Similar Documents at Byron |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl ML20210A3151999-07-16016 July 1999 Forwards Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.Three Violations Being Treated as Noncited Violations ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196K0161999-06-30030 June 1999 Discusses 990622 Meeting at Byron Nuclear Power Station in Byron,Il.Purpose of Visit Was to Meet with PRA Staff to Discuss Ceco Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20212H8241999-06-24024 June 1999 Informs That Effective 990531 NRC Project Mgt Responsibility for Byron & Braidwood Stations Was Transferred to Gf Dick ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20207G0601999-06-0707 June 1999 Provides Updated Info Re Number of Failures Associated with Initial Operator License Exam Administered from 980914-0918. NRC Will Review Progress Wrt Corrective Actions During Future Insps ML20207G0421999-06-0404 June 1999 Forwards Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.Violations Identified & Being Treated as non-cited Violations ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20207E5451999-05-28028 May 1999 Forwards Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Fire Protection Program Was Effective ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20207B6361999-05-25025 May 1999 Forwards SE Accepting Revised SG Tube Rupture (SGTR) Analysis for Bryon & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed ML20206U3471999-05-20020 May 1999 Forwards Insp Rept 50-454/99-05 on 990401-22.No Violations Noted.Insp Reviewed Activities Associated with ISI Efforts Including Selective Exam of SG Maint & Exam Records, Calculations,Observation of Exam Performance & Interviews ML20207A2151999-05-19019 May 1999 Forwards Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Insp Consisted of Review of Liquid & Gaseous Effluent Program,Radiological Environmental Monitoring Program,Auditing Program & Outage Activities 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207E9831999-05-18018 May 1999 Forwards Copy of Commonwealth Edison Co EP Exercise Evaluation Objectives for 1999 Byron Station Annual EP Exercise,Which Will Be Conducted on 990825.Without Encl ML20206N8551999-05-11011 May 1999 Forwards 1998 Annual Radioactive Environ Operating Rept for Byron Station. Rept Includes Summary of Radiological Liquid & Gaseous Effluents & Solid Waste Released from Site ML20206U3351999-04-30030 April 1999 Forwards Evaluation of Matter Described in Re Byron Station.Concludes That Use of Overtime at Byron Station Was Controlled IAW Administrative Requirements & Mgt Expectations Established to Meet Overtime Requirement of TS ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206C7901999-04-23023 April 1999 Provides Suppl Info Re Use of W Dynamic Rod Worth Measurement Technique,As Requested During 990413 Telcon.Rev Bars in right-hand Margin Identify Changes from Info Submitted by ML20206E7521999-04-22022 April 1999 Submits Rept on Number of Tubes Plugged or Repaired During Inservice Insp Activities Conducted at Plant During Cycle 9 Refueling Outage,Per TS 5.6.9 ML20206A7431999-04-22022 April 1999 Forwards Comments Generated Based on Review of NRC Ltr Re Preliminary Accident Sequence Precursor Analysis for Byron Station,Unit 1 ML20206B3941999-04-21021 April 1999 Forwards Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors, for Byron & Braidwood Stations.Updated Info Re PCT for Limiting Small Break & Large Break LOCA Analysis Evaluations & Detailed Description of Errors ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205S9621999-04-20020 April 1999 Responds to 981203 RAI Telcon Re SG Tube Rupture Analysis for Byron Station,Unit 2 & Braidwood Station,Unit 2.Addl Info & Subsequent Resolution of Issues Discussed During 990211 Telcon Are Documented in Encl ML20206A8141999-04-20020 April 1999 Advises NRC of Review of Cycle 10 Reload Under Provisions of 10CFR50.59 & to Transmit COLR for Upcoming Cycle ML20205T3901999-04-13013 April 1999 Forwards Byron Station 1998 Occupational Radiation Exposure