86 Enti gy Operttions,Inc.
Killona. LA 7006G Tel 504 739 6242 Early C. Ewing, til tu ar ety & Regulatory Affairs W3F1-99-0042 A4.05 PR 1
March 22,1999 U.S. Nuclear Regulatory Commission j
Attn: Document Control Desk j
Washington, D.C. 20555 i
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 i
Additional Information Regarding inservice Inspection (ISI)
Relief Request ISI-001, Revision 7 Gentlemen:
By Letter W3F1-98-0003, " Inservice inspection (ISI) Relief Request 1S1-001, Revision j
7, Limited Examination of Welds / Components" dated January 27,1998, Entergy provided for NRC Staff review a complete listing of alllim?ed examinations
~
performed during the first inservice inspection interval at Waterford 3, which ended July 1,1997. Whenever a complete examination, as defined by Section XI, is not
//
attainable due to component design or configu*ation, the limitations to the required
'/
examinations must be submitted to the NRC per 10CRF50.55a(g)(5)(iii). In compliance with this regulation, Entergy submitted Re'ief Request 181-001, Revision
- 7. Per phone conversation with Mr. Chandu Patel of the NRC Staff, further information was requested on four welds. Attachment 1 provides that information.
/t)l[7
~
G
Additional Information Regarding inservice Inspection (ISI)
Relief Request ISI-001, Revision 7 W3F1-99-0042 Page 2 March 22,1999 Should you have any questions or comments concerning this request, please contact me at (504) 739-6242 or Curt Taylor at (504) 739-6725.
Very truly yours,
/~
4 E.C. Ewing
- Director, Nuclear Safety & Regulatory Affairs ECE/ CWT /ssf Attachment (w/ Attachment) cc:
E.W. Merschoff, NRC Region IV C.P. Patel, NRC-NRR J. Smith N.S. Reynolds NRC Resident inspectors Office I
Administrator Radiation Protection Division (State of Louisiana)
American Nuclear insurers
Attachmi:nt 1 to W3F1-99-0042 Page 1 of 2 Information on ISI Weld 15-010 This weld is the Pressurizer surge line branch connection weld. The weld received a magnetic particle examination along with a limited ultrasonic examination. The ultrasonic examination was conducted using a 45-degree shear wave. The scans are limited due to the branch connection configuration. The coverage is as follows:
Clockwise circ scan: 100%
Counter clockwise circ scan: 100%
' Upstream axial scan: 0%
Downstream axial scan: 100%
Total coverage: 75%
Information on ISI Weld 19-008 This weld is a stainless steel Safety Iniection pipe to valve weld. The weld received a liquid penetrant examination along with a limited ultrasonic examination. The ultrasonic examination was conducted using a 45-degree shear wave augmented by a 60 degree RL wave. The scans are limited due to the v/ eld material and the valve and weld contours.
The coverage is as follows:
Clockwise circ scan: 100%
Counter clockwise circ scan: 100%
Upstream 45-degree axial scan: 50%
Upstream 60-degree axial scan: 60%
Downstream axial scan: 0%
Total coverage: 65%
information on ISI Weld 25-016 This weld is a stainless steel Combined Pressurizer Spray pipe to valve weld. The weld received a liquid penetrant examination along with a limited ultrasonic examination. The ultrasonic examination was conducted using a 45-degree shear wave augmented by a 60 degree RL wave. The scans are limited due to the weld material and the valve and weld contours. The coverage is as follows:
Clockwise circ scan: 100%
Counter clockwise circ scan: 100%
Upstream axial scan: 0%
i Downstream 45-degree axial scan: 50%
Downstream 60-degree axial scan: 94%
Total coverage: 73.5%
~
Att chment 1 to W3F1-99-0042 Page 2 of 2 Information on ISI Weld 25-018 This weld is a stainicss steel Combined Pressurizer Spray pipe to valve weld. The weld received a liquid penetrant examination along with a limited ultrasonic examination. The ultrasonic examination was conducted using a 45-degree shear wave augmented by a 60 degree RL wave. The scans are limitM due to the weld material and the vr.lve and weld contours. The coverage is as followt Clockwise circ scan: 100%
Counter clockwise circ scan: 100%
Upstream 45-degree axial scan: 50%
Oostream 60-degree axial scan: 65%
Downstream axial scan: 0%
Total coverage: 66%