Text
f O PSI G Company Pubic Servtce Doctnc and Gas 80 Park Plaza, Newark NJ 07101/ 201430 8217 MAILING ADDRESS / P.O. Box 570. Newark. NJ 07101 Robert L. Mitti General Manager Nuclear Assurance and Regulation September 9, 1985 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20814 Attention:
Mr. Walter Butler, Chief Licensing Branch 2 Division of Licensing Gentlemen:
HOPE CREEK GENERATING STATION INDEPENDENT DESIGN VERIFICATION PROGRAM DOCKET NO. 50-354 The Independent Design Verification Program (IDVP) for the Hope Creek Generating Station has been completed.
Fifteen (15) copies of the final report of the results of the IDVP, dated August 30, 1985, were transmitted to D. Wagner, NRC, under separate cover, see letter P.
L. Wattelet, Sargent &
Lundy to W.
Gailey, Public Service Electric and Gas Company, dated August 30, 1985.
Should you have any questions in this regard, please contact us.
Very truly yours,
// /
/
w n:
g'# r,w C
D.
H. Wagner USNRC Licensing Project Manager ph h[
d 8
g6 A.
R.
Blough l
i Voll-7 A
USNRC Senior Resident Inspector I
J.
L.
Milhoan USNRC 8509120057 850909 The Energy People
$DR ADOCK O g4 954112 (dVI 7 83
=.
SARGENT & LUNDY ENGINEERS F O U N D E D 18 91 I
55 EAST MONROE STREET CHICAGO, ILLINOIS 60603 312 269 6905
( 312 ) 269 2000 T W X 910 2 2 6 2 0 07 LSP-119 August 30, 1985 Project No. 7212-30 Public Service Electric and Gas Company dope Creek Generating Station - Unit 1 Hope Creek Independent Design Verification Program Final Report 4
Mr. W. Gailey Chief Project Engineer Public Service Electric and Gas Company 80 Park Plaza Newark, New Jersey 07101
Dear Mr. Gailey:
Sargent & Lundy has completed the Independent Design Verification Program (IDVP) of the Hope Creek Generating Station.
The Fin.nl Report of the results of the IDVP is enclosed for your use.
The report is dated August 30, 1985 and includes seven volumes.
Volume 1 addresses the Executive Summary, Introduction, Assess-ments and conclusions, and the individual discipline reviews.
Volume 2 includes the Appendices A through D and Volumes 3 through 7 include the Observation Reports, Resolution Reports, and Completion Reports generated during the IDVP.
A limited distribution of 13 copies of the Final Report is being made with this letter.
The remainder of the copies agreed upon will be transmitted by separate cover.
As previously agreed, copies of the,IDVP Final Report have been sent directly to the Nuclear Regulatory Commission and Westec Services, Inc.
Yours very truly, P.
L. Wattelet Project Director PLW:WAB :rl Enclosures Copies:
W. F.
Bauer (1/0)
D. Wagner (1/l)
W. A.
Bloss (1/0)
'J. L. Milhoan (1/5)
K. Burrowes (1/l)
H.
S. Taylor (1/0)
. T.
DelGaizo (1/5)
B. Markowitz (l/0)
~