Rept, Which Is Tabulation of Station,Utility & Other Personnel Receiving Annual Deep Dose Equivalent of Less than 100 Mrem ML20196K6661999-03-31031 March 1999 Forwards Byron Nuclear Power Station 10CFR50.59 Summary Rept, Consisting of Descriptions & SE Summaries of Changes, Tests & Experiments.Rept Includes Changes Made to Features Fire Protection Program,Not Previously Presented to NRC ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util ML20207K0351999-03-0404 March 1999 Forwards Util Which Transmitted Corrected Pages to SG Replacement Outage Startup Rept.Subject Ltr Was Inadvertently Not Sent to NRC Dcd,As Required by 10CFR50.4 ML20205C6861999-03-0404 March 1999 Provides Notification That Byron Station Implemented ITS on 990205 & Braidwood Station Implemented ITS on 990219 ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) ML20207D4301999-02-26026 February 1999 Informs NRC That Supplemental Info for Byron & Braidwood Stations Will Be Delayed.All Mod Work Described in Ltr Is on Schedule,Per GL 96-06 ML20207B8971999-02-25025 February 1999 Expresses Concern That Low Staffing Levels & Excessive Staff Overtime May Present Serious Safety Hazard at Some Commercial Nuclear Plants in Us ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List ML20202F5911999-01-29029 January 1999 Forwards Byron Unit 1 Cycle 9 COLR in ITS Format & W(Z) Function & Byron Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function. New COLR Format Has Addl Info Requirements ML20199E1611999-01-15015 January 1999 Forwards Response to 980902 RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. CE Endorses Industry Response to RAI as Submitted by NEI ML20199B7511999-01-0808 January 1999 Forwards Proprietary Versions of Epips,Including Rev 52 to Bzp 600-A1 & Rev 48 to Bzp 600-A4 & non-proprietary Version of Rev 52 to Bzp 600-A1 & Index.Proprietary Info Withheld 1999-09-30
[Table view] Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
MONTHYEARML20245D6611988-08-0808 August 1988 Submits Listed Comments in Response to Re Safety Practice to Schedule Nuclear Plant Operating & Maint Personnel for 16 H Shifts &/Or Excessive Overtime ML20205C1191988-06-16016 June 1988 FOIA Request for Listed Documents Re QC Inspector Reinsp Program ML20155B6651988-06-16016 June 1988 FOIA Request for plant-specific Documents Re Fire Protection Requirements,Insp repts,hardware-specific Deficiencies & NRC Communications W/Util ML20235L7061987-07-0808 July 1987 Opposes Util Application for Amends to Licenses,Allowing New Ownership & Financing Arrangement.Nshc Should Not Be Made W/O Public Hearings on Serious Financial Qualifications Questions ML20215L5051987-06-23023 June 1987 Provides Brief Updated Rept on Status of Comm Ed Proposal Before State of Il Commerce Commission to Restructure Ownership & Other Financial Arrangements Re Facilities.Urges NRC Not to Make Finding Prior to Hearing ML20215L4871987-06-23023 June 1987 Urges NRC Not to Approve Comm Ed Request for Amend of Any OL Re Braidwood 1 & 2 & Not to Determine No Significant Hazard Exists W/O First Holding Adjudicatory Hearings on Serious Financial Qualifications Issues ML20209H0151987-04-29029 April 1987 Urges That NRC Not to Approve Util Request to Amend License NPF-66 or Determine That No Significant Hazards Exist W/O Holding Adjudicatory Hearings on Financial Qualifications Issues Raised by Request to Restructure Facility Ownership ML20212M3101987-01-25025 January 1987 Submits Questions Re Operations & Procedures at Facility ML20215K2791986-09-0404 September 1986 FOIA Request for Six Categories of Documents Re 1982 Civil Penalty & Ofcs of Investigations & Inspector & Auditor Investigations of Listed Facilities ML20134L4021985-08-27027 August 1985 Opposes Amend to Tech Spec Section 6.12.2,allowing Workers to Enter Areas W/Radiation Levels Greater than 1,000 M/H W/O Approved Radiation Work Permit.Slackening of Rules for Worker Protection to Save Machinery Not Condoned ML20134L1231985-08-14014 August 1985 Requests Update of Tech Specs in Lpdr in Order to Determine Appropriateness of Util Amend