ML20204H561
ML20204H561 | |
Person / Time | |
---|---|
Issue date: | 03/12/1999 |
From: | Mace M NRC OFFICE OF ADMINISTRATION (ADM) |
To: | Bailey P, Schossow F ICF, INC. |
References | |
CON-FIN-J-5236, CON-NRC-04-95-065, CON-NRC-4-95-65 NUDOCS 9903290099 | |
Download: ML20204H561 (5) | |
Text
.
D co p etroq d %. UNITED STATES
- 5 j
NUCLEAR REGUL'ATORY COMMISSION n WASHINGTON, D.C. 20065-4001
% ..... ! ~Nht10,1111 ICF Incorporated ATTN: Ms. Frances Schossow Project Administrator 9300 Lee Highway Fairfax, VA 22031-1207
Dear Ms. Schossow:
Subject:
Modification No. 8 to Task Order No.15 under Contract No. NRC-04-95-065 The purpose of this modification is to (1) add within scope work to the Statement of Work in accordance with the contractor's letter dated 02/22/99 and the attached pages, (2) increase the ceiling by $14,200 from $209,512 to $223,712, all of which represents the reimbursable costs, and (3) increase the obligated amount by .$14,032 from $209,512 to .
$223,544. This confirms the verbal authorization provided to you on 02/24/99, by Ms. i
, Rosemary Mann of my staff, to commence work effective 02/24/99 with a temporary ceiling of $7,000. The $14,200 is inclusive of the temporary ceiling of $7,000 that was verbally authorized pending definitization of this modification.
Accounting Data for Task Order No.15, Modification No. 8 is as fo!!ows:
A P P N N o.: 31XO200 B&R No. - 95015203115 Job No. : J5236 BOC No. : 252A
. Amt. Obligated: $14,032.00 A summary of obligations for this task order from award date through the date of this action is given below:
Total FY97 Obligation Amount: $ 50,000.00 Total FY98 Obligation Amount: $151,633.29 Total FY99 Obligation Amount: $ 21,910.71 Cumulative Total of NRC Obligations: $223,544.00 1
This modification obligates FY99 funds in the amount of $14,032.
The issuance of this modification does not amend any other terms or conditions of the subject task order. ~ g 9903290099 990312 PDR CONTR NRC-04-95-065 PDR '() Q 4 0 U U J t N*
. 7. Contract No. NRC-04-95-065 Modification No. 8 to Task Order No.15 l
Please indicate your acceptance of Modification No. 8 to Task Order No.15 by having an official, authorized to bind your organization, execute three (3) copies of this document in the space provided and return two (2) copies to the U.S. Nuclear Regulatory Commission, ATTN: Ms. Amy Siller, ADM/DCPM/CMB1, Mail Stop T-7-1-2, Washington, D.C. 20555.
You should retain the third copy for your records. I l
Should you have any questions regarding this modification, please contact the contract specialist, Ms. Amy Siller, on (301) 415-6747.
1 Sincerely, I
/
a Mace, o racting Officer :
7 Contract Management Branch 1 l Division of Contracts and Property Management Office of Administration EPTED:
(F110 a %
NAME J2 w Or l Le /ltd TITLE
/z/09
. DATE l
l
L w .. :
u MODIFICATION NO. 8 TO THE STATEMENT OF WORK .
- FOR TASK. ORDER #15 '
.JOBCODE J5236 L
~
- Section 3.0 WORKSCOPE The scope of work includes: ...and; (4) the contractor shall prepare summary reports of public '
meetings. '
Task 5 1 The contractor shall prepare summary reports for four public meetings related to the revision of the regulations in 10 CFR Part 35 - Medical Use of Byproduct Material.
Subtask 1.
The contractor shall review the transcript of the NRC's meeting with medical specialities boards I scheduled to be held on February 17-18,1999, and prepare a draf t and final report based on the transcript of the meeting. The reports shall categorize and summarize the comments and '
recommendations of the boards by subject areas agreed to by the NRC Technical Project
' Manager (TPM).
Subtask 2 The contractor shall attend the ACMUI Diagnostic Subcommittee meeting to be held on February 23-24,1999, at the NRC offices located in Rockville, MD, and prepare a draft and final :
report. The reports shall categorize and summarize the comments and recommendations of the ACMUI Diagnostic Subcommittee by subject areas agreed to by the NRC TPM.
Subtask 3 The contractor shall attend the ACMUI Therapy Subcommittee meeting to be held on February 26,1999, at the NRC offices located in Rockville, MD, and prepare a draft and final report.
The reports shall categorize and summarize the comments and recommendations of the ACMUI Therapy Subcommittee by subject areas agreed to by the NRC TPM.
Subtask 4.
I i
'The contractor shall review the transcript of the NRC's ACMUI meeting scheduled to be held on March 24 25,1999, and prepare a draft and final raport based on the transcript of the meeting. The report shall categorize and summarize the comments and recommendations of the ACMUI by subject areas agreed to by the NRC TPM.
L l
l
l .:
a: 2 t . .
Section 4.0 DELIVERABLES AND SCHEDULES Task 5 The contractor shall prepare summary reports for four public meetings related to the revision of the~ regulations in 10 CFR Part 35 - Medical Use of Byproduct Material.
Subtask 1 No later than eight working days after the contractor receives the transcript of the meeting of the medical specialities boards from the NRC TPM, the contractor shall deliver a draft report to the NRC TPM.
No later than ten working days after the NRC TPM receives the draft report from the contractor, l the NRC TPM shall provide the contractor with comments on the draft report. l No later than five working days after the contractor receives the NRC TPM's comments on the draft report, the contractor shall provide a final report to the NRC TPM.
Subtask 2 No later than ten working days after the completion of ACMUI Diagnostic Subcommittee meeting, the contractor shall deliver a draft report to the NRC TPM.
No later than seven working days after receipt of the draft report from the contractor, the NRC TPM shall provide the contractor with comments on the draft report.
No later than five working days after the contractor receives the NRC TPM's comments on the draft report, the contractor shall provide a final report to the NRC TPM.
Subtask 3 No later than ten working days after the completion of ACMUI Therapy Subcommittee meeting, the contractor shall deliver a draft report to the NRC TPM.
No later than five working days after receipt of the draft report from the contractor, the NRC TPM shall provide the contractor with comments on the draft report.
No later than five working days after the contractor receives the NRC TPM's comments on the draft report, the contractor shall provide a final report to the NRC TPM.
Subtask 4 No later that six working days after the contracto" receives the transcript of the ACMUI meeting from the NRC TPM, the contractor shall deliver a draf t report to the NRC TPM.
. . .. . - -- .- . _ . - -.._-.._-,-._ -._ -. ~-_
l No later than five working days after the NRC TPM receives the draft report from the contractor, the NRC TPM shall provide the contractor with comments on the draft report.
No later than five working days after the contractor receives the NRC TPM's comments on the draft report, the contractor shall provide a final report to the NRC TPM.
i 5.0 PERIOD OF PERFORMANCE The period of performance for Task 5 shall be from the effective date of this modification to April 30,1999.
6.0 LEVEL OF EFFORT The level of effort for Task 5 is 177 hours0.00205 days <br />0.0492 hours <br />2.926587e-4 weeks <br />6.73485e-5 months <br />, increasing the total level of effort for Task Order #15 to 2,111 hours0.00128 days <br />0.0308 hours <br />1.835317e-4 weeks <br />4.22355e-5 months <br />.
I i
i I
l i