ML20205B790
| ML20205B790 | |
| Person / Time | |
|---|---|
| Issue date: | 01/11/1999 |
| From: | Diaz N NRC COMMISSION (OCM) |
| To: | Hoyle J NRC OFFICE OF THE SECRETARY (SECY) |
| Shared Package | |
| ML20205B764 | List: |
| References | |
| SECY-98-296-C, NUDOCS 9903310365 | |
| Download: ML20205B790 (2) | |
Text
727 363 1339
)#'[' #,j%I JAN-11-1999 13:39 NRC 727 363 1339 P.01/02
' NOTATION VOTE
~
i
_ RESPONSE SHFMT John C. Hoyle, Secrstery TO:
COMMISSIONER DIAZ FROM:
SEC%98-298 AGENCYPOUCYREGARDING RECAPTURE OF LOW POWER TESTING
SUBJECT:
TIME FOR NUCLEAR POWER PLANTS Approved I l Disapproved Abstain
?
Not Participating _
COMMENTS:
I See attached comments.
m i
f j/
)'
?
SIG%TUREV
}
bvw 0.%
~
DATE Q l
Entered 'on "AS" Yes 1 No._
i 9903310365 990330 i
PDR COMMS NRCC
+
1 CORRESPONDENCE PDR 0
==ei-w c
- = ~
.__.--..m.
JAN-11-1999 13:40 RAC 727 363 1339 P.02/02 C0hOsvautroNuit DIA2' COMlwrNTS ON SEC%
i f
d ent I approve the staffs recommendation to grant the Grand G tin an-x+mded low request to change the license expiration date to recaptwe the time s Similar requests power testas condition before receiving the full b
ith alowpower
%=% = license and was issued a separate fullpower operating l are I do not believe that, at the time oflicense issuance, the deci f ll er full power +4 license or to amend the low power operating h t ffshould operation was based on technica1 differences between the p li without investigste whether a mer.hanism could be developed to also a d dlow power separate full power operating M.wases to sock recapture of ti conditions throughlicense amendment requests.
i d t to The staff should continue to grantlicenses requests to amend recover the time spent in plant constructio.n.
ture the
! concur with the staffs recomtnendation to deny license amen i
time spent in shutdown conditions. The recaptur turedby the scope of the j
b l
l rule.
5 I
)
}
i i
1 I
4 O
a
'd i
4 l
l 1
I TOTAL P.02 I
.