OPERATIN8 DATA REPORT Docket No.:
50-309 Date:
04/Feb/87 I
Completed By:
J.M. TAYLOR Telephone:
207-882-6321
- 1. Unit Name.......................................
Maine Yankee
- 2. Reporting Period................................
January 1987
{
- 3. Licensed Thermal Power (MWt)....................
2630 1
l
- 4. Nameplate Rating ( Br oss MWe )....................
864 l
- 5. Design Electrical Rating (Net MWe)..............
825'
- 6. Maximum Dependable Capacity-(Bross MWe).........
850
- 7. Maximum Dependable Capacity (Net MWe)...........
810 8.
If Changes in Capacity Ratings (Items Number 3-7)
.Since Last. Report, Give Reasons:-
NO CHANGES
- 9. Power Level to Which Restricted, if Any (Net MWe)
NO RESTRICTIONS
- 10. R3asons for Restrictions, if Any:
l l
~-
THIS MONTH YEAR-TO-DAT,E CUMULATIVE
- 11. Hours In Reporting Period 744.00 744.00 l
- 12. Number of Hours Reactor 1
Was Critical...........
744.00 744.00 100.872.89
- 13. Reactor Reserve Shutdown Hours..................
0.00 0.00 0.00 14.. Hours Generator On-line..
744.00 744.00 98.083.69
- 15. Unit Reserve Shutdown Hours..................
0.00 0.00 0.00 16,. Gross Thermal Energy Generated (MWH)........
1.933.009.00 1.933.009.00 223.190.321.00
- 17. Gross Electrical Energy Generated (MWH)........
646.290.00 646.290.00 73.347.300.00
- 18. Net Electrical Energy.
Generated (MWH)........
626.229.00 626.229.00 70.054.300.00
- 19. Unit Service Factor......
100.00 100.00 78.64
- 20. Unit Availabilty Factor..
100.00 100.00 79.39
- 21. Unit Capacity Factor (Using MDC Net)........
103.91 103.91 71.05 I. 22. Unit Capacity Factor (Using DER Net)........
102.02 102.02 69.21
- 23. Unit Forced Outage Rate..
0.00 0.00 6.45
- 24. Shutdowns Scheduled Over Next 6 Months:
Date Type Duration 3/28/87 REFUELING OUTAGE 3/28/87-5/07/87
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
N/A 0703300030 870131 PDR ADOCK 05000309
[
R PDR
AVERAGE DAILY UNIT POWER LEVEL FOR JANUARY 1987 Docket No.:
50-309 Unit:
Maine Yankee Date:
04/Feb/87 Completed By:
J.M. TAYLOR Telephone:
207-882-6321 Dr,y Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net)
(MWe-Net) 1.
1 854 16 853 2
854 17 854 3
742 18 853 4
852 19 853 5
.................T..
853 20
.851
~
6 855 21 853 7
854 22 849 8
854 23 850 9
853 24 839 10 854 25 838 11 854 26 830 12 854 27 826 13 851 28 821 14
................. ~...
856 29 816 15 853 30 811 31 804
....___..Z__,-___.
~
UNIT SHUTDOWNS AND POWER REDUCTIONS Dockat No.:
50-309 FOR JANUARY 1987 Unit Maine Yankee Date:
04/Feb/87 Completed By:
J.M. TAYLOR i
Telephone:
207-882-6321 Page:
1 of 1 Number L.R. TO 75%
D' to 870103 a
Typa (1)
S i'
-Durction (Hours)
O R;ccon (2)
B Method (3) 4 LER #
N/A Cyctem Cod 3 (4)
HA Component Cods (5)
VALVEX-C REDUCED POWER FOR TURBINE VALVE TESTING, EFCV TESTING, AND NRV Cruce and TESTING.
Corrective Action
- 1. TYPE:
- 2. REASON: (cont) 4.
SYSTEM CODE:
(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain)
Entry Sheets for
- 2. REASON Licensee Event Report A-Equipment Failure
- 3. METHOD:
(LER) File (NUREG.0161)
B-Maintenance or Test 1-Manual C-Rafueling 2-Manual Scram
- 5. COMPONENT CODE:
i D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &
4-Other (Explain) as above.
License Examination
,i
5 UNIT SHUTDOWNS AND POWER REDUCTIONS Docket No.:
50-309 FOR JANUARY 1987 Unit:
Maine Yankee Date:
04/Feb/87 Completed By:
J.M. TAYLOR Telephone:
207-882-6321 Page:
1 of 1 Number L.R. TO 75%
D'ato 870103 Typa (1)
S Durction (Hours)
O R cson (2)
B Method (3) 4 LER O N/A Syctem Cod] (4)
HA Component Cod] (5)
VALVEX-C REDUCED POWER FOR TURBINE VALVE TESTING, EFCV TESTING, AND NRV Cauna and TESTING.
Corrective Action 1.
TYPE:
2.
REASON: (cont) 4.
SYSTEM CODE:
(F)orced F-Administrative Exhibit G-Instructions (S)chxduled G-Operational Error for Preparation of Data H-Other (Explain)
Entry Sheets for
- 2. REASON Licensee Event Report A-Equipment Failure 3.
METHOD:
(LER) File (NUREG.0161)
C-M;intenance or Test 1-Manual C-R2 fueling 2-Manual Scram 5.
COMPONENT CODE:
D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &
4-Other (Explain) as above.
Liccnse Examination I
a e
Dockct No:
50-309 Unit Names Maine Yankee Date:
04/Feb./87 Completed By:
R.S.
Jucovics Telephone:
207-882-6321 Report Month:
January, 1987 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES At the beginning of the month the plant was at 100% power.
On January 3rd, power was reduced to 75% for excess flow check valve, non-return valve and turbine valve testing.
..s On January 4th, power was returned to 100% and remained there until January 22.
On January 22nd, cycle 9 coastdown began.
At the.end of the month power was 95%.
a
+
W MAIRE HARHEE 'ATOMICPOWERCOMPARUe
,vougr,Ja?n"g%,
h (207) 623-3521 e
February 9, 1987 MN-87-14 GDH-87-29 Office of Resource Management United States Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Mr. Richard A. Hartfield, Chief Management Information Branch
References:
(a) License No. DPR-36 (Docket No. 50-309)
(b) NUREG-0020, Licensed Operating Reactors Status Summary Report
Subject:
Maine Yankee Monthly Statistical Report Gentlemen:
Enclosed you will find the Monthly Statistical Report for the Maine Yankee Atomic Power Station for January, 1987.
Very truly yours, MAINE YANKEE ATOMIC POWER COMPANY
$ h 11 V G. D. Whittier, Manager Nuclear Engineering and Licensing GDH/hbg Enclosure cc: Mr. Ashok C. Thadani Dr. Richard H. Vollmer Mr. Pat Sears Mr. Cornelius F. Holden I//
8456L-GDH 2
_ - _.