ML20204H247

From kanterella
Jump to navigation Jump to search
Licensed Operating Reactors Status Summary Report.Data as of April 30,1986.(Gray Book I)
ML20204H247
Person / Time
Issue date: 07/31/1986
From: Beebe M, Ross P
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0020, NUREG-0020-V10-N05, NUREG-20, NUREG-20-V10-N5, NUDOCS 8608080060
Download: ML20204H247 (459)


Text

{{#Wiki_filter:- 1 NUREG-0020 Vol.10, No. 5 May 1986 1 l LICENSED OPERATING REACTORS STATUS

SUMMARY

REPORT DATA AS OF 04-30-86 l l l ? I UNITED STATES NUCLEAR REGULAIORY COMMISSION p e= = c o ,, a

                     !                    g ' 2(jf' '"

m-h

                                                                                                                                      'I t

4 Available from NRC/GPO Sales Program Superintendent of Documents Government Printing Office - Washington, D. C. 20402 - l 1 A year's subscription consists of 12 issues for this publication. Single copies of this publication . i are available from National Technical information Service, Springfield, VA 22161 - Microfiche of single copies are available from NRC/GPO Sales Program Washington, D. C. 20555 ' i . 4 a

i NUREG-0020 Vol.10, No. 5 May 1986 l LICENSED OPERATING REACTORS STATUS

SUMMARY

REPORT DATA AS OF 04-30-86 1 ate u ished j 98 0FFICE OF RESOURCE MANAGEMENT l U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 p  %,,,

 *s       o#

STATEMENT OF PURPOSE The U.S. Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. .This information is , collected by t h's O f fice of R esou rc e N>eas se rwe nt, teem the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the f!rst contains monthly highlights and statistics for commercial operating units, and errata

.from previously reported data; the second is a compilation of detailed information on each unit, provided by HRC Regional Offices, IE Head-quarters and the Utilities; and the third section is an appendix for

. miscellaneous information such as spent fuel storage capability, reactor years of experience and non power reactors in the United States. The percentage computations, Items 20 through 24 in Section 2, the vendor capacity factors on page 1-7, and actual vs. notential energy production on Page 1-2 are computed using actual data for the period of consideration. The percentages listed in power generation on Page 1-2 are computed as an arithmetic averago. The factors for the life span of each unit (the " Cumulative" column) are reported by the utility and are not entirelg re-computed by HRC. , Utility power production data is checked for consistency with previously submitted statistics. It is hoped this status report proves informative and helpful to all agencies and individuals interested in analyzing trends in the nuclear industry which might have safety impitcations, or in maintaining an awareness of the U.S. energy situation as a whole.

TA8LE OF C0NTENTS PAGE li GLOSSARY vil INDEX TO LICENSED UNITS i SECTION 1 - CURRENT DATA SUMMARIES MONTHLY HIGHLIGHTS OF COMMERCIAL NUCLEAR POWER UNITS 1-2 1-2 [ Licensed Power Reactors 1-2 Power Generation 1-2  : Actual vs. Potential Energy Production Outage Data 1-2 Reasons for Shutdown 1-3 Derated Units 1-3 Shutdowns Greater Than 72 Hours Each 1-3 UNIT AVAILABILITY, CAPACITY, AND FORCED OUTAGE RATE PLOT 1-4 AVERAGE DAILY POWER LEVEL FOR ALL COMMERCIAL OPERATING UNITS 1-5 AVERAGE CAPACITY FACTORS BY VENDOR Vendor Plot 1-6 Statistics 1-7 L MEMORANDA - SPECIAL INFORMATION 1-8 ERRATA - CORRECTIONS TO PREVIOUSLY REPORTED DATA 1-9 ) SECTION 2 - OPERATING POWER REACTORS ARKANSAS 1 THROUGH ZION 2 2402 throuW 2-428 For each reactor: Operating Status Average Daily Power Level (MWe) Plot Unit Shutdowns / Reductions Summary Facility Data Inspection Status Licensee Reports SECTION 3 - APPENDIX STATUS OF SPENT FUEL STORAGE CAPABILITY 3-{ 3-e REACTOR-YEARS OF CPERATION NON-POWER REACTORS IN THE U.S. 3-7 PAGE 1 l

G8 OSSARY AVERAGE DAILY POWER LEVEL The net riectrical energy generated during the (MWe). day (mea sured from 0001 to 2400 hours inclusive) in megalatts hours, divided by 24 faurs. i LICENSED THERMAL POWER The maximum thermal power of the reactor authorized (MWt) by the NRC, expressed in megawatts. DATE OF COMMERCIAL OPERATION Date unit was declared by utility owner to be available for the regular production of electricity; usually related to satisfactory completion of qualification tests as specified in the purchase contract and to accounting policies and practices of utility. DESIGN ELECTRICAL RATING The nominal net ' electrical output of the unit (DER) (HET MWe) specified by the utility and used for the purpose of plant design. FORCED OUTAGE An outage required to be initiated no later than the weekend following discovery of an offnormal condition. FORCED OUTAGE HOURS The. clock hours during the report' period that a unit is unavailable due to forced outages. GROSS ELECTRICAL EMERGY Electrical output of the unit during the report GENERATED (MWH) period as measured at the output terminals of the turbine generator, in megawatts hours. GROSS HOVRS The clock hours from the beginning of a specified situation until its end. For outage durations, the clock hours during which the unit is not in power production. GROSS THERMAL ENERGY GENERATED (MWH) The thermal energy produced by the unit during the report period as measured or computed by the licensee in megawatt hours. HOURS GENERATOR ON-LINE Also, " Unit Service Hours." The total clock hours in the report period during which the unit operated ' with breakers closed to the station bus. These hours added to the total outage hours experienced by the unit during the report period, shall equal the hours in the report period. HOURS IN REPORTING PERIOD For units in power ascension at the end of the period, the gross hours from the beginning of the period or the first electrical production, whichever comes last, to the end of the period. For units in commercial operation at the end of the period, the gross hours from the beginning of the period or of commercial operationp whichever comes last, to the end of the period or decommissioning, whichever comes PAGE il first.

G L 0 S S'A R Y (continued) HOURS REACTOR CRITICAL The total clock hours in the report period during which the reactor sustained a controlled chain reaction. MAXIMUM DEPENDABLE CAPACITY Dependable main-unit gross capacity, winter or summer, (GROSS) (MDC Gross) (Gross MWe) whichever is smaller. The dependable capacity varies because the unit efficiency varies during the year due to cooling water temperature variations. It is the gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions (usually summer). MAXIMUM DEPENDABLE CAPACITY Maximum Dependable Capacity (Gross) less the normal (HET) (MDC Net) (Het MWe) station service loads. NAMEPLATE RATING The nameplate power designation of the generator in (Gross MWe) magavoit amperes (MVA) times the nameplate power factor of the generator. HOTE: The nameplate rating of the generator may not be indicative of the maximum or dependable capacity, since some other item of aquipment of a lesser rating (e.g., turbine) may limit unit output. HET ELECTRICAL ENERGY GENERATED Gross electrical output of the unit measured at the output terminals of the turbine generator during the reporting period, minus the normal station service If this quantity is electrical energy utilization. less than zero, a negative number should be recorded. DUTAGE A situation in which no electrical production takes place. DUTAGE DATE As reported on Appendix D of Reg. Guide 1.16, the date of the start of the outage. If continued from a previous minth, report the same outage date but change " Method of Shutting Down Reactor" to "4' (continuations)" and add a note: " Continued from previous month." , 1 i OUTAGE DURATION The Total clock hours of the outage measured from the beginning of the report period or the outage, r whichever comes last, to the end of the report period or the outage, whichever comes first. OUTAGE HUMBER A number unique to the outage assigned by the licensee. - The same number is reported each month in which the outage is in progress. One format is "76-05" for the fifth outage to occur in 1976. PERIOD HOURS See " Hours in Reporting Period." POWER REDUCTION A reduction in the Average Daily Power Level of more than 20% from the previous day. All power reductions are defined as outage of zero hours durations for the purpose of computing unit service and availability PAGE 111 factors, and forced outage rate.

l l GL0SSARY (esntinund) REACTOR AVAILABLE HOURS The Total clock hours in the report period during which the reactor was critical or was capable of being made critical. (Reactor Reserve Shutdown Hours + Hours Reactor Critical.) REACTOR AVAILAEILITY FACTOR Reactor Available Hours x 100 Period Hours REACTOR RESERVE SHUTDCWN The cessation of criticality in the reactor for administrative or other similar reasons when operation could have been continued. REACTOR RESERVE SHUTDOWN HOURS The total clock hours in the report period that the reactor is in reserve shutdown mode. NOTE: Ho credit i s given for NRC imposed shutdowns. REACTOR SERVICE FACTOR Hours Reactor Critical x 100 Period Hours REPORT PERIOD Usually, the preceding calender month. Can also be the preceding calendar year, (Year-to-Date), or the life span of a unit (cumulative). RESTRICTED POWER LEVEL Maximum net electrical generation to which the unit is restricted during the report period due to the state of equipment, external condi ticns, admini strative reasons, or a direction by NRC. SCHEDULED OUTAGE Planned removal of a unit from service for refueling, inspection, training, or maintenance. Those outages which do not fit the definition of " Forced Outage" perforce are " Scheduled Outages." STARTUP AND POWER ASCENSION Period following initial criticality during which the TEST PHASE unit is tested at successively higher levels, culmin-ating with operation at full power for a sustained period and completion of warranty runs. Following this phase, the utility generally considers the unit to be available for commercial operation. UNIT The set of equipment uniquely associated with the reactor, including turbine generators, and ancillary equipment, considered as a single electrical energy production facility. UNIT AVAILABLE HOURS The total clock hours in the report period during which the unit operated on-line or was capable of such operation. (Unit Reserve Shutd.own Hours + Hours Generator On-Line.) PAGE iv

                                /

GL0SSARY (continued) UNIT AVAIL ABILITY FACTOR Unit Available Hours x 100 Period Hours UNIT CAPACITY FACTORS

  - Using Licensed Thermal Power Gross Thermal Enerov Generated x 100 Period Hours x LIc. Thermal Power
  - Using Hameplate Rating                         Gross Electrical Enerov Generated x 100 Period Hours x Hameplate Rating
  - Using DER                                      Het Electrical Enerov Generated x 100 Period Hours x DER
  - Using MDC Gross                                0 oss Electrical Enerov Generated x 100 Period Hours x MDC Gross
  - Using MDC Net                                  Net Electrical Enerov Generated x 100 Period Hours x MDC Net 1

NOTE: if MDC GROSS and/or MDC HET have not been determined, the DER is substituted for this quantity for Unit Capacity Factor calculations. UNIT FORCED OUTAGE RATE Forced Outace Hours Unit Service Hours + Forced Outage Hours UNIT RESERVE SHUTDOWN The removal of the unit from on-line operation for economic or other similar reasons when operation could have been continued. UNIT RESERVE SHUTDOWH HOURS The total clock hours in the report period during which the unit was in reserve shutdown mode. UNIT SERVICE FACTOR Unit Service Hours x 100 Period Hours UNIT SERVICE HOURS See " Hours Generator On-Line." I NOTE: At the end of each statement in the Enforcement Summary for any given facility may be found numbers in parentheses. These numbers are related to the inspection, e.g., 8111 (the 11th inspection of the plant in 1981); and the severity level, e.g.,4 (severity level IV). Violations are ranked by severity levels from I through V with level I being the most serious. The severity level is used in the determination of any resulting enforcement action. Gray Book lists severity level by Arabic numbers corresponding to the Roman + numerals. Details on the various severity levels and enforcement actions can be found in Appendix C to 10 CFR Part 2 published in the'. Federal Register of March 9,1982 pages 9987 through 9995, and as PAGE v j corrected April 14,1982.

INDEX TO OPERATING P0HER REACTORS PAGE PAGE 2-002 MONTICELLO 2-212 ARKANSAS 1 2-216 ARKANSAS 2 2-006 NINE MILE POINT 1 2-010 NORTH ANNA 1 2-220 BEAVER VALLEY 1 NORTH ANNA 2 2-226 BIG ROCK POINT 1 2-014 2-018 OCONEE 1 2-230 BROHNS FERRY 1 2-236 BROHNS FERRY 2 2-024 OCONEE 2 2-240 BROHNS FERRY 3 2-028 OCONEE 3 2-244 BRUNSHICK 1 2-032 DYSTER CREEK 1 2-038 PALISADES 2-250 BRUNSHICK 2 2-256 BYRON 1 2-042 PALO VERDE 1 2-048 PEACH BOTTOM 2 2-262 CALLANAY 1 2-266 CALVERT CLIFFS 1 2-052 PEACH BOTTOM 3 2-056 PILGRIM 1 2-270 CALVERT CLIFFS 2 2-274 CATAHBA 1 2-060 POINT BEACH 1 COOK 1 2-066 POINT BEACH 2 2-278 COOK 2 2-070 PRAIRIE ISLAND 1 2-282 COOPER STATION 2-074 PRAIRIE ISLAND 2 2-286 2-080 QUAD CITIES 1 2-290 CRYSTAL RIVER 3 2-294 DAVIS-BESSE 1 2-084 QUAD CITIES 2 DIABLO CANYON 1 2-088 RANCHO SECO 1 2-298 DIABLO CANYON 2 2-094 RIVER BEND 1 2-304 DRESDEN 2 2-100 ROBINSON 2 2-308 DRESDEN 3 2-106 SALEM 1 2-312 DUANE ARNOLD 2-112 SALEM 2 2-316 2-116 SAN ONOFRE 1 2-320 FARLEY 1 2-326 FARLEY 2 2-120 SAN ONOFRE 2 FITZPATRICK 2-124 SAN ONOFRE 3 2-330 FORT CALHOUN 1 2-128 SEQUOYAH 1 2-336 FORT ST VRAIN 2-132 SEQUOYAH 2 2-342 GINNA 2-136 ST LUCIE 1 2-348 GRAND GULF 1 2-140 ST LUCIE 2 2-352 HADDAM NECK 2-144 SUMMER 1 2-356 HATCH 1 2-148 SURRY 1 2-360 l l HATCH 2 2-154 SURRY 2 2-364 INDIAN POINT 2 2-158 SUSQUEHANNA 1 2-368 INDIAN POINT 3 2-162 SUSQUEHANNA 2 2-37 2 KEHAUNEE 2-166 THREE MILE ISLAND 1 2-376 LA CROSSE 2-170 TROJAN 2-380 LASALLE 1 2-174 TURKEY POINT 3 2-386 LASALLE 2 2-180 TURKEY POINT 4 2-392 LIMERICK 1 2-184 VERMONT YANKEE 1 2-398 MAINE YANKEE 2-188 HASHINGTON NUCLEAR 2 2-402 MCGUIRE 1 2-192 HATERFORD 3 2-408 MCGUIRE 2 2-196 HOLF CREEK 1 2-412 MILLSTONE 1 2-200 YANKEE-RONE 1 2-416 MILLSTONE 2 2-204 ZION 1 2-420 MILLSTONE 3 2-208 ZION 2 2-424 PAGE vli

SECTION 1 j i 1 . u a >

CURRENT j DATA SUMMARIES

M0NTHLY HIGHLIGHTS MMMMMMMMMMMMMMM 93 IN COMMERCIAL OPERATION . . . . . . . . . . 77,703. CAPACITY MWe (Net) --Based upon maximum dependable M LICENSED M (a) 2 IN POWER ASCENSION. . . . . . . . . . . . 2.029 capacity; design elec. rating M POWER M --- =- used if MDC not determined M REACTORS M (b) 95 LICENSED TO OPERATE . . . . . . . . . . . . 79,732 TOTAL MMMMMMMnMMMMMMM (c) 5 LICENSED FOR FUEL LOADING AND LOH P0HER TESTING MDC NET DER - DATE DER (a) EN RICO FERMl 2 .1093(b) Excludes these plants 1. DRESDEN 1...... 200 (c) SHOREHAM ... 07/03/85 ... 820 RIVER BEND .. 936 licensed for operation 2. HUMBOLDT BAY.... 65 PALO VERDE 2 . . . 12/09/85 ... 1304 which are shut down 3. TMI 2.......... 906 CATA,WB A 2 .. 02/27/86 ... 1145 indefinitely PERRY 1 ... 03/16/86 ... 1205 HOPE CREEK 1 ... 04/11/86 ---

                                                                                                                                                                                                                                           ... 1067
                                                                                                                                                                   ==.                    _ _ _ _ _ _ _                               _

_=_- _. __ __ REPORT MONTH PREVIOUS MONTH YEAR-TO-DATE MMMMMMMMMMMMMMM 1. GROSS ELECTRICAL (MHHE) . . . . . . . . . . 31,528,182 31,585,127 133,677,717 M POWER M 2. NET ELECTRICAL (MHHE). . . . . . . . . . . 29,811,385 30,054,612 127,338,884 M GENERATION M 3. AVG. UNIT SERVICE FACTOR (%). . . . . . . . 59.5 57.0 63.6 MMMMMMMMMMMMMMM 4. AVG. UNIT AVAILABILITY FACTOR (%) . . . . . 60.2 57.6 63.9

5. AVG. UNIT CAPACITY FACTOR (MDC) (%) . . . . 54.8 55.0 59.2
6. AVG. UNIT CAPACITY FACTOR (DER) (%) . . . . 53.6 51.9 57.9
7. FORCED OUTAGE RATE (%). . . . . . . . . . . 15.1 13.1 12.6
                                                                                                                  - -_===__

___ =-------- ,- ==__ __ - - - _ _ _ _ _ = - - - = _ _

                                                                                                                                                                                                         % OF POTENTIAL PRODUCTION MMMMMMMMMMMMMMM              1. ENERGY ACTUALLY PRODUCED DURING TMIS REPORT PERIOD.                                                                     . .  .29,811,385 NET                                      53.9 M ACTUAL VS. M                                                                                                                                               .13,635,047 MWHe                                     24.7 M POTENTIAL M               2. ENERGY NOT PRODUCED DUE TO SCHEDULED OUTAGES (NET).                                                                      . .

M ENERCY M M PRODUCTION N 3. ENERGY NOT PRODUCED DUE TO FORCED OUTAGES (NET) . . . . . 9,325,877 MHHe 16.9 MMMMMMMMMMMMMMM

4. ENERGY NOT PRODUCED FOR OTHER REASONS (NET) . . . . . . . 2,489,476 MHHe 4.5 POTENTIAL ENERGY PRODUCTION IN THIS PERIOD BY UNITS IN COMMERCIAL OPERATION 35,261,785 MHHe 100.0% TOTAL CUsing Maximum Dependable Capacity Net)
5. ENERGY NOT PRODUCED DUE TO HRC-REQUIRED OUTAGES . . . . . MHHe
6. ENERGY NOT PRODUCED DUE TO NRC RESTRICTED POWER LEVELS. . ....... MHHe 0 UNIT (S) HITH NRC RESTRICTION PERCENT OF MWHE LOST MMMMMMMMMMMMMMM NUMBER HOURS CLOCK TIME PRODUCTION M OUTAGE M 1. FORCED OUTAGES DURING REPORT PERIOD . . . . 55 9,712.3 14.6 9,325,877 M DATA M 2. SCHEDULED OUTAGES DURING REPORT PERIOD. . . 41 17,341.1 26.1 13,635,047 nuMMMMMMMMMMMMM TOTAL 96 27,053.4 40.8 22,960,924 MHHE LOST PRODUCTION = Down time X maximum dependable capacity not Rrport Period APR 1986 PAGE 1-2

M0NTHLY HIGHLIGHTS

 =-                                --

NUMBER HOURS LOST u%MMMMMMhMMMMMM A - Equipment Failure . . . . . . . . . . . . . . 38 5,664.3 N REASONS M B - Maintenance or Test . . . . . . . . . . . . . 15. 1,094.5 M FOR M C - Refueling . . . . . . . . . . . . . . . . . . 29 16,020.1 M SHUTDOHNS M D - Regulatory Restriction. . . . . . . . . . . . 0 0.0 uuMMMMMMMMMMMMM E - Operator Training & License Examination . . . 0 0.0 F - Administrative. . . . . . . . . . . . . . . . 5 3,595.0 G - Operational Error . . . . . . . . . . . . . . 8 560.9 H - Other . . . . . . . . . . . . . . . . . . . . 1 118.8 TOTAL 96 27,053.4 MuxuMMMMMMMMMMM MDC (MHe Net) PONER LIMIT (MHe Net) TYPE , M DERATED M ARKANSAS 1 836 682 Self-imposed M UNITS M BYRON 1 M29 M52 Self-imposed Mr%NMMMMMMMMMMM FORT ST VRAIN 330 115 Self-imposed GRAND GULF 1 M08 700 Self-imposed SAN ONOFRE 1 436 390 Self-imposed umurMMMMMMMMMMM UNIT REASON UNIT RESbN UNIT REASON UNIT REASON M SHUTDONNS M BROHNS FERRY 1 F BROWNS FERRY 2 F BROHNS FERRY 3 F BRUNSHICK 1 A L M GREATER M BRUNSHICK 2 C CALLAHAY 1 C COOK 2 C CRYSTAL RIVER 3 A M THAN 72 HRS M DAVIS-BESSE 1 A DRESDEN 2 B DRESDEN 3 C EUANE ARNOLD B M EACH M FARLEY 2 C FORT ST VRAIN A GRAND GULF 1 G HADDAM NECK C uxxxwMMMMMMMMMM HATCH 1 C HATCH 2 A INDIAN POINT 2 C INDIAN PDINT 3 H KEHAUNEE C LA CROSSE C LASALLE 1 C MCGUIRE 2 C i NINE MILE POINT 1 C NORTH ANNA 2 A OCONEE 1 A,C OYSTER CREEK 1 C PALO VERDE 1 A PEACH BOTTOM 2 B PEACH BOTTOM 3 A PILGRIM 1 A,A POINT BEACH 1 C PRAIRIE ISLAND 1 C QUAD CITIES 1 C RANCHO SECO 1 A , SALEM 1 C SAN ONOFRE 1 C SAN ONOFRE 2 C SEQUOYAH 1 F SEQUOYAH 2 F ST LUCIE 2 C SUSQUEHANNA 1 C THREE MILE ISLAND 1 B TROJAN C TURKEY POINT 3 A TURKEY POINT 4 C VERMONT YANKEE 1 C HASHINGTON NUCLEARM C HOLF CREEK 1 G l i i RrPsrt Period APR 1986 FAGE 1-3

Unit Availability, Capacity Forced Outage Avg. Unit Percentage o. of 84-38-86 Percent 188 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Avetlability Factor 98 - 88 - Capooity 78

                                                                                                                     /^

Factor 00C) m ~sr , j%\ P\ D. Capacity

                   - r-M    ~
                            's Js. fn                                    . y 4' y                           .-

Factor (DER) Fore d Outage Rat. 3 ~ ~~ 28 A .A y U 18 -

                                        \/-[N[                           f v.V .I                                                                  N-e                                                                                                                                ,

JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JAN 1982-APR 1986 R:psrt Period APR 1986 PAGE 1-4

AVERAGE DAILY POWER LEVEL FOR ALL COMMERCIALLY OPERATING UNITS i E. g- SUM OF 100 - 77703 (1000 8 10 This chart depicts the average daily power level for tha units in commercial operation during the month. Tha straight line on the graph labelled " SUM OF MDC" is plotted at the value shown by summing the separate y g;- maximum dependable capacities of the commercially z _g C operating units (in Net MWe). The plot shown below M g;' ths line is calculated by summing the separate average daily power levels of the same units for each day of a I the month. M Ei z Tha scale on the left vertical axis runs in 1,000 -

                                                                    >< S ..

MHa increments from 0 to 55,000 MWo (Net). The right vartical axis shows the percentage in 10% increments, a y m; -8 g up to 100% of the " SUM OF MDC". He. a E It should be recognized that the 100% line would be ky g; obtainable only if all of the commercially operating 2 - w units operated at 100% capacity, 24 hours per day, for the entire month. In other words, since any power y; g-O gnnerator .aust occasionally shut down to refuel and/or W 2 perform needed maintenance, and also since 100% E ~S c, capacity production is not always required by power R' demands, the 100% line is a theoretical goal and not F4

 .a practical one.                                                   y                                                                 -

_3 H @ -. C O - H "ai

                                                                                                                                              -8 22 m-O                                         -

s s a a

                                                                                                                                              -O s     i O                        5    10      15    20  25 30 DfUS PAGE 1-5 Raport Period APR 1986 t

I

i Vender Average Capacity Facters A. OF 94-38-06 Percent 100 l Generol El etrio 90 - as - - N '-

                                                              /                                      \   '

M \

              & Wilcox           3       ~ ___._    y'. M
                                                                   ~

N ' . N N ,N,'s - 68

                                        /            \                                                           N.N --

Ca h.-tion N Engin.oring E ~

                                                                                           ^%
                                                                                                         'N Voetinghcx.mo               _
        ~'

3 - 10 - g i i DEC JAN FEB MAR APR APR 1986 NOTE: This display of average capacity factors provides a general performance comparison of plants supplied by the four nuclear l steam supply system plantvendors. One must may be be careful when drawing conclusions regarding(the reasons fordesigns the performance levels ledicated, since performance affected by unspecified factors such ass 1) various plant and models are included for each vendors (2) turbine / generators and (3) different architect / engineers are also involved. Ripsrt Period APR 1986 PAGE 1-6

AVERAGE CAPACITY FACT 0RS BY VEND 0RS --_______ . _ = . _ _ _ - -- -- ---

                                                                  -         =-           .___ __ ----------                  _ - - -            ==. ==- -                   - - - . - - - = = - - - - - -----                                                    ------

MMMMMMMMMMMMMMM CFMDC CFMDC CFMDC CFMDC M GENERAL M 0.0 BROHNS FERRY 1 0.0 BROWNS FERRY 2 0.0 BROHNS FERRY 3 68.7 BRUNSHICK 1 K ELECTRIC M 0.0 BRUNSHICK 2 63.9 COOPER STATION 75.1 DRESDEN 2 0.0 DRESDEN 3 MMMMMMMMMMMMMMX 69.1 DUANE ARNOLD 89.9 FITZPATRICK 51.3 GRAND GULF 1 0.0 HATCH 1 66.1 HATCH 2 0.0 LASALLE 1 96.4 LASALLE 2 100.0 LIMERICK 1 99.2 MILLSTONE 1 68.1 MONTICELLO 0.0 NINE MILE POINT 1 29.9 OYSTER CREEK 1 85.2 PEACH BOTTOM 2 38.7 PEACH BOTTOM 3 11.9 PILGRIM 1 74.6 QUAD CITIES 1 96.1 QUAD CITIES 2 8.4 SUSQUEHANNA 1 98.9 SUSQUEHANNA 2 0.0 VERMONT YANKEE 1 0.0 HASHINGTON NUCLEAR 2


---------------- __ - - _ _ = ==- =-- _ ---========__ -_ --

MMMMMMMMMMMMMMM CFMDC CFMDC CFMDC CFMDC M BABCOCK & M 76.4 ARKANSAS 1 0.0 CRYSTAL RIVER 3 0.0 DAVIS-BESSE 1 0.0 OCONEE 1 M HILCOX M 96.7 OCONEE 2 99.0 DCONEE 3 0.0 RANCHO SECO 1 17.1 THREE MILE ISLAND 1 MMMMMMMMMMMMMMM MMMMMMMMMMMMMMM CFMDC CFMDC CFMDC CFMDC M COMBUSTION M 92.8 ARKANSAS 2 105.7 CALVERT CLIFFS 1 105.3 CALVERT CLIFFS 2 99.3 FORT CALHOUN 1 M ENGINEERING M 91.2 MAINE YANKEE 98.4 MILLSTONE 2 77.5 PALISADES 0.0 PALO VERDE 1 MMMMMMMMMMMMMMM 0.0 SAN ONOFRE 2 95.8 SAN ONOFRE 3 99.6 ST LUCIE 1 15.4 ST LUCIE 2 97.9 HATERFORD 3

                                                         ------ _                    =------=--             ==------                      -
                                                                                                                                                               ==-----                   -------------------------------------

MMMMMMMMMMMMMMM CFMDC CFMDC CFMDC CFMDC M HESTINGHOUSEX 93.6 BEAVER VALLEY 1 93.2 BYRON 1 20.0 CALLAHAY 1 92.4 CATAWBA 1 MMMMMMMMMMMMMMM 90.7 COOK 1 0.0 COOK 2 100.9 DIABLO CANYON 1 83.2 DIABLO CANYON 2 99.4 FARL EY 1 12.1 FARLEY 2 104.4 GINNA 0.0 HADDAM NECK 0.0 INDIAN POINT 2 83.0 INDIAN POINT 3 23.0 KEHAUNEE 88.7 MCGUlRE 1 0.0 MCGUIRE 2 80.2 MILLSTONE 3 99.2 NORTH ANNA 1 51.1 NORTH ANNA 2 36.7 POINT BEACH 1 96.8 POINT BEACH 2 63.3 PRAIRIE ISLAND 1 102.2 PRAIRIE ISLAND 2 105.5 ROBINSON 2 0.0 SALEM 1 89.0 SALEM 2 0.0 SAN ONOFRE 1 0.0 SEQUOYAH 1 0.0 SEQUOYAH 2 96.4 SUMMER 1 97.5 SURRY 1 98.4 SURRY 2 36.9 TROJAN 71.7 TURKEY POINT 3 0.0 TURKEY POINT 4 36.7 HOLF CREEK 1 102.5 YANKEE-ROHE 1 97.5 ZION 1 99.3 ZION 2


_=== = = - _ ------- ------------ _ =

Units excluded are: MMMMMMMMMMMMMMX BIG ROCK POINT Capacity factor in this page, denoted as CFMDC, is a function of the net maximum M OTHER INFO M DRESDEN 1 dependable capacity. See the corresponding definition in the glossary. The MMMMMMMMMMMMMMM FORT ST VRAIN vendor averages are computed by the formula HU1BOLDT BAY LACROSSE Not Electrical Energy Produced by Vendor x 100% THREE MILE ISLAND 2 ------- --- - -- -- - ===- =- = Potential Electrical Production by Vendor in this Month GE BHRs West PHRs Comb PHRs B8N PHRs ALL PHRs NET ELECTRICAL ------- --------- --------- -------- -------- PRODUCTION.......... 7,740,412 14,333,382 5,911,838 1,755,454 22,000,674 MDC NET................ 24,552 34,436 11,522 6,746 52,704 CFMDC.................. 43.8 59.3 71.4 36.2 59.0 Report Period APR 1986 PAGE 1-7

1 MEM0RAHDA THE FOLLOWING UNITS USE WEIGHTED AVERAGES TO CALCULATE CAPACITY FACTORS: ITEM 22 ITEM 22 . 23 BIG ROCK POINT 1 GINHA CALVERT CLIFFS 1 82 HADDAM HECK (CONNECTICUT YANKEE) FARLEY 1 MAINE YANKEE FITZPATRICK MILLSTONE 2 FORT CALHOUN 1 OCONEE 1, 2, 8 3 INDIAN POINT 2M YANKEE-ROWE 1 KEWAUNEE OYSTER CREEK 1 POINT BEACH 182 THREE MILE ISLAND 1 TURKEY POINT 3 8 4 NCOMPUTED SINCE 7/1/74, THE DATE OF COMPLETION OF A 100 DAY - 100% POWER OPERATION TEST. THE FOLLOWING UNITS USE THE DATE OF FIRST ELECTRICAL GENERATION INSTEAD OF COMMERCIAL OPERATION, FOR THEIR CUMULATIVE DATA: ITEMS 20 THROUGH 24 ITEM 24 ONLY COOK 1 8 2 BIG ROCK POINT 1 BEAVER VALLEY 1 SAN ONOFRE 1 Meport Period APR 1986 PAGE 1-8

