ML20204H256

From kanterella
Jump to navigation Jump to search
Forwards Info Supporting Request for Approval of Irradiated Fuel Shipping Route,Per 10CFR73.Author Should Be Contacted If Questions or Correspondence Re Request Presented
ML20204H256
Person / Time
Site: 05000026
Issue date: 12/14/1998
From: Ducamp B
MICHIGAN, UNIV. OF, ANN ARBOR, MI
To: Bennington G
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9903290039
Download: ML20204H256 (4)


Text

_. _

C6CDoocQgpc

~.

L.1R77V TO:

.Mrs. Gloria M Bennington Spent Fuel Project Office OWFN-6 F-18 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 FROM:

Bernard P Ducamp

[h Assistant Manager Ford Nuclear Reactor The University of Michigan gd 2301 Bonisteel Boulevard Ann Arbor, MI 48109 DATE:

December 14,1998 SUBJECT Route Approval Request Irradiated Fuel Shipments Summer 1999 Please find enclosed the information supporting a request for the approval of an irradiated fuel shipping route in accordance with 10 CFR 73.

Please contact me if you have any questions or correspondence regarding this request.

i l

l 1

I E)0#So!$o$o$$o26 hl QtW 1

~-.

060 ooceAL7eg General Descriptiom h

l Four Irradiated Fuel Shipments From:

l Ford Nuclear Reactor i

NRC License # R-28 i

Ann Arbor, Michigan To:

Westinghouse Savannah River Plant Aiken, South Carolina 29802 Carrier:

Tri-State Motor Company Subcontractor to U.S. DOE, Idaho University Research Reactor Fuel Program Number of Shipments:

Two planned for June,1998 One planned for July,1998 One planned for August,1998 Certified Shipping Cask: BMI1 Contents: Radioactive Material, Fissile Class III, n.o.s., UN2918.

Each shipment will consist of 12 irradiated nuclear research reactor fuel elements loaded in one cask per truck. The fuel elements are irradiated MTR-type plate fuel, composed of low-enriched uranium (less than 20%) clad in aluminum. There will be approximately 7,500 Curies of activity and less than 25 Watts of fission product decay heat per shipment.

Details required by 10 CFR 73 and 49 CFR will be provided prior to shipment.

l.-.

l l

Spent Fuel Shipment Route Please see attached route description.

i Communications Capabilities The Tri-State vehicle will have satellite-linked radio communications available 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day while transporting irradiated nuclear fuel.

Escorts Escorts will occur as follows:

Michigan State Police Detroit, MI = heavily populated Ohio State Police

. Toledo, OH = heavily populated Dayton, OH = heavily populated Cincinnati, OH = heavily populated i

Kentucky Dep't for Entire state (internal Health Services requirement)

Tennessee Highway Patrol Knoxville = heavily populated Notifications and Coordination The University of Michigan, Ann Arbor (Bernard P Ducamp, Assistant Manager) will be responsible for state / local armed escort services and for inter-organization communications, i

l l

l-

,e l

R-28 trr Fuzi Ship Route t

l l

l l MILES TO NEXT iCUMULATIVE WAYPOINT/ INSTRUCTION l ROAD DLR lTOWARDS j

WAYPOINT l MILES I

Depart Univ of Michigan Local S/E Ypsilanti 3

l 3

I Take US-23 South US-23 S

Ypsilanti 6

l 9

Take I-94 East to I-275 lI-94 E

Detroit 14 23

)

Take I-275 South to I-75 i!-275 S

Monroe 17 40 TakeI 75 South towards Toledo I-75 S

Ohio state line 20 60 State Mileage Subtotal I

j j

60 -

I Continue on I-75 to I-475 I 75 IS Toledo 7

I 7

Take I-475 West / South to I-75 lI-475 S

Findlay 20 27 Take I-75 South to I-275 lI-75 S

Cincinnati 183 210

~

Take I-275 E/S around Cincinnatill-275 IE/S Kentucky state line 29 239 l

State Mileage Subtotal 239 TakeI 275 S toI 75

,I 275 S

.Erlanger 11 11 Turn onto I-75 South I-75 S

Kentucky siate line 185 196 State Mileage Subtotal l

l 196 Takel-75 South towards I-640 1-75 S

Knoxville 49 49 Take I-640 East to I-40 I-640 E

Knoxville 7

56 Take I-40 East towards NC I-40 E

Tennessee state line 65 121 State Mileage Subtotal l

l 121 l

Takel-40 East towards 1-26

!!40

[E Asheville 47 Take I-26 East to SC I 26 lE lSC State Line 42 State Mileage Subtotal 89 l

Take I-26 South towrds I-20 I-26 IS/E iColumbia 107 Take I-20 SW towards SC-19 lI-20 IS/W Aiken 47

[

SC-19 South to Sav River Plant ISC-19 S

Westinghouse S Rvr 20 l

State Mileage Subtotal 174 I

I Page1

-