Informs of Rev to Schedule for PNPS USI A-46 Implementation Plan.Work Cannot Be Integrated & Completed within Current Outage Scope & Duration.Schedule for Completion Cannot Be Finalized Until NRC Issues USI A-46 SER Plant
ML20204H814
Person / Time
Site: Pilgrim
Issue date: 03/22/1999
From: Alexander J
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR LTR.2.99.033, NUDOCS 9903290167
Download: ML20204H814 (2)


Text

-

/%

A Boston Edison A BEC ENER9Y COMPANY J.F. Alexander Nuclear Assessment Group Manager March 22, 1999 BECo Ltr. 2.99.033 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 License DPR-35 Docket 50-293 USl A-46 Schedule Revision The schedule for Pilgrim Nuclear Power Station's USI A-46 implementation plan is revised.

Pilgrim planned to complete the existing A-46 work scope by RFO 12. However, the work package planning for modifications associated with the A-46 out'ier resolutions identified the implementation phase to be larger than anticipated. This work cannot be integrated and completed within the current outage scope and duration.

j A significant number of the highest priority modifications of this A-46 scope is expected to be completed by RFO 12. The remaining work will be integrated with additional scope resulting from the re-application of the Generic Implementation Procedure (GIP) Method A methodology, as discussed in BECo's RAI response letter dated June 15,1998, (BECo letter 2.98.045). A schedule for completion cannot be finalized until the NRC issues its USl A-46 Safety Evaluation Report (SER) for Pilgrim.

g Should you have any questions regarding this notification, please do not hesitate to contact Dr.

Fred Mogolesko of the Pilgrim Station Asset Management Group at extension (508) 830-7832.

xander JDK/cis

'l-h lg 299033-9903290167 990322 PDR ADOCK 05000293 P

PDR 2

Pilgrim Nuclear Power Station, Rocky Hill Road, Plymouth, Massachusetts 02360

I; i

. cc:

Mr. Alan B. Wang, Project Manager Project Directorate 1-3 Office of Nuclear Reactor Regulation Mail Stop: OWFN 8F2 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike 1

Rockville, MD 20852 i

U. S. Nuclear Regulatory Commission Region i

.j 475 Allendale Road l

King of Prussia, PA 19406 l

l l

Senior Resident inspector

.j Pilgrim Nuclear Power Station 1

l l

l t

i