1 l lll llllllll a. 9 1 E G A P A T T R A O D P E D R E T T S R N T E O E H P R G E E R I R U L E N C H Y G E N A L E I S H T U T H N O O A I N Y N O V I L R E H O N R D T R P E N O N N O E O I M N T A S T N D N E N O S O C I I T A V C T E E A R R D R O E C H T N I D E T C E L F E R E R A S E 6 G 8 N 9 A 1 H C R P E A S E d H i o T r e P t

r E o T p O e N R 1,l ll ll
 "                                                                         E    gag sklll Z                                                                         G    LLI O k

9 r as: cz: E c-) O w C at N ClL. W o = I

1. Docket: 50-313 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M ARKANSAS 1 M i
2. Reporting Period: 04/01/86 Outage + On-line Hrs: Z12,1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMxM
3. Utility

Contact:

J. N. GOBELL (501) 964-3251 AVERAGE DAILY P0HER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2568 ggggggg3 g
5. Nameplate Rating (Gross MWe): 1003 X 0.9 = 903
6. Design Electrical Rating (Net MWe): 850
7. Maximum Dependable Capacity (Gross MWe): 883 1500
8. Maximum Dependable Capacity (Not MWe): 836 DESIGN ELCO. RRTING = BSO
                                                                                                           ---...MRX. DEPDO. CRP. - 836 E100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe): 682
11. Reasons for Restrictions, If Any:

FOULING AT THE TUBE SUPPORT PLATE CREVICE. 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.0 99,618.0

{}

13. Houes Reactor Critical 708.5 2,436.5 68,099.6 .. ____________ __..________..... 3g3
14. Rx Reserve Shtdwn Hrs .0 .0 5,044.0
15. Hrs Generator On-Line 698.2 2,418.0 66,676.1 W - U
                                                                                                                                                                   - 80 gj g
                                                                             .0        817.5                                                                            n-
16. Unit Reserve Shtdwn Hrs .0
17. Gross Therm Ener (MHH) 1,420,785 5,166,251 157,751,013 l 18. Gross Elec Ener (MHH) 484,120 1,767,545 52,202,270
19. Het Elec Ener (MHH) 459.109 1,679,295 49,732,171
                                                                                                                                                                 - to
20. Unit Service Factor 97.1 84.0 66.9
21. Unit Avail Factor 97.1 84.0 67.8
22. Unit Cap Factor (MDC Net) 76.4 69.8 59.7 - 20
23. Unit Cap Factor (DER Net) 75.1 68.6 58.7 j
24. Unit Forced Outage Rate 2.9 16.0 15.3 o , , , , , o O 5 10 15 20 25 30
25. Forced Outage Hours 20.8 461.0 __j2,021.5 DAYS
26. Shutdowns Sched Over Next 6 Months ' Type,Date, Duration):

REFUELING: AUGUST 22, 1986 - 10 HEEKS. APRIL 1986

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-002 l

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M Report Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M ARKANSAS 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM lygg Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence No. Date 3 86-004 TO JX REACTOR TRIP DN HIGH RCS PRESSURE DUE TO CONTROL l 8604 04/08/86 F 20.8 A PROBLEMS ON THE MAIN TURBINE GENERATOR. REPLACED POWER SUPPLY TO CORRECT PROBLEM. l l l I

                                                                                     /

l MMMMMMMMMMM ARKANSAS 1 OPERATED HITH 1 OUTAGE DUE TO EQUIPMENT FAILURE IN APRIL. M

SUMMARY

M MMMMMMMMMMM Method System 8 Component Type Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Ooor Error 2-Manual ScramPreparation 3-Auto Scram Instructionsoffor I C-Refueling H-Other Data Entry Sheet D-Regulatory Restriction 4-Continued E-Operator Training 5-Reduced Load Licensee Event Report

                     & License Examination         9-Other         (LER) File (NUREG-0161)                                               PAGE 2-003 T

n:wrzann '77vrawnnamrrnwncz 22~: cts M ARKANSAS 1 x m 7:wwwwwzunw zntz innzuzurrrrrun w22 FACILITY D#TA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTII.ITY STATE.................... ARKANSAS LICENSEE.. ......... .... ARKANSAS PCHER & LIGHT COUNTY... ... ....... POPE CORPORATE ADDRESS........ NINTH & LOUISIANA STREETS LITTLE ROCK, ARKANSAS 72203 DIST AND DIRECTION FROM NEAREST POPULATION CTR. .6 MI HNH OF CONTRACTOR RUSSELLVILLE, AR ARCHITECT / ENGINEER.. ....BECHTEL TYPE OF REACTOR.. .........PHR NUC STEAM SYS SUPPLIER. . BABCOCK & HILCOX DATE INITIAL CRITICALITY... AUGUST 6, 1974 CONSTRUCTOR... ....... .BECHTEL DATE ELEC EtlER 1ST GENER... AUGUST 17, 1974 TURBINE SUPPLIER... . . .HESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 19, 1974 REGULATORY INFORMATION CONDEt4SER COOLING METHOD. .ONCE THRU IE REGION RESP 0tlSIBLE......IV l CONDEt4SER COOLING HATER. .DARDANELLE RESERVOIR IE RESIDENT INSPECTOR......B. JOHNSON l ELECTRIC RELIABILITY .G. VISSING COUNCIL. . .. .SOUTHHEST P0HER POOL LICENSING PROJ MANAGER. . . 50-313 DOCKET NUMBER.. .. LICENSE & DATE ISSUANCE. ..DPR-51, MAY 21, 1974 PUBLIC DOCUMENT ROOM. . ARKANSAS TECH UNIVERSITY , RUSSELLVILL E, ARKANSAS 72801 ( INSPECTION STATUS INSPECTION

SUMMARY

IllSPECTION CONDUCTED MAY 20-24, 1985 (85-11) Ari ANNOUtlCED APPRAISAL OF THE EMERGENCY RESPONSE FACILITIES (ERF'S) HAS CONDUCTED TO DETERt1INE IF THE LICENSEE HAD SUCCESSFULLY IMPLEMENTED THE REQUIREMENTS IN SUPPLE!1Et1T 1 TO NUREG-0757 AND REGULATI0t4S. THE APPRAISAL INCLUDED THE TECHNICAL SUPPORT CEtiTER (TSC), OPERATIONAL SUPPORT CEt4TER (OSC), EMERGENCY OPERATIONS FACILITY (EOF), j BACKUP EOF AND TSC, THE EMERGEllCY DATA ACQUISITI0t4 SYSTEMS AS HELL AS THE IllSTRUMErlTATION, SUPPLIES AND EQUIPMEt4T FOR THESE FACILITIES. THE APPRAISAL INVOLVED 360 HOURS OtiSITE BY 11 HRC INSPECTORS AND NRC CONTRACTORS. HITHIN THE EMERGENCY RESPONSE FACILITIES INSPECTED, NO VIOLATIONS OR DEVIATI0tlS HERE IDENTIFIED. INSPECTION CONDUCTED DEC.16-19, 1985 (85-28) ROUTINE, UNANNOUNCED ItiSPECTION OF LICENSEE'S RADI0 ACTIVE HASTE SYSTEMS INCLUDING: mat 3AGEMENT ORGAt1IZATI0t3S; TRAINIl4G AND QUALIFICATI0tlS; RADI0 ACTIVE LIQUID AND GASEOUS EFFLUENT RELEASE; RECORDS AND REPORTS OF RADIDACTIVE EFFLUEtJTS; PROCEDURES FOR C0HIROLLING EFFLUENT RELEASE; TESTING OF AIR CLEANING SYSTEMS; INSTRUMENTATION; RADI0 CHEMISTRY AND PLANT QUALITY CONTROLS; AND LICEf1SEE AUDITS. THE INSPECTION It1VOLVED 59 INSPECTOR-HOURS ONSITE BY ONE NRC Ills P ECT O R . HITHIt1 THE AREAS IllSPECTED NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. l ItJSPECTI0tJ CotJDUCTED J All.27-31, 1986 (86-04) ROUTINE, UNANNDUNCED It4SPECTION OF THE LICENSEE'S EMERGENCY PREPAREDNESS TRAINING l PROGRAM, INCLUDING FOLLOHUP OF PREVIOUSLY IDENTIFIED ITEMS, PERSONNEL PROFICIENCY, AND TRAINING RECORDS. HITHIN THE AREA INSPECTED, VIOLATIONS HERE IDENTIFIED AND SIXTEEN OPEN ITEMS FROM PREVIOUS INSPECTIONS HERE CLOSED. INSPECTIDH CONDUCTED FEB.18-21, 1986 (86-05) ROUTINE, UNANNOUNCED INSPECTION OF THE LICENSEE'S RADIOLOGICAL ENVIRON-MENTAL MONITORING PROGRAM (ret 1P) INCLUDING: ORGAtlIZATION AND MANAGEMENT C0t4TROLS; QUALIFICATIONS AND TRAINING; RADIOLOGICAL INVIRONMENTAL MONITOR-ING PROGRAM; METEOROLOGICAL MONITORING PROGRAM; FACILITIES, EQUIPMENT AND SUPPLIES; QUALITY CONTROL OF PAGE 2-004

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 19'6 INSPECTION STATUS - (CONTINUED) M ARKANSAS 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

RADIOLOGICAL ANALYTICAL MEASUREMENTS; QUALITY ASSURANCE (QA) PROGRAM; CONTRACTOR ACTIVITIES; AND REPORTABLE OCCURRENCES. HITHIN THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. THREE PREVIOUSLY IDENTIFIED OPEN ITEMS HERE CLOSED. INSPECTION CONDUCTED MARCH 17-21, ta84 (86-07) ROUTINE, UNANNDUNCED INSPECTION OF THE LICENSEE'S RADICACTIVE MATERIAL TRANSPORTATID'8 PROGRAM, LOH-LEVEL RADI0 ACTIVE HASTE STORAGE FACILITY, AND SOLID RADIDACTIVE WASTE MANAGEMENT. HITHIN THE AREAS INSPECTED, f JIOLATION HAS IDENTIFIED. NO DEVIATIONS HERE IDENTIFIED. INSPECTION CL.4 DUCTED MARCH 17-21, 1986 (86-09) ROUTINE, UNANNOUNCED INSPECTION OF CALIBRATION OF PLANT INSTRUMENTATION AND FIRE PROTECTION / PREVENTION PROGRAM. HITH THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: POWER LIMITED TO ABOUT 88% DUE TO HIGH INDICATED HATER LEVEL IN THE A DTSG CAUSED BY SECOUNDARY SIDE FOULING. ( FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: MAINTENANCE OUTAGE LAST IE SITE INSPECTION DATE: MARCH 17-21, 1986 INSPECTION REPORT NO: 50-313/86-09 REPORTS FR0M LICENSEE

   ==================================================================================================================================

NUMBER DATE OF DATE 3F SUBJECT EVENT REPORT -- -------_ --------------- 86-003 2/13/86 3/15/86 BREACHES IN CONTROL ROOM ISOLATION INTEGRITY CAPABILITY

   ==================================================================================================================================

PAGE 2-005 l

50-368 0PERATING STATUS MuxsunzuunuuunnurnursuzuuM:rgunzznnMa

1. Docket u ARKANSAS 2 M
2. Reporting Period: 04/01/86 Outage + On-line Hes: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts D. F. HARRISON (501) 964-3743 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MHt): 2815 RRKRNSRS 2
5. Nameplate Rating (Gross MWe): 943
6. Design Electrical Rating (Net MHe): 912
7. Maximum Dependable Capacity (Gross MWe): 897 1sm3 858 DCSION ELOC. RRTING = 912
8. Maximum Dependable Capacity (Net MWe):
                                                                                  .. .. Pf0C. DEPDO. CfF. -                  858 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE l

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any NONE 1000 -

MONTH YEAR CUMULATIVE reo oms at ==m unnot artirou. caserflows

12. Report Period Hrs 719.0 2.879.0 53,447.0 E3 s -- ,yg _

38,481.0

                                                                                 '-----------------------=               ---       ---- -    -100
13. Hours Reactor Critical 683.3 2.799.0 1,430.1
14. Rx Reserve Shtdwn Hrs .0 .0 2,777.5 37,213.2 _ go
15. Hrs Generator On-Line 663.3 g Q-
16. Unit Reserve Shtdwn Hrs .0 .0 75.0
17. Gross Therm Ener (MHH) 1,810,739 7,711.679 94,749,029
                                                                                                                                            - 80 sa3 601,385 2,571,809      31,061,051
18. Gross Elec Ener (MWH)
19. Het Elec Ener (MHH) 572,640 2,456,111 29,565,227 g
                                                                                                                                            - 40
20. Unit Service Factor 92.3 96.5 69.6
21. Unit Avail Factor 92.3 96.5 69.8 i t
                                                                                                                                            - 20
22. Unit Cap Factor (MDC Net) 92.8 99.4 64.5
23. Unit Cap Factor (DER Net) 87.3 93.5 60.7
24. Unit Forced Outage Rate 7.7 3.5 15.9 0 , , , , , o O 5 to 15 20 25 30
25. Forced Outage Hours 55.7 101.5 7.058.7 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

frRIL 1986 REFUELING: 06/13/86 - 7 WEEKS.

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-006 l

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M ARKANSAS 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Tyre Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence l 8603 04/21/86 F 32.9 A 3 86-04 AB IL UNIT TRIP FOLLOHING LOSS OF "D" REACTOR COOLANT PUMP. THE PUMP TRIPPED DUE TO AN ELECTRICAL SHORT HHI REPLACING A LIGH' BULB AT THE REMOTE SHUTDOHN PANEL. 8604 04/26/86 F 22.8 A 3 86-07 AB CAP UNIT TRIP FOLLOHING LOSS OF "D" RCP DUE TO A FAILED STARTING SURGE CAPACITOR. THE CAPACITOR HAS REPLACED AND THE UNIT RETURNED TO POWER. l MMMMMMMMMMM ARKANSAS 2 OPERATED HITH 2 OUTAGES DUE TO EQUIPMENT FAILURE. M

SUMMARY

M MMMMMMMMMMM Type Reason Method System 8 Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Shcat E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination       9-Other          (LER) File (HUREG-0161)

PAGE 2-007 l

cn===nu=%2ursusunu==rrmanrnnurxcumnu u ARKANSAS 2 u x==m=usmumu=mmuum=muunnnmuumrm:sunux FACILITY DATA Rep:rt Peried APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... ARKANSAS LICENSEE................. ARKANSAS POWER 8 LIGHT COUNTY..... ........... . POPE CORPORATE ADDRESS........ NINTH & LOUISIANA STREETS LITTLE ROCK, ARKANSAS 72203 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 6 MI HNH OF CONTRACTOR RUSSELLVILLE, AR ARCHITECT / ENGINEER.. ....BECHTEL TYPE OF REACTOR. ..........PHR NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY... DECEMBER 5, 1978 CONSTRUCTOR... ... ......BECHTEL DATE ELEC ENER 1ST GENER. . DECEMBER 26, 1978 TURBINE SUPPLIER. . . . . . . . . GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH 26, 1980 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOHER IE REGION RESPONSIBLE......IV CONDENSER COOLING HATER....DARDANELLE RESERVOIR IE RESIDENT INSPECTOR......H. JOHNSON ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....R. LEE COUNCIL............ .....SOUTHHEST POWER POOL DOCKET NUMBER........... 50-368 LICENSE & DATE ISSUANCE....NPF-6, SEPTEMBER 1, 1978 PUBLIC DOCUMENT ROOM....... ARKANSAS TECH UNIVERSITY RUSSELLVILLE, ARKANSAS 72801 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION CONDUCTED MAY 20-24, 1985 (85-11) AN ANNOUNCED APPRAISAL OF THE EMERGENCY RESPONSE FACILITIES (ERF'S) HAS CONDUCTED TO DETERMINE IF THE LICENSEE HAD SUCCESSFULLY IMPLEMENTED THE REQUIREMENTS IN SUPPLEMENT 1 TO NUREG-0737 AND REGULATIONS. THE APPRAISAL INCLUDED THE TECHNICAL SUPPORT CENTER (TSC), OPERATIONAL SUPPORT CENTER (OSC), EMERGENCY OPERATIONS FACILITY (EOF), BACKUP EOF AND TSC, THE EMERGENCY DATA ACQUISITION SYSTEMS AS HELL AS THE INSTRUMENTATION, SUPPLIES AND EQUIPMENT FOR THESE FACILITIES. THE APPRAISAL INVOLVED 360 HOURS ONSITE BY 11 NRC INSPECTORS AND NRC CONTRACTORS. HITHIN THE EMERGENCY RESPONSE FACILITIES INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION CONDUCTED DEC.16-19, 1985 (85-29) ROUTINE, UNANNOUNCED INSPECTION OF LICENSEE'S RADI0 ACTIVE HASTE SYSTEMS INCLUDING: MANAGEMENT ORGANIZATIONS; TRAINING AND QUALIFICATIONS; RADI0 ACTIVE LIQUID AND GASEOUS EFFLUENT RELEASE; RECORDS AND REPORTS OF RADICACTIVE EFFLUENTS; PROCEDURES FOR CONTROLLING EFFLUENT RELEASE; TESTING OF AIR CLEANING SYSTEMS; INSTRUMENTATION; RADI0 CHEMISTRY AND PLANT QUALITY CONTROLS; AND LICENSEE AUDITS. THE INSPECTION INVOLVED 59 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR. HITHIN THE AREAS INSPECTED NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION CONDUCTED JAN.27-31, 1914 (86-04) ROUTINE, UNANNOUNCED INSPECTION OF THE LICENSEE'S EMERGENCY PREPAREDNESS TRAINING PROGRAM, INCLUDING FOLLOHUP OF PREVIOUSLY IDENTIFIED ITEMS, PERSONNEL PROFICIENCY, AND TRAINING RECORDS. HITHIN THE AREA INSPECTED, VIOLATIONS HERE IDENTIFIED AND SIXTEEN OPEN ITEMS FROM PREVIOUS INSPECTIONS HERE CLOSED. INSPECTION CONDUCTED FEB.18-21, 1986 (86-05) ROUTINE, UNANNOUNCED INSPECTION OF THE LICENSEE'S RADIOLOGICAL ENVIRON-MENTAL MONITORING PROGRAM (REMP) INCLUDING: ORGANIZATIDH AND MANAGEMENT CONTROLS; QUALIFICATIONS AND TRAINING; RADIOLOGICAL INVIRONMENTAL MONITOR-ING PROGRAM; METEOROLOGICAL MONITORING PROGRAM; FACILITIES, EQUIPMENT AND SUPPLIES; QUALITY CONTROL OF PAGE 2-008

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M ARKANSAS 2 N Report Period APR 1986 INSPECTION STATU$ - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM IN3PECTION

SUMMARY

RADIOLOGICAL ANALYTICAL MEASUREMENTS: QUALITY ASSURANCE (QA) PROGRAM; CONTRACTOR ACTIVITIES; AND P.EPORTABLE OCCURRENCES. HITHIN-THC AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. THREE PREVIOUSLY IDENTIFIED OPEN ITEMS HERE CLOSED. INSPECTION CONDUCTED MARCH 17-21, 1986 (86-07) ROUTINE, UNANNOUNCED INSPECTION OF THE LICENSEE'S RADI0 ACTIVE MATERIAL TRANSPORTATION PROGRAM, LOH-LEVEL RADI0 ACTIVE HASTE STORAGE FACILITY, AND SOLID RADIDACTIVE HASTE MANAGEMENT. MITHIN THE AREAS INSPECTED, ONE VIOLATION HAS IDENTIFIED. NO DEVIATIONS HERE IDENTIFIED, INSPECTION CONDUCTED MARCH 17-21, 1986 (86-09) ROUTINE, UNANNOUNCED INSPECTION OF CALIBRATION OF PLANT INSTRUMENTATIO:4 AND FIRE PROTECTION / PREVENTION PROGRAM. WITH THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: POWER OPERATION LAST IE SITE INSPECTION DATE: MARCH 17-21, 1986 IOSPECTION REPORT NO: 50-368/86-09 REPORTS FR0M LICENSEE

        ============================================================================================================================S=====

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT ._ _ 86-001 2/11/86 3/13/86 REACTOR TRIP DUE TO CLOSURE OF A MAIN STEAM ISOLATION VALVE 86-003 3/12/86 4/11/86 FAILURE OF FIRE DAMPERS

                                                                                                                                       =====
        =====================================================================================================================sss====

PAGE 2-009 L___

1. Docksti 50-334 0PERATING STATUS :fz Mangzrn2:=ntsu==nrn=== =cra M BEAVER VALLEY 1 n
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719,0 MMMMMMMMMuuxxxxxxuuunuxmunuwmumuuuun
3. Utility

Contact:

P. A. SMITH (412) 643-1825 AVERAGE DAILY PONER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2652 BCfWER VALLEY 1
5. Nameplate Rating (Gross MWe): 1026 X 0.9 = 923
6. Design Electrical Rating (Not MWe): 835
7. Maximum Dependable Capacity (Gross MHe): 860 I" '

DESIGN ELEC. RRTING - 835

8. Maximum Dependable Capacity (Net MHe): 810 ...... tWDC. DEPDE). Cfr. - 810 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE . 1000-MONTH YEAR CUMULATIVE El

12. Report Period Hrs 719.0 2.879.0 87,647.0 p peo cres se runerrwn tsent crfma. Ome171cus
13. Hours Reactor Critical 719.0 2,835.6 48,440.5 ,_ __- , ....- V y . ....... -100 F
14. Rx Reserve Shtdwn Hrs .0 .0 4,482.7
15. Hrs Generator On-Line 719.0 2,834.3 46,969.2 h gg
16. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Ener (MHH) 1,776,190 7.224,538 110,248,010 500 - m
18. Gross Elec Ener (MHH) 578,940 2,364.120 35,145,560 1
19. Het Elec Ener (MHH) 545,300 2,232,190 32.768,403 l -10
20. Unit Service Factor 100.0 98.4 56.1
21. Unit Avail Factor 100.0 98.4 56.1
                                                                                                                                                                                                                                                               -30
22. Unit Cap Factor (MDC Net) 93.6 95.7 49.7
23. Unit Cap Factor (DER Net) 90d 92.9 48.3 0
24. Unit Forced Outage Rate .0 1.6 22.8 0 5 1'O l's ~$0 $5 30
25. Forced Outage Hours .0 44.7 18,534.9 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

FIPRIL 1988 FIFTH REFUELING - MAY 16, 1986: 93 DAYS. *

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-010

( t MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Rrport Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M BEAVER VALLEY 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Type Hours Reason Method LER Number $ygtgm Component Cause & Corrective Action to Prevent Recurrence 5 04/09/86 F 0.0 B 5 CH VALVEX POWER LEVEL HAS REDUCED SO THAT MAINTENANCE COULD BE PERFORMED ON MAIN FEEDHATER FLOH CONTROL VALVE (FCV-FH-488). REPAIRS COMPLETE AT 1410 ON THE 10TH. POWER LEVEL RETURNED TO A NOMINAL 100 PERCENT ON THE 11TH. 1 uur MMMMMMM BEA'iER VALLEY 1 OPERATED HITH 1 REDUCTION FOR MAINTENANCE IN APRIL. M

SUMMARY

M DMHMMMMMMMM Type Reason Method Svstem & Component F-Farced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operatca Training 5-Reduced Load Licensee Event Report

                           & Lice 1se Examination        9-Other         (LER) File (NUREG-0161)

PAGE 2-011

n:Emnzz=s==r=ru====zcunc=unns E=unun u BEAVER VALLEY 1 u n uwnturenunnuuuunrununna nsurn==nnu -FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY a CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... PENNSYLVANIA LICENSEE.................DUQUESNE LIGHT COUNTY................... BEAVER CORPORATE ADDRESS........ONE OXFORD CENTRE, 301 GRANT STREET PITTSBURGN, PENNSYLVANIA 15279 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI E OF CONTRACTOR E. LIVERPOOL, ON ARCHITECT / ENGINEER....... STONE a HEBSTER TYPE OF REACTOR . . . . . . . . . . . .PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY...MAY 10, 1976 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER 1ST GENER. . . JUNE 14, 1976 TURBINE SUPPLIER.........HESTINGN0USE DATE COMMERCIAL OPERATE... 0CTOBER 1, 1976 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TONER IE REGION RESPONSIBL E. . . . . .I CONDENSER COOLING HATER... 0HIO RIVER IE RESIDENT INSPECTOR......H. TROSKOSKI ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....P. TAM COUNCIL.................. EAST CENTRAL AREA DOCKET NUMBER........... 50-334 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-66, JULY 2, 1976 PUBLIC DOCUMENT R00M. . . . . . .B.F. JUNES MEMORI AL LIBRARY 633 FRANKLIN AVENUE ALIQUIFPA, PA 15001 INSPECTION STATUS INSPECTION

SUMMARY

I NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): 1 NO INPUT PROVIDED. PAGE 2-012

                                                                                                                                                                                                                      ~~ ~~ ~ ~ ~ ~ ~ ~
   ~ . _ . -       ..-~-.-n-~.._,.         .-_ . . - - -.              -t    - -, . .    . . _ _ . - . .
                                                                                                     .    . . - - . - .          .       -        2- .-. - -                          .

1 5 i a muMER u2mH"EunnunHun%u2UZuuR:35CuuR3 f BEAVER WALLEY 1 m i Report Period APR 1986 INSPECTION STATUS - (CONTINUED) m unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum l i. OTHER ITEMS

MANAGERIAL ITEMS

, f40 INPUT PROVIDED. l PLANT STATUS: ) NO INPUT PROVIDED. ) LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED.

INSPECTION REPORT NO
NO INPUT PROVIDED.

i REPORTS FR0M LICENSEE j

               ==================================================================================================================================

l NUMBER DATE OF DATE OF SUBJECT j EVENT REPORT .._. 1 ] NO INPUT PROVIDED. 1

 !             ==================================================================================================================================

i 4 i  ; i  ! i i I i e ) + l f PAGE 2-013 1 i 1 l i

1. Docket 50-155 0PERATICG STATUS wunnnManuunannnununMxnnunnnnnnnM:nnM H BIG ROCK POINT 1 M l 2. Reporting Period: 04/01/86 Outage + On-line Hrs 719.0 MMMMMMMMMMMMMMmMMMMMMMMMMMMMMMMMMMMM l 3. Utility

Contact:

LINDA BALCH (616) 547-4537 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 240 SIG ROCK POINT 1
5. Nameplate Rating (G.oss MHe): 70.6 X 0.85 = 60

! 6. Design Electrical Rating (Het MWe): 72 1500 7, Maximum Dependable Capacity (Gross MHe): 73 DESIGN E2.EC. ItRTINS - 72

8. Maximum Dependable Capacity (Net MHe): 69 ,,,__.MRX. DEPDC. CRP. - SS (100%)
9. If Changes Occur Above Since Last Report, Give Reasons' NONE
10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1033-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 202.410.0
13. Hours Reactor Critical 719.0 2.751.4 143.983.2
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line 719.0 2.741.8 141.382.1
16. Unit Reserve Shtdwn Hrs .0 .0 .0 hj
17. Gross Therm Ener (MHH) 148.406 573,084 26.618.353 gas.
18. Gross Elec Ener (MHH) 47.620 182.804 8.423.992
19. Het Elec Ener (MHH) 45.152 173.764 7.965.927
20. Unit Service Factor 100.0 95.2 69.8
21. Unit Avail Factor 100.0 95.2 69.8
22. Unit Cap Factor (MDC fiet) 91.0 87.5 58.6M
23. Unit Cap Factor (DER Not) 87.2 83.8 54.7 100
24. Unit Forced Dutage Rate .0 4.8 14.9 o' s g'o 3's in is ' 30
25. Forced Outage Hours .0 137.2 11.486.3 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE RPRIL 1998

27. If Currently Shutdown Estimated Startup Dates N/A M Item calculated with a Heighted Average PAGE 2-014

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Rcpsrt Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M . BIG ROCK POINT 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM N9, Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 85-02 03/01/86 F 0.0 A 5 SELF IMPOSED POWER REDUCTION AS A RESULT OF A HIGH PRESSURE TURBINE STEAM SEAL PROBLEM. THE PLANT HILL CONTINUE TO OPERATE AT REDUCED P0HER UNTIL THE NEXT APPROPRIATE OPPORTUNITY TO MAKE REPAIRS. unnzuMMMMMM BIG ROCK POINT OPERATED WITH 1 REDUCTION FOR EQUIPMENT FAILURE. ,M

SUMMARY

M MMXKHMMMMMM Tvoe Reason Method Svstem & Componen1 F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-futo Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                      & License Examination       9-Other          (LER) File (NUREG-0161)

PAGE 2-01

        - - . - .               .-                   -_-           _-         - - . . - .-                _- -          . , . . - .- . - . - =                             .

un=nu=unusucu=uunucu2=r==u=mn:02 urn I n BIG ROCK POINT 1 m ug:M gununnsuunMrcumurMM:Mun:Mur:55u FACILITY DATA Report Period APR'1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY j STATE....................MICHICAN LICENSEE................. CONSUMERS POWER l COUNTY...................CHARLEVOIX CORPORATE ADDRESS....... 212 NEST MICHIGAN AVENUE JACKSON, MICHIGAN 49201 ! DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 4 MI NE OF CONTRACTOR j CHARLEVOIX, MICH ARCHITECT / ENGINEER.......BECHTEL TYP E O F R EACTOR . . . . . . . . . . . . BWR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY.. . SEPTEMBER 27, 1962 CONSTRUCTOR..............BCCHTEL l DATE ELEC ENER IST GENER... DECEMBER 8, 1962 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH 29, 1963 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... LAKE MICHIGAN IE RESIDENT INSPECTOR......S. GUTHRIE ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....T. ROTELLA 4 COUNCI L . . . . . . . . . . . . . . . . . . EAST CENTRAL AREA DOCKET NUMBER........... 50-155 RELIABILITY COORDINATION

;                                                         AGREEMENT                          LICENSE & DATE ISSUANCE....DPR-6, AUGUST 30, 1962 5

PUBLIC DOCUMENT ROOM....... NORTH CENTRAL MICHIGAN COLLEGE '

1515 H0HARD STREET 1 PETOSKEY, MICHIGAN 49770 INSPECTION

SUMMARY

INSPECTION STATUS [ i i INSPECTION ON JANUARY 24 THROUGH APRIL 8 (86004): ROUTINE, UNANNOUNCED INSPECTION CONDUCTED BY THE SENIOR RESIDENT INSPECTOR OF LICENSEE ACTIONS ON PREVIOUS INSPECTION FINDINGS, OPERATIONAL SAFETY, MAINTENANCE, LICENSEE EVENT REPORT FOLLOHUP, AND LICENSING ACTIONS. OF THE FIVE AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. NO SIGNIFICANT SAFETY ITEMS HERE IDENTIFIED. 4 - HONEVER, THE QUESTION OF DIESEL FIRE PUMP DEPENDABILITY IN LIGHT OF ITS AGE AND DIFFICULTIES ENCOUNTERED IN OBTAINING PARTS AND l EXPERIENCED SPRAY HATER AS HELLREPAIR AS HATER SERVICE ISPROTECTION FOR FIRE A SOURCEPURPOSES. OF INCREASING CONCERN BECAUSE OF THAT PUMP'S CRUCIAL ROLE IN PROVIDING INSPECTION ON MARCH 18-20 (86006): RELEASE RECORDS AND REPORTS OF EFFLUENTS; EFFLUENT CONTROL INSTRUMENTATIONROUTINE, UNANNOUNCED INSPECTION OF GASEOUS AND L } PROCEDURES FOR CONTROLLING RELEASES; PRIMARY COOLANT CHEMISTRY AND ACTIVITY; GASEQUS EFFLUENT FILTRATION; AND AUDITS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. 4 i ENFORCEMENT

SUMMARY

I NONE i OTHER ITEMS PAGE 2-016, l l 4 i

                                                                ~.