Request.Fr Notice of Amend Request Encl ML20128Q9031985-04-24024 April 1985 FOIA Request for Region III Tracking Sys for Facilities & Other Associated Documents ML20129E9471985-04-24024 April 1985 FOIA Request for Region III Tracking Sys for Byron & Other Associated Documents ML20099C0271984-11-13013 November 1984 Advises That Arguments Will Be Presented on Behalf of Intervenors Rockford League of Women Voters,Dekalb Area Alliance for Responsible Energy & Sinnissippi Alliance for Environ,Per 841108 Order ML20098A3751984-09-21021 September 1984 Lists Errors in Proposed Findings ML20098A1801984-09-18018 September 1984 Forwards Intervenor Proposed Supplemental Initial Decision in Form of marked-up Comm Ed Proposal & Handwritten Interlineations Indicating Changes.Addl or Substitute Paragraphs Inserted.Certificate of Svc Encl ML20097F2141984-09-14014 September 1984 Forwards Amended Certificate of Svc Dtd 840912.Encl Certificate Includes Judge Wilbur & Indicates That Streeter Served by first-class Mail ML20097C5081984-09-12012 September 1984 Forwards 840912 Motion to Reopen Record to Include Plant Design as Issue ML20097B9041984-09-12012 September 1984 Expresses Opposition to Licensing & Opening of Plant.Util Does Not Have Finances to Safely Operate Plant & Has Long History of Noncompliance W/Nrc Regulations.Nrc Should Not Issue Ol.Served on 840913 ML20097B9291984-09-12012 September 1984 Expresses View That Facility Not Safe & Reinsp Program Inadequate.Plant Should Not Go on-line ML20097B9171984-08-29029 August 1984 Expresses Concern Over Licensing of Facility.Nrc Should Review Outstanding Items,Listen to Testimony of Workers & Reevaluate Facility Financial Situation & Util Economic Status ML20095J5211984-08-28028 August 1984 Expresses Concerns Re Licensing & Opening of Plant.In Jan 1984,when Util Was Denied License,Ruling Considered Final.Nrc Issuance of License to Plant So Obviously Defective as to Be Beyond Belief ML20095J5701984-08-20020 August 1984 Questions Sanity & Political Persuasion of Members of Sinnissippi Alliance for Opposing Start Up of Facilities. Delays Cost Millions.Urges Startup ML20095J6201984-08-20020 August 1984 Expresses Concern Re Licensing of Plant.Urges NRC to Review Outstanding Points of Contention About Safety & Make Sure Reinsp Evidence Not Merely Testimony Convincing of Safety ML20095J5041984-08-17017 August 1984 Expresses Concerns Re Safety of Facility & Citizens Paying for Util Miscalculation ML20095J5871984-08-16016 August 1984 Expresses Concern Re Licensing of Plant.Aslb Should Listen to Concerns of Workers Wishing to Testify.Facilities Not Needed & Being Put on Line for Convenience of Util ML20095J5761984-08-16016 August 1984 Expresses Concern Re Licensing of Plant & 6,000 Discrepancies in Bldg of Plant Labeled Nonsignificant.Review of NRC Outstanding Items Requested ML20095J5791984-08-15015 August 1984 Expresses Concern That Plant Will Go on Line Before Proven Safe.Performance of NRC Has Caused Puzzlement & Disappointment.Nrc Supports Util Position Even in Face of Serious Allegations Re Plant Safety ML20094P7801984-08-15015 August 1984 Forwards Corrections & Attachments to CC Stokes Written Testimony.W/O Encls.Related Correspondence ML20097B9161984-08-15015 August 1984 Expresses Concern Re Licensing of Plant.Nrc Should Review Outstanding Items Re Lack of QA & QC Program & Listen to Testimony of Workers ML20094P6061984-08-14014 August 1984 Forwards Corrected Pages 6,11 & 17 to EP Erickson Testimony Re Reinsp Program.Related Correspondence ML20095J5771984-08-11011 August 1984 Requests NRC Review of Outstanding Items Re Licensing of Plant ML20095J5631984-08-0909 August 1984 Expresses Concern & Opposition to Licensing of Plant.Aslb Should Listen to Concern of Workers.Facilities Not Needed & Being Put on Line for Convenience & Profit of Util ML20197H7211984-06-13013 June 1984 Forwards Affidavit of Nondisclosure for J Levin.Requests Response to Concerns Raised in Re Breach of Certain Confidentiality Matters.Related Correspondence ML20091R9241984-05-29029 May 1984 Expresses Concern Re Job Safety