SEP 0 91985 Docket Nos.: 50-410 and 50-441 Mr. Milton Hite 2683 Larchview Drive Painesville, Ohio 44077

Dear Mr. Hite:

This letter is in response to your June 5,1985 letter to me concerning methane gas that is being produced at the landfill in Lake County, Ohio.

Although the landfill in Lake County is only about 3 miles from the Perry plant site, and thus closer to the plant site than the landfill previously discussed in my May 24, 1985 letter, the response given to you in that letter is still valid. To reiterate, because methane gas is lighter than air, and because its buoyancy tends to cause it to disperse rapidly, the methane gas produced at the Lake County landfill would also have no adverse effect on the operation of the Perry plant.

Sincerely h_ /

% ,ing Ste Br o,Phj& ect Manager i Licenn ch Q. 1 DivisLon of ice s ng cc: See next page DISTRIBUTION:

Docket File ABrauner, SAB/DE NRC PDR JPGleason, ASLB Local PDR G0 Bright, ASLB PRC System JRKline, ASLB NSIC ARosenthal, ASLAP MRushbrook WJohnson, ASLAP JStefano GEdles, ASLAP OELD ACRS (16)

, JPartlow BGrimes 8509120046 050909 EJordan PDR ADOCK 05000440 CPWoodhead, ELD H PDR WVJohnston DCleary,SAB/DE 3#1:DL LB#1:DL OELD )]

efano/mac BJYoungblood CPWoodhead

/3>/85 / /85 k/3 b/85 t

, , - - , ,r -- - - - -~y .- , - - - - . , , y --- --. -- -,_ , .-y- # ,

I,_ ,

.[ ' .. -l

.s; I

SEP 0 91995 DISTRIBUTIONi F6 deet File '

NRC PDR Local PDR

~PRC System NSIC-MRushbrook JStefano OELD ACRS (16)

' JPartlow BGrimes EJordan CPWoodhead, ELC WJohnston DCleary,SAB/DE ABrauner, SAB/DE JPGleason, ASLB' G0 Bright, ASI.B JRKline, ASLB ARosenthal, ASLAP WJohnson, ASLAP

-GEdles, ASLAP

Mr. Murray R. Edelman Perry Nuclear Power Plant The Cleveland Electric Units 1 and 2 Illuminating Company cc:

Jay Silberg, Esq. Mr. Larry 0. Beck Shaw, Pittman, & Trowbridge The Cleveland Electric 1800 M Street, N. W. Illuminating Company Washington, D. C. 20006 P. O. Box 97 E-210 Perry, Ohio 44081 Donald H. Hauser, Esq.

The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 Resident Inspector's Office U. S. Nuclear Regulatory Commission Parmly at Center Road

, Perry, Ohio 44081 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Donald T. Ezzone, Esq.

Assistant Prosecuting Attorney 105 Main Street Lake County Administration Center Painesville, Ohio 44077 Ms. Sue Hiatt OCRE Interim Representative 8275 Munson Mantor, Ohio 44060 Terry J. Lodge, Esq.

618 N. Michigan Street Suite 105 Toledo, Ohio 43624 John G. Cardinal, Esq.

Prosecuting Attorney Ashtabula County Courthouse Jefferson, Ohio 44047 l

l