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 INSPECTION STATUS - (CONTINUED) M BIG ROCK POINT 1 M MMMMMMMFMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS OPERATING ROUTINELY LAST IE SITE INSPECTION DATE: 5/20/86 INSPECTION REPORT NO: 85008 REPQRTS FR0M LICENSEE

 ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT

 --      ___    _      _ ----                   __      __ _                                          =_. __-_=_--- _

NONE

 ==================================================================================================================================

PAGE 2-017

1. Dockott 50-259 0pEnATINO STATUS Exur:Mutturuuxxunuuutugn==nunuzuunnu u BROWNS FE'!RY 1
                                                                                                              .           n
2. R:perting Period: 04/01/86 Outtg3 + On-lins Hrs: 219J urnunuunununxxxuuumuxuzum =nunuus=us
3. Utility Contact TED THOM (205) 729-C534 AVERAGE DAILY POWER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 3293 BROWNS FERRY 1
5. Nameplate Rating (Gross MHe): 1280 X 0.9 = 1152
6. Design Electrical Rating (Not MHe): 1065 ISU3
7. Maximum Dependable Capacity (Gross MWe): 1998 DESIGN ELEC. R87ING - 1C35
8. Maximum Dependable Capacity (Not MWe): 1065 ______ r1RX. DEPDC. CAP. - 1065 (200%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MHe):

NO NET POWER OUTPUT THIS MONTH

11. Reasons for Restrictions, If Any:
                                                                                                                            - 100 NONE                                                                1000 -

MONTH YEAR CUMULATIVE 9

12. Report Period Hrs 719.0 2,879.0 102,985.0 p
                                                                                                                            - 90 M
13. Hours Reactor Critical .0 .0 59.520.9 E
14. Rx Reserve Shtdwn Hrs .0 .0 6,996.8
15. Hrs Generator On-Line .0 .0 58,276.4 hf 23
                                                                                                                            - 60  a_
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 0 0 167,963,338 gg3,
18. Gross Elec Ener (MHH) 0 0 55,398,130 . go
19. Not Elec Ener (MHH) -1,559 -11,176 53,705,833
20. Unit Service Factor .0 .0 56.6
21. Unit Avail Factor .0 .0 56.6 - 20
22. Unit Cap Factor (MDC Net) .0 .0 49.0
23. Unit Cap Factor (DER Net) .0 .0 49.0 0
24. Unit Forced Dutage Rate 100.0 100.0 24.4 0 5 d3 d5 do IS 30
25. Forced Outage Hours 719.0 719.0 18,760.1 OOTS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

fFRIL 1986 NONE

27. If Currently Shutdown Estimated Startup Date: 03/15/87 PAGE 2-018 i

T MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M R:pset Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M BROHNS FERRY 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM H9, Date Type Hours Reason Method LER Humber System Component Cause & Corrective Action to Prevent Recurrence F 719.0 F 4 ADMINISTRATIVE HOLD TO RESOLVE VARIOUS TVA 315 06/01/86 AND NRC CONCERNS. unnuMMMMMMM BROWNS FERRY 1 REMAINS SHUTDOWN IN AN ADMINISTRATIVE OUTAGE.

 .R 

SUMMARY

M NMMMMMMMMMM Method Svstem 8 Component Typ* Reason F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Sc. wm Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-operator Training 5-Reduced Load Licensee Event Report

                                       & License Examination       9-Other          CLER) File (NUREG-016I)                                                                           PAGE 2-019

mux : urs : rt:c :::::::: rrent:In=3 n BROWNS FERRY 1 M munuwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE... ................ ALABAMA LICENSEE.... .. .... .. TENNESSEE VALLEY AUTHORITY l COUNTY....... ......... . LIMESTONE CORPORATE ADDRESS....... 500A CHESTHUT STREET T0HER II CHATTANOOGA, TENNESSEE 37401 DIST AND DIRECTION FROM NEAREST POPUL ATION CTR. .10 MI NH OF CONTRACTOR DECATUR, ALA ARCHITECT / ENGINEER.. ... TENNESSEE VALLEY AUTHORITY TYPE OF REACTOR. . .. ....BHR HUC STEAM SYS SUPPLIER. . GENERAL ELECTRIC l DATE INITIAL CRITICALITY... AUGUST 17, 1973 CONSTRUCTOR.. . .. . . . TENNESSEE VALLEY AUTHORITY l l DATE ELEC ENER IST GENER. .0CTOBER 15, 1973 TURBINE SUPPLIER... . . GENERAL ELECTRIC DATE COMMERCIAL OPERATE.. . AUGUST 1, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE.. . .II CONDENSER COOLING HATER.. . TENNESSEE RIVER IE RESIDENT INSPECTOR. . .J. PAULK ELECTRIC RELIABILITY LICENSING PROJ MANAGER. .R. CLARK COUNCIL. .. . . . .. SOUTHEASTERN ELECTRIC DOCKET NUMBER. .50-259 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE. .DPR-33, DECEMBER 20, 1973 PUBLIC DOCUMENT ROOM. . ATHENS PUBLIC LIBRARY SOUTH AND FORREST ATHENS, ALABAMA 35611 INSPECTION STATUS INSPECTION

SUMMARY

   + INSPECTION FEBRUARY 1-28 (66-06):         THIS ROUTINE, INSPECTION INVOLVED 80 RESIDENT INSPECTOR-HOURS Ill THE AREAS OF OPERATIONAL SAFETY, MAIf4TENANCE OBSERVATION, REPORTABLE OCCURRENCES, UNRESOLVED ITEMS, SURVEILLANCE OBSERVATION, PREVIOUS ENFORCEMENT ACTIVITY, HOUSEKEEPING. AND FACILITY MODIFICATIONS. TH0 VIOLATIONS:            1. TECHNICAL SPECIFICATION 6.3 FOR INADEQUATE PROCEDURES, FAILURE TO FOLLOH PROCEDURES, AND CONTROL PROCEDURE CHANGES OF SIX EXAMPLES; CA) FAILURE TO HAVE AN ADEQUATE PROCEDURE FOR FIRE PROTECTION SURVEILLANCE; (B) CHANGING A PROCEDURE USING A TEMPORARY NON-INTENT CHANGE INSTEAD Of A PROCEDURE REVISION; (C) FAILURE TO FOLLOW PROCEDURE DURING CHEMISTRY SAMPLE; (D) FAILURE TO HAVE ADEQUATE PROCEDURE DUE TO NOT INCORPORATING A PREVIOUS HON-INTENT CHANGE; (E) FAILURE TO FOLLON PROCEDURE FOR LOCKING VALVES; AND (F) FAILURE TO PROPERLY CONTROL CLEARANCE TAGS; AND 2.                        TECHNICAL SPECIFICATION 3.5.C.7 FOR FAILURE TO SATISFY THE MINIMUM REQUIRED RESIDUAL HEAT REMOVAL SERVICE HATER (RHRSH) PUMP LIMITING CONDITION FOR OPERATION (LCO).

INSPECTION MARCH 3-7 (86-08): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 24 INSPECTOR-HOURS ON SITE IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS, QUALITY ASSURANCE (QA) PROGRAM ANNUAL REVIEH, DOCUMENT CONTROL, RECORDS, AND LICENSEE ACTION ON PREVIOUSLY IDENTIFIED INSPECTION ITEMS. ONE VIOLATION HAS IDENTIFIED - FAILURE TO PROTECT ITEMS IN STORAGE IN ACCORDANCE HITH ANSI STANDARDS AND LICENSEE PROCEDURES. INSPECTION MARCH 10-12 (86-10): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 8 INSPECTOR-HOURS ON SITE IN THE AREAS OF ORGANIZATION AND MANAGEMENT OF THE HEALTH PHYSICS PROGRAM, TRAINING AND QUALIFICATIONS OF THE FACILITY STAFF, EXTERNAL EXPOSURE CONTROL AND PERSONAL DOSIMETRY, INTERNAL EXPOSURE CONTROL, AND 10CFR 61 HASTE CLASSIFICATION AND CHARACTERIZATION. ONE VIOLATION FOR FAILURE TO FOLLOH PROCEDURES. PAGE 2-020

m., , , 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM BROWNS FERRY 1 N Report Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

INSPECTION MARCH 1-31 (86-11): THIS ROUTINE INSPECTION INVOLVED 68 RESIDENT INSPECTOR-HOURS IN THE AREAS OF OPERATIONAL SAFETY, MAINTENANCE OBSERVATION, REPORTABLE OCCURRENCES, PREVIOUS ENFORCEMENT MATTERS, AND SURVEILLANCE OBSERVATION. ONE VIOLATION: 10CFR 50, APPENDIX B CRITERION V FOR FAILURE TO CONDUCT TESTING OF CARBON SAMPLES OF THE STANDBY GAS TREATMENT SYSTEM IN ACCORDANCE HITH THE TEST REQUIREMENTS. (REFERENCE REPORT 85-57-06.) ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: ENVIRONMENTAL QUALIFICATION HORK. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: SHUTDOWN FOR REPAIRS ON 03/19. LAST IE SITE INSPECTION DATE: MARCH 1-31, 1986 + INSPECTION REPORT NO: 50-259/86-11 + PAGE 2-021

n:Mrcumua MMncnnnnn=h.anMn 2:3 Report Period APR 1985 REP 0RTS FR0M LICENSEE u BROWNS FERRY 1 D MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

                       ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-005 02/10/86 03/11/86 RECEIVED HIGH RADIATION ALARM HHICH INITIATED ACTUATION OF CONTROL ROOM EMERGENCY VENTILATION SYSTEM ON 'A' AND 'B' TRAINS; DUE TO INTERNAL SOURCE MOTOR MOUNTING BRACKET FAILURE. 36-007 02/19/86 03/21/86 UNISTRUT SPACE FRAME SUPPORTS FOR CONTROL NOD DRIVE INSERT AND HITHDRAW LINES HOULD NOT ADEQUATELY SUPPORT DRIVE TUBING DURING DESIGN-BASIS EARTHQUAKE; CAUSE - CONSTRUCTION PERSONNEL ERROR. 86-009 02/15/86 03/17/86 FAILURES EXPERIENCED WITH REACTOR BUILDING VENTILATION RADIATION MONITOR CIRCUITS; CAUSE - JUMPER NOT IN GOOD CONTACT HITH THE TERMINAL POINTS. 86-010 02/26/86 03/28/86 DESIGN ENGINEERS IDENTIFIED CONNECTION OF UNQUALIFIED PIPING TO CONTAINMENT SENSING LINES (TORUS HATER LEVEL) HITHOUT PROPER ISOLATION.

                       =========================================================================================================================g========

l PAGE 2-022

i i I l THIS PAGE INTENTIONALLY LEFT SLANK t I 'I 4 i 3 j i i PAGE 2-023 l 1 i l

1. Docket 50-260 0PERATING STATUS axumnunsunnu=uMxumw=umuzanuunMmmzaus M BROWNS FERRY 2 M
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contact TED THOM (205) 729-0834 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MWt): 3293 BROWNS PERRY 2
5. Nameplate Rating (Gross MWe): 1280 X 0.9 = 1152
6. Design Electrical Rating (Not MWe): 1065
7. Maximum Dependable Capacity (Gross MWe): 1098 Dc!9N E1.EO. RRTING - 1065
8. Maximum Dependable Capacity (Net MWe): 1065 ...... f1RX. DEFEND. ORP. - 1065 (100%)
9. If Changes Uccur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Not MWe):

NO NET POWER DUTPUT THIS MONTH

11. Reasons for Restrictions, If Any: .g NONE gg_

MONTH YEAR CUMULATIVE R

12. Report Period Mrs 719.0 2. 8 7 9 .J 97.896.0 I"*
13. Hours Reactor Critical .0 .q 55,859.6
14. Rx Reserve Shtdwn Hrs .0 .0 14,200.4 os
15. Hrs Generator On-Line 0 .0 54,338.5 k -60
16. Unit Reserve Shtdwn Mrs .0 .0 .0
17. Gross Therm Ener (MWH) 0 0 155,245,167 g .,
18. Gross Elec Ener (MWH) 0 0 50,771,798 .g
19. Het El-c Ener (MMH) -5,447 -19,710 49,245,654
20. Unit Service Factor .0 .0 55.5
21. Unit Avail Factor .0 .0 55.5 - 20
22. Unit Cap Factor (MDC Net) .0 .0 47.2
23. Unit Cap Factor (DER Net) .0 .0 47.2 0
24. Unit Forced Outage Rate 100.Q 100.0 23.8 C' 5 1'O l'5 do is 30
25. Forced Outage Hours 719.0 719.0 17.023.4 08YS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
  • RPRIL 1986 NONE
27. If Currently Shutdown Estimated Startup Date: 12/25/86 PAGE 2-024

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM BROWNS FERRY Z M Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Date Type Hours Reason Method LER Number 112133 Component Cause & Corrective Action to Prevent Recurrence No, F 719.0 F 4 ADMINISTRATIVE HOLD TO RESOLVE VARIOUS TVA AND NRC 1 305 09/15/84 CONCERNS. KuunMMMMMMM BROWNS FERRY 2 - REMAINS SHUTDOWN IN AN ADMINISTRATIVE OUTAGE. M

SUMMARY

M EMMMMMMMMMM Tvoo Reason Method System & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Oth er 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination       9-Other          (LER) File (NUREG-0161)

PAGE 2-025 l

s. _ - ,,

c:=usuuascurnuxasuunw==unuman=ng:Muu x. u BROWNS FERRY 2 m c:Munnurusunnuunusumusuzurnmununnsru FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... ALABAMA LICENSEE. . . . . . . . . . . . . . . . . TENNESSEE VAL L EY AUTHORITY COUNTY................... LIMESTONE CORPORATE ADDRESS. . . . . . . 500A CHESTNUT STREET TOMER II DIST AND DIRECTION FROM - CHATTANOOGA, TENNESSEE 37401 HEAREST POPULATION CTR.. 10 MI NH OF CONTRACTOR DECATUR, ALA ARCHITECT / ENGINEER. . . . . . . TENNESSEE VALL EY AUTHORITY TYPE OF REACTOR............BWR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... JULY 20, 1974 CONSTRUCTOR. . . . . . . . . . . . . . TENNESSEE VALL EY AUTHORITY l DATE ELEC ENER IST GENER... AUGUST 23, 1974 TURBINE SUPPLIER......... GENERAL LLECTRIC DATE COMMERCIAL OPERATE.... MARCH 1, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... TENNESSEE RIVER IE RESIDENT INSPECTOR......J. PAULK ELECTRIC RELIABILITY COUNCIL.................. SOUTHEASTERN ELECTRIC LICENSING PROJ PANAGER.....R. CLARK DOCKET NUMBER'........... 50-260 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-52, AUGUST 2, 1974 PUBLIC DOCUMENT ROOM....... ATHENS PUBLIC LIBRARY SOUTH AND FORREST ATHENS, ALABAMA 35611 INSPECTION

SUMMARY

INSPECTION STATUS

    + INSPECTION FEBRUARY 1-28 (86-06):

SAFETY, ACTIVITY, MAINTENA*1CE HOUSEKEEPING, OBSERVATION, AND FACILITY MODIFICATIONS.REPORTABLE OCCURRENCES, UNRESOLVED ITEMS, SURVEILLANCE OB THQ VIOLATIONS: 1. TECHNICAL SPECIFICATION 6.3 FOR INADEQUATE PROCEDURES, FAILURE TO FOLLON PROCEDURES, AND CONTROL PROCEDURE CHANGES OF SIX EXAMPLES: (A) PROTECTION SURVEILLANCEs (B) TO FOLLOH PROCEDURE DURING CHEMISTRY SAMPLES (D) CHANGING A PROCEDURE USING(C)AFAILURE CHANGES (E) FAILURE TO FOLLOW PROCEDURE FOR LOCKING VALVES; AND (F) FAILURE TO HAVE ADEQUATE PROCEDURE DUE TD NOT INCORPORATING A PR TEMPORAR TECHNICAL CONDITION FOR OPERATION (LCO). SPECIFICATION 3.5.C.7 FOR FAILURE TO SATISFYPUMP THELIMITING MINIMUM REQUI INSPECTION MARCH 3-7 (86-08): ACTION ON PREVIOUS ENFORCEMENT MATTERS, QUALITY ASSURANCE (QA)THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 23 INSPE ACTION ON PREVIOUSLY IDENTIFIED INSPECTION ITEMS. PROGRAM ANNUAL REVIEN, DOCUMENT CONTROL, RECORDS, AND LICENSEE ACCORDANCE HITH ANSI STANDARDS AND LICENSEE PROCEDURES.DNE VIOLATION HAS IDENTIFIED - FAILURE TO PROTECT ITEMS I INSPECTION MARCH 10-12 (86-10): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 7 INSPECTOR-HOURS ON SITE IN TFE AREAS OF ORGANIZATION AND MANAGEMENT OF THE HEALTH PHYSICS PROGRAM, TRAINING AND QUALIFICATIONS OF THE FACILITY ST CONTROL FOR FAILUREAND PERSONAL TO FOLLOW DOSIMETRY. INTERNAL EXPOSURE CONTROL, AND 10CFR 61 HASTE CLASSIFICATION AND CHARACTERIZATION PROCEDURES. . ONE VIOLATION PAGE 2-026 l l l

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 INSPECTION STATUS - (CONTINUED) M BROWNS FERRY 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

INSPECTION MARCH 1-31 (86-11): THIS ROUTINE INSPECTION INVOLVED 66 RESIDENT INSPECTOR-HOURS IN THE AREAS OF OPERATIONAL SAFETY, MAINTENANCE OBSERVATION, REPORTABLE OCCURRENCES, PREVIOUS ENFORCEMENT MATTERS, AND SURVEILLANCE OBSERVATION. DNE VIOLATION: 10CFR 50, APPENDIX B CRITERION V FOR FAILURE TO CONDUCT TESTING OF CARB0H SAMPLES OF THE STANDBY GAS TREATMENT SYSTEM IN ACCORDANCE WITH THE TEST REQUIREMENTS. (REFERENCE REPORT 85-57-06.) ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: SHUTDOHN ON SEPTEMBER 15, 1984 FOR REFUELING OUTAGE. LAST IE SITE INSPECTION DATE: MARCH 1-31, 1986 + INSPECTION REPORT NO: 50-260/86-11 + REP 0RTS FR0M LICENSEE

           ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-002 02/05/86 03/04/86 MOMENTARY LOSS OF SECONDARY CONTAINMENT DUE TO PERSONNEL AIRLOCK FAILURE ATTRIBUTED TO NORMAL HEAR. 86-003 02/26/86 03/28/86 REACTOR PROTECTION SYSTEM TRIP BECAUSE OF TRANSFER SWITCH BEING BUMPED; DUE TO PERSONNEL ERROR.

           ==================================================================================================================================

PAGE 2-027 l

1. Docket 50-296 0PERATING STATUS nurruunu=an==u==uan=cxxuzun n==nrtuM
2. Rrperting Ptried: 04/01/86 M BROHNS FERRY 3 M Outtg3 + On-lins Hros 719.0 MM% MMH M:MME%2EM%M222:M:nnMMMMMMMMMM
3. Utility Contacts TED THOM (205) 729-3624 AVERAGE DAILY POWER LEVEL (MWo) PLOT
4. Licensed Thermal Power (MWt): 3293 3ROWHS FERRY 3
5. Nameplate Rating (Gross MHe): 1280 X 0.9 = 1152
6. Design Electrical Rating (Net MWe): 1065
7. Maximum Dependable Capacity (Gross MWe): 1998 1500
8. Maximum Dependable Capacity (Net MWe): 1065 DESIGN ELDC. RATING - 1085
9. If Changes Occur Above Since Last Report, Give Reasons: ...... FWtX. DEPDC. Cfr. - 1085 1100%)

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any, NO NET POWER OUTPUT THIS MONTH NONE - 1m3 1000 -

MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 80.351.0
13. Hours Reactor Critical .0 .0 45.306.8 - 80 hh
14. Rx Reserve Shtdwn Hrs .0 .0 5.149.4
15. Hrs Generator On-Line .0 .0 44,195.6
16. Unit Reserve Shtdwn Hrs .0 .0 .0 - 80
17. Gross Therm Ener (MHH) 0 0 131.846.076 500-
18. Gross Elec Ener (MHH) 0 0 43.473.760
19. Het Elec Ener (MHH) -3.224 -12.778 42.121.895
                                                                                                                                                          - to
20. Unit Service Factor .0 .0 55.0
21. Unit Avall Factor .0 .0 55.0
                                                                                                                                                          - 30
22. Unit Cap Factor (MDC Net) .0 .0 49.2
23. Unit Cap Factor (DER Net) .0 .0 49.2
24. Unit Forced Outage Rate 100.0 100.0 23.0 0 O
                                                                                    ,      ,       ,      ,     ,                                           o
25. Forced Outage Hours 5 10 15 30 25 30 719.0 719.0 13,10,Z 1 DRYS
26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):

NONE ftPRIL 1988

27. If Currently Shutdown Estimated Startup Date: 03/15/87 PAGE 2-028

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M R:ptet Period APR 1986 UNIT SHUTDDNNS/ REDUCTIONS M BROWNS FERRY 3 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date E Hours Reason LER N ker System Component ,_, cause & Corrective Action to Prevent Recurrence 12/01/85 F 719.0 F 4 ADMINISTRATIVE HOLD TO RESOLVE VARIOUS TVA AND 157 NRC CONCERNS. MMMMMMMMMMM BROHNS FERRY 3 REMAINS SHUTDOWN IN AN ADMINISTRATIVE OUTAGE. M

SUMMARY

M MMMMMMMMMMM Tvne Reason Method Svstem & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

              & License Examination        9-Other         (LER) File (NUREG-0161)

PAGE 2-029

wwuxunnmummwumunuummununexx=umurunnu M BROHNS FERRY 3 M unmunuwuumurmunxmuummunuxummmmmunwxM FACILITY DATA Report Period APR 1956 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION STATE.................... ALABAMA UTILITY L ICENSEE. . . . . . . . . . . . . . . . . TENNESSEE VALL EY AUTHORITY COUNTY...................LINESTONE CORPORATE ADDRESS....... 500A CHESTNUT STREET TOWER II DIST AND DIRECTION FROM CHATTANDOGA, TENNESSEE 37401 NEAREST POPULATION CTR.. 10 MI NH OF CONTRACTOR DECATUR, ALA ARCHITECT / ENGINEER. . . . . . . TENNESSEE VALLEY AUTHORITY TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER. . . GENERAL ELECTRIC DATE INITIAL CRITICALITY... AUGUST 8, 1976 CONSTRUCTOR.............. TENNESSEE VALLEY AUTHORITY DATE ELEC ENER IST GENER... SEPTEMBER 12, 1976 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE. . . . MARCH 1, 1977 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... TENNESSEE RIVER IE RESIDENT INSPECTOR......J. PAULK ELECTRIC RELIABILITY COUNCIL.................. SOUTHEASTERN ELECTRIC LICENSING PROJ MANAGER.....R. CLARK RELIABILITY COUNCIL DOCKET NUMBER........... 50-296 LICENSE & DATE ISSUANCE....DPR-68, AUGUST 18, 1976 PUBLIC DOCUMENT ROOM....... ATHENS PUBLIC LIBRARY SOUTH AND FORREST 4 INSPECTION ATHENS, ALABAMA 35611 INSPECTION

SUMMARY

STATUS

    + INSPECTION FEBRUARY 1-28 (86-06):

SAFETY, MAINTENANCE OBSERVATION, REPORTABLE OCCURRENCES, UNRESOLVED ITEMS, SURVEILLANCE OBSERVA ACTIVITY, HOUSEKEEPING, AND FACILITY MODIFICATIONS. TH0 VIOLATIONS: 1. FAILURE TO FOLLOH PROTECTION PROCEDURES, SULVEILLANCE; (B) AND CONTROL PROCEDURE CHANGES OF SIX EXAMPLES: (A) TECHNICAL SPECIFICATION 6.3 FOR INADEQUATE PROCEDURES TO FOLLOW PROCEDURE DURING CHEMISTRY (D) SAMPLE; CHANGING A PROCEDURE USING A TEMPORARY NON-INTENT CHANGE INS (C) FAILURE CHANGES (E) FAILURE TO FOLLON PROCEDURE FOR LOCKING VALVES: AND (F) FAILURE TO PROPERLY FAILURE TO HAVE CONTROL ADEQUATE CLEARANCE PROCEDURE DUE TAGS; AND 2. TECHNICAL SPECIFICATION 3.5.C.7 FOR FAILURE TO SATISFY THE MINIMUM REQUIRED RESIDUAL CONDITION FOR OPERATION (LCO). HEAT PUMP LIMITING REMOV INSPECTION MARCH 3-7 (86-08) ACTION ON PREVIOUS ENFORCEMENT MATTERS, QUALITY ASSURANCE (QA)THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILE ACTION ON PREVIOUSLY IDENTIFIED INSPECTION ITEMS. ACCORDANCE HITH ANSI STANDARDS AND LICENSEE PROCEDURES. ONE VIOLATION HAS IDENTIFIED - FAILURE TO PROTECT ITEMS IN STO INSPECTION MARCH 10-12 (86-10): ORGANIZATION AND MANAGEMENT OF THE HEALTH PHYSICS PROGRAM, TRAINING AND QUALIFICATI CONTROL AND PERSONAL DOSIMETRY, FOR FAILURE TO FOLLOH PROCEDURES. INTERNAL EXPOSURE CONTROL, AND 10CFR 61 HASTE CLASSIFICATION AND CHARACTERIZATION., E ONE VIOLATION PAGE 2-030 t

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM BROWNS FERRY 3 M R:ptet Period APR 1986 IN$PECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

THIS ROUTINE INSPECTION INVOLVED 66 RESIDENT INSPECTOR-HOURS IN THE AREAS OF OPERATIONAL SAFETY, INSPECTION MARCH 1-31 (86-11): ONE VIOLATION: MAINTEllANCE OBSERVATION, REPORTABLE OCCURRENCES, PREVIOUS ENFORCEMENT MATTERS, AND SURVEILLANCE OBSERVATION. 10CFR 50, APPENDIX B CRITERION V FOR FAILURE TO CONDUCT TESTING OF CARBON SAMPLES OF THE STANDBY GAS TREATMENT SYSTEM IN ACCORDAf4CE WITH THE TEST REQUIREMENTS. (REFERENCE REPORT 85-57-06.) ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: LICENSEE EVALUATING CAUSE OF REACTOR VESSEL HATER LEVEL INDICATION PROBLEMS. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: SHUTDOWN ON MARCH 9, 1985. LAST IE SITE INSPECTION DATE: MARCH 1-31, 1986 + INSPECTION REPORT NO: 50-296/86-11 + REPORTS FR0M LICENSEE

      ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT - NONE.

      ==================================================================================================================================

PAGE 2-031

l

1. Docket: 50-325 0PERATING STATUS HMMO:n ::: nt Z :: En:h5 :M:n ::::::

H BRUNSHICK 1 n

2. R;perting Pcriad 04/01/86 Outtg3 + On-lina Hro 719.0 unt:nnzu nnnann ctz:R:Mumwx3:n:xM:nn
3. Utility

Contact:

FRANCES HARRISON (919) 457-9521 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2436 BRLDNH4ICK 1
5. Nameplate Rating (Gross MWe): 963 X 0.9 = 867
6. Design Electrical Rating (Net MWe): 821
7. Maximun Dependable Capacity (Gross MWe): 815 1883
8. Maximum Dependable Capacity (Net MWe): 790
                                                                                                                                                                                       ,,,,                                                              [                g
9. If Changes occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any:

NONE 1033-MONTH YEAR CUMULATIVE -

12. Report Period Hrs 719.0 2,879.0 79,944.0
13. Hours Reactor Critical 658.4 2.686.6 49,518.0 h
14. Rx Reserve Shtdwn Hrs .0 1,647.1 -100
                                                                                                                                                          .0
15. Hrs Generator On-Line 554.4 2,570.7 46,709.2 ll g
16. Unit Reserve Shtdwn Hrs .0 .0 .0 - 80 E
17. Gross Therm Ener (MHH) 1,230,649 6,035,728 96,142,383 500-
18. Gross Elec Ener (MHH) 404,505 1,988,204 31,739,474 ,,
19. Not Elec Ener (MHH) 390,272 1,929,545 30,488,233
20. Unit Service Factor 77.1 89.3 58.4 - 90
21. Unit Avail Factor 77.1 89.3 58.4
22. Unit Cap Factor (MDC Net) 68.7 84.8 48.3 - 20

, 23. Unit Cap Factor (DER Net) 66.1 81.6 46.5 1

24. Unit Forced Outage Rate 22.9 10.7 17.7 0 , , , ,. , 0 0 5 to 15 20 25 30
25. Forced Outage Hours 164.6 308.3 10,005.7 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE frftIL 1986

27. If Currently Shutdown Estimated Startup Date N/A PAGE 2-032 i

f

i l l MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l Reprrt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M BRUNSHICK 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M No, Date Type Hours keason Method LER Number System Component ~~ Cause & Corrective Action to Prevent Recurrence 86-016 03/26/86 F 161.4 A 4 1-86-009 REACTOR SCRAM-MAIN TURBINE AND REACTOR FEED PUMP TRIP DN HIGH REACTOR HATER LEVEL INSTRUMENT MALFUNCTION. 86-024 04/02/86 F 3.2 A 3 MAIN TURBINE TRIP. 86-020 04/19/86 F 0.0 A 5 HEATER DRAIN PUMP PROBLEMS. 86-022 04/26/86 S 0.0 B 5 ROD IMPROVEMENT. MMMMMMMMMMM BRUNSHICK 1 OPERATED HITH 2 OUTAGES AND 2 REDUCTIONS IN APRIL.