at Plant ML20197G7751984-05-29029 May 1984 Forwards to FEMA Re State of Il Plan for Radiological Accidents & Effects on City of Dekalb. Opportunity to Comment on Future Hearings on QA & QC Measures Requested ML20091R9281984-05-29029 May 1984 Submits Four Issues for Discussion of 840530 Prehearing Conference ML20091R9221984-05-28028 May 1984 Handwritten Ltr Expressing Concern Re Safety of Nuclear Plants to Public & Environ ML20090J0671984-05-18018 May 1984 Forwards List of Issues for Consideration in Remanded Proceeding & Comments on Util 840509 List.Util Suggestions Merely Seek to Relitigate Previous Adverse Findings ML20084P8131984-05-16016 May 1984 Requests Attendance at 840524 or 25 Conference to Resolve Differences Prior to 840530 Prehearing Conference.Related Correspondence ML20084L4991984-05-10010 May 1984 Forwards Proposed Financial Qualification Contention for Discussion.W/O Encl.Related Correspondence ML20084L4551984-05-10010 May 1984 Reconfirms That Listing of Suggested Issues Will Be Sent to Intervenors on 840518 Not 840517.Prehearing Conference in Rockford Advisable So Parties May Fully Present Views on Scope of Hearing ML20084C4201984-04-25025 April 1984 Forwards Executed Affidavit of Nondisclosure.Related Correspondence ML20083L6001984-04-13013 April 1984 Informs That Jm Whicher Will Argue for Intervenors Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Safe.Related Correspondence ML20083M2731984-04-11011 April 1984 Requests That 840419 Meeting for Util Appeal Be Held in Rockford or Chicago,Il to Enable League Members to Attend ML20088A8121984-04-10010 April 1984 Requests That Aslab Hearing of Util Appeal from Denial of Request for OL Be Held in Either Rockford or Chicago,Il ML20083K5951984-04-0808 April 1984 Requests 840419 Oral Arguments Re Appeal of ASLB 840113 Denial of OL Be Moved to Rockford or Chicago,Il ML20087K8671984-03-22022 March 1984 Forwards Listing of Errata in 840312 Brief ML20086T0061984-03-0101 March 1984 Advises of Issues to Be Addressed in 840312 Brief,Per 840127 Request ML20081C3971984-02-20020 February 1984 Requests Reconsideration of Decision to Bar Facility from Starting Up.Util Most Experienced W/Nuclear Plants & Revs Will Result in Corrective Actions 1988-08-08
[Table view] |
Text
-r -
1750 N. Mohawk Ave.
Apt. 406 Chicago, II. 60614 June 16, 1988 LREEDOM 0F INFORMATION Director, Of fice of Administration "% ACT REQUES:
U. S. Nuclear Regulatory Commission Washington, DC 20555
'g .g g J g gu e/ 6 .u-n RE: FREEDOM OF INFORMATION ACT REQUEST Dear Sirt I would like to obtain some in80emation related to the Byron Plant.
In accordance with Title 10, Code of Federal Regulations, Part 9, please provide copies of the documents listed on the attached.
I am willing to pay the charges related to copying the documents requested. Please contact see at (312) 266-2139 if a deposit is required, or if there are any 4uestions.
Thank yc u for your assistance.
Sincerely, -
(W /
Michael u ,y cc: Bruce A. Berson, Esq.
NRC Region III Counsel U.S. Nuclear Regulatory Commission - Region III 799 Roosevelt Road Glen Ellyn, Il 60137 8810260396 FOIA 000616 PDR ppg MURPHY 88-345
9 Freedom Of Information Act Recuest List of Documents Requested - Page 1 I_._ INFORMAT_I_Orj RELATED TO THE OUALITY CONTROL INSPECTOR REINSPECTJON PROGRAM _(0_CIRP),AT_BYR_ON A. Provide inspector notes, work papers, internal NRC correspondence, minutes of meetings between NRC. personnel and Edison personnel or Edison contractor personnel, and minutes of meetings within the NRC, related to the items noted in the inspection reports listed below. To assist the NRC, this list includes the inspection numbers, the dates of the inspection, the inspector (s) conducting the inspection, the NRC person who appr oved the report, and the report page number (s) where the item of interest is discussed. All Docket Numbers are 50-454/82-05 and 50-455/82-04.
A1. Inspection Report 78-02/78-02 -
Pages 3 and 4 Itee 1, subitem b, related to the determination of minimum technical and physical requirements for qualification as a Hatfield OC inspector.
