 p.m.
The Comittee will continde their review of the proposed Generic Letter on SPDS implementation begun at Meeting No,148.
2-3 p.m.
L.Shao(NRR)willpresentforCRGRreviewproposedfinalrevisions to three Standard Review Plan Sections (6.5.2, 6.5.4, and 6.5.5) to reflect the latest source term research information on fission product scrubbing.
(The review package was transmitted earlier under separatecover.)
3-4 p.m.
B. Morris (RES) will present for CRGR review the staff's draft SER on their pre-application review of the Modular High Temperature Gas Cooled Reactor. (The SER was transmitted earlier under separate cover. Coverletterandothermaterialisattached.)
If a CRGR rember cannot attend the meeting, it is his responsibility to assure that an alternate, who is approved by the CPGk Chairman, attends the meeting.
Persons making presentations to the CRGR are responsible for (1) assuring that the information required for CRGR review is provided to the Comittee (CRGR Charter-IV.8),(2)coordinatingandpresentingviewsofotheroffices,(3) as appropriate, assuring that other offices are represented during the presenta-tion,and(4)assuringthatagendamodificationserocoordinatedwithtieCRGR contact (J.Conran,X29855)andothersinvolvedwiththepresentation.
Division Directors or higher management should attend meetings addressing agenda items under their purview.
In accordance with the E00's March 29, 1984 remorandum to the Comission concerning "Forwarding of CRGR Documents to the Public Document Room (POR),"
the review packages for items scheduled at this meeting, which contain predecisional information, w',ll not be released to the POR until the NRC has G810260486 8G1020 O
PDR REVGP NROCRGR II MEETING 149 PDC
. _. _ _ ~ _ - - -
m
_ _ ~. r.
N f
a
.,n.**
2
~
-ccnsidered.(in a public forum) or decided t!.e matter addressed oy ths
'information.
arc. "
' u e, J. u.......,6<.
Edward L. Jorden, Chairman Ccunittee to Review Generic Requirements
Enclosure:
As stated cc w/ enclosure:
SECY i
V. Stello, Jr.
Distribution:
E. Jordsn J. Heltemes J. Conran
['
C. Sakenas R. Fraley (w/o enc.)
B. Morris J. Roe (w/oenc.)
L.Shao(w/oenc.))
E.Rossi(w/oenc.
C.Berlinger(w/oenc.)
P.Kadambi(w/oenc.)
CRGRCF(w/oenc.)
CRGR SF S. Treby (w/o enc.)
J. Hoyle (w/cenc.)
1.
M. Taylor, OE00 PDR:(NRC/CRGR) -(w/o' enc. )f Contral File 4
i i
i bhb Ak6b:cRbk := l U : N
- T,hNMN ':'....'..*.*.*-... ::............ ::...'..*
...... m ;S(.....:.
s NME :,Jtonran:cg : C ltemes : EL ai 10/J,988 DATE
- 10// y/88 10/g/88 m
OFFICIAL RECORD COPY