 .M 

SUMMARY

M MMMMMMMMMMM Type Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                & License Examination        9-Other         (LER) File (NUREG-0161)                                                          '

PAGE 2-033 4 4 l

i EMMMZE%MMMMMMM%%M2NHH MEMEM M%M%C%M3 n BRUNSHICK 1 M MrMuurMMuunsxzzusunuaux:MurM2MMMMM:n FACILITY DATA Report Period APR 1986

                                           ' FACILITY DESCRIPTION                                                     UTILITY & CONTRACTOR INFORMATION LOCATION                                                             UTILITY STATE.................... NORTH CAROLINA                               LICENSEE................. CAROLINA POWER & LIGHT COUNTY...................BRUNSHICK                                     CORPORATE ADDRESS........P. O. BOX 1551 RALEIGH, NORTH CAROLINA 27602 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 3 MI N OF                                 CONTRACTOR SOUTHPORT, NC ARCHITECT / ENGINEER....... UNITED ENG. & CONSTRUCTORS TYPE OF REACTOR............BNR                                            HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY.. 0CTOBER 8, 1976                               CONSTRUCTOR..............BROHN & ROOT DATE ELEC ENER IST GENER... DECEMBER 4, 1976 3

TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH 18, 1977 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... CAPE FEAR RIVER IE RESIDENT INSPECTOR......H. RULAND ELECTRIC RELIABILITY COUNCIL.................. SOUTHEASTERN ELECTRIC LICENSING PROJ MANAGER.....E. SYLVESTER RELIABILITY COUNCIL DOCKET NUMBER........... 50-325 i LICENSE & DATE ISSUANCE....DPR-71, NOVEMBER 12, 1976 PUBLIC DOCUMENT ROOM.......SOUTHPORT-BRUNSHICK COUNTY LIBRARY t 108 H. MOORE STREET INSPECTION

SUMMARY

INSPECTION STATUS '

                                                  + INSPECTION MARCH 17-21 (86-09):

INSERVICE INSPECTION - OBSERVATION OF HORK ACTIVITIES AND DATA REVIEN AND EVALUATION.THIS ROUTINE, UNANNOUNCED IN FOLLOH ASME SECTION XI PERIOD REQUIREMENTS FOR THE EXAMINATION OF COMPONENTS. DNE VIOLATION HAS IDENTIFIED - FAILURE TO INSPECTION MARCH 1-31 (86-11): OBSERVATION, SURVEILLANCE OBSERVATION,THIS ROUTINE SAFETY OPERATIONAL INSPECTION SAFETY INVOLVED VERIFICATION, 77 INSPECTOR-HOURS ON SITE IN THE AREAS OF MAINTEhANCE MEETINGS HITH LOCAL OFFICIALS, FOLLOHUP DN UNRESOLVED ITEM, AND PLANT MODIFICATIONS. ENGINEERED SAFETY FEATURES SYSTEM HALKDOHN, INFORM i THREE VIOLATIONS - INADEQUATE ACCEPTANCE i TEST AFTER CORE SPRAY VALVE MOTOR-CPERATOR REPLACEMENT; FAILURE TO FOLLOH PROCEDURE WHEN RECORDING TEST TANK LEVEL AND INADEQUA ' PROCEDURE FOR A STANDBY LIQUID CONTROL (SLC) SYSTEM SURVEILLANCE TEST; FAILURE TO HAVE A PROCEDURE TO VERIFY SLC SYSTEM DISCHA IS FLOODED AFTER INSTALLATION OF RELIEF VALVES PER FSAR COMMITMENT. ENFORCEMENT

SUMMARY

COULD ADVERSELY ACTION BYAFFECT THE FIREASPROTECTION STATUS FPP-013. OF THE DIESEL GENE ! NOTED FOR CORRECTIVE THE LICENSEE'S INSPECTORS REQUIRED BY PROCEDURE i 6.8.1.F, NOT ALL PLANT PERSONNEL ASSIGNED DUTY AS FIRE BRIDADE MEMBERS HAD RECEIVED THE REQUALIFICATION TRAINING AND DRILLCONT PAGE 2-034

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM BRUNSHICK f M Rupert Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l ENFCnfEMENT

SUMMARY

PARTICIPATION REQUIRED BY PROCEDURE FPP-003 TO BE QUALIFIED UNDER THE FIRE PROTECTION PROGRAM. CONTRARY TO 10 CFR 10.103( A)(3), THE REQUIREMENT TO USE SUITABLE MEASUREMENTS OF CONCENTRATIONS1985, OF RADI0 ACTIVE DURING THEMATERIALS IN AIR INSTALLATION OF HERE NOT MET IN THAT HORK AREA AIRBORNE RADI0 ACTIVITY SURVEYS HERE NOT PERFORMED ON DECEMBER 8, THE UNIT 2 FUEL TRANSFER CANAL PROTECTION CHUTE. CONTRARY TO TECHNICAL SPECIFICATION 6.8.1.F, PROCEDURE FPP-013 HAS NOT PROPERLY IMPLEMENTED IN THAT HOUSEKEEPING CONDITIONS WHICH COULD ADVERSELY AFFECT THE FIRE PROTECTION STATUS OF THE DIESEL GENERATOR AND SERVICE HATER CONTRARY BUILDINGS TO TECHNICAL HERE NOT IDENTIFIED SPECIFICATION NOTED FOR CORRECTIVE ACTION BY THE LICENSEE'S INSPECTORS AS REQUIRED BY PROCEDURE FPP-013. 6.8.1.F, NOT ALL PLANT PERSONNEL ASSIGNED DUTY AS FIRE BRIGADE MEMBERS HAD RECEIVED THE REQUALIFICATION TRAINING AND DRILL PARTICIPATION REQUIRED BY PROCEDURE FPP-003 TO BE QUALIFIED UNDER THE FIRE PROTECTION PROGRAM. CONTRARY TO 10 CFR 10.103( A)(3), THE REQUIREMENT TO USE SUITABLE MEASUREMENTS OF CONCENTRATIONS OF RADIDACTIkC MATERIALS IN AIR HERE NOT MET IN THAT WORK AREA AIRBORNE RADI0 ACTIVITY SURVEYS HERE NOT PERFORMED ON DECEMBER 8, 1985, DURING THE INSTALLATION OF THE UNIT 2 FUEL TRANSFER CANAL PROTECTION CHUTE. UNITS 1 AND 2 TECHNICAL SPECIFICATIONS 6.8.2 AND 6.8.3 PERMIT CHANGES TO PROCEDURES OF SPECIFICATION 6.8.1, NHICH INCLUDES PROCEDURES FOR SURVEILL ANCE AND TEST ACTIVITIES OF SAFETY RELATED EQUIPMENT, PROVIDED THE CHANGE IS REVIEHED BY THE PLANT NUCLEAR SAFETY REVIEN COMMITTEE (PHSRC) AND APPROVED BY THE PLANT MANAGER PRIOR TO IMPLEMENTATION (FOR PERMANENT CHANGES); OR, PROVIDED THE CHANGE DOES NOT ALTER THE PROCEDURE'S INTENT, IS APPROVED BY TH0 MEMBERS OF MANAGEMENT (ONE HITH AN SRO LICENSE), IS DOCUMENTED, AND IS REVIEHED BY THE PNSRC AND APPROVED BY THE PLANT MANAGER HITHIN 14 DAYS OF IMPLEMENTATION (FOR TEMPORARY CHANGES). CONTRARY TO THE ABOVE, ON AUGUST 22, 1985 AH NRC INSPECTOR OBSERVED LICENSEE PERSONNEL PERFORMING A TEST OF SAFETY RELATED EQUIPMENT USING A PROCEDURE (2 THP 4030 STP.145, " REACTOR LOGIC TRAIN A AND B AND REACTOR TRIP BREAKERS A AND B") HHICH HAD BEEN CHANGED BY HANDHITTEN REVISIONS, AND THESE CHANGES HAD NOT BEEN SUBJECTED TO EITHER TYPE OF REQUIRED REVIEW, APPROVAL 10 CFR,AND DOCUMENTATION PROCESS. FURTHER REVIEN INDICATED HANDHRITTEN CHANGES HERE RELATIVELY COMMON IN PROCEDURES OF THIS TYPE. APPENDIX B, CRITERION III, AS IMPLEMENTED BY THE D. C. COOK OPERATIONS QUALITY ASSURANCE PROGRAM AND ITS COMMITMENT TO STANDARD ANSI N45.2.11, " QUALITY ASSURANCE REQUIREMENTS FOR THE DESIGN OF NUCLEAR POWER PLANTS," REQUIRES THAT DESIGNS RECEIVE INDEPENDENT VERIFICATION AND THAT THESE DESIGNS BE APPROPRIATELY DOCUMENTED. CONTRARY TO THE ABOVE: (A) THE PIPE SUPPORT DESIGN SH0HH ON HANGER DRAHING HO. 1-ASI-L-923 FOR THE CVCS CROSS-TIE PIPING (DC-12-2665) HAD BEEN REDESIGNED BY RED-LINING THE DRAHING. THERE HAS NO EVIDENCE THE PIPING SUPPORT REDESIGN HAD BEEN INDEPENDENTLY CHECKED OR VERIFIED. IN ADDITION TO THIS, THO LUGS COULP HOT BE INSTALLED AS DESIGNATED IN THE ORIGINAL DESIGN BECAUSE OF INADEQUATE ALSO,CLEARANCE. LUGS THERE HAS NO OF A DIFFERENT EVIDENCE SIZE THAT THIS HERERECEIVED CHANGE INSTALLEDAN WITHOUT RED-LINING THE INSTALLATION CRAHING TO DOCUMENT THE CHANGE. INDEPENDENT DESIGN VERIFICATION. THIS LUG INSTALLATION HAS LATER REPLACED DUE TO MATERIAL PROBLEMS USING A PROPERLY RED-LINED DRANING, BUT AGAIN HITHOUT AN INDEPENDENT DESIGN VERIFICATION; AND (B) THE REPLACEMENT OF CARBON STEEL COMPONENTS IN THE STEAM GENERATOR BLONDOWN TANKS, COMPLETED IN 1984 AND 1985, HERE NOT DOCUMENTED ON THE TANK DRAHINGS. IN ADDITION, HO RECORDS COULD BE LOCATED DOCUMENTING PREVIOUS MODIFICATIONS MADE TO THESE TANKS. 10 CFR 50, APPENDIX B, CRITERION XVI, AS IMPLEMENTED BY THE D. C. COOK OPERATIONS QUALITY ASSURANCE PROGRAM, REQUIRES THAT MEASURES BE ESTABLISHED TO ENSURE THAT CONDITIONS ADVERSE TO QUALITY ARE PRONPTLY IDENTIFIED AND CORRECTED. CONTRARY TO THE ABOVE: (A) IN APRIL 1982, LICENSEE PERSONNEL HERE AHARE THAT THE DIESEL GENERATOR (DG) ROOM VENTILATION DAMPER MOTORS HERE UNDERSIZED AND SERIOUSLY DEGRADED. CONDITION REPORT (CR) NO. 1-03-83-263 AND RFC-12-2760, ADDRESSING LER NO. 83-023, BOTH ADDRESSING THE DAMPER ISSUE, HERE HRITTEN IN MARCH 1983. MODIFICATION NO. REPLACEMENT OF THE DAMPER MOTORS, WAS HRITTEN IN AUGUST 1985 AND HAD NOT BEEN COMPLETED AT THE TIME OF THIS INSPECTION. THIS DOES NOT REPRESENT PROMPT CORRECTIVE ACTION; AND (B) HITH REGARD TO CR HO. 1-03-83-263 AND LER NO. 83-023, THE LICENSEE FAILED TO IDENTIFY THE DEGRADED DAMPER MOTORS AS THE ROOT CAUSE OF THE DIESEL GENERATOR INVERTER FAILURES UNTIL JANUARY 11, 1985, 18 MONTHS AFTER THE EVENT. THESE ACTIONS DO NOT REPRESENT PROMPT IDENTIFICATION OF THE EVENT'S BASIC CAUSE TO ENSURE APPROPRIATE CORRECTIVE ACTION. 10 CFR 50.59 REQUIRES THAT A SAFETY EVALUATION BE PERFORMED FOR ANY MODIFICATION THAT CHANGES THE CONFIGURATION OF THE PLANT AS DESCRIBED IN THE FSAR. CONTRARY TO THE ABOVE, THE LICENSEE INSTALLED HERCULITE OVER THE SUPPLY VENTILATION DAMPER IN THE UNIT 1 DIESEL GENERATOR ROOM HITHOUT PERFORMING THE REQUIRED SAFETY EVALUATION. THIS MODIFICATION COULD LEAD TO HIGH TEMPERATURES IN THE ROOM HHEN THE GENERATORS ARE RUNNI;tG AND THE SUBSEQUENT LOSS OF THEIR AVAILABILITY DUE TO THESE HIGH TEMPERATURES. UNITS 1 AND 2 TECHNICAL SPECIFICATIONS 6.8.2 AND 6.8.3 PERMIT CHANGES TO PROCEDURES OF SPECIFICATION 6.8.1, HHICH INCLUDES PAGE 2-035 1

M M52M M M3%M3%! 9902LMnZUMZC2ML3 Reptrt Perlsd APR 1981 INSPECTION STATUS - (CONTINUED) H BRUNSHICK 1 0 MMMM%MIMMM3CC%MMMCMZMMMUMNMHMZZh!MZ3 ENFORCEMENT

SUMMARY

PROCEDURES FOR SURVEILLANCE AND TEST ACTIVITIES OF SAFETY RELATED EQUIPMENT, PROVIDED THE CHANGE IS REVIEHED BY THE PLANT' NUCLEAR SAFETY REVIEW COMMITTEE (PNSRC) AND APPROVED BY THE PLANT MANAGER PRIOR TO IMPLEMENTATION (FOR PERMANENT CHANGES); OR, PROVIDED THE CHANGE DOES NOT ALTER THE PROCEDURE'S INTENT, IS APPROVED BY THQ MEMBERS OF MANAGEMENT (ONE HITH AN SRO LICENSE), IS DOCUMENTED, AND IS REVIEHED BY THE PHSRC AND APPROVED BY THE PLANT MANAGER HITHIN 14 DAYS OF IMPLEMENTATION (FOR TEMPORARY CHANGES). CONTRARY TO THE ABOVE, ON AUGUST 22, 1985 AN NRC INSPECTOR OBSERVED LICENSEE PERSONNEL PERFORMING A TEST OF SAFFtY RELATED EQUIPMENT USING A PROCEDURE (2 THP 4030 STP.145, " REACTOR LOGIC TRAIN A AND B AND REACTOR TRIP BREAKERS A AND B") I, iICH HAD BEEN CHANGED BY HANDHITTEN REVISIONS, AND THESE CHANGES HAD NOT BEEN SUBJECTED TO EITHER TYPE OF REQUIRED REVIEH, APPROVAL AND DOCUMENTATION PROCESS. APPENDIX B, FURTHER REVIEH INDICATED HANDHRITTEN CHANGES HERE RELATIVELY COMMON IN PROCEDURES OF THIS TYPE. 10 CFR, CRITERION III, AS IMPLEMENTED BY THE D. C. COOK OPERATIONS QUALITY ASSURANCE PROGRAM AND ITS COMMITMENT TO STANDARD ANSI N45.2.11,

                 " QUALITY ASSURANCE REQUIREMENTS FOR THE DESIGN OF NUCLEAR P0HER PLANTS," REQUIRES THAT DESIGHS RECEIVE INDEPENDENT VERIFICATION AND THAT THESE DESIGNS 3E APPROPRIATELY DOCUMENTED. CONTRARY TO THE ABOVE        (A) THE PIPE SUPPORT DESIGN SH0HN ON HANGER DRAHING NO.

1-ASI-L-923 FOR THE CVCS CROSS-TIE PIPING (DC-12-2665) HAD BEEN REDESIGNED BY RED-LINING THE DRAHING. THERE HAS NO EVIDENCE THE PIPING SUPPORT REDESIGN HAD BEEN INDEPENDENTLY CHECKED OR VERIFIED. IN ADDITION TO THIS, TWO LUGS COULD NOT BE INSTALLED HITHOUT AS DESIGNATED RED-LINING IN THE THE INSTALLATION ORIGINAL DRAHING DESIGN BECAUSE TO DOCUMENT OF INADEQUATE CLEARANCE. LUGS OF A DIFFERENT SIZE HERE INSTALLED THE CHANGE. ALSO, THERE HAS NO EVIDENCE THAT THIS CHANGE RECEIVED AN INDEPENDENT DRAHING, DESIGN VERIFICATION. THIS LUG INSTALLATION HAS LATER REPLACED DUE TO MATERIAL PROBLEMS USING A PROPERLY RED BUT AGAIN HITHOUT AN INDEPENDENT DESIGN VERIFICATION; AND (B) THE REPLACEMENT OF CARBON STEEL COMPONENTS IN THE STEAM GENERATOR BLONDOHN TANKS, COMPLETED IN 1984 AND 1985, HERE NOT DOCUMENTED ON THE TANK DRAHINGS. IN ADDITION, NO RECORDS COULD BE LOCATED DOCUMENTING PREVIOUS HDDIFICATIONS MADE TO THESE TANKS. (8600 4) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: NORMAL OPERATION. LAST IE SITE INSPECTION DATE: MARCH 1-31, 1986 + INSPECTION REPORT NO: 50-325/86-11 + PAGE 2-036

                                             .~. -           . .                        __

RMEM%uM%%MMMZMEM:M2%%%%MZZZCCMMMMEMM BRUNSHICK 1 M R psrt Period APR 1986 REPQRTS FR0M LICENSEE M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM i

   =================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT -___ _ b 86-006 02/f2/86 03/11/86 AUTOMATIC ISOLATION OF UNITS 1 AND 2 CB HVAC SYSTEM OCCURRED DUE TO ACTUATIONS OF CHLORINATION SYSTEM STORAGE AREA CHLORINE DETECTOR; CAUSE - CHLORINE GAS IN VICINITY OF THE DETECTOR. , 86-007 02/24/86 03/21/86 UNITS 1 AND 2 CBEAF SYSTEM TR4IN '2A' AUTOMATICALLY STARTED DUE TO A CONTROL BUILDING FIRE ALARMS CAUSE - ACTUATION OF FTRE DETECTOR IN THE UNITS' COMMON CONTROL ROOM KITCHEN; DUE TO COOKING FUMES.

   ===========================================================================================================================

4 e

                                                                              'l PAGE 2-037 e
1. Docksts 50-324 0PERATING STA1US uununz=unannatannunnanux:Munuzrnnnwu H BRUNSHICK 2 W
2. R!pirting Pcrisd 04/01/86 Outtge + On-lina Hrs: 719.0 nuunuxununxnnunnunnruxxxxununnzzunna
3. Utility Contacts FRANCES HARRISON (919) 457-9521 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MHt): 2436 BRUNSWICK 2
5. Nameplate Rating (Gross MHe): 963 X 0.9 = 867
6. Design Electrical Rating (Not MHe): 821
7. Maximum Dependable Capacity (Gross MHe): 815 188D
8. Maximum Dependable Capacity (Not MHe): 790 *
  • I8~ I
                                                                                                                                           ...... MPDC. DEPDC. CRP. -       790 (100%)
9. If Changes occur Above Since Last Report, Give Reasons:

NONE

10. power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1003-MONTH YEAR CUMULATIVE g

12. Report Period Hrs 719.0 2.879.0 91.968.0 p.

NO NET POWER OUTPUT THIS MONTH o

13. Hours Reactor Critical .0 .0 54.512.2 E!
                                                                                                                                          .. ........._..__..............._____ ..      - 100
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line .0 .0 51.011.1 hf o$
16. Unit Reserve Shtdwn Hrs - 80 a.
                                                                                                     .0         .0            .0
17. Gross Therm Ener (MHH) 0 0 98,828.458 500-
18. Gross Elec Ener (MHH) 0 0 32.795.388
                                                                                                                                                                                        ~
19. Het Elec Ener (MHH) -5.826 -15,496 31.422.193
20. Unit Service Factor .0 .0 55.5 - to
21. Unit Avail Factor .0 .0 55.5
22. Unit Cap Factor (MDC Net) .0 .0 43.2 - 20
23. Unit Cap Factor (DER Net) .0 .0 41.6
24. Unit Forced Outage Rate .0 .0 17.0 0 g 3 3', 3's do is 30
25. Forced Outage Hours .0 .0 10.870.3 DAYS
26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):

NONE ftPRIL 1986

27. If Currently Shutdown Estimated Startup Date: 06/13/86 PAGE 2-038

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M R:pgrt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M BRUNSWICK 2 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence No. Date C 4 RC FUELXX REFUELING / MAINTENANCE OUTAGE CONTINUES. 85-078 11/30/85 S 719.0 t unuuMMMMMMk BRUNSWICK 2 REMAINS SHUTDOWN IN A CONTINUI REFUELING OUTAGE. M

SUMMARY

M MMMMMMMMMMM Method Svstem & Component i Type Reason F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                  & License Examination         9-Other         (LER) FIIe (NUREG-0161)                                                                   PAGE 2-039

unununuuu=2munuunnuuxuruntruzzzzmunu M BRUNSHICK 2 M FACILITY DATA R:pict Pcritd APR 1986 nrummusumuuuxnnuwxumuMXxmunKMuuMMIMM UTILITY 8 CONTRACTOR INFORMATION FACILITY DESCRIPTION LOCATION UTILITY LICENSEE.. . CAROLINA POWER 8 LIGHT STATE.... ............. NORTH CAROLINA ..... ...... COUNTY. ...... ........BRUNSHICK CORPORATE ADDRESS.... .. 411RALEIGH, FAYETTEVILLE NORTHSTREET CAROLINA 27602 DIST AND DIRECTION FROM CONTRACTOR NEAREST POPULATION CTR..SOUTHPORT, 3 MI N OF NC ARCHITECT / ENGINEER....... UNITED ENG. & CONSTRUCTORS HUC STEAM SYS SUPPLIER. . GENERAL ELECTRIC TYPE OF REACTOR............BHR CONSTRUCTOR. . BROWN & ROOT DATE INITIAL CRITICALITY... MARCH 20, 1975 ...... ... DATE ELEC ENER 1ST GENER. . APRIL 29, 1975 TURBINE SUPPLIER. ....... GENERAL ELECTRIC DATE COMMERCIAL OPERATE....HOVEMBER 3, 1975 REGULATORY INFORMATION f IE REGION RESPONSIBLE. .. .II CONDENSER COOLING METHOD...ONCE THRU CONDENSER COOLING HATER.... CAPE FEAR RIVER IE RESIDENT INSPECTOR.. ...H. RULAND LICENSING PROJ MANAGER.....E. SYLVESTER ELECTRIC RELIABILITY DOCKET NUMBER....... ... 50-324 COUNCIL. ................ SOUTHEASTERN ELECTRIC RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-62, DECEMBER 27, 1974 PUBLIC DOCUMENT ROOM.......SOUTHPORT-BRUNSHICK COUNTY LIBRARY 108 H. MOORE STREET SOUTHPORT, NORTH CAROLINA 28461 ' INSPECTION STATUS INSPECTION

SUMMARY

THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 16 INSPECTOR-HOURS ON SITE IN THE AREAS OF { + INSPECTION MARCH 17-21 (86-10): ONE VIOLATION HAS IDENTIFIED - FAILURE TO INSERVICE INSPECTION - OBSERVATION OF HORK ACTIVITIES AND DATA REVIEH AND EVALUATION. FOLLON ASME SECTION XI PERIOD REQUIREMENTS FOR THE EXAMINATION OF COMPONENTS. INSPECTION MARCH 1-31 (86-12): THIS ROUTINE SAFETY INSPECTION INVOLVED 77 INSPECTOR-HOURS ON SITE IN THE AREAS OF MAINTENANCE OBSERVATION, SURVEILLANCE OBSERVATION, OPERATIONAL SAFETY VERIFICATION, ENGINEERED SAFETY FEATURES SYSTEM HALKDOWN, INFORMATION l MEETINGS HITH LOCAL OFFICIALS, FOLLONUP DN UNRESOLVED ITEM, AND PLANT MODIFICATI0HS. THREE VIOLATIONS - INADEQUATE ACCEPTANCE FAILURE TO FOLLOH PROCEDURE HHEN RECORDING TEST TANK LEVEL AND INADEQUATE I TEST AFTER CORE SPRAY VALVE MOTOR-OPERATOR REPLACEMENT; SYSTEM SURVEILLANCE TEST; FAILURE TO HAVE A PROCEDURE TO VERIFY SLC SYSTEM DISCHARGE PROCEDURE FOR A STANDBY LIQUID CONTROL (SLC) IS FLOODED AFTER INSTALLATION OF RELIEF VALVCS PER FSAR COMMITMENT. 1 ENFORCEMENT

SUMMARY

NONE OTHER ITEMS PAGE 2-040

Muunn2MuuM::cuunnu nnunuxunnunununnun BRUNSHICK 2 M R:pset Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS:

 + COLD SHUTDOHN REFUELING AND E.Q. MODIFICATIONS, PROJECTED RESTART MAY 30, 1986.

LAST IE SITE INSPECTION DATE: MARCH 1-31, 1986 + INSPECTION REPORT NO: 50-324/86-12 + REPORTS FR0M LICENSEE

 ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _ - - - _ _ 86-004 03/03/86 04/02/86 PRIMARY CONTAINMENT GROUP 6 ISOLATION / AUTOMATIC ISOLATION OF REACTOR BUILDING VENTILATION SYSTEM At;D AUTOMATIC STARTING OF STANDBY GAS TREATMENT SYSTEM OCCURRED; CAUSE - ELECTRICAL SHORTING. 86-005 02/09/86 03/10/86 LLRT OF PRIMARY CONTAINMENT ISOLATION VALVES REVEALED A NONQUALIFIABLE LEAKAGE RATE FOR 2-RXS-PV-1222C; ATTRIBUTED TO LEAKAGE PAST THE VALVE SEAT; VALVES ARE BEING REPLACED. 86-007 03/09/86 04/08/86 HIGH RADIATION ALARM TRIP OF REACTOR BUILDING VENTILATION EXHAUST RADIATION MONITOR D12-RM-N010B; DUE TO ELECTRICAL GROUNDING OF THE MONITOR P0HER LEAD.

 ==================================================================================================================================

PAGE 2-041

1. Dockst s 50-454 0PERATING STATUS utuurnntwunxxxxzzxnnxung xx nnungnux u BYRON 1 x
2. Rrperting Psricds 04/01/86 Outtgi + On-lins Mrs: 719.0 Huxxuununnununzausnusumun=nnunxxnnsu
3. Utility

Contact:

J. E. LANGAN (815) 234-5441 X2825 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3411 BYRON 1
5. Nameplate Rating (Gross MWe): -

1175

6. Design Electrical Rating (Not MWe): 1120 1500
7. Maximum Dependable Capacity (Gross MHe): 1175
8. Maximum Dependable Capacity (Net MWe): 1129 DN 0. ROTING - 1120
                                                                                      ...... mX . OEPDO. CRP. - 1129 (100%)
9. If Changes Occur Above Since Last Raport, Give Reasons:
10. Power Level To Hhich Restricted, If Any (Not MHe): 1152
                                                                                     ._______________________________________       300
11. Reasons for Restrictions, If Any _

split FEEDHATER FLON REQUIREMENT. 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.0 5,448.0 - so
13. Hours Reactor Critical 719.0 2,497.1 3,778.1 h!
14. Rx Reserve Shtdwn Hrs .0 21.7, 37.8
15. Hrs Generator On-Line 719.0 2,452.0 3,644.4 - so hf
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 2,336,975 7,699,718 11.038,910 500 -
18. Gross Elec Ener (MHH) 794,799 2,590.875 3,679,465 - to
19. Het Elec Ener (MHH) 756,481 2,450,996 3,463,894
20. Unit Service Factor 100.0 85.2 66.9
21. Unit Avail Factor 100.0 85.2 66.9 - 20
22. Unit Cap Factor (MDC Net) 93.2 75.4 56.3
23. Unit Cap Factor (DER Net) 93.9 76.0 56.8
24. Unit Forced Outage Rate .0 4.0 5.3 0 , , , , , o 0 5 10 15 20 25 30
25. Forced Outage Hours .0 102.7 205.3 DAYS
24. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE I"

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-042

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM BYRON 1 M Rrport Period APR 1986 UNIT SHUTD0HNS /- REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Date IXE1 Hours Reason Method LER Number $vstem Component Cause & Corrective Action to Prevent Recurrence No. NONE uMMMMMMMMMM BYRON 1 OPERATED ROUTINELY DURING APRIL. u

SUMMARY

M MMMMMMMMMMM Type Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report i

                   & License Examination            9-Other         (LER) File (HUREG-0161)

PAGE 2-043

I DMMODONDDDDOODOOONDDDOOMMODDDDDDDDDD l 0 BYRON 1 O l DDDRMDanDDDDuMaaaaacanDannDMDDDDMRUD FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE...... ............. ILLINOIS LICENSEE.................COMMONHEALTH EDISON COUNTY.................. 0GLE CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINDIS 60690 DIST AND DIRECTION FROM HEAREST POPULATION CTR.. 17 MI SH OF CONTRACTOR ROCKFORD, ILL ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... FEBRUARY 2, 1985 CONSTRUCTOR..............COMMONHEALTH EDISON DATE ELEC ENER IST GENER... MARCH 1, 1985 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... SEPTEMBER 16, 1985 REGULATORY INFORMATION CONDENSER COOLING METHOD...CC HNDCT IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... ROCK RIVER IE RESIDENT INSPECTOR......J. HINDS ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....L. OLSHAN COUNCIL..................MID-AMERICA DOCKET NUMBER........... 50-454 INTERPOOL NETWORK LICENSE 8 DATE ISSUANCE....NPF-37, FEBRUARY 14, 1985 PUBLIC DOCUMENT R00M....... LIBRARIAN BUSINESS SCIENCE 8 TECHNOLOGY DEPT. ROCKFORD PUBLIC LIBRARY 215 NORTH HYMAN STREET ROCKFORD, ILLINDIS 61101 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON JANUARY 16 THROUGH MARCH 17 (86004): ROUTINE . UNANNOUNCED SAFETY INSPECTION BY THE RESIDENT INSPECTORS AND A i REGIONAL INSPECTOR OF FUEL RECEIPT AND STORAGE; PREOPERATIDHAL TEST HITNESSING; HOUSEKEEPING; LICENSEE ACTIONS RELATED TO POTENTIAL DRUG USE AND OTHER ACTIVITIES. THE INSPECTION CONSISTED OF 206 INSPECTOR-HOUR 3 ONSITE BY 4 HRC INSPECTORS INCLUDING 59 }

'   INSPECTOR-HOURS DURING OFF-SHIFTS. OF THE 4 AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN 3 AREAS; 2 VIOLATIONS HERE IDENTIFIED IN THE REMAINING AREA: (FAILURE TO FOLLON CLEANLINESS STANDARDS; FAILURE TO FOLLON ADMINISTRATIVE PROCEDURES).