Date Inspection Conducted: April 11-14, 1978 Inspector G.F. Maxwell Approved by: R.L. Spessard A2. Inspection Report 78-04/78 Page 16,Section IV, Item 1, subitem f, related to Hunter DC inspector certifications.
Date Inspection Conducted: May 24-25,1978 Inspector: J.H. Neisler Reviewed by: D.W. Hayes A3. Inspection Report 78-07/78 3 items:
a) Appendix A, Pages 1 and 2 related to the Hatfluid and Reliable lack of a prescribed Edison approved instruction or procedure for meeting the intent of ANSI N45.2.6-1973.
b) Page 7 of the inspection report related to the closure of unresolved item 78-04-03. 1 I
i 1
1
Freedom Of Information Act Request List of Dccuments Raquested - Page 2 c) Pages 19 and 20 of the inspection report Section III Item 2, related to Qualification and Training of Electrical Inspection Personnel.
Both subitems a and b.
Date Inspection Conducted: August 8-10, 1978 Inspectors: J.H. Neisler, J. Konklin, K. N aidu, G.F. Maxwell, H.M. Wescott.
Approved by: D.W. Hayes and R.L. Spessard A4. Inspection Report 79-03/79 2 items:
a) Page 3 of inspecticn report, related to closure of 78-07-06.
b) Page 8 of Section I, Item 2, subitem et, related to the qualification as QC field inspectors to ANSI N 45.2.6 of PTL and Midway personnel.
Date Inspection Conducted: February 7-9, 1979 Inspectors: F.C. Hawkins, G.F. Maxwell and V.F.
Suermann Approved by: D.W. Hayes A5. Inr.pection Report 79-14/79 2 items:
I a) Page 1 of Appendix A, Item 1, subitems a,b and ,
c and Section III Item 2 on pages 18-22 of the !
inspection report related to Hunter, Blount and Hatfield QC Inspector qualification and I certification practices and procedures.
b) Documentation provided to the inspection team by J. Neisler, NRC Inspector at LaSalle.
Date Inspection Conducted: September 11 - 2 8, 1979 Inspectors: J. Konklin, G.F. Maxwell, J.F.
Suermann Approved by: C.C. Williams l
A 6. Inspection Report 00-01/80 2 items: -
l a) Page 2 of inspection report related to the closure of 79-14-21 I
F eedom Of Information Act Request List of Documents Requested - Page 3 b) Pages 3-5 Item 2 related to the follow-up to Inspection 79-14, to examine corrective actions in the areas of procedure revisions, documentation and implementation of existing pr ocedures for qualification and certification of contractor DC inspectors. (Unresol ved item 80-01-01 resulted from this review.)
Date Inspection Conducted: January 16-17, 1 980 Inspector: J.E. Konklin Approved by: C.C. Williams A7. Inspection Report 80-08/80-07 -
Page 2 of the inspection report related to the closure of unresolved item 80-01-01.
Date Inspection Conducted: May 8-9, 1980 Inspector: C.E. Jones Approved by: C.C. Williams A B. Inspection Report 81-18/18 2 items:
a) Page 3 Item 3 subitem a.4 related to Blount personnel certification / qualification records.
b) Page 4 Item 3 subitem b.2 related to Hatfield personnel certification / qualification.
Date Inspection Conducted: October 5-34 1981 4 Inspectors W. Forney ;
Approved by: D.W. Hayes l
l A9. Inspection Report 82-05/82 Pages 2-3 of Appendix A 1 and pages 45-67 or the report, related to DC Inspector '
ef fectiveness and contractor DC inspector qualifications.
Date Inspection Conducted: March 29-31 April 1-4, May 11, 1982 Inspectors: D.H. Danielson, J.M. Peschel, R.S. Love, H.M.
Westcott, E.H. Nightingale, W. Forney (SRI Byron), P.
Keshiritan (IE Headquarters)
Approved by: D.H. Danielson
Freedom Of Information Act Request List of Documents Requested - Page 4 i B. Internal NRC correspondence, meeting minutes or work papers regarding Edison's August 17, 1981 response to generic letter 80-01 related to DC Inspector personnel certification and qualification requirements as defined by ANSI N45.2.6-1978.
