A Boston Edison A BEC ENER9Y COMPANY J.F. Alexander Nuclear Assessment Group Manager March 22, 1999 BECo Ltr. 2.99.033 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 License DPR-35 Docket 50-293 USl A-46 Schedule Revision The schedule for Pilgrim Nuclear Power Station's USI A-46 implementation plan is revised.
Pilgrim planned to complete the existing A-46 work scope by RFO 12. However, the work package planning for modifications associated with the A-46 out'ier resolutions identified the implementation phase to be larger than anticipated. This work cannot be integrated and completed within the current outage scope and duration.
j A significant number of the highest priority modifications of this A-46 scope is expected to be completed by RFO 12. The remaining work will be integrated with additional scope resulting from the re-application of the Generic Implementation Procedure (GIP) Method A methodology, as discussed in BECo's RAI response letter dated June 15,1998, (BECo letter 2.98.045). A schedule for completion cannot be finalized until the NRC issues its USl A-46 Safety Evaluation Report (SER) for Pilgrim.
g Should you have any questions regarding this notification, please do not hesitate to contact Dr.
Fred Mogolesko of the Pilgrim Station Asset Management Group at extension (508) 830-7832.
xander JDK/cis
'l-h lg 299033-9903290167 990322 PDR ADOCK 05000293 P
PDR 2
Pilgrim Nuclear Power Station, Rocky Hill Road, Plymouth, Massachusetts 02360
I; i
. cc:
Mr. Alan B. Wang, Project Manager Project Directorate 1-3 Office of Nuclear Reactor Regulation Mail Stop: OWFN 8F2 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike 1
Rockville, MD 20852 i
U. S. Nuclear Regulatory Commission Region i
.j 475 Allendale Road l
King of Prussia, PA 19406 l
l l
Senior Resident inspector
.j Pilgrim Nuclear Power Station 1
l l
l t
i