THESE VIOLATIONS HERE OF MINOR SAFETY SIGNIFICANCE AND HAD MINIMAL IMPACT ON THE PUBLIC HEALTH AND SAFETY. i INSPECTION ON MARCH 1-31 (86010): ROUTINE UNANNOUNCED SAFETY INSPECTION BY THE RESIDENT INSPECTORS AND A REGIONAL INSPECTOR OF LERS; OPERATIONS

SUMMARY

SURVEILLANCE; MAINTENANCE; OPERATIONAL SAFETY; NON-ROUTINE EVENTS; MANAGEMENT MEETINGS AND OTHER ACTIVITIES. THE INSPECTION CONSISTED OF 78 INSPECTOR-HOURS ONSITE BY THREE HRC INSPECTORS INCLUDING 18 INSPECTOR-HOURS DURING OFF-SHIFTS. OF THE SIX AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN FIVE AREAS; ONE VIOLATION HAS IDENTIFIED IN THE NOT IMPACT REMAINING PUBLIC AREA

HEALTH(FAILURE TO FOLLOH TECHNICAL SPECIFICATIONS). THIS VIOLATION HAS OF MINIMAL SAFETY SIGNIFICANCE AND DID OR SAFETY. INSPECTION ON MARCH 17-21 (86011; 86009)* ROUTINE ANNOUNCED INSPECTION OF; (1) THE CONFIRMATORY MEASUREMENTS PROGRAM INCLUDING COLLECTION, ANALYSIS AND COMPARISON OF RESULTS OF SAMPLES SPLIT HITH THE LICENSEE AND ANALYZED ONSITE USING THE REGION III MOBILE LABORATORY, AND (2) QUALITY CONTROL OF ANALYTICAL MEASUREMENTS. ND VIOLATIONS OR DEVIATIONS HERE IDENTIFIED DURING THIS PAGE 2-044

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM BYRON 1 M l R:pret Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

1 INSPECTION. INSPECTION ON MARCH 17-21, 24-27, 31, AND APRIL 1-3 (86012): UNANNOUNCED INSPECTION BY TWO REGIONAL INSPECTORS OF QA PROGRAM ANNUAL REVIEH; RECEIPT, STORAGE AND HANDLING OF MATERIAL; ONSITE REVIEW COMMITTEE; AUDIT PROGRAM IMPLEMENTATION; SURVEILLANCE PROGRAM; SURVEILLANCE TESTING AND CALIBRATION CONTROL; MAINTENANCE PROGRAM AND MAINTENANCE PROGRAM IMPLEt1ENTATION. THE INSPECTION HAS CONDUCTED IN ACCORDANCE HITH NRC INSPECTION PROCEDURES NOS. 35701, 38702, 40700, 40704, 61700, 61725, 62700 AND 62702. OF THE EIGHT AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN SIX AREAS. TH0 VIOLATIONS HERE IDENTIFIED IN THE REMAINING TH0 AREAS (FAILURE TO ASSURE THAT TEST REQUIREMENTS HERE MET, FAILURE TO CALIBRATE PLANT INSTRUMENTATION HITHIN SPECIFIED PERIODS. , INSPECTION ON APRIL 7-9 (86015): INCLUDED A REVIEW OF THE LICENSEE'S IMPLEMENTATION OF THE SECURITY PERFORMANCE IMPROVEMENT PROGRAM (SPIP). SPECIFICALLY, THE INSPECTION ADDRESSED SECURITY PROGRAM AUDIT; RECORDS AND REPORTS; PHYSICAL BARRIERS - VITAL AREAS; COMPENSATORY MEASURES; ACCESS CONTROL - PERSONNEL; ASSESSMENT AIDS; AND ALARM STATIONS. THE INSPECTION ALSO ADDRESSED PREVIOUSLY IDENTIFIED PROGRAM HEAKNESSES/ CONCERNS. THE INSPECTION BEGAN DURING THE DAYSHIFT. THE LICENSEE HAS FOUND TO BE IN COMPLIANCE HITH NRC REQUIREMENTS WITHIN THE AREAS EXAMINED DURING THE INSPECTION. THE VIOLATIONS ASSOCIATED HITH INSPECTION REPORT NO. 50-454/85054, AND AN OPEN ITEM RELATING TO THE SECURITY COMPUTER SYSTEM REMAIN OPEN. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: R. FLAHIVE, FORMER ASSISTANT TECHNICAL STAFF SUPERVISOR BECAME RAD / CHEM SUPERVISOR EFFECTIVE MARCH 24, 1986 PLANT STATUS: l ( THE UNIT HAS BEEN OPERATING AT UP TO 98%. OPERATIONAL TESTING OF STEAM GENERATOR MOISTURE CARRYOVER IS STILL UNDER EVALUATION. OPERATION AT 100% POWER IS PENDING RESULTS OF STEAM GENERATOR FEED SYSTEM TESTING. LAST IE SITE INSPECTION DATE: 5/15/86 INSPECTION REPORT NO: 86020 PAGE 2-045

nuunucunMMsManM:nuMnnnnunnMunannMnnM Report P;ried APR 1986 REPORTS FR0M LICENSEE u BYRON 1 M , MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

                ====================================================================s=============================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT ___ 86-11 03/24/86 04/14/86 CONTROL ROOM VENTILATION ACTUATION DUE TO HIGH VACUUM ALARM ON OPR34J RADIATION MONITOR 86-12 03/27/86 04/21/86 ROD POSITION INDICATION SURVEILLANCE NOT PERFORMED HITHIN REQUIRED PERIODICITY DUE TO PERSONNEL ERROR

                ==================================================================================================================================

i PAGE 2-046

THIS PAGE INTENTIONALLY LEFT BLANK PAGE 2-047

1. Dockst 50-483 0PERATING STATUS MX:EHEM:E%%%DuMMMMMKH:K 53E2un%%%% 3 u CALLAHAY 1 N
2. Reporting Period 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

DAN PRATTE (314) 676-8460 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 3411 CALLAWAY 1
5. Nameplate Rating (Gross MHe): 1373 X .9 = 1236
6. Design Electrical Rating (Not MHe): 1171 I"
7. Maximum Dependable Capacity (Gross MHe): 1174 DESIGN ELEC. ftftTING = 1171
8. Maximum Dependable Capacity (Het MHe): 1120
                                                                                                                       ..._ _. t1RX . DEPDO. CnP. - 1120 1100%)
9. If Changes Occur Above Since Last Report, Give Reasens:
10. Power Level To Which Restricted, If Any (Not MHe):
                                                                                                                      ....................................       -100
11. Reasons for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 11.941.5 - s0 o
13. Hours Reactor Critical 356.3 1.772.1 10.235.6 @
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line 274.9 1.688.4 9.875.8 k -so
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Cross Therm Ener (MHH) 558,152 5,164.895 31.092.389 500 -
18. Gross Elec Ener (MHH) 175.169 1.751.194 10.565.137 - 40
19. Not Elec Ener (MHH) 161.283 1.661.646 10.030.433
20. Unit Service Factor 38.2 58.6 82.7
21. Unit Avail Factor 38.2 58.6 82.7 - 20
22. Unit Cap Factor (MDC Not) 20.0 51.5 75.0
23. Unit Cap Factor (DER Net) 19.2 49.3 71.7
24. Unit Forced Outage Rate 5.2 .9 5.3 0 0 5 l'0 l's $0 d5 30
25. Forced Outage Hours 15.0 15.0 551.8 DAYS
25. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-048

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM N R:rptrt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M CALLAHAY 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence No. 4 REFUELING 5 02/28/86 S 429.1 C REACTOR TRIP, NN11 INVERTER FAILURE. LER 86-010-00. 6 04/16/86 F 0.0 A 5 BLOWN COUPLING SEAL BETHEEN GENERATOR AND 7 04/18/86 F 6.0 A 1 EXCITER. 04/19/86 F 9.0 G 3 S/G LOW LEVEL REACTOR TRIP. LER 86-013-00. 8 EXCESSIVE INITIAL LOADING OF MAIN GENERATOR. MMMMMMMMMMM CALLAHAY OPERATED HITH 3 OUTAGES AND 1 REDUCTION DURING APRIL.

          ,M  

SUMMARY

M MMMMMMMMMMM Tvoe Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                               & License Examination        9-Other         (LER) File (NUREG-0161)

PAGE 2-049

uzrunuxn:MuruzKuns==nungun:nanuzur:M M CALLAHAY 1 u ux wummuxxwunuuxxxxxxxxxxxxxxuMxMMMM FACIL.ITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE....................MISS00RI LICENSEE................. UNION ELECTRIC COUNTY...................CALLAHAY CORPORATE ADDRESS. . . . . . . .P.O. BOX 149 ST LOUIS, MISSOURI 63166 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 10 MI SE OF CONTRACTOR FULTON, MD ARCHITECT / ENGINEER.......BECHTEL

TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY.. 0CTOBER 2, 1984 CONSTRUCTOR.............. DANIEL INTERNATIONAL DATE ELEC ENER IST GENER.. 0CTOBER 24, 1984 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCI AL OPERATE. . . . DECEMBER 19, 1984 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING T0HER IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... MISSOURI RIVER IE RESIDENT INSPECTOR......B. LITTLE ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....T. ALEXION COUNCIL....... ..........MID-AMERICA DOCKET NUMBER. ........ 50-485 INTERPOOL NETHORK LICENSE & DATE ISSUANCE. . . .NPF-30, OCTOBER 18, 1984 PUBLIC DOCUMENT ROOM.......FULTON CITY LIBRARY 709 MARKET STREET FULTON, MO 65251 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON MARCH 17-21 (86004): ROUTINE, UNANNOUNCED INSPECTION OF THE RADIATION PROTECTION PROGRAM DURING A MAINTENANCE OUTAGE, INCLUDING: CHANGES IN ORGANIZATION, PERSONNEL, FACILITIES, EQUIPMENT, PROGRAMS, AND PROCEDURES; AUDITS AND APPRAISALS; PLANNING AND PREPARATION; TRAINING AND QUALIFICATIONS OF NEH PERSONNEL; INTERNAL AND EXTERNAL EXPOSURE CONTROL; CONTROL OF RADI0 ACTIVE MATERIALS, CONTAMINATION, SURVEYS, AND MONITORING; AND THE ALARA PROGRAM. ALSD REVIEHED HERE OPEN ITEMS AND LICENSEE'S RESPONSE TO IE INFORMATION NOTICE NO. 85-81. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION ON FEBRUARY 10 THROUGH MARCH 12 (86007): SPECIAL UNANNOUNCED SAFETY INSPECTION BY THE SENIOR RESIDENT INSPECTOR OF THE ENVIRONMENTAL INCLUDING 14 INSPECTOR-HOURS QUALIFICATION OF ELECTRICAL ONSITE EQUIPMENT. THE INSPECTION INVOLVED A TOTAL OF 63 INSPECTOR-HOURS BY ONE NRC INSPECTOR DURING OFF-SHIFTS. ONE APPARENT VIOLATION HITH TH0 EXAMPLES HAS IDENTIFIED (FAILURE TO ENVIRONMENTALLY QUALIFY ELECTRICAL EQUIPMENT. ONE UNRESOLVED ITEM (REPORTABILITY REQUIREMENTS). INSPECTION ON MARCH 24-28 (86009): ROUTINE, UNANNOUNCED INSPECTION OF THE FOLLOHING AREAS OF THE CALLAHAY NUCLEAR PONER PLANT EMERGENCY PREPAREDNESS PROGRAft: ACTIVATIONS OF THE LICENSEE'S EMERGENCY PLAN; EMERGENCY DETECTIDH AND CLASSIFICATION: PROTECTIVE ACTION DECISIONMAKING, NOTIFICATIONS AND COMMUNICATIONS; CHANGES TO THE EMERGENCY PREPAREDNESS PROGRAM; SHIFT STAFFING AND AUGNENTATION; KNOHLEDGE AND PERFORMANCE OF DUTIES (TRAINING); LICENSEE AUDITS. THE INSPECTION HAS CONDUCTED BY THREE NRC INSPECTORS AND TH0 CONSULTANTS. NO VIOLATIONS, DEFICIENCIES, OR DEVIATIONS HERE IDENTIFIED. H0HEVER, FIVE OPEN ITEMS HERE IDENTIFIED DURING THE INSPECTION. PAGE 2-050

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

  • M CALLAHAY 1 Rapsrt Period APR 1986 INSPECTION STATUS -

(CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT

SUMMARY

NONE OTHER ITEf!S SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: THE UNIT HAS TAKEN CRITICAL ON APRIL 15, 1986 AND HAS PLACED ON THE GRID ON APRIL 19, 1986 AFTER A 49 DAY REFUELING OUTAGE. LAST IE SITE INSPECTION DATE: 5/16/86 INSPECTION REPORT NO: 86014

                                    .                    REP 0RTS          FR0M            LICENSEE
   ============================================_===============================_======================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT .-- __. - - - - - - - - - - - - . - - - - _ . _ _ _ - - - - _ = - - - __. 862h6 03/18/86 04/17/86 ESF ACTUATIONS DUE TO SPURIOUS RADIATION MONITOR SIGNALS 86-07 03/18/86 04/17/86 MISSING FIRE BARRIER PENETRATION SEALS 86-08 03/18/86 04/24/86 FAILURE TO MEET TECHNICAL SPECIFICATION REQUIREMENT

    ============================================================================================================

PAGE 2-051

1. Docksts 50-317 0PERATING STATUS MMunurEZ:HM MEMMunzunMHM2MM2%%2MMEM M CALVERT CLIFFS 1 H
2. Ryperting Pirled: 04/01/86 Outtg] + On-lina Hrs: 719.0 EMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts H. PORTER (301) 260-4868 AVERAGE DAILY P0HER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 2700 CALVERT CLIFFS 1
5. Nameplate Rating (Gross MHe): 1020 X 0.9 = 918
6. Design Electrical Rating (Not MHe): 845
7. Maximum Dependable Capacity (Gross MWe): 860 1500
8. Maximum Dependable Capacity (Net MHe): 825

__ [

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any NONE 1000-
12. Report Period Hes .0 2 .O O " " " " " "I" "I"
13. Hours Reactor Critical ^M r O 719.0 2.712.4 75,577.9
                                                                                   ...____.___............__...___..__.s.__ - 100 @@
14. Rx Reserve Shtdwn Hrs .0 .0 2,299.2
15. Hrs Generator On-Line 719.0 2,692.5 74,052.0 f - 80 23
16. Unit Reserve Shtdwn Hrs .0 .0 .0 "~
17. Gross Therm Ener (MHH) 1,927.356 7,158,681 184,482.874 500- - 60
18. Gross Elec Ener (MHH) __653,013 2,424.213 61,026,990
19. Het Elec Ener (MHH) 626.786 2,323,770 18 2 240,072
20. Unit Service Factor 100.0 93.5 76.9
                                                                                                                                            ~
21. Unit Avail Factor 100.0 93.5 76.9
22. Unit Cap Factor (MDC Net) 105.7 97.8 73.8N - 20
23. Unit Cap Factor (DER Net) 103.2 95.5 71.6
24. Unit Forced Outage Rate .0 1.1 8.0 0 , , , , . 0 0 5 to 15 20 25 30

( 25. Forced Outage Hours .0 30.5 6.325.6 DAYS

26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration): s REFUELING OUTAGE: OCTOBER 25, 1986 - JANUARY 4, 1987. RPRIL 1966
27. If Currently Shutdown Estimated Startup Date: - N/A M Item calculated with a Heighted Average PAGE 2-052

unnguxM zurucunnunuruMuMuM==minMntra CALVERT CLIFFS 1 M R2purt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Date IEEE Hours Reason Method LER Numbe- System Component Cause & Cerrective Action to Prevent Recurrence _H22__ NONE MMMMMMMMMMM CALVERT CLIFFS 1 OPERATED AT FULL POWER DURING APRIL. , n

SUMMARY

M MMMMMMMMMMM Type Reason Method Svstem & Component l F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                     & License Examination        9-Other           (LER) File (NUREG-0161)

PAGE 2-053

nrnec=ugununuzuuuuuuuuuuutuumunnunun s-U CALVERT CLIFFS 1 u unnusuurzunwrunuunuxuununzwxnxgruzzx. FACILITY DATA Rep 1rt Pericd APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... MARYLAND LICENSEE................. BALTIMORE GAS & ELEC COUNTY...................CALVERT CORPORATE ADDRESS........P.O. BOX 1475 EALTIMORE, MARYLAND 21203 N DIST AND DIRECTION FROM - NEAREST POPULATION CTR.. 40 MI S OF CONTRACTOR ANNAPOLIS, MD , ARCHITECT / ENGINEER.......BECHTEL ( TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY.. 0CTOBER 7, 1974 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER. . .J ANUARY 3,1975 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE....MAY 8, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER.... CHESAPEAKE BAY IE RESIDENT INSPECTOR. . . . . .T. FOL EY ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. JAFFE COUNCIL..................MID-ATLANTIC DOCKET NUMBER........... 50-317 AREA COUNCIL LICENSE & DATE ISSUANCE....DPR-53, JULY 31, 1974 s PUBLIC DOCUMENT ROOM.......CALVERT COUNTY LIBRARY FOURTH STREET PRINCE FREDERICK, MARYLAND 20678 I-N S P E C T I O N STATUS INSPECTION

SUMMARY

h0 INSPECTION INPUT PROVIDED. ' ENFORCEMENT

SUMMARY

NONE OTHER ITEMS K SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. I PAGE 2-054 _ m _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _

  . - . .                                                         . _s                     - - .                  _ . - - - - _ .          -

MMMEM3M:MMUMEUMMMU%MEM2%M%MHANZMMZW3 M M CALVERT CLIFFS 1 Rrpart Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ' OTNER ITEMS MANAGERIAL ITEMS 8 NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE 1

           ==========================================================================

NUMBER DATE OF DATE OF SUBJECT _ REPORT __- __ EVENT --- NO INPUT PROVIDEU.

           =============.=================================================================

I 1 1 I. G PAGE 2-055

'. Docksts                                                         50-318       0PERATING              STATUS                             EMMMxuMxuuMuununM Munununracun%EuMMn u        CALVERT CLIFFS 2            M
2. R! parting Period: 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts H. PORTEP (301) 260-4868 AVERAGE DAILY POWER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 2700 CRLVERT CLIFFS 2
5. Nameplate Rating (Gross MHe): 1012 X 0.9 = 911
6. Design Electrical Rating (Net MHe): 845
7. Maximum Dependable Capacity (Gross MWe): 860 18N
8. Maximum Dependable Capacity (Net MWe): 825
                                                                                                                                                                  ~
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MWe):
11. Reasons for Restrictions, If Any NONE 1033-MONTH YEAR CUMULATIVE
12. Report Period Hrs 719.0 2.879.0 79.607.0 m mu - m mimomITIm wA
13. Hours Reactor Critical 719.0 2.837.6 66,279.8 ....................................s... - 300 Q g
14. Rx Reserve Shtdwn Hrs .0 24.3 1.285.2
15. Hrs Generator On-Line 719.0 2,832.4 65,242.8 ll . , ,
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 1,937,090 7,481,668 163,963,703 Sm3- - so
18. Gross Elec Ener (MHH) 650,280 2,536,838 54,058,397
19. Net Elec Ener (MHH) 624,442 2,433,620 51.583,875
20. Unit Service Factor 100.0 98.4 - 40 82.0
21. Unit Avail Factor 100.0 98.4 82.0
22. Unit Cap Factor (MDC Net) 105.3 102.5 78.7M - 20
23. Unit Cap Factor (DER Net) 102.8 100.0 76.7
24. Unit Forced Outage Rate .0 1.6 5.8 0 .- 0 g .,

g ,- 25 Forced Dutage Hours .0 46.6 4.048.4 DAYS

26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE ME IE

27. If Currently Shutdown Estimated Startup Dates N/A M Item calculated with a Heighted Average PAGE 2-056
             ._=_--             ~_.     - . _ _ .                           .                    _.                     .             .           . _ .   . _ _ - _ _ .

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM CALVERT CLIFFS 2 M i R:psrt Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM i Ho, Date Tvpe Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence i NONE 1 l i 1 I i 1

MMMurMMMMMM CALVERT CLIFFS 2 OPERATED AT FULL PONER IN APRIL.

l H

SUMMARY

M

MMMMEMMMMMM Tvoe Reason Method Svstem 8 Component i

F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H  ;

;   S-Sched       B-Maint or Test G-Oper Error 2-Manual Scram Instructions for i                  C-Refueling       .H-Other          3-Auto Scram    Preparation of D-Regulatory Restriction            4-Continued     Data Entry Sheet E-Operator Training                 5-Reduced Load Licensee Event Report
                     & License Examination            9-Other         (LER) File (NUREG-0161)

PAGE 2-057

i EM:3M555 nun %EM22nnr2HM:MzununncKunru u CALVERT CLIFFS 2 H Ennruun2=xunMunuM:MuunM% M25:MMMM:MM FACILITY DATA Repirt Perlsd APR 1986 , FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY ST AT E . . . . . . . . . . . . . . . . . . . . MARYL AN D LICENSEE................. BALTIMORE GAS & ELEC COUNTY...................CALVERT CORPORATE ADDRESS. . . . . . . .P.O. BOX 1475 BALTIMORE, MARYLAND 21203 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 40 MI S OF CONTRACTOR ANNAPOLIS, MD ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY... NOVEMBER 30, 1976 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... DECEMBER 7, 1976 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... APRIL 1, 1977 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING MATER....CHESAFEAKE BAY IE RESIDENT INSPECTOR......T. FOLEY ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. JAFFE COUNCIL..................MID-ATLANTIC DOCKET NUMBER........... 50-318 AREA COUNCIL LICENSE & DATE ISSUANCE....DPR-69, NOVEMBER 30, 1976 PUBLIC DOCUMENT ROOM.......CALVERT COUNTY LIBRARY FOURTH STREET PRINCE FREDERICK, MARYLAND 20678 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENTS: ) NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. PAGE 2-058

               - - _       __.   . ~ _ - _ .       _                  _ _ _ _ . _.            _ .           . _ . ._               _. _                           _       _

M u n u n u n u n u n u x u w M w M u u M M u n u m m u n u s:nngua M M CALVERT CLIFFS 2 i INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Rrpart Period APR 1986 1 i I OTHER ITEMS f MANAGERIAL ITEMS: NO INPUT PROVIDED. t PLANT STATUS: i NO INPUT PROVIDED. I j LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

                                                                                                                                                                        ====
     ====================================================================

DATE OF DATE OF SUBJECT NUMBER -_._ EVENT REPORT - - _ . NO INPUT PROVIDED. ===

      ====================================================================

1, i 4 i i i i, l l . i PAGE 2-059' I

1. Dockat: 50-413 0PERATINO STATUS ttxtussxxxnu xnnnnrx xnum: in;:nuxcnu nx x nu
2. R:psrting Perlad u CATAHBA 1 n 04/01/86 Outige + On-lina Hras 719.0 u x: xtuxxx%nrnaturmaunz;:xxxxx nnnusin
3. Utility Contacts J. A. REAVIS (704) 373-7567 I AVERAGE DAILY POWER LEVEL (MHe) PLOT

{ 4. Licensed Thermal Power (MHt): 3411 CRTRWBA 1

5. Nameplate Rating (Gross MWe): 1205
6. Design Electrical Rating (Not MHe): 1145
7. Maximum Dependable Capacity (Gross MWe): 1145 **

l

8. Maximum Dependable Capacity (Net MWe): 1145 DESIGN ELEO. RRTING - 1145 *
                                                                                                                         ......MRX.      OEPENO. CRP. - 1145 (1004
9. If Changes Occur Above Since Last Report, Give Reasons:

, 10. Power Level To Which Restricted, If Any (Net MWe):

11. Reasons for Restrictions, If Any: _
                                                                                                                                                                        -100 NONE MONTH       YEAR
12. Report Period Hrs 719.0 2,879.0 CUMULATIVE 7,344.0 g
                                                                                                                                                                       -80
13. Hours Reactor Critical 689.3 2,720.2 6,332.6
14. Rx Reserve Shtdwn Hrs .0 .0 .0 IS. Hrs Generator On-Line 684.2 2,679.1 6,194.8 g -so
16. Unit Reserve Shtdwn Hrs .0 .0 0 g
17. Gross Therm Ener (MHH) 2,286,805 8,613,005 19,303.185 g,
18. Gross Elec Ener (MHH) 804,319 3,019,879 6,704,148
                                                                                                                                                                      - 40
19. Het Elec Ener (MHH) 760,473 2,846,722 6,287,236
20. Unit Service Factor 95.2 93.1 84.4
21. Unit Avail Factor 95.2 93.1 84,c, -20
22. Unit Cap Factor (MDC Net) 92.4 86.4 74.8
23. Unit Cap Factor (DER Net) 92.4 86.4 74.8
24. Unit Forced Outage Rate 4.8 6.9 15.6 0 0 5 1'o l's
25. Forced Outage Hours 34.8 199.9 1,149.2 2'o 3!5 30 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUEL ING - AUGUST 15, 1986 - 10 WEEKS.

27. If Currently Shutdown Estimated Startup Date: _ N/A PAGE 2-060

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM CATAHBA : Rrport Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Cause & Corrective Action to Prevent Recurrence N9, Date 1XE2 Hours Reason Method LER Number _ System Component 5 CC VALVES CONTROL VALVE MOVEMENT TEST. 45-P 04/04/86 S 0.0 B "C" 3 CB INSTRU REACTOR TRIP DUE TO REACTOR COOLANT LOOP 04/19/86 F 26.2 A 5 FLOW TRANSMITTER REPLACEMENT. 3 IA ZZZZZZ REACTOR TRIP'DUE TO FAILURE TO BLOCK SOURCE 6 04/20/86 F 8.6 G RANGE HI FLUX TRIP SETPOINT DURING STARTUP. 5 CB ZZZZZZ POWER INCREASE DEL AY DUE TO REACTOR COOL ANT 46-P 04/21/86 F 0.0 B SYSTEM LEAKAGE CALCULATIONS. 5 HH HTEXCH POWER INCREASE DELAY DUE TO PLACING FEEDHATER 47-P 04/22/86 F 0.0 A HEATERS (D1 AND E1) INTO SERVICE. 5 HC HTEXCH SEASONAL HIGH CONDENSER COOLING HATER TEMPERATURE. 48-P 04/26/86 F 0.0 H HC HTEXCH SEASONAL HIGH CONDENSER COOLING HATER TEMPERATURE, 49-P 04/27/86 F 0.0 H 5 5 HH VALVEX FEEDHATER HEATER El SHELL-SIDE DRAIN TO CONDENSER 50-P 04/30/86 F 0.0 A CONTROL VALVE FAILURE. MxwwMMMMMMM CATAHBA 1 OPERATED HITH 2 OUTAGES AND 6 REDUCTIONS IN APRIL. M

SUMMARY

M MMMMMMMMMMM Method Svstem a Component Tvoo Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructionsoffor Preparation C-Refueling H-Other 3-Auto Scram Data Entry Sheet D-Regulatory Restriction 4-Continued E-Operator Training 5-Reduced Load Licensee Event Report

                              & License Examination            9-Other            (LER) File (NUREG-0161)                                                 PAGE 2-061
                                                                   .=
   . - - - . - - _-                            . - - - ~ - . . . - - -              -            . ..             -    -           --     --      . - . .      . - . --                               - .    - . . _ . .                 .-

[ uunusuu=ununc=nuunnumuuuuuuu=un=u==u u CATAHBA 1 .N nuusunzuu==muunnmu=unnunzuruzzurxM%M FACILITY DATA R:ptrt Perlad APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION 4 i LOCATION UTILITY ST AT E. . . . . . . . . . . . . . . . . . . 50UTH CAROLINA LICENSEE................. DUKE PONER COUNTY................... YORK ' CORPORATE ADDRESS....... 422 SOUTH CHURCH STREET DIST AND DIRECTION FROM CHARLOTTF, NORTH CAROLINA 28242 NEAREST POPULATION CTR.. 6 MI NNH OF CONTRACTOR ROCK HILL, SC ARCHITECT / ENGINEER....... DUKE PDHER

TYPE OF REACTOR.............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE l

, DATE INITIAL CRITICALITY... JANUARY 7, 1985 CONSTRUCTOR.............. DUKE POWER DATE ELEC ENER IST GENER... JANUARY 22, 1985 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JUNE 29, 1985 REGULATORY INFORMATION l CONDENSER COOLING METHOD...MDCT IE REGION RESPONSIBLE......II ! CONDENSER COOLING HATER.... LAKE HYLIE 1 IE RESIDENT INSPECTOR......P. SKINNER l ELECTRIC RELIABILITY 'i COUNCIL.................. SOUTHEASTERN ELECTRIC LICENSING PROJ MANAGER.....K. JABBOUR DOCKET NUMBER........... 50-413 RELIABILITY COUNCIL LICEhSE & DATE ISSUANCE....NPF-35, JANUARY 17, 1985 PUBLIC DOCUMENT R00M....... YORK COUNTY LIBRARY 138 E. BLACK STREET ROCK HILL, SOUTH CAROLINA 29730 INSPECTION

SUMMARY

INSPECTION STATUS

                    + INSPECTION DECEMBER 26 - FEBRUARY 1, 1986 (85-55):

l ON SITE IN THE AREAS OF FOLLONUP OF LICENSEE AND NRC IDENTIFIED ITEMS;THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 163 RESIDENT INSPE i FOLLOHUP OF 10CFR 21 REPORTS; FOLLONUP OF AN INFORMATION

  • NOTICE; PLANT OPERATIONS REVIEH; SURVEILLANCE OBSERVATION; AND MAINTENANCE OBSERVATION. OF THE NINE AREAS INSPECTED, NO 1 VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN EIGHT AREAS; TWO APPARENT VIOLATIONS HERE FOUND IN ONE AREA (FAILURE TO FOLLOW PROCEDURES ASSOCIATED HITH OPERATION OF DIESEL GENERATOR 1Bs AND FAILURE TO PROVIDE ADEQUATE CORRECTIVE REGURRENCE (FAILURE TO MEETOF COMMITMENT TECHNICAL SPECIFICATION IN FSAR SECTION 7.4.7.1VIOLATIONS FOR AUXILIARYOF SHUTDOHN FIRE HATCHPANELS).REQUIREMENTS) AND ONE APPARENT DEVIATION
'                   INSPECTION JANUARY 6-10 (86-05): THIS ROUTINE, ANNOUNCED INSPECTION ENTAILED 87 INSPECTOR-HOURS ON SITE EN THE AREAS OF SURVEILLANCE TESTING, 5                    IDENTIFIED. THE VIOLATION                    MAINTENANCE    ACTIVITIES, AND THE CLOSE OUT OF SELECTED OPEN INSPECTION ITEMS. TH0 VIOLATIONS HERE (413/86-05-05),

j ACCORDANCE WITH 10CFR 50.49 IS NOT dEING SITED IN THE NOTICE OF VIOLATION.ON HYDROGEN SKIMMER FAN ISOLA IT IS UNDER CONSIDERATION FOR PROPOSED ENFORCEMENT POLICY AND HILL BE SITED IN SEPARATE CORRESP0taENCE. I INSPECTION FEBRUARY 18-21 (86-08): l ANNUAL RADIOLOGICAL EMERGENCY PREPAREDNESS EXERCISE.THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 97 INSPECTOR-HOURS ON SITE IN THE A HEAKNESSES HERE DISCLOSED, NAMELY; NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED; H0HEVER, THREE EXERCISE l READINGS, PREDICTING RADIATION LEVEL AT THE SITE BOUNDARY IN EXCESS OF PAGS FOR ADVERSE METEOROLO CONSISTENT FAILURE OF TSC FIELD MONITORING TEAM C0ORDINATORS TO EFFECTIVELY DIRECT FIELD MONITORING TEAMS T 1 PAGE 2-062 i I

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M M CATAWBA 1 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 INSPECTION

SUMMARY

O CENTERLINE; AND FAILURE TO IDENTIFY AND FACTOR INTO ACCIDENT ANALYSIS AND MITIGATION, CRITICAL THE ACCIDENT OR MAJOR EFFECTS RESULTING THEREFROM. THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 42 INSPECTOR-HOURS ON SITE INSPECTING IN INSPECTION FEBRUARY 10-13, 26-28 (86-10): NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. THE AREAS OF REVIEN OF STARTUP TEST PROCEDURES, AND REVIEH OF SURVEILLANCE TESTS. THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 81 INSPECTOR-HOURS ON DESIGN CHANGES SITE INSPECTINGAND IN TH INSPECTION FEBRUARY 2-25 (86-11): AREAS OF REVIEH OF LICENSEE EVENT REPORTS; REVIEN OF INSPECTOR IDENTIFIED ITEM OF THE 12 AREAS INSPECTED, H0 VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. MAINTENANCE OBSERVATION. ENFORCEMENT

SUMMARY

NONE i OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: NONE. LAST IE SITE INSPECTION DATE: FEBRUARY 2-25, 1986 + INSPECTION REPORT ND: 50-413/86-11 + l i PAGE 2-063 i

   - . .      . . - . .               _ . _ .                                  _     -.               . _ =           -- .

