ML20204J088
| ML20204J088 | |
| Person / Time | |
|---|---|
| Issue date: | 03/24/1999 |
| From: | Mckenna E NRC (Affiliation Not Assigned) |
| To: | Carpenter C NRC (Affiliation Not Assigned) |
| References | |
| PROJECT-689 NUDOCS 9903290282 | |
| Download: ML20204J088 (3) | |
Text
,
March 24, 1999
)
0 bSh MEMORANDUM TO: Cynthia A. Carpenter, Chief s
I Generic issues and Environmental Projects Branch Division of Regulatory Improvement Programs
)
Office of Nuclear Reactor Regulation j
FROM:
Eileen M. McKenna, Senior Reactor Engineer " Original Signed By" Generic issues and Environmental Projects Branch j
Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI) ON CRITERIA IN 10 CFR 50.59 DATE AND TIME:
March 31,1999 2:30 p.m. - 4:30 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Room O-10B2 PURPOSE:
To discuss clarity and feasibility of implementation of staff-proposed Rule Language that would implement the process outlined by NEl in their j
comments on the Proposed Revision to 10 CFR 50.59, in particular, for j
meeting design basis limits and control of methods PARTICIPANTS:
NRC NEl D. Matthews T. Pietrangelo F. Akstulewicz, et al.
R. Bell Project No. 689 cc: See next page Meetings betwecn the NRC technical staff and apolicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Pe! icy Statement on Staff Meeting Open to the Public," 59 Federa! Reaister 48344, 9/20/94. Members of the public who wish to attend should contact Eileen McKenna at D
(301) 415-2189 (emm@nrc. gov)
Document Name:g:\\emm\\mtg331 OFFICE PGEBp,,.
SC:PGES
]
h l
NAME EMcKenrd:'sw kN 303 /99 3/LY/99 f pg4 9 DATE OFFICIAL OFFICE COPY 9903290282 990324 PDR REVGP ERGNUMRC PDR 0%f h3Wj
n a
Nuclear Energy Institute Project No. 689 cc:
Mr. Ralph Beedle Ms. Lynnette Hendricks, Director Senior Vice President Plant Suppor:
and Chief Nuclear Officer Nuclear Energy institute Nuclear Energy institute Suite 400 Suite 400 1776 l Street, NW 1776 l Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Charles B. Brinkmaa. Director Programs Washington Operations Nuclear Energy Institute ABB-Combustion Engineering, Inc.
Suite 400 12300 Twinbrook Parkway, Suite 330 1776 i Street, NW Rockville, Maryland 20852 Washington, DC 20006-3708 Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400 1776 l Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy Institute Suite 400 1776 l Street, NW Washington, DC 20006-3708 Mr. Nicholas J. Liparuto, Manager Nuclear Safety and Regulatory Activities Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Jim Davis, Director Operations Nuclear Energy Institute Suite 400 1776 i Straet, NW Washington, DC 20006-3708
O I-85 Distribution: Mtg. Notice w/NEl Dated Hara Qony Project File dPUBuC' '!
PGEB R/F OGC ACRS SMagruder EMcKenna OWFN Receptionist EMail SCollins/RZimmerman WKane BSheron BBoger CCarpenter DMatthews SNewberry GHolahan JStrosnider FAkstulewicz SMagruder TKing, RES MDrouia, RES GMizuno,000 GTracy, EDO PMNS OPA 290027