C All meeting minutes, notes, or internal NRC correspondence relating to the following meetings
- Informal meetings conducted at the Byron site during the period from April 14 to June 9, 1982 between W. Forney and Edison site personnel to establish minimum certification and qualification requirements for contractor DC inspectors at Byron in response to inspection 50-454/82-05 and 50-455/82-04 findings.
Informal meetings conducted at the Byron site during the period from September 22, 1982 to December 13, 1982 between W. Forney and R. Tuetken to develop an approach to demonstrate the adequacy of pr eviously performed inspections in response to inspection 50-454/82-05 and 50-455/82-04 findings related to OC inspector qualifications.
Informal meetings conducted at the Byron site during the period from February 28 to March 10, 1983 between W. Forney, R. Tuetken and R. Klingler to establish conservative bias to the reinspection sample at Dyron 1.) response to the findings in inspection report 50-454/82-05 and 50-455/82-04.
December 13, 1982 Re-exit meeting on inspection 50-454/82-05 and 50-455/82-04 inspection findings. Attended by: Little, Danielson, Forney and Connaughton (NRC).
October 26, 1982 meeting between NRC and Edison personnel i to discuss Edison response to inspection report 50-454/82-05 l and 50-455/82-04 at Byron.
- January 14, 1983 meeting at NRC of fices in Glen Ellyn, IL to discuss Edison proposed reanalysis (formula) approach to qualification and certification of DC inspectors. B. Davis and W. Fornuy present for NRC.
- January 25, 1983 meeting between NRC and Edison regarding DC inspector qualifications. Jim Taylor and Terry Harpster of the NRC present.
I l
= !
Freedom Of Information Act Request List of Documents Requested - Page 5 I
- January 26, 1983 internal NRC meeting at I&E Headquarters in Bethesda, MD attended by Region III Director and staff, 1&E Director of OA and Safeguards and Inspection programs and staff. Meeting focused on corr ective actions required from Edison to address NRC concerns.
- February 3, 1983 meeting between NRC and Edison held at the NRC oHices an Glen Ellyn, IL to discuss a proposed sampling plan for reinspwction at Byron.
- February 9, 1983 meeting between Edison and tF<C personnel (Knop and Hayes) to resolve final items of negotiations reg.arding corrective actions at Byron.
- February 11, 1983 meeting between Edison and ;#<C personnel (Knop, Forney, Hayes) to complete negotidions regarding reinspection program at Byron.
D. All inspector notes, meeting notes, work papers and internal NRC correcapondence related to the following inspec tions verif ying proper implementation of the revised certification and qualification procedures and tc ensure that OCIRP was being conducted in accordance with the program approved by the NRC 3-03/83-02 in late February 1983; 83-13/83-11 in March 1983; 83- l 15/83-13 in late March 1983; 83-16 in early April 1983: 83-26/83-19 in June 1983: 83-39/83-29 in August 1983; 83-37 in August and September 1983; 83-38/83-28 in August 1983; 84-02/84-02 in January 1984 84-05/84-04 in January and February 1983; 84-13/84-09 in April 1984.
E. All internal NRC correspondence, work papers and meeting minutes pertaining to the February 22, 1983 special SALP evaluation to review Edison corrective actions in response to the findings of inspection report 50-454/82-05 and 50-455/82-04 at Byron.
F. All correspondence, inspector notes, s',ocumentation of telephone conversations, and meeting minutes rulated to discussions within i the NRC ( both Region III and Headquarters } regarding QC inspector !
qualifications deficiencies noted by the NRC at Byron, as well as the corrective acticns proposed by Edison to resolve Violation 2 1 of inspection reports 50-454/82-05 and 50-455/82-04. l I
l
e Freedom Of Information. Act Request List of Documents Requested - Page 6 G. All documentation that reflects the NRC's position on the implementation of ANSI /ASME' N45.2.6 -1978 for QC inspector qualifications, during the period from .lanuary 1980 to the NRC acceptance of the OCIRP program in March 1983.
l H. Docuuientation of any internal NRC reviews, meetings or correspondence related to the NRC consideration of Edison proposed approaches to verifying the adequacy of previously performed inspections and the qualification and certification of on-site and of f-site QC inspector personnel at Byron.
l l
l
,