MSCUMr%%HUZ:MMMENZEUNCMIMM3En32nM3Z3 Report Pericd APR 1986 REP 0RTS FR0M LICENSEE M CATAMBA 1 D UMMMCM2MM3HUMEMMMZUCM"2MMCUZMUCCCMZH i' E=3=======33==3============3====3===33======3=================3==========================3==33====3===3333============3========333 NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-004 01/15/86 03/12/86 INVALID TURBINE SUMP RAD MONITOR SAMPLES; DUE TO MALFUNCTION OF VALVE. 86-010 01/18/86 03/13/86 ALTERNATE POWER SOURCES NOT VERIFIED OPERABLE HHILE DIESEL GENERATOR '18' INOPERABLE; CAUSE - PERSONNEL ERROR. 86-011 02/14/86 03/14/86 BOTH TRAINS OF ANNULUS VENTILATION SYSTEM INOPERABLE; DUE TO PERSONNEL ERROR.

           ==================E==E====3===3==============3===========33==3=============3=3===3====3=======3====33====3=======3E===3===333===3=

l r i i I i l PAGE 2-064 I I i l

y _y.-__._---.

  -.m_. - ~ _- - _                                           .

I THIS PAGE INTENTIONALLY LEFT BLANK i i l 4 I f PAGE 2-065

1. Dockst: 50-315 0PERATINO STATU$ unrunuzxnzuunn%nmunzuanzununungn: tan M COOK 1 u
2. Raperting Period: 04/01/86 Outtg3 + Dn-lins Hrs: 719.0 nunu=uurnux=uzunungununnzuuznnunn=xu
3. Utility

Contact:

W. T. GILLETT (616) 465-5901 AVERAGE DAILY POWER LEVEL (MWo) PLOT

4. Licensed Thermal Power (MWt): 3250 COOK 1
5. Nameplate Rating (Gross MWe): 1280 X 0.9 = 1152
6. Design Electrical Rating (Not MWe): 1030
7. Maximum Dependable Capacity (Gross MWe): 1056 DESIGN ELEC. RATING - 1030
8. Maximum Dependable Capacity (Net MWe): 1020 _ _ _ MAX. M. CRP. - 1 2 (1 M )
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE ' " " " " " " " " " " " " " " " " " " " " " - 100 1000 - MON 1H YEAR CUMULATIVE [3

12. Report Period Hrs 719.0 2,879.0 99,311.0 e4 c.)
13. Hours Reactor Critical 719.0 2,879.0 71,178.7 - so E3 463.0 5

CD

14. Rx Reserve Shtdwn Hrs .0 .0
15. Hrs Generator On-Line 719.0 2,879.0 69,731.6 hf og
                                                                                                                                         ~ 80
16. Unit Reserve Shtdwn Hrs .0 .0 321.0
17. Gross Therm Ener (MWH) 2.110,806 8,440,500 203.436,153 500-
18. Gross Elec Ener (MHH) 690,810 2,748,990 66,726,530
                                                                                                                                         -40
19. Het Elec Ener (MWH) 665,013 2,644,891 64,192,048
20. Unit Service Factor 100.0 100.0 71.6
21. Unit ' vail Factor 100.0 100.0 71.6 - 20
22. Unit Cap Factor (MDC Net) 90.7 90.1 64.7
23. Unit Cap Factor (DER Net) 89.8 89.2 62.3
24. Unit Forced Outage Rate .0 .0 7.5 0 5 1'O l's 20 2's 30
25. Forced Outage Hours .0 .0 4.942.9 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

RPRIL 1986 ICE CONDENSER SURVEILL ANCE - 09/1986 3 WEEKS.

27. If Currently Shutdown Estinated Startup Date: N/A PAGE 2-066 l

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM COOK 1 M j Rsport Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Nunber Svsten Component Cause 8 Corrective Action to Prevent Recurrence No. Date NONE i a l ] KXMMMMMMMMM COOK 1 OPERATED ROUTINELY HITH NO OUTAGES OR REDUCTIONS IN APRIL. . m

SUMMARY

M MMMMMMMM.4MM Method System & Component Iyna Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Rafueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                        & License Examination         9-Other   '

(LER) File (NUREG-0161) PAGE 2-067 f

===========2 =========n============u u C0!K 1 M usu====nu==u===n=ccuu==u==uu======nN FACILITY DATA R:ptet Portsd APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE............. ...... MICHIGAN LICENSEE................. INDIANA & MICHIGAN ELECTRIC COUNTY. . . .............BERRIEN CORPORATE ADDRESS....... 1 RIVERSIDE PLAZA COLUMBUS, OHIO 45216 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 11 MI S OF CONTRACTOR BENTON HARBOR, MI ARCHITECT / ENGINEER.......AMERICAN ELEC. POWER SERVICE CORP. TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... JANUARY 18, 1975 CONSTRUCTOR..............AMERICAN ELEC. P0HER SERVICE CORP. DATE ELEC ENER 1ST GENER... FEBRUARY 10, 1975 TURBINE SUPPLIER....... . GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... AUGUST 27, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... LAKE MICHIGAN IE RESIDENT INSPECTOR......B. JORGENSEN ELECTRIC RELIABILITY LICENSING PROJ MANAGER... .D. HIGGINTON COUNCIL.. .... . ........ EAST CENTRAL AREA DOCKET NUMBER........... 50-315 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-58, OCTOBER 25, 1974 PUBLIC DOCUMENT ROOM.......MAUDE PRESTON PALENSKE MEMORIAL LIBRARY 500 MARKET STREET ST. JOSEPH, MICHIGAN 49085 IN$PECTION STATUS INSPECTION

SUMMARY

INSPECTION ON APRIL 14-18 (86018; 86018): INCLUDED A REVIEW OF SECURITY MANAGEMENT EFFECTIVENESS; SECURITY ORGANIZATION; RECORDS AND REPORTS; TESTING AND MAINTENANCE; LOCKS, KEYS AND COMBINATIONS; PHYSICAL BARRIER - VITAL AREAS; POWER SUPPLY; LIGHTING: COMPENSATORY MEASURES; ACCESS CONTROL - PERSONNEL, PACKAGES AND VEHICLES; DETECTION AIDS - VITAL AREAS; ALARM STATIONS; PERSONNEL TRAINIt:G AND QUALIFICATIONS; CONTINGENCY PLAN REVIEW AND SAFEGUARDS INFORMATION. THE INSPECTION BEGAN DURING THE DAYSHIFT. THE LICENSEE HAS FOUND TO BE IN COMPLIANCE HITH NRC REQUIREMENTS IN THE AREAS INSPECTED. TH0 OPEN ITEMS HERE IDENTIFIED DURING THIS INSPECTION. ALL PREVIOUSLY IDENTIFIED VIOLATIONS AND OPEN ITEMS HERE CLOSED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: PAGE 2-068 l

       .-. _        - - - -~.      -            . - .   - -_      . _ .      .  -.      -     . ._              .      - . -  .

I r MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M COOK 1 M Report Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS NOWE FACILITY ITEMS (PLANS AND PROCEDURES): WOWE l fiAWAGERIAL ITEMS: I NDHE i PLANT STATUS: MAXIMUM P0HER LIMITED TO 90% BY LICENSEE TO MINIMIZE SG HEAR 4 LAST IE SITE INSPECTION DATE: 6/09/86 INSPECTICH REPORT NO: 86022 REP 0RTS FR0M LICENSEE l l

      ========================================================================================

! NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-05 04/11/86 04/16/86 GLASS TEST SPECIMEN FOR CONTAINMENT AIRLOOK FAILED GLASS TEST SPECIMEN FOR CONTAINMENT AI j 86-05 04/11/86 04/16/86 FAILED HHEN EXPOSED TO BETA RADIATION i 86-06 03/26/86 04/24/86 TIME RESPONSE TESTING OF REACTOR TRIP FROM REACTOR COOLANT PUMP UNDERVOLTAGE HAS INADEQUA TO PROCUDURAL DEFICIENCY.

       ================================================================================================

I l PAGE 2-069

1. Docksts 50-316 0PERATING STATUS En 23:22:203n232:2 ns:MZM22:02:Innnu M COOK 2 M
2. Reporting Periad 04/01/86 Outage + On-line Hrs: 719.0 MIMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

H. T. GILLETT (616) 465-5901 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3411 COOK 2
5. Nameplate Rating (Gross MHe): 1333 X 0.85 = 1133
6. Design Electrical Rating (Net MWe): 1100
7. Maximum Dependable Capacity (Gross MWe): 1100 1500
8. Maximum Dependable Capacity (Net MWe): 1060 DESIGN ELEC. ItRTING = 1100
                                                                                                 ......MRX. DEPDO. Crr. - 1000 1100%)
9. If Changes Occur Above Since Last Report, Give Roasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):

NO NET POWER OUTPUT THIS NONTH

11. Reasons for Restrictions, If Any:
                                                                                                 ==
                                                                                                       ----.__ _-=- ___.. ..._______....     - 100 NONE 1000-MONTH       YEAR      CUMULATIVE   R
12. Report Period Hrs 719.0 2,879.0 73,007.0 W 1,352.6 - 80 o
13. Hours Reactor Critical .0 50,381.4 gg
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line

{

                                                          .0   1.272.5      49,126.4 hf
                                                                                                                                            - 80                   fh n_
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 0 3,404,597 157,079,049 500-
18. Gross Elec Ener (MHH) 0 1.097.780 50,784,190
                                                                                                                                            - to
19. Het Elec Ener (MHH) 0 1,053,472 48,954,822
20. Unit Service Factor .0 44.2 69.6
21. Unit Avail Factor .0 44.2 69.6 - 20
22. Unit Cap Factor (MDC Net) .0 34.5 65.5
23. Unit Cap Factor (DER Net) .0 33.3 64.0
24. Unit Forced Outage Rate .0 9.9 15.7 0 0 5 1'O l's 2'O 2's 30
25. Forced Outage Hours .0 139.2 9.104.7 DAYS
                 ,26 . Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE

27. If Currently Shutdown Estimated Startup Date: 06/01/86 PAGE 2-070

_ . _ . . . _ _ __ ._ _ _ _ ____m . MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM COOK 2 M i Report Period APR 1956 UNIT SHUTD0NNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Number _ System Component Cause & Corrective Action to Prevent Recurrence tio , Date 4 ZZ ZZZZZZ THE UNIT HAS REMOVED FROM SERVICE ON 860228 FOR 172 02/28/86 S 719.0 C CYCLE 5-6 REFUELING OUTAGE. THE CORE HAS BEEN UNLOADED AND THE CONTROL ROD GUIDE TUBE SPLIT l PIN REPLACEMENT AND THE STEAM GENERATOR EDDY l CURRENT TESTING AND TUBE PLUGGING COMPLETED. , THE ESTIMATED RETURNED TO SERVICE DATE IS JUNE 1, 1986. t i i l l 1 1 J uMuMMMMMMMM COOK 2 REMAINS SHUTDOHN FOR REFUELING IN APRIL.

! N 

SUMMARY

M l MMMMMMMMMMM Method Svstem 8 Component Type Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of i D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                   & License Examination           9-Other            (LER) File (NUREG-0161)

PAGE 2-071 l

cac :::::::::::::: urenewar ::::::=u u COOK 2 n trutn ::::=r====um:ns :::::=nu====wn FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTIQH UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATC.................... MICHIGAN LICENSEE................. INDIANA & MICHIGAN ELECTRIC COUNTY...................BERRIEN CORPORATE ADDRESS....... 1 RIVERSIDE PLAZA COLUMBUS, OHIO 43216 i DIST AND DIRECTION FROM NEAREST POPUL ATION CTR. .11 MI S OF CONTRACTOR 4 BENTON HARBOR, MI ARCHITECT / ENGINEER.......AMERICAN ELEC. POWER SERVICE CORP. TYPE OF R EACT OR. . . . . . . . . . . . PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... MARCH 10, 1978 CONSTRUCTOR..............J. A. JONES CONSTRUCTION DATE ELEC ENER IST GENER... MARCH 22, 1978 TURBINE SUPPLIER.........BROHN BOVERI DATE COMMERCIAL OPERATE.... JULY 1, 1978 REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0HCE THRU IE REGION RESPONSIBLE......III C0" DENSER COOLING HATER.... LAKE MICHIGAN IE RESIDENT INSPECTOR......B. JORGENSEN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. HIGGINTON i COUNCIL.................. EAST CENTRAL AREA DOCKET NUMBER........... 50-316 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-74, DECEMBER 23, 1977 PUBLIC DOCUMENT ROOM.......MAUDE PRESTON PALENSKE MEMORIAL LIBRARY 500 MARKET STREET ST. JOSEPH, MICHIGAN 49085 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON APRIL 14-18 (86018; 86018): INCLUDED A REVIEW OF SECURITY MANAGEMENT EFFECTIVENESS; SECURITY ORGANIZATION; RECORDS AND REPORTS: TESTING AND MAINTENANCE; LOCKS, KEYS AND COMBINATIONS; PHYSICAL BARRIER - VITAL AREAS; POWER SUPPLY; LIGHTING; COMPENSATORY MEASURES; ACCESS CONTROL - PERSONNEL, PACKAGES AND VEHICLES; DETECTION AIDS - VITAL AREAS; ALARM STATIONS; PERSONNEL TRAINING AND QUALIFICATIONS; CONTINGENCY PLAN REVIEH AND SAFEGUARDS INFORMATION. THE INSPECTION BEGAN DURING THE DAYSHIFT. THE LICENSEE HAS FOUND TO BE IN COMPLIANCE HITH NRC REQUIREMENTS IN THE AREAS INSPECTED. TH0 OPEN ITEMS HERE IDENIIFIED DURING THIS INSPECTION. ALL PREVIOUSLY IDENTIFIED VIOLATIONS AND OPEN ITEMS HERE CLOSED. ENFORCEMENT

SUMMARY

UNIT INSTRUMENTATION 2 TECHNICALCHANNELS SPECIFICATION OPERABLE,3.3.3.10BTAKEREQUIRES THE ACTIONWITH LESS SH0HN THAN3.5-13. IN TABLE THE MINIMUM NUMBER OF RADI0 ACTIVE GASEOUS EFFLUENT MONITORING THE ACTION SH0HN IN TABLE 3.5-13 FOR NO CPERABLE UNIT AUXILIARY BUILDING VENTILATION SYSTEM NOBLE GAS ACTIVITY MONITOR IS ACTION 28, NHICH PERMITS CONTINUED EFFLUENT RELEASES PROVIDED i GRAB SAMPLES ARE TAKEN AT LEAST ONCE PER EIGHT HOURS. CONTRARY TO THE ABOVE, ON DECEMBER 27, 1985 HITH NO OPERABLE UNIT 2 AUXILIARY BUILDING VENTILATION NOBLE GAS ACTIVITY MONITOR, ACTION 28 HAS NOT COMPLIED HITH IN THAT CONSECUTIVE SAMPLES HERE TAKEN AFTER OCCURRENCES AN INTERVAL ON JUNE OF3,1985 10 HOURS AND AND, ON 22 MINUTES UNIT RATHER 1, ON NOVEMBER THAN 8 AND AT LEAST ONCE PER EIGHT HOURS. THIS EVENT APPEARS REPETITIVE OF P 12,1984. (SS00 S) PAGE 2-072

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM COOK 2 M Report Period APR 1986 INSPECTI,0N STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM-ENFORCEMENT

SUMMARY

i i 4 OTHER ITEMS 'l ) i SYSTEMS AND COMPONENT PROBLEMS: t / NOME i FACILITY ITEMS (PLANS AND PROCEDURES): NONE

;                              MANAGERIAL ITEMS:

l NOME ( 4 PLANT STATUS: I HHEN IT RETURNS TO POWER, THE LICENSEE HILL RESUME LIMITING PDHER TO 80% TO MINIMIZE SG HEAR. 1 4 LAST IE SITE INSPECTION DATE: 6/9/86 i INSPECTION REPORT NO: 86022 I REP 0RTS FR0M LICENSEE

                               ================================================================================================================

] I NUMBER DATE OF DATE OF SUBJECT EVENT REPORT - i,r _ i 86-09 03/15/86 04/10/86 CONTAINMENT TYPE B AND C LEAKAGE EXCEEDS L.C.O. VALUE DUE TO DEGRADATION OF ISOLATION VALVE SEATING SURFACES 86-10 03/17/86 04/10/86 INOPERABLE FIRE SEAL DUE TO MISSING SEALENT 4 86-11 03/18/86 04/17/86 ICE CONDENSER ICE BASKET HEIGHTS 86-12 03/27/86 04/24/86 ECCS FLDH BALANCE FOUND OUT OF SPECIFICATION 86-14 04/04/86 05/02/86 EXCESSIVE SAFEGUARD VENTILATION SYSTEM AIR FLOW RATE DUE TO SURVEILLANCE PROCEDURE DEFICIENCIES. I ================================================================================================================================== I, I l ! PAGE 2-073 , i

1. Dockst: 50-298 0PERATINO 5TATUS I:M M :: MH:n======U :M n; :: ns:! n a COOPER STATION n
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts K. E. SUTTON (402) 825-3811 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MHt): 2381 COOPER STATION
5. Nameplate Rating (Gross MWe): 983 X 0.85 = 836
6. Design Electrical Rating (Not MWe): 778
7. Maximum Dependable Capacity (Gross MWe): 787 1500
8. Maximum Dependable Capacity (Not MWe): 764 DESIGN E120. MTINS = 778
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE - 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 103,728.0
13. Hours Reactor Critical 719.0 2.851.0 77.864.1
14. Rx Reserve Shtdwn Hrs .0 .0 .0 ====-- =---------------------- -800
15. Hrs Generator On-Line 719.0 2.839.0 76,544.8 f
16. Unit Reserve Shtdwn Hrs .0 .0 .n -so
17. Gross Therm Ener (MHH) 1,095.693 5.785,106 150,647.772 __
18. Gross Elec Ener (MHH) 363,179 1,946,057 48,086,030 -80
19. Net Elec Ener (MHH) 351,272 1,875,880 46,330,240
20. Unit Service Factor 100.0 98.6 73.8 - 40
21. Unit Avail Factor 100.0 98.6 73.8
22. Unit Cap Factor (MDC Net) 63.9 85.3 58.5 - 30
23. Unit Cap Factor (DER Net) 62.8 83.7 57.4
24. Unit Forced Outage Rate .0 1.4 4.9 0 e -

g 5 lg l5 lo is 30

25. Forced Dutage Hours .0 40.0 3,314.7 DAYS
26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):

REFUELING & MAINTENANCE: 10/03/86 - 10 HEEKS. I

27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-074

_ . _ _ _ . ___ . _ _ _ . _ . - _ _ _ _ . _ _ _ . . _ _ _ _. m.__ _ _ . _ _ . _ , _ . . . _ _ ._ _ __ _ _.___.___.__-._.__ _ . . _ _ _ . . _ _ _ . MMMMMMMMMMMMMMMMMMMMMMMDEMMMMMMKCMME COOPER STATION M ! Raport Period APR 1986 UNIT -SHUTD0HNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM t4o . Date Type Hours Reason Method LER Number $sstem Component Cause & Corrective Action t' Prevent Recurrence NONE i a I 1 1 1 i 1 MMMMMMMMMMM COOPER STATION OPERATEP ROUTINELY HITH NO OUTAGES OR REDUCTIONS IN APRIL. W

SUMMARY

M

MMMMMMMMMMM Type Reason Method System 8 Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H

, S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for ! C-Refueling H-Gther 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report . & License Examination 9-Other (LER) File (NUREG-0161) PAGE 2-075 ] 1 i

CCO 2=% EnM:U:KCEMEEM2=HinfUnc25: MUM n COOPER STATION u

     . n==n==umunnunnuuMuun=muun===nnunur=u                          FACILITY              DATA                                             Rrport Period APR 1986

, FACILITY DESCRIPTION UTILITY a CONTRACTOR INFORMATION l LOCATION . UTILITY i STATE.................... NEBRASKA LICENSEE................. NEBRASKA PUBLIC POWER DISTRICT COUNTY...................NEMAHA CORPORATE ADDRESS........P.O. BOX 479 DIST AND DIRECTION FROM ' i' NEAREST POPULATION CTR.. 25 MI S OF CONTRACTOR NEBRASKA CITY, NEB ARCHITECT / ENGINEER....... BURNS & ROE TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... FEBRUARY 21, 1974 CONSTRUCTOR.............. BURNS & ROE DATE ELEC ENER 1ST GENER...MAY 10, 1974 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... JULY 1, 1974 REGULATORY INFORMATION j CCNDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......IV CONDENSER COOLING HATER.... MISSOURI RIVER IE RESIDENT INSPECTOR......D. DUBOIS ELECTRIC RELIABILITY l COUNCIL..................MID-CONTINENT AREA LICENSING PROJ MANAGER.....H. LONG DOCKET NUMBER........... 50-298 i RELIABILITY C00RDINATION . 3 AGREEMENT - LICENSE & DATE ISSUANCE....DPR-46, JANUARY 18, 1974 PUBLIC DOCUMENT ROOM....... AUBURN PUBLIC LIBRARY 1118 15TH STREET AUBURN, NEBRASKA 68305 i INSPECTION

SUMMARY

i INSPECTION CONDUCTEL FER.24-28, 1986 (86-05) ROUTINE, UNANNOUNCED INSPECTION OF THE LICENSEE'S RADIATION PROTECTION PROGRAM INCLUDING: AUDITS. HITHINORGANIZATION AND MANAGEMENT CONTROLS, TRAINING AND QUALIFICATIONS. MAINTAINING DCCUPATIONAL EXPOSURES ALARA, AND THE AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION CONDUCTED MARCH 3-7, 1986 (86-09) i l INCLUDING REVIEW EMENISTRY/RADI0 CHEMISTRY OF ORGANIZATION PROGRAM, AND MANAGEMENT CONTROL, STAFFING AND STAFF QUALIFICATIONS, TRAINING PR 4 FACILITIES AND EQUIPMENT, POSTACCIDENT SAMPLING SYSTEM (PASS), QUALITY ASSURANCE (QA) PROGRAM OF } CHEMISTRY /RADI0 CHEMISTRY ACTIVITIES. QUALITY CONTROL OF ANALYTICAL MEASUREMENTS, RADI0 CHEMISTRY CONFIRMATORY MEASUREMENTS, AND A WHOLE BODY COUNTING SYSTEM CONFIRMATORY MEASUREMENTS. MITHIN THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. 1 ENFORCEMENT

SUMMARY

4 j 4 1 COMPENSATORY (8502 3) MEASURES" SAFEGUARDS INFORMATIONINADEQUATE MANAGEMENT CONTROL IMPACTING SECURITY INADEQUATE SECURITY ORGANIZATION SAFEGUARDS INFORMATION FAILURE TO DEMONSTRATE SECURITY RELATED T PAGE 2-076

.                                                                                                                                                                                                      1 I

nuunnMununnunuunnn=ntunuzzzannum=enn COOPER STATION M Report Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT

SUMMARY

(8502 4) CONTRARY TO COOPER NUCLEAR STATION TECHNICAL SPEC IFICATION 6.3.3, THE LICENSEE FAILED TO PERFORM C OMPONENTS MANUFACTUREERS PREVENTIVE MAINTENANCE R ECOMMENDATIONS FOR SAFETY RELATED EQUIPMENT, OR I N LIEU THEROF, PERFORM A DOCUMENTED ENGINEERING A NALYSIS OF A BASIS FOR NOT PERFORMING THE SUBJECT MAINTENANCE. CONTRARY TO COOPER HUCLEAR STATION TECHNICAL SPEC IFICATION 6.1.4, THE LICENSEE FAILED TO HAVE IDEN TIFIED PROCEDURES OR DOCUMENTATION OF MINIMUM QUA LIFICATIONS AND TRAINING AS SPECIFIED IN ANSIN18. 1-1971, SECTION 5.3. CONTRARY TO TS 6.12.1.A, ON JANUARY 28, 1986, A RADIATION HORKER HAS PRESENT IN THE TRIANGLE ROOM, A POSTED HIGH RADIATION AREA HITH DOSE RATES UP TO 350 MREM PER HOUR, AND DID NOT POSSESS A RADIATION MONITORING DEVICE HHICH CONTINUOUSLY INDICATED THE RADIATION DOSE RATE IN THE AREA. CONTRARY TO 10 CFR 20.311 AND 10 CFR 61.55(A)(8), ON SEPTEMBER 26, 1985 AND JANUARY 23, 1986, COMPACTED DRY ACTIVE HASTE WAS SHIPPED, THE HASTE CLASSIFICATION OF HHICH HAS DETERMINED, BASED ON SCALING FACTORS DERIVED FROM RADIONUCLIDE RATIOS IN REACTOR COOLANT, WITHOUT REASONABLE ASSURANCE THAT THE RADIONUCLIDE DISTRIBUTION OF DRY ACTIVE HASTE COULD BE CORRELATED TO ACTUAL MEASUREMENTS OF REACTOR COOLANT. CONTRARY TO TS 6.8.1.A AND REGULATORY GUIDE 1.33, 1972, NHICH REQUIRED ADEQUATE PREVENTATIVE MAINTENANCE PROGRAM PROCEDURES, PROCEDURE PM-123 HAS FOUND TO BE INADEQUATE AND RESULTED IN IMPROPER MAINTENANCE ON AN EMERGENCY DIESEL GENERATOR. CONTRARY TO TS 6.8.3, A TEMPORARY CHANGE HAS MADE TO PROCEDURE OP-404 HITHOUT APPROVAL OF TH0 MEMBERS OF THE PL ANT STAFF AT LEAST DNE OF HHOM HOLDS AN SRO LICENSE. (8600 4) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: PLANT STATUS: NORMAL POWER OPERATION LAST IE SITE INSPECTION DATE: MARCH 3-7, 1986 INSPECTION REPORT NO: 50-298/86-09 PAGE 2-077

  - _ _ _ _ _ _ - _ _ - _ -            . - _ - .       -  .       - _ _ _ ~                       . _-.          . .- _                   _._-                   .. _.     .-

i . n=nnnt:2:nnunun rn=ur== c ;ntx="2Lu== Report Period APR 1986 REPORTS FR0M LICENSEE M COOPER STATION D Man 2 urnun:nnusunncannuanununnnaannu a================================================================================================================================= NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-002 01/29/86 04/10/86 HIGH PRESSURE COOLANT INJECTION OVERSPEED TRIP CONTROL VALVE bIkPHRAGM FAILURE ! 86-005 02/20/86 05/21/86 APRM SURVEILLANCE TESTING VALVE DIAPHRAGM FAILURE r 86-004 02/27/86 03/27/86 RNCU GROUP III ISOLATION 86-005 02/27/86 03/27/86 HIGH PRESSURE COOLANT INJECTION TURBINE GLAND SEAL STEAM CONDENSER FAILURE ! 86-006 02/27/86 05/27/86 REACTOR TRIP .

86-007 03/11/86 04/09/86 MAIN STEAM LINE HIGH FLOH SETPOINT ANOMALY
                              ==================================================================================================================================

1 i i .) l i 1 PAGE 2-078; '

  ._ u.-_, .. .-2,e _u.m, s. -__ .4--4 4- - e+- m _   .m_ m .. __ % - ,       m_._______ _ _ w m. 4 m_ _ m a-,

I l t s i i THIS PAGE INTENTIONALLY LEFT BLANK } l l 1 i I i I l l l l PAGE 2-079

1. Dockct: 50-302 0PERATINO STATUS C;u 22Mn22nz:MMunaa, 2 MOM M3M MZMZMM u CRYSTAL RIVER 3 0
2. Reporting Pericds 04/01/86 Outage + On-lina Hrs: 719.0 EU::Un ZMZ3EMZ tM225mM M29'"E' ' ' 125HM
3. Utility

Contact:

D. GRAHAM (904) 795-3802 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2544 CRYSTAL RIVER 3
5. Nameplate Rating (Gross MWe): 989 X 0.9 = 890
6. Design Electrical Rating (Net MHe): 825
7. Maximum Dependable Capacity (Gross MWe): 860 1803
8. Maximum Dependable Capacity (Net MHe): 821 DESIGN ELEO. RATING - 825
                                                                                                                                                      ..... 190(. OEPDO. CRP. -         821'(100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any NONE 1000 -

MONTH YEAR CUMULATIVE ,q

12. Report Period Hrs 719 9 2.879.0 80.063.0 =
13. Hoars Reactor Critical .0 23.6 50,325.4 NO NET POWER OUTPUT THIS MONTH g

__ ____ goo g

14. Rx Resweve Shtown Hrs .0 .0 1.275.5 co .
15. Hrs Generator On-Line .0 23.6 49,114.5 I

hf , ,g ;

16. Unit Reserve Shts1wn Mrs .0 _ .0 .0 '
17. Gross Therm Ener (MHH) 0 55,103 110,523.968 500- . ao
18. Gross Elec Ener (MHH) 0 19,541 37.761,185
19. Het Elec Ener (MHH) 0 18.580 35.863,252
20. Unit Service Factor 0 .8 61.3 - to
21. Unit Avail Factor .0 .8 61.3
22. Unit Cap Factor (MDC Net) .0 .8 54.6 - E3
23. Unit Cap Factor (DER Net) .0 .8 54.3
24. Unit Forced Outage Rate 100.0 99.2 23.4 0 . . . . .- 0 0 5 to 15 30 25 30
25. Forced Outage Hours 719.0 2.855.4 15.016.2 DAYS
25. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE APRIL 1986

27. If Currently Shutdown Estimated Startup Date: 06/15/86 PAGE 2-080

m - _ - -- . _ _ . _ . _. = _ . . _ ___ __ ._ _. . _ . . _ _ _ _ _ - - _ _ - _ _ - - - - - n==u==u==n:nnusu M:ssaunt :c cacc n CRYSTAL RIVER 3 M Rrport Period APR 1986 UNIT SHUTD0NNS / REDUC, IONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date ~~ lype Hours Reason Method LER Number System Component Cause a Corrective Action to Prevent Recurrence i 01/01/86 F 719.0 A 4 86-01 CB PUMPXX THE FOUR REACTOR C00LANT PUMPS ARE BEING MODIFIED 81-01 AND REPAIRED WITH NEN PUMP SHAFTS. I i i i rurMMMMMMMM CRYSTAL RIVER 3 REMAINS SHUTDOWN FOR EQUIPMENT REPAIR IN APRIL. M

SUMMARY

M MHKMXMMMMMM i Tvpe Reason Method System & Component  ; l F-Fe rced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for , C-Refueling H-Other 3-Auto Scram Preparation of 4 D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                  & License Examination         9-Other                  (LER) File (NUREG-0161)                                                                                                         ,

PAGE 2-081-l

_s. ' c. nunnunen=nutunzun=nn=u=uns=n===nnsza - u CRYSTAL RIVER 3 n nazunusunsunsumenununxsuunnannutzunn- FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION - UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... FLORIDA LICENSEE................. FLORIDA P0HER CORPORATION COUNTY................... CITRUS CORPORATE ADDRESS....... 3201 34TH STREET, SOUTH ST PETERSBURG, FLORIDA 33733 i DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 7 MI NH OF CONTRACTOR CRYSTAL RIVER, FLA ARCHITECT / ENGINEER. . . . . . . GILBERT ASSOCI ATES TYPE OF REACTOR............PHR NUC 51EAM SYS SUPPLIER. . . BABCOCK & HILCOX DATE INITIAL CRITICALITY... JANUARY 14, 1977 CONSTRUCTOR..............J. A. JONES CONSTRUCTION DATE ELEC ENER 1ST GENER... JANUARY-30,.1977 TURBINE SUPPLIER. . . . . . . . .HESTINGil0USE DATE COMMERCIAL OPERATE.... MARCH 13, 1977- REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING WATER.... GULF OF MEXICO IE RESIDENT-INSPECTOR......Y. STETKA ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....H. SILVER COUNCIL.... ............. SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-302 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-72, JANUARY 28, 1977 PUBLIC DOCUMENT ROOM....... CRYSTAL RIVER PUBLIC LIBRARY 668 N.H. FIRST f CRYSTAL RIVER, FLORIDA 32639 INSP5CTION STATUS INSPECTION

SUMMARY

             + INSPECTION JANUARY 2-3, 28 (86-02): THIS SPECIAL, ANNOUNCED PHYSICAL SECURITY INSPECTION ENTAILED 9 INSPECTOR-HOURS ON SITE REVIEHING THE CIRCUMSTANCES ASSOCIATED HITH A PHYSICAL SECURITY EVENT REPORTED BY THE LICENSEE ON DECEMBER 19. 1985. A VIOLATION HAS IDENTIFIED HHICH RELATED TO THE LICENSEE'S FAILURE TO FULLY IMPLEMENT THE PHYSICAL SECURITY PLAN IN THE APEA 0F INSPECTION AND MAINTENANCE OF VITAL AREA BARRIERS.

INSPECTION JANUARY 3-7 (86-04): THIS SPECI AL, UNANNOUNCED INSPECTION ENTAILED 139 INSPECTOR-HOURS ON SITE IN THE AREA 0F EVENT FOLLONUP. 1, THE EVENT UNDER ASSESSMENT HAS THE FAILURE OF REACTOR COOLANT PUMP (RCP) 1A AND THE SUBSEQUENT REACTOR TRIP DN JANUARY 1986. AREAS UNDER REVIEW INCLUDED: AN INSPECTOR REVIEW OF RECORDED VALUES OF SELECTED PLANT PARAMETERS ASSOCIATED HITH THE EVENT; AN INSPECTOR REVIIEH OF THE LICENSEE'S POST TRIP REVIEH; AND INSPECTOR REVIEW OF SELECTED PLANT CHEMISTRY DATA FOR INDICATION OF FUEL ELEMENT FAILURE; AND AN INSPECTOR REVIEH OF RCP 1 A'S SURVEILLANCE, PREVENTATIVE MAINTENANCE, CORRECTIVE MAINTENANCE AND PREDICTIVE MAINTENANCE PROGRAMS. ONE VIOLATION HAS IDENTIFIED - THREE EXAMPLES.0F FAILURE TO FOLLON HRITTEN AND APPROVED ABNORMAL PROCED"JRE CAP) 580, REACTOR PROTECTION SYSTEM ACTUATION DURING RECOVER FROM A REACTOR TRIP. INSPECTION MARCH 3-7 (86-10): THIS UNANNOUNCED PHYSICAL SECURITY INSPECTION INVOLVED 80 INSPECTOR-HOURS (14 HOURS ON BACKSHIFT) INSPECTING: PHYSICAL SECURITY PLAN AND IMPLEMENTING PROCEDURES; MANAGEMENT EFFECTIVENESS - SECURITY PROGRAMS SECURITY CRGANIZATION; SECURITY PROGRAM AUDIT; RECORDS AND REPORTS; TESTING AND MAINTENANCE; LOCKS, KEYS, AND COMBINATIONS; PHYSICAL-BARRIERS - PROTECTED AREA; PHYSICAL BARRIERS - VITAL AREAS; COMPENSATORY MEASURES; ASSESSMENT AIDS; ACCESS CONTROL - VEHICLES; DETECTION AIDS - PROTECTED AREA; DETECTION AIDS - VITAL AREAS; COMMUNICATIONS; AND PERSONNEL TRAINING AND QUALIFICATI0H - GENERAL REQUIREMENTS. THE LICENSEE HAS FOUND TO BE IN COMPLIANCE HITH REGULATORY REQUIREMENTS IN THE 16 AREAS INSPECTED HITH THE PAGE 2-082 s

l' MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM CRYSTAL RIVLR 3 M j Repsrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMFMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

EXCEPTION OF THE FOLLOHING: FAILURE TO PROVIDE ADEQUATE ASSESSMENT CAPABILITY FOR PROTECTED AREA PERIMETER. THIS SPECIAL, UNANNOUNCED INSPECTION INVOLVED 80 INSPECTOR-HOURS ON SITE INVESTIGATING AIRBORNE INSPECTION MARCH 3-13 (86-11): RADI0 ACTIVITY CONCERNS AND POTENTIAL AIRBORNE RADI0 ACTIVITY RELEASED TO UNRESTRICTED AREAS AS A RESULT OF HYDROLASING ACTIVITIES TH0 VIOLATIONS HERE IDENTIFIED - (1) FAILURE TO MAINTAIN ADEQUATE RADIATION HORK PERMIT PROCEDURE AND (2) FAIL ADEQUATE EVALUATIONS OF RADIOLOGICAL HAZARDS THAT MAY BE PRESENT. ENFORCEMENT

SUMMARY

I NONE 4 OTHER ITEMS t SYSTEMS AND COMPONENT PROBLEMS:

     + RCP SHAFT REPLACEMENT CONiiHUING.
     + PLANT RESTART SCHEDULED FOR JUNE 14.

FACILITY ITEMS (PLANS AND PROCEDURES): MANAGERIAL ITEMS: NONE. PLANT STATUS: SHUTDOHN, COOLED DOWN (MODE 5) IN ORDER TO REPAIR RCP 1 A/1B/1C/1D. LAST IE SITE INSPECTION DATE: MARCH 3-13,1986 + INSPECTION REPORT NO: 50-302/86-11 + l REP 0RTS FR0M LICENSEE 1 , ______ .._. ________.._... _______. ___.======================================================================================== NUMBER DATE OF DATE OF SUBJECT EVENT REPORT __ --

                                                                                                               -        -_- --=___--

NONE.

     =========================================================================================               ========================================

l ' PAGE 2-083

1. Docksts 50-546 0PERATINO $TATUS unnunurunMucunn=zMutuut==nzunnanngMu M DAVIS-BESSE 1 M
2. Rapsrting Pcried: 04/01/86 Outags + On-lina Hrs: 719.0 EM%2MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

MORTEZA KHARZRAI (419) 249-5000 X290 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2772 DRVIS-BEJ'SSE 1
5. Nameplate Rating (Gross MHo): 1069 X 0.9 = 962
6. Design Electrical Rating (Nat MWe): 906
7. Maximum Dependable Capacity (Gross MWe): 90G ISUU
8. Maximum Dependable Capacity (Net MHe): 860
9. If Changes Occur Above Since Last Report, Give Reasons:
                                                                                                                                                     ,,,,,,                      [

NONE

10. Power Level To Which Restricted, If Any (Not MMe):
11. Reasons for Restrictions, If Any:

NONE 1000-MONTH YEAR

12. Report Period Hrs 719.0 2.879.0 CUMULATIVE 67.944.0 g NO NET POWER OUTPUT THIS MONTH
13. Hours Reactor Critical .0 .0 35.878.0 -------------------------------------- -100
14. Rx Reserve Shtdwn Hrs .0 .0 4,058.8 u
15. Hrs Generator On-Line .0 .0 34,371.8 hf - 80 gg
16. Unit Reserve Shtdwn Hrs .0 .0 1.732.7 [3 ""

2:

17. Gross Therm Ener (MHH) 0 0 81.297.599 500 - - 80
18. Gross Elec Ener (MHH) 0 0 26.933.622
19. Net Elec Ener (MHH) O q 25,253.177
20. Unit Service Factor .0 .0 50.6 - 90
21. Unit Avail Factor .0 .0 53.1
22. Unit Cap Factor (MDC Net) .0 .0 43.2 -20
23. Unit Cap Factor (DER Net) ___ .0 .0 41.0
24. Unit Forced Outage Rate 100.0 100.0 29.7 U 0' 5' 10' 15 30
                                                                                                                                                                                     .                              0
25. Forced Outage Hours 719.0 2.879.0 15.170.8 25 30 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE "Il N

27. If Currently Shutdown Estimated Startup Date: 08/16/86 PAGE 2-084

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM DAVIS-BESSE 1 M Ripset Period APR 1986 U N I T' SHUTD0WNS / R(DUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No, Date Type hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 4 85-013 JK SC THE UNIT REMAINED SHUTDOHN FOLLOHING THE REACTOR TRIP 7 06/09/85 F 719.0 A DN JUNE 9, 1985, DUE TO MAIN FEED CONTROL PUMP PROBLEMS. MMuxMMMMMMM DAVIS-BESSE REMAINS SHUTDOWN FOR EQUIPMENT REPAIR. N

SUMMARY

M MMMEMMMMMMM Type Reason Method Svstem & Componeni F-Fa rced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                & License Examination         9-Other         (LER) File (NUREG-0161)

PAGE 2-085 l

MDMOOMOMMMMDMODOMMOOMnnnnnnnonnnnMDM M DAVIS-BESSE 1 O MDDDDDDDDDMMDDDDDDDDDDouuuaanuvnu DD FACILITY DATA Repor t Per-lod APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE................... 0HIO LICENSEE................. TOLEDO EDISDN COUNTY.................. 0TTAHA CORPORATE ADDRESS. . . . . . . 300 MADISDN AVENUE DIST AND DIRECTION FROM TOLEDO, OHIO 43652 NEAREST POPULATION CTR.. 21 MI E OF CONTRACTOR TOLEDO, OH ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...BABCDCK & HILCOX DATE INITIAL CRITICALITY... AUGUST 12, 1977 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... AUGUST 28, 1977 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JULY 31, 1978 REGULATORY INFORMATI0B CONDENSER COOLING METH'0D... COOLING TOWER IE REGION RESPONSIBLE......III CONDENSER COOLING HATER. . . .L AKE ERIE IE RESIDENT INSPECTOR......H. ROGERS ELECTRIC RELIABILITY COUNCIL............ ..... EAST CENTRAL AREA LICENSING PROJ MANAGER.....A. DEAGAZIO RELIABILITY COORDINATION DOCKET NUMBER........... 50-346 AGREEMENT LICENSE & DATE ISSUANCE....NPF-3, APRIL 22, 1977 PUBLIC DOCUMENT R00M..... . UNIVERSITY OF TOLEDO LIBRARY GOVERNMENT DOCUMENTS COLLECTION 2801 NEST BANCROFT AVENUE TOLEDO, OHIO 43606 INSPECTION

SUMMARY

INSPECTION STATUS INSPECTION ON JANUARY 14 THROUGH APRIL 2 (86004): SUPPLY (AFPTSS) PIPING MODIFICATIONS; THE FACILITY CHANGE REQUEST (FCR)SPECIAL,SYSTEM; ANNOUNCED INSPECTION OF THE AUXILIARY FEEDHATER PUMP T CONFIRMATORY ACTION LETTER (CAL) (IEB) 79-14; THE BECHTEL CONTROL OF HIGH ENERGY LINE BREAK (HELB)85-13 ACTIONS; THE STATUS ACTIONS OF COMPLETION OFON LICENSEE EV IE BULLETIN AREAS INSPECTED, ANALYSES; AND FOLLOHUP DN PREVIOUS INSPECTION FINDINGS. OF THE SITE PROCEDURES; FAILURE OF THE LICENSEE TO TAKE ADEQUATE CORRECTIVE ACTION ON IDENTIFIED PRO INSPECTION ON JANUARY 5 THROUGH MARCH 3 (86005): REPORTS (LER), OPERATIONAL SAFETY, ROUTINE, UNANNDUNCED INSPECTION OF PREVIOUS INSPECTION FINDINGS, LICENSEE EVENT OF LICENSEE PERFORMANCE CORRECTIVE ACTIONS, TMI ACTION ITEMS, MAINTENANCE AND MANAGEMENT SYSTEMATICMEETING. ASSESSMENT INTER SPECIAL INSPECTION BY RESIDENT AND DURINGREGIONAL THE TRANSIENTINSPECTORS OF JUNE 9, 1985. OF LICENSEE ACTIONS IDENTIFIED AS A RESULT OF THE ROOT CAUSE INVEST YNSPECTOR-HOURS ONSITE DURING OFF-SHIFTS.THE INSPECTION INVOLVED 593 INSPECTOR-HOURS ONSITE BY SEVEN NRC INSPECT AND TH0 VIOLATIONS HERE IDENTIFIED IN THE AREA 0F FOLLOHUP OF PREVIOUS INSPECTION FINDINGS (IMP AND FAILURE TO UPDATE THE SAFETY ANALYSIS REPORT). PAGE 2-086 d N

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM R: port Period APR 1986 INSPECTION STATUS - (CONTINUED) M DAVIS-BESSE 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: THE UNIT IS IN COLD SHUTDOWN FOLLONING THE JUNE 9, 1985 TRIP. LAST IE SITE INSPECTION DATE: 7/11/86 INSPECTION REPORT NO: 86015 REPORTS FR0M LICENSEE

                =================================================================================_================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-13 03/12/86 04/10/86 TH0 (2) PIPING SYSTEM STRESS PROBLEMS EXCEED USAR ALLONABLE STRESSES 86-14 03/12/86 04/10/86 INADEQUATE AFPT SC LEVEL CONTROL FUNCTIONAL TESTING 86-15 03/21/86 04/18/86 SEISMIC QUALIFICATION, DOMESTIC HATER LINE IN BATTERY ROOMS A 8 8 86-16 04/01/86 04/28/86 SAFETY FEATURES ACTUATION DUE TO AN ELECTRIC SHORT 86-17 03/25/86 04/30/86 THERMAL DEGRADATION OF FIRE BARRIER PENETRATION FILL MATERIAL

                ===============================================================================================================, =================

PAGE 2-087 i

1. D:ckst 50-275 0PERATIhG STATUS ununuxunununununux=runuzuunuunuMunau M DIABLO CANYON 1 H
2. Rapseting Paried: 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

BOB KANICK (805) 595-7351 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3338 DIRBLO CRNYON 1
5. Nameplate Rating (Gross MWe): 1137
6. Design Electrical Rating (Het MHe): 1086
7. Maximum Dependable Capacity (Gross MHe): 1125 18"'
8. Maximum Dependable Capacity (Net MHe): 1073
                                                                                         ,,,,,                                        [
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MWe):

a a g - a ggg g

11. Reasons for Restrictions, If Any:
                                                                                    - y -------                             ... .. _______              . goo NONE gogo _                                                               .f . .

y MONTH YEAR CUMULATIVE R

12. Report Period Hrs 719.0 2,879.0 8,613.3 W
13. Hours Reactor Critical 719.0 2,847.5 8,143.1 - 80
14. Rx Reserve Shtdwn Hrs .0 .0 .0 G
15. Hrs Generator On-Line 719.0 2,822.0 8,029.3 hf ,
16. Unit Reserve Shtdwn Prs
                                         .0          .0            .0 gj                                                                                      '
17. Gross Therm Ener (MHH) 2,406,348 9,065,053 25.630,506 500-
18. Gross Elec Ener (MHH) 884,700 3.021.300 8,535,632
                                                                                                                                                     - 40
19. Het Elec Ener (MHH) 778,141 2,875.091 8.109,322
20. Unit Service Factor 100.0 98.0 93.2
21. Unit Avail Factor 100.0 98.0 93.2
                                                                                                                                                     - 20
22. Unit Can Factor (MDC Net) 100.9 93.1 87.7
23. Unit Cap Factor (DER Net) 99.7 92.0 86.7
24. Unit Forced Outage Rate .0 2.0 3.7 0 0 5
25. Forced Outage Hours dD d5 $D is 30
                                        .0        57.0         304.4                                                     DRYS
25. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

l REFUELING OUTAGE, SEPTEMBER 1, 1986, 63 DAYS. #

27. If Currently Shutdown Estimated Startup Dater N/A PAGE 2-088
                                         - _.        ~     _    m         _ _ - .                 _

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Reprrt Period APR 1986 UNIT SHUTD0NNS / REDUCTICNS M DIABLO CANTON 1 MXMMMMMMvMKMMMMMMMMMMMMMMMMM:8MMMMMMM M No. Date lygg Hours Reason Method LER Number System Component Caase & Co.roctive Action to Prevent Recurrence l NONE 1 I i I i MMMMMMMMMMM DIABLO CANYON 1 OPERATED AT FULL POWER IN APRIL. M

SUMMARY

M MMMMMMMMMMM Tvoc Reason Method System & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhi*oit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                & Licease Examination         9-Other         (LER) Flie (NUREG-0161)

PAGE 2-089

_ _ _ _ _ . . _ . . _ . . - _ . _ _ _ - . _._.._ _ ._. _ . _ _ _ _ _ _ _ . _ _,m . _._m __m. _~ _mo . -- , _ . . ._ l

l. EM%M22nMNuMEE UNMZHH53%EMM MEMH%HUMM
                  .M          DIABLO CANYON 1                         u uw2nnusuuuuuumunnuunnunmuuuuuuuuuKEM                                           FACILITY                DATA-                                                Report Period APR 1986 3                   FACILITY DESCRIPTION                                                                          UTILITY a CONTRACTOR INFORMATION.

l LOCATION UTILITY. STATE.................... CALIF 0RNIA . LICENSEE................. PACIFIC GAS & ELECTRIC COUNTY................... SAN LUIS OBISPO CORPORATE ADDRESS....... 77 BFaLE STREET SAN FRANCISCO, CALIFORNIA 94106 DIST AND DIRECTION FROM NEAREST POPUL ATION CTR. .12 MI HSH OF CONTRACTOR , SAN LUIS OBISPD ARCHITECT / ENGINEER....... PACIFIC GAS & ELECTRIC

  • TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...NESTINGHOUSE ,

DATE INITIAL CRITICALITY... APRIL 29, 1984 CONSTRUCTOR.............. PACIFIC GAS a ELECTRIC DATE ELEC ENER IST GENER... NOVEMBER 11, 1984 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE....MAY 7, 1985 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......V CONDENSER COOLING HATER.... PACIFIC OCEAN IE RESIDENT INSPECTOR......M. MENDONCA ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....H. SCHIERLING l COUNCIL..................HESTERN SYSTEMS DOCKET NUMBER........... 50-275 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-80, NOVEMBER 2, 1984 PUBLIC DOCUMENT ROOM....... ROBERT F. KENNEDY LIBRARY - I CALIFORNIA POLYTECHNIC STATE UNIVERSITY . ' SAN LUIS OBISPO, CA. 93407 f j INSPECTION

SUMMARY

INSPECTION STATUS  !

                     + INSPECTION ON FEBRUARY 24 - MARCH 7, 1986 (REPORT NO.                                     50-275/86-02) AREAS INSPECTED: ANNUAL, ANNOUNCED TEAM INSPECTION OF THE L

DIABLO CANYON P0HER PROJECT. SPECIFIC REVIENS OF HARDWARE AND RECORDS FOR A SIZEABLE NUMBER OF MECHANICAL, ELECTRICAL AND' INSTRUMENTATION COMPONENTS HERE PERFORMED TO ASSESS HHETHER ALL ELEMENTS OF COMPONENT QUALITY SUCH AS MAINTENANCE, MODIFICATIONS, TESTING AND CALIBRATION HERE PRDPERLY CONTROLLED. THE TEAM ALSO PERFORMED EVALUATIONS OF THE LICENSEE'S PROGRAMS FOR: 1)- EQUIPMENT LINEUP; 2) SURVEILLANCE TESTING; 3) HORK CLEARANCE / AUTHORIZATION; 4) MAINTENANCE; 5) POST MAINTENANCE TESTING; 6) MODIFICATIONS AND DESIGN CHANGES; 7) MEASURING AND TEST EQUIPMENT; 8) PLANT EQUIPMENT CALIBRATION; 9) EQUIPMENT PERFORMANCE TRENDING; 10) TEMPORARY MODIFICATIONS / LIFTED LEADS; 11) MOTOR OPERATED VALVES; 12) INDEPENDENT VERIFICATION /QC; 13) NON-LICENSED PERSONNEL TRAINING; 14) NORK PLANNING. THE INSPECTION SAMPLING PLAN HAS BASED ON GENERIC PROBABILISTIC RISK ASSESSMENT DATA. THE

INSPECTION ALSO ASSESSED, THROUGH INTERVIENS, HORKING LEVEL PERCEPTIONS OF THE ADEQUACY OF QUALITY CONTROLS, MANAGEMENT SUPPORT OF QUALITY, AND HORKER'S FREEDOM TO RAISE SAFETY CONCERNS.

l INSPECTOR FROM THE NRC INSPECTION AND ENFORCEMENT OFFICE AND TH0 NRC CONSULTANTS.THE DURING THISINSPECTION INSPECTION,HAS VARIOUS PERFORMEDINSPECTION BY SIX REGIONAL PROCEDURES HERE UTILIZED. t i RESULTS: IN THE AREAS INSPECTED, THREE VIOLATIONS OF NRC REQUIREMENTS HERE IDENTIFIED: 1) FAILURE TO FOLLOW PROCEDURE IN THAT ' PROCEDURE CHANGES HERE MADE BY A MAINTENANCE MECHANIC, IN THE COURSE OF ACCOMPLISHING PREVENTIVE MAINTENANCE ON A CCH PUMP, AND THE CHANGES DID NOT HAVE THE REQUIRED LEVEL OF REVIEH AND APPROVAL; 2) ! IMPROPERLY MODIFIED GASKET HAS INSTALLED IN A VALVE; 3) FAILURE TO ADHERE TO PROCEDURE REQUIREMENTS IN THAT AN 1

REQUIRED TO BE SET TO MUTUALLY EXCLUSIVE TORQUE / LIMIT SHITCHADDITIONALLY, SYSTEMS HERE IDENTIFIED.

ARRANGEMENTS. FAILURE TO SEVERAL HEAKNESSES IN PROVIDE MANAGEMENT ADEQUATE CONTROL PRO ! THESE HEAKNESSES HERE IN THE STRUCTURE OF THE MANAGEMENT CONTROL SYSTEMS AND HERE NOT FOUND TO HAVE BEEN 1 PAGE 2-090 F t

                                                                                -e                       _

f MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M DIABLO CANYON 1 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Rspert Period APR 1986 INSPECTION

SUMMARY

THESE ITEMS HERE IDENTIFIED TO THE LICENSEE AND ARE REFLECTED AS FOLL REFLECTED IN THE PERFORMANCE OF THE HORK SAMPLED. IN THIS REPORT. ROUTINE, ANNDUNCED INSPECTION OF RADI0 ACTIVITY AREAS INSPECTED:

    + INSPECTION ON FEBRUARY 24-28, 1986 (REPORE NO. 50-275/86-06) THIS INSPECTION INVOLVED THE REGION V MOBILE LABORATORY. DURING MEASUREMENTS PROGRAM AND ASSOCIATED QUALITY ASSURANCE PROGRAM.

THIS INSPECTION, THQ INSPECTION PROCEDURES HERE UTILIZED. RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. ROUTINE, UNANNOUNCED INSPECTION OF THE LICENSEE'S 50-275/86-07) AREAS INSPECTED:

    + INSPECTION ON MARCH 3-7, 1986 (REPORT NO. KNOHLEDGE         AND PERFORMANCE OF DUTIES, PROTECTIVE ACTIDH DECISION MAKING, SHIFT STAFFING EMERGENCY PREPAREDNESS     PROGRAM INCLUDING:                                   CHANGES TO THE EMERGENCY PREPAREDNESS PROGRAM, NOTIFICATION AND AND AUGMENTATION, EMERGENCY DETECTION AND CLASSIFICATION,                                                     DURING THIS INSPECTION, VARIOUS INSPECTION COMMUNICATION,     AND FOLLOHUP OH OPEN ITEMS IDENTIFIED DURING PREVIOUS NRC INSPECTIONS.

I PROCEDURES HERE UTILIZED. RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

    + INSPECTION ON MARCH 2 - APRIL 12, 1986 (REPORT NO. 50-275/86-09)                      AREASOF FOLLOHUP    INSPECTED:   THE INSPECTION ONSITE EVENTS,              INCLUDED OPEN ITEMS, AND        ROUTINE LERS, AS HELL ASINSPECTIONS                SELECTED OF PLANT OPERATIONS, MAINTENANCE AND SURVEILLANCE ACTIVITIES,VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

INDEPENDENT INSPECTION ACTIVITIES. DURING THIS INSPECTION, RESULTS: ONE VIOLATION AND NO DEVIATIONS HERE IDENTIFIED.

     + INSPECTION ON JUNE 9-13, 1986 (REPORT NO.

50-275/86-10) INSPECTION CONTINUING; TO BE COMPLETED IN JUNE, 1986. 50-275/86-11) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF ACTIONS ON

     + INSPECTION ON APRIL 21 - MAYLIQUIDS 2, 1986 AND (REPORT LIQUIDNO.

WASTES, GASEOUS HASTE SYSTEM, SEMIANNUAL EFFLUENT REPORT EVALUATION AND FACILITY PREVIOUS INSPECTION FINDINGS, TOURS. DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED. RESULTS: OF THE AREAS INSPECTED, ONE VIOLATION HAS IDENTIFIED IN ONE AREA: FAILURE TO CALIBRATE THE CONTAINMENT PARTICULATE ATMOSPHERE SAMPLING SYSTEM FLON RATE MEASURING DEVICE. l

     + INSPECTION ON APRIL 7-11, 1986 (REPORT NO. IE 50-275/86-12)                   AREAS INSPECTED: UNANNOUNCED INSPECTION BY TH0 REGIONALLY BASED BULLETIN (S)/ NOTICE (S), PART 21 REPORT (S), LICENSEE EVENT REPURTS, AND INDEPENDENT INSPECTORS OF INSERVICE INSPECTION PROGRAM,DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

INSPECTION OF THE PLANT. RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. 50-275/86-13) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.

      + INSPECTION ON APRIL 13 - MAY 17, 1986 (REPORT NO.
      + ENFORCEMENT CONFERENCE ON APRIL 25, 1986 (REPORT NO.                50-275/86-14) 

SUMMARY

THE LICENSEE PRESENTED A DETAILED DESCRIPTION OF DNE ITEM OF NONCOMPLIANCE HAS HIS ACTION IDENTIFIED, PLAN IN THE TO AREA 0FCORRECT FOLLOHUP OF THE PROBLEM LICENSEE EVENT OF REPORTS. MISSED TECHNICAL SPECIFICATIONS SURVEILLANCES.THE VIOLATION I 50-275/86-12.
      + INSPECTION ON APRIL 28 - MAY 2, 1986 (REPORT NO.          50-275/86-15) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.

ENFORCEMENT

SUMMARY

NONE PAGE 2-091

R:ptrt Paried APR 1986 INSPECTION c=nna urnurunc=enMuniten M MannMnM cn STATUS - (CONTINUED) u DIABLO CANYON 1 H ME22%5EMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

OTHER ITEMS l

SYSTEMS AND COMPONENT PROBLEMS: NONE f FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS:

                                + NONE PLANT STATUS:

THE PLANT IS IN COMMERCIAL OPERATION. LAST IE SITE INSPECTION DATE: 06/09-13/86+ INSPECTION REPORT NO: 50-275/86-10+ REPORTS FR0M LICENSEE NUMBER DATE OF DATE OF SUBJECT EVENT REPORT

                               ---                _-_ _ _ _ - _ = _ --               __- _

_= -- _- 85-38-LO 12-18-85 02-18-86 AUXILIARY FD PUMP I INOPERABLE DUE TO INCORRECT N00DHARD GOVERNOR SETTING 85-39-LO 10-10-85 03-27-86 MISSED SURVEILLANCE OF CONTROL ROOM VENTILATION SYSTEM HTR 86-01-L1 10-25-84 03-10-86 86-03-LO 01-07-86 03-10-86 REACTOR COOLANT SYSTEM TEMPERATURE AND CONTAINMENT PRESSURE INSTRUMENTAT ] FAILURE TO MEET TECH SPEC ACTION STATEMENT FOR INOPERABLE SAFETY

                               ================================================================================                                          ===============================

PAGE 2-092

TilIS PAGE INTENTIONALLY LEFT BLANK PAGE 2-093

1. Docket 50-323 0PERATING STATUS unzuunnuurarusun:unn:MunuMznnr annru M DIABLO CANYON 2 n
2. R:ptrting Pcried: 04/01/86 Outtg2 + On-lina Hro 719.0 ununMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

BOB KANICK (805) 595-7351 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3411 _

DIABLO CANYON 2 ! 5. Nameplate Rating (Gross MHe): 1164

6. Design Electrical Rating (Not MWe): 1119
7. Maximum Dependable Capacity (Gross MWo): 1124 1500
8. Maximum DeFondable Capacity (Not MHe): 1073 DESIGN ELEO. MTING = 1119
9. If Changes Occur Abose Since Last Report, Give Reasons:

um

10. Power Level To Whlch Restricted, If Any (Net MWe): M00 GRM EE '==n taset crinvu. comr72cus
11. Reasons for Restrictions, If Any:

MAX DEP CAP (ITEMS 6 8 7) RE CALC.

                                                                                                                                                                               -- - -      -     -100 1000 -

MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 1.172.0 1.172.0
13. Hours Reactor Critical 692.0 1.100.0 1.100.0 - 80 g
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line 664.8 1.072.3 1.072.8 hf
16. Unit Reserve Shtown Hrs .Q .0 .0 - 80 1'
17. Gross Therm Ener (MHH) 2.058.587 3.431.527 3.431.527 3,g ,
18. Gross Elec Ener (MHH) 678.700 1.135.099 1.135.099
19. Het Elec Ener (MWH) - 40 642.117 1.075.318 1.075.318
20. Unit Service Factor 92.5 91.5 91.5
21. Unit Avail Factor 92.5 91.5 91.5
                                                                                                                                                                                               - 20
22. Unit Cap Factor (MDC Net) 83.2 84.9 85.5
23. Unit Cap Factor (DER Net) 79.8 82.0 82.0
24. Unit Forced Outage Rate 7.5 8.5 8.5 0 ,

0 5 10

                                                                                                                                                               ,                 ,-    ,.        0
25. Forced Outage Hours 15 30 25 30 54.2 99.2 99.2 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE I

27. If Currently Shutdown Estimated Startup Date: _ N/A PAGE 2-094

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Rrpart Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M DIABLO CANYON 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Typi Hours Reason Method LER Number System Conponent Cause 8 Corrective Action to Prevent Recurrence 03/30/86 F 31.5 A 4 2-86-011 SG COND A MANUAL UNIT TRIP HAS INITIATED IN ACCORDANCE HITH OPERATING PROCEDURE AP-20 " CONDENSER TUBE LEAK" FOLLONING A MAIN CONDENSER TUBE RUPTURE. THE RUPTURED TUBE HAS PLUGGED AND THE MAIN CONDENSER CONDENSATE HOT HELL DRAINED AND REFILLED. 2 04/09/86 F 22.7 A 3 2-86-012 JK DET AN AUTOMATIC REACTOR TRIP AND SUBSEQUENT TURBINE TRIP OCCURRED DUE TO A LOH STEAM GENERATOR LEVEL COINCIDENTAL HITH STEAM FLON/ FEED FLOH MISMATCH HHICH HAS CUASED BY A MAIN FEEDHATER PUMP (MFP) 2-2 TRIP. i MMMMMMMMMMM DIABLO CANYON 2 OPERATED HITH 2 OUTAGES FOR EQUIPMENT REPAIR

  ,,u  

SUMMARY

M IN APRIL. MEMMMMMMMMM l Tvne Reason Method System & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                  & License Examination        9-Other          (LER) File (HUREG-0161)

PAGE 2-095

MM2WMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M DIABLO CANYON 2 M mMMMMMMMMMMMMMMMMMMMMMuMcMMMMMMMMMMu FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION STATE............. ...... CALIFORNIA UTILITY LICENSEE................. PACIFIC GAS 8 ELECTRIC COUNTY................... SAN LUIS OBISPD CORPORATE ADDRESS. . . . . . . 77 BEALE STREET DIST AND DIRECTION FROM SAN FRANCISCO, CALIFORNIA 94106 NEAREST POPULATION CTR.. 12 MI HSH OF CONTRACTOR SAN LUIS OBISPD ARCHITECT / ENGINEER. . .... PACIFIC GAS & ELECTRIC TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...NESTINGHOUSE DATE INITIAL CRITICALITY... AUGUST 19, 1985 CONSTRUCTOR......... .... PACIFIC GAS 8 ELECTRIC DATE ELEC ENER 1ST GENER.. 0CTOBER 20, 1985 TURBINE SUPPLIER... .. ..HE3TINGHOUSE DATE COMMERCIAL OPERATE.. . M ARCH 13.1986 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......V CONDENSER COOLING HATER.... PACIFIC OCEAN IE RESIDENT INSPECTOR......M. MEND 0UCA ELECTRIC RELIABILITY COUNCIL..................HESTERN SYSTEMS LICENSING PROJ MANAGER.....H. SCHIERLING COORDINATING COUNCIL DOCKET NUMBER........... 50-323 LICENSE & DATE ISSUANCE....DPR-81, AUGUST 26, 1985 PUBLIC DOCUMENT ROOM....... ROBERT F. KENNEDY LIBRARY CALIFORNIA SAN LUIS OBISPD, POLYTECHNIC CA. 93407 STATE UNIVERSITY INSPECTION

SUMMARY

INSPECTION STATUS

                                + INSPECTION ON MARCH 3-7, 1986 (REPORT NO.

EMERGENCY PREPAREDNESS PROGRAM INCLUDING: 50-323/86-09) AREAS INSPECTED: AND AUGMENTATION, KNOHLEDGE AND PERFORMANCE OF DUTIES, ROUTINE, UNANNOUNCED INSPECTION OF THE LICENSEE'S COMMUNICATION, PROCEDURES HERE UTILIZED. AND FOLLOHUP DN OPEN ITEMS IDENTIFIED DURING PREVIOUS NRC INSPECTIONS. EMER DURING THIS INSPECTION, VARIOUS INSPECTION RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

                                + INSPECTION ON MARCH 2 - APRIL 12, 1986 (REPORT NO.

l OF PLANT OPERATIONS, MAINTENANCE AND SURVEILLANCE ACTIVITIES,50-323/86-10) AREAS INSPECTED: l INDEPENDENT INSPECTION ACTIVITIES. ' ADDITIONALLY, FOLLONUP OF ONSITE EVENTS,THE OPENINSPECTION ITEMS, INCLUDED ROUTINE INSPECTIONS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED. INSPECTION OF THE POWER ASCENSION STARTUP PROGRAM CONTINUED.AND DURING THIS LERS, RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

                                + INSPECTION ON JUNE 9-13, 1986 (REPORT No: 50-323/36-11)

INSPECTION CONTINUING; To BE COMPLETED IN JUNE,1986.

                                + INSPECTION ON APRIL 21 - MAY 2, 1986 (REPORT NO. 50-323/86-12)

INSPECTION FINDINGS, LIQUIDS AND LIQUID HASTES,. GASEOUS HASTE SYSTEM, ROUTINE, UNANNOUNCED INSPECTION OF ACTIONS ON PREVIOUS SEMIANNUAL EFFLUENT REPORT EVALUATION AND FACILITY TOURS. PAGE 2-096

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM DIABLO CANYON 2 M RePirt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED. RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

     + INSPECTION ON APRIL ?-11, 1986 (REPORT NO. 50-323/86-13) AREAS INSPECTED: UNANNOUNCED INSPECTION BY TH0 REGIONALLY BASED INSPECTORS OF IE BULIETIN(S)/ NOTICE (S), PART 21 REPORT (S), LICENSEE EVENT REPORTS,' AND INDEPENDENT INSPECTION OF THE PLANT.

DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED. RESULTS: NO ITEMS OF HONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

     + INSPECTION ON APRIL 13 - MAY 17, 1986 (REPORT NO. 50-323/86-14) INSPECTION CONTINUING; TO BE COMPLETED IN MAY, 1986.
     + ENFORCEMENT CONFERENCE ON APRIL 25, 1986 (REPORT NO. 50-323/86-15) 

SUMMARY

THE LICENSEE PRESENTED A DETAILED DESCRIPTION OF HIS ACTION PLAN TO CORRECT THE PROBLEM OF MISSED TECHNICAL SPECIFICATIONS SURVEILLANCES. ONE ITEM OF NONCOMPLIANCE HAS IDENTIFIED, IN THE AREA 0F FOLLOHUP OF LICENSEE EVENT REPORTS. THE VIOLATION IS IDENTIFIED AND DISCUSSED IN INSPECTION REPORT 50-323/86-13.

ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: THE PLANT IS IN COMMERCIAL OPERATION. LAST IE SITE INSPECTION DATE: 06/09-13/86+ INSPECTION REPORT NO: 50-323/86-11+ l l PAGE 2-097 I

Report Perled APR 1986 M2H23%HMH3CMZMCMr5ZZ3GHCZMMM2M2HMMZ3 l REPORTS FR0M L I C E'N S E E u DIABLO CANYON 2 M c 2M nM:MMzun :::MMZuMnnZM252U M3 Ma NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 85-11-LO 10-25-85 03-06-86 AUXILIARY C0fioITIONSFD STEAM FOR LINE SNUBBER INOPERABILITY HAS NOT DETERMINED BEFORE EXCEEDING LIMITING OPERATIONS 85-26-LO 05-07-85 03-11-86 MISSED SURVEILLANCE CONTAIN PENETRATION DUE TO INADEQUATE PROCEDURES 86-04-L0 02-06-86 03-10-86 INADVERTENT SECURED ENGINEERED RADIATION SAFETY FEATURES ACTUATION OF FUEL BUILDING VENTILATION SYSTEM IMPROPERLY MONITOR CONN 86-05-LO 02-22-86 03-24-86 TURBINE TRIP / REACTOR CAUSED BY GEN V. REGULATOR TRANSIENT 86-06-L0 02-20-86 03-27-86 AXIAL FLUX DIFF SURVEILLANCE MISSED 86-07-LO 03-05-86 04-04-86 REACTOR TRIP DUE TO NIS NEG CAUSE TH0 DROPPED RODS 86-08-LO 03-11-86 04-10-86 NU INSTR SYSTEM NIS NEG RATE REACTOR TRIP 86-09-L0 03-03-(6- 04-03-86 TECNNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 4.11.2.1.2 NOT MET

   ========= ================-=========================================================================

PAGE 2-098

        --          a               - m x _,www-------    --

THIS PAGE INTENTIONALLY LEFT BLANK i ) 4 PAGE 2-099

1. Dock ts 50-237 0PERATINO STATUS HM:MM:!;iMuuntami:MunctM2M=0M MM MC 2 M DRESDEN 2 K
2. R ptrting P:rirds 04/01/86 Outrge + On-lina Hros E 9, Mn:MutM 2MEMMM%IZMMMMZM MMMMMUNHMMZM
3. Utility Contacts D. C. MAXHELL (815) 942-2920 AVERAGE DAILY PONER LEVEL (MWo) PLOT
4. Licensed Thermal Power (MHt): 2527 DRESDEN 2
5. Nameplate Rating (Gross MHe): 920 X 0.9 = 828
6. Design Electrical Rating (Net MHe): 794
7. Maximum Dependable Capacity (Gross MWe): 812 1500
8. Max.imum Dependable Capacity (Not MHe): 772 DESIGN EXEC. RATING - 794
                                                                               ......MRX. OEPDO. CRP. -                                772 (20G%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Re trictions, If Any:

NONE

12. Report Period Hrs MONTH 719.0 YEAR 2.879.0 CUMULATIVE 139,943.0 g

p,

13. Hours Reactor Critical 637.3 2,704.4 106,402.9 m m E N m min anesm h
14. Rx Reserve Shtdwn Hrs .0 .0 .0
                                                                              ' ~ ~ ~ ~ ~ ~ ~ ~ ~ - ^                                ' = - - - - -100
15. Hrs Generator On-Line 579.5 2.446.7 101,431.7 g g
16. Unit Reserve Shtdwn Hrs .0 .0 .0 ~"
17. Gross Therm Ener (MHH) 1,344,204 5,699,529 207,376,128 500 -
18. Gross Elec Ener (MHH) 437,095 1,858,070 66.341,246 -so
19. Not Elec Ener (MHH) 416,825 1,772,074 62,717,366
20. Unit Service Factor 80.6 85.0 72.5 - 40
21. Unit Avail Factor 80.6 85.0 72.5
22. Unit Cap Factor (MDC Net) 75.1 79.7 58.1 - 20
23. Unit Cap Factor (DER Net) 73.0 77.5 56.4
24. Unit Forced Outage Rate 19.4 15.0 11 1 0 0 5 1'o l's do' is 30
25. Forced Outage Hours 139.5 432.3 5,879.2 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

HEEKEND SNUBBER INSPECTION: MID-MAY. I I

27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-100
          . ~ _ _                .            ._
                                              .                                   . _ - _              .                      .~. -   .---   - _ . - - .-

MMMMMMMMMUMUIIHHH2MMM3E3MZMCEMNZEMM2MM DRESDEN 2 Raptrt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMhAMMMMMMMMMMMMMMMMMMMMMMM. Cause & Corrective Action to Prevent Recurrence _Ng,__ Date IXE2 Hours Reason Method LER Number _ System Component

                                                    .86-006-0                             MANUALLY SHUT DOWN TO INSTALL SEISMIC RESTRAINTS 4          04/02/86        F 139.5     B        1 (BOLTING) ON CONTROL ROOM PANELS.

l i l MMMMMMMMMMM DRESDEN 2 OPERATED HITH 1 OUTAGE FOR MAINTENANCE IN APRIL.

 ,M  SUt1 MARY M MMMMMMMMMMM Method         System 8 Component Tvoo              Reason                                                                                                                                           '

F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Shoot E-Operator Training 5-Reduced Load Licensee Event Report 8 License Examination 9-Other (LER) File (NUREG-0161) PAGE 2-101

_. - __. _ . _ _ _ . . . _ _ . _ . ___ _. __- _ _ _ _ _ . . -_ _ . . _ - _ . - _ . m - - _ _ - - munusuunsuunNXuNu nu%MuuHuMunuHuuunu u DRESDEN 2 m l' Munuxnnuuurzuuuuuuuuuuuuuuuuuuuunnum FACILITY DATA Repsrt Pcried APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY , ST AT E . . . . . . . . . . . . . . . . . . . . I L LIN0IS LICENSEE.................COMMONHEALTH EDISDN COUNTY...................GRUNDY CORPORATE ADDRESS........P.O. BOX-767 CHICAGO, ILLINDIS 60690 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 9 MI E OF CONTRACTOR MORRIS, ILL ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC t DATE INITIAL CRITICALITY... JANUARY 7, 1970 CONSTRUCTOR.............. UNITED ENG. & CONSTRUCTORS DATE ELEC ENER 1ST GENER... APRIL 13, 1970 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JUNE 9, 1970 FEGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING LAKE IE REGION RESPONSIBLE......III l CONDENSER COOLING HATER....KANKAKEE RIVER IE RESIDENT INSPECTOR......L. MCGREGOR i ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....R. GILBERT COUNCIL..................MID-AMERICA DOCKET NUMBER........... 50-237 INTERPOOL NETHORK i LICENSE & DATE ISSUANCE....DPR-19, DECEMBER 22, 1969 PUBLIC DOCUMENT ROOM....... MORRIS PUBLIC LIBRARY l 604 LIBERTY STREET MORRIS, ILLINDIS 60450 ! INSPECTION

SUMMARY

INSPECTION DtfRING THE PERIOD OF FEBRUARY 14 THROUGH APRIL 15 (86004; 86005): ROUTINE UNANNOUNCED RESIDENT INSPECTION OF PREVIOUS FINDINGS, REGIONAL REQUEST, OPERATIONAL SAFETY, EVENTS, MAINTENANCE, SURVEILLANCES, LICENSEE EVENT REPORTS, AND IE BULLETIN. OF l t THE EIGHT AREAS INSPECTED, NO VIOLATIONS OF NRC REQUIREMENTS HERE IDENTIFIED. INSPECTION ON MARCH 25 (86007): ANNOUNCED, SPECIAL INSPECTION TO REVIEW ACTIVITIES RELATED TO THE MAIN STEAM (MS) TRANSIENT l MONITORING SYSTEM. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION ON MARCH 24-25 (36006; 86009): SPECIAL ANNOUNCED (SAFETY) INSPECTION BY TH0 REGIONAL INSPECTORS OF POTENTIAL l ENVIRONMENT QUALIFICATION PROBLEMS RELATIVE TO ELECTRICAL SPLICES, CONTROL AND P0HER CABLES, AND FLEXIBLE LIQUID TIGHT CONDUIT INSTALLED IN THE UNITS 2 AND 3 DRYWELL. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED; H0HEVER, FURTHER NRC REVIEW IS BEING i CONDUCTED IN THE AREAS INSPECTED. ENFORCEMENT

SUMMARY

' 10 CFR 50, APPENDIX B, CRITERION III, AS IMPLEMENTED BY COMMONNEALTH EDISON QUALITY ASSURANCE MANUAL, QUALITY PROCEDURE 3-51, REQUIRES SPECIFICATIONS. TECHNICAL THAT PROCESURES REFERENCED IN MAINTENANCE / MODIFICATION PROCEDURES BE SUBJECTED TO AN ONSITE REVIEH AS DEFINED IN CONTRARY TO THE ABOVE, ELECTRICAL CONSTRUCTION TEST PROCEDURES REFERENCED IN MAINTENANCE / MODIFICATION PAGE 2-102

MunMnM nni::<:nsuu=nuitMrcuu:c:MannMuranu DRESDEN 2 M R:ptrt Period APR 1986 INSPECTIGN STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

' ENFORCEMENT 

SUMMARY

(237/85038-08 AND 249/85034-08) PROCEDURES AT DRESDEN HAVE NOT BEEN REVIEHED AND APPROVED BY THE DRESDEN ONSITE REVIEH COMMITTEE. (8503 4) 10 CFR 50, APPENDIX B, CRITERION VI, AS IMPLEMENTED BY CECO QUALITY ASSURANCE MANUAL, QUALITY REQUIREMENT 6, REQUIRES THAT MEASURES SHALL BE ESTABLISHED TO CONTROL THE ISSUANCE OF PROCEDURES NHICH CONTRARY TO THE PRESCRIBE ABOVE, THE FOLLONING ACTIVITIES AFF PROCEDURES SHALL BE USED AT THE LOCATION HHERE THE PRESCRIBED ACTIVITY IS PERFO IIERE PERFORMED: (A) PROTECTIVE RELAY TESTING HAS PERFORMED AT THE DRESDEN NUCLEAR POWER STATION, USING A PREDATED PROCEDURE INSTEAD OF THE APPROVED REVISED PROCEDURE. (237/85038-01 AND 249/85034-01) 10 CFR 50, APPENDIX B, CRITERION V, AS IMPLEMENTED BY CECO QUALITY ASSURANCE INCLUDE MANUAL, QUALITY REQUIREMENT 5, REQUIRES THAT APPROPRIATE QUANTITATIVE OR QUALITATIVE ACTIVITIES AFFECTING QUALITY SHALL BE ACCOMPLISHED BY PROCEDURES THAT SHALL CONTRARY TO THE ABOVE, THE ACCEPTANCE CRITERIA FOR DETERMINING THAT IMPORTANT ACTIVITIES HAVE BEEN SATISFACTORILY ACCOMPLISHED. PROTECTIVE RELAY SURVEILLANCE TESTING PROCEDURE USED BY OPERATIONAL ANALYSIS (237/85038-02 DEPARTMENTAND- PERSONNEL AT TH STATION DID NOT REQUIRE RECORDING QUANTITATIVE OR QUALITATIVE ACCEPTANCE "AS-FOUND" TEST RESULTS DATA. 249/85034-02) (8503 5) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: UNIT IS OPERATING NORMALLY. LAST IE SITE INSPECTION DATE: 5/19/86 INSPECTION REPORT NO: 86014 PAGE 2-103 l t i

uxxumuuruunuurunzuzurununrnununancru Repict Pcried APR 1985 REPORTS FR0M LICENSEE u DRESDEN 2 . M unzwunnuxxxxu:ramuurt=uuss::x::uunnscun .) ================================================================================================================================== NUMBER DATE OF DATE OF SUBJECT EVENT REPORT j -- i 86-08 03/31/86 04/24/86 j AUTOMATIC INITIATION OF STANDBY GAS TREATMENT SYSTEM CAUSED BY REFUEL FLOOR AREA RATIATION MONITOR FAILURE UPSCALE 6W W W W M MM MWW eee e e e e e e ee ee e ee=m==me========e==$=====g"======= 1 l J 1 l i 4 i 'l 1 I I 4 L PAGE 2-104 i

l THIS PAGE INTENTIONALLY LEFT BLANK i l PAGE 2-105

l

1. Docket 50-247 0PERATING STATUS uzzuuzzsuunnunnunznuxunxenannururnau u DRESDEN 3 u
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 nuxxxxxunuzuuzw=uxusunzununununaxnzu
3. Utility Contact D. C. MAXHELL (815) 942-2920 AVERAGE DAILY POWER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 2527 DRESDEN 3
5. Nameplate Rating (Gross MHe): 920 X 0.9 = 828
6. Design Electrical Rating (Net MHe): 794
7. Maximum Dependable Capacity (Gross MWe): 812 ISW3 773 DESIW4 ELEC. RRTING = 794
8. Maximum Dependable Capacity (Het MHe):
                                                                                       -----. MX. DEPDO. CRP. -                 773 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.0 129,528.0 0
13. Hours Reactor Critical .0 .0 93.442.9 NO NET POWER OUTPUT THIS NONTH $$
14. Rx Reserve Shtdwn Hrs .0 .0 .0 3 - 100 gg
15. Hrs Generator On-Line .0 .0 89,794.8 gf Q-
16. Unit Reserve Shtdwn Hrs .0 .0 ,p - 80
17. Gross Therm Ener (MHH) 0 0 181,765,542 500-
18. Gross Elec Ener (MHH) 0 0 58,821.103 - 80
19. Het Elec Ener (MHH) -4,721 -19,443 55.706,850
20. Unit Service Factor .0 .0 69.3 - to
21. Unit Avail Factor .0 .0 69.3
22. Unit Cap Factor (MDC Net) .0 .0 55.6 - 20
23. Unit Cap Factor (DER Net) .0 .0 54.2
24. Unit Forced Dutage Rate .0 .0 12.2 0 , , , , , 0 0 5 to 15 20 25 30
25. Forced Outage Hours .0 .0 7,365.0 DAYS 2&. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE FIPRIL 1986

27. If Currently Shutdown Estimated Startup Date: 06/13/86 PAGE 2-106

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M Rrpert Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M DRESDEN 3 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Ng, Date Type Hours Reason Metho(' LER Number Systen Component Cause & Corrective Action to Prevent Recurrence 10/23/85 S 719.0 C 4 CONTINUATION OF REFUELING / RECIRCULATION PIPE 6 - REPLACEMENT GUTAGE. t i i MMMMMMMMMMM DRESDEN 3 REMAINS SHUTDOHN FOR REFUELING AND MAINTENANCE. M

SUMMARY

4 MMMMMMMMMMM Tvpe Reason Method Svstem & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                  & License Examination          9-Other          (LER) File (NUREG-0161)

PAGE 2-107

! 00000000a000a000a000aMa0000a00000000

 .      a               DRESDEN 3                    a

! acaccMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION 4 LOCATION UTILITY STATE....................ILLIN0IS LICENSEE.................COMMONHEALTH EDISON COUNTY................. .GRUNDY ., CORPORATE ADDRESS. ......P.O. BOX 767

                                                                                              -                                   CHICAGO, ILLINDIS 60690 DIST AND DIRECTION FROM NEAREST POPrJLATION CTR.. 9 MI E OF                                   CONTRACTOR MORRIS, ILL                                ARCl;ITECT/ ENGINEER. . . . . . .SARGENT & LUNDY TYPE OF REACTOR............BHR                                                NUC STEAM.SYS SUPPLIER... GENERAL E'LECTRIC DATE INITIAL CRITICALITY... JANUARY 31, 1971                                  CONSTRUCTOR..         .   ......... UNITED ENG. & CONSTRUCTORS DATE ELEC ENER 1ST GENFR... JULY 72, 1971                                     TURBINE SUPPLIER...... .. GENERAL ELECTRIC DATE COMMERCIAL OPERATE....NGVEMBER 16, 1971                             REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING LAKE                                   IE REGION RESP 5NSIBLE......III CONDENSER C00L'ING HATER.s..KANKAXE* RIVER                                 IE' RESIDENT INSPECTOR......L. MCGREGOR                           -

i ELECTRIC.PELIABILITY LICENSING PROJ MANAGER.....R. GILBERT: , ] COUNCIL........... ......MID-/.MERICA DOCKET NUMBER........... 50-249 , INIERFOOL NETHORK ' LICENSE & DATE ISSUANCE....DPR-25, MARCH 2,'1971 - PUBLIC DOCUMENT R00M.... .. MORRIS PUBLIC LIBRARY 604 LIBERTY STREET

                                                                         .                                                       MORRIS, IL LI:10IS 60450                    .

INSPECTION STATUS ' JNSPECTION

SUMMARY

INSPECTION DURING THE PERIOD OF FEBRUARY 14 THROUGH APRIL 15 (86004; 86005):- ROUTINE UNANNOUNCED RFSIDENT INSPECTION OF PREVIOUS FINDINGS, REGIONAL REQUESJ, OPERATICNAL SAFETY, EVEN15, MAINTENANCE, SURVEILLANCES, LICENSEE EVENT REPORTS, AND IE BULLETIN. OF THE EIGHT AREAS INSPECTEP, NO VIOLAT10NS OF NRC REQUIREMENTS HERE ILENTIFIED. , s

q 1HSPECTION ON MARCH 24-25 (86006; 860F9): SPECIAL ANNOUNCED (SAFETY) INSPECTION BY TWO REGIONAL.I SPECTORS Cp POTENTIAL 1

' ENVIRONMENT QUALIFICATION PROBLEMS REL'ATIVE TO ELECTRICAL SPLICFS;- CONTROL AND POWER CABLES, AND FLEXIBLE LIQUID TIGHT CONDUIT " INSTALLED IN THE UNITS 2 AND 3 DRYHELL. N0'VIOLATTOMSJuR DEVIATIONS HERE IDENTIFIED; H0HEVER, FURThER NRC REVIEW IS BEING CONDUCTED IN THE AREAS INSPECTED.

                                                                           ~                                                                   ~
      ~

ENFORCEMENT

SUMMARY

4 10 CFR 50, APPENDIX B, CRITERION III, AS IMPLEMENTE PY COMMONHEALTH'EDIsdN QUAL'ITY ASSURANCE MANUAL, QUALITY PROCEDURE 3-51, REQUIRES THAT PROCEDURES REFERENCED IN MAINTENANCE / MODIFICATION PROCEDURES BE SUBJECTED TO AN Ot SITE REVIEW AS DEFINED If THE TECHNICAL SPECIFICATIONS. CONTRARY TO THE ABOVE, ELECTRICAL CONSTRUCTION TEST PROCEDURES RFFERENCED IN MAINTENANCE / MODIFICATION PROCEDURES AT DRESDEN HAVE NOT.BEEN REVIEHED AND APPROVED BY THE DRESDEN ONSITE REVIEW COMMIT 1CE. (237/85038-08 AND 249/85034-0S) (8503 4) PAGE 2-108 i

m.-. . _ ___ _ o . . ._m _ ._ _ _ . __m.__._. .__,. ._ _ _ . ___m - . - . n MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M DRESDEN 3 M RJPret Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM i ENFORCEMENT

SUMMARY

I to CFR 50, APPENDIX B, CRITERION VI, AS IMPLEMENTED BY CECO QUALITY ASSURANCE MANUAL, QUALITY REQUIREMENT 6, REQUIRES THAT MEASURES SHALL BE ESTABLISHED TO CONTROL THE ISSUANCE OF PROCEDURES WHICH PRESCRIBE ACTIVITIES AFFECTING QUALITY AND THAT TH PROCEDURES SHALL BE USED AT THE LOCATION HHERE THE PRESCRIBED ACTIVITY IS PERFORMED. CONTRARY TO THE ABOVE, THE FOLLONING PRESCRIBED ACTIVITIES HERE PERFORMED HITHOUT THE USE OF THE ESTABLISHED PROCEDURES AT THE LOCATION HHERE THE PRESCRIBED AC HERE PERFORMED: (A) PROTECTIVE RELAY TESTING HAS PERFORMED AT THE DRESDEN NUCLEAR POWER STATION, USING A PREDATED PROCEDURE INSTEAD OF THE APPROVED REVISED PROCEDURE. (237/85038-01 AND 249/85034-01) 10 CFR 50, APPENDIX B, CRITERION V, AS IMPLEMENTED BY CECO QUALITY ASSURANCE MANUAL, QUALITY REQUIREMENT 5, REQUIRES THAT l ACTIVITIES AFFECTING QUALITY SHALL BE ACCOMPLISHED BY PROCEDURES THAT SHALL INCLUDE APPROPRIATE QUANTITATIVE OR ' QUALITATIVE ' ACCEPTANCE CRITERIA FOR DETERMINING THAT IMPORTANT ACTIVITIES HAVE BEEN SATISFACTORILY ACCOMPLISHED. CONTRARY TO THE ABOLE, THE  ! PROTECTIVE RELAY SURVEILLANCE TESTING PROCEDURE USED BY OPERATIONAL ANALYSIS DEPARTMENT PERSONNEL (237/85038-02 AT THE DRESDEN ANDNUCLEAR P0HER i i STATION DID NOT REQUIRE RECORDING QUANTITATIVE OR QUALITATIVE ACCEPTANCE "AS-FOUND" TEST RESULTS DATA. i 249/85034-02) to CFR 50.72(B)(2)(II) REQUIRES THAT THE LICENSEE NOTIFY THE NRC OPERATION CENTER, VIA THE EMERGEN CY NOTIFICATION i SYSTEM, AS SOON AS PRACTICAL AND IN ALL CASES HITHIN FOUR HOURS OF ANY EVENT THAT RESULTS IN AUTOMATIC ACTUATION OF ANY ENGINEERED SAFETY FEATURE. CONTRARY TO THE AB0VE, THE LICEN SEE DID NOT NOTIFY THE NRC OPERATIONS CENTER OF A UTOMATIC ISOLATIONS OF THE HIGH PRESSURE COOLANT INJECTION SYSTEM HHICH OCCURRED ON DECEMBER 13, 1 985, AND THICE ON DECEMBER 16, 1985. to CFR 50.7 2(B((2)(III)D) REQUIRES THAT THE LICENSEE NOTIFY THE NRC OPERATION CENTER, VIA THE EMERGENCY NOTIF ICATION SYSTEM, AS SOON AS i PRACTICAL AND IN ALL C ASES HITHIN FOUR HOURS OF ANY EVENT OR CONDITION THAT ALONE COULD HAVE PREVENTED THE FULFILLMENT 0 F THE SAFETY FUNCTION OF STRUCTURES OR SYSTEMS NE EDED TO MITIGATE THE CONSEQUENCES OF AN ACCIDENT. ' CONTRARY TO THE ABOVE, THE LICENSEE t DID NOT NOT IFY THE NRC OPERATIONS CENTER HHEN THE HIGH PRESS URE COOLANT INJECTION SYSTEM HAS DECLARED IN0PERA ELE AS A RESULT OF THE FAILURE OF THE STEAM SUPPL Y ISOLATION VALVE ON OCTOBER 29, 1985. t (8503 5) OTHER ILEMS l SYSTEMS AND COMPONENT PROBLEMS: DRESDEN 3 RECIRCULATING SYSTEM PIPING REPLACEMENT PROJECT IN PROGRESS FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: ! SHUT DOHN FOR MAJOR PIPING REPLACEMENT ON OCTOBER 27, 1985. , LAST IE SITE INSPECTION DATE: 5/19/86 INSPECTION REPORT NO: 86016 PAGE 2-109

                                     'I1lljll                          1\                     1                             llll l)               il4                                 l1Ii              4
    ~.                                 =             _     r                                                         0
    -.                                  =            _ R =                                                           1
                                        =              O =                                                           1

- %w

                                        =
                                        =

R R =.

                                                            =                                                        2
                  .E 1Mu                =              E =

C u = - = E _ - Om = -- L = G

     ,-           . F u       =          -   E =                                                           A 2 w               =              N =                                                           P K w               =              N =

C u = - O = U n = S = G u = R = 2 m = E = M m = P =

                  . U u                 =                  =

H u P

                                        =              O =

d u = T =

                 - M3u; f u            =

E =

                                                           =
                                    ~=                                                                                           _

m = U = _ 3Nu = D = _

                 . mDxWEx               =
                 ,                                         =                                                                     .
                                        =              N =                                                                       _
Sx i = O =

nEu = I = nRx = T = tDx = A = n x = L = n x = O = . u = S = tiu+u = I = n1 u = = n u = N = uu M n u

                                        =
                                        =
                                        =            -

O = I T

                                                           =
                                                           =
w
= A =

J w = L = rNM t 4

                                        =              I T
                                                           =
                                                           =
                                        =              N =                  ~                                *
                                        =              E =                                                       -
                                        =              V =                %                                      .
                                        =                  =
                                        =              G =
                                        =              N =
                                        =              I   =
                                        =              D =
                                        =              L   =
                                        =              I   =
                                        =              U =

E = B =

                                        =                  =

E = R =

               --                       =              O =

S = T =

                                        =              C =

N = A =

                                        =              E   =                                                       5 E             =              R =                  ,
                                        =                  =              -

C = D =

  • _ = N = , --
                         .I             =              A =         *
                                        =                  =

L = S =

                                        =              U =
                                        =              B   =                                           -
                                        =                  =

M = Y =

                                        =              C =

0 = N =

                                        =              E   =

R = G =

                                        =              R   =

F = E =

                                        =              M =
                                        =              E =
                                        =                  =

S = V =

                                        =              K =                                        \

T = 4 =

                                        =                  =

R = E =

                                        =              H =

0 = T =

                                        =                  =

P = T F =

                                        = C            O =

E = E =

                                        =     J        S =

R = B S =

                                        =     U        O =                    '
                                        =     S        L
                                        =                  o
                                        =                  =
                                        =                  =
                                        =              6   =
                                        = FT           8   =
                                        = OR           / =
                                        =       O      2   =                                    .
                                        = EP           0   =                                                              %
                                        =
                                        =

TE AR

                                                       / =

5 =

                                                                                            %.N     p
                                        =     D        0   =                                         _
                                        =                  =
                                        =                  =
                                        =                  =

6 = 6 = 8 = F 8 = 9 = OT / = 1 = N 3 =

                                        =     EE       0   =                           '%,.

R = TV / = P = AE 4 = A = D 0 =

                                        =                  =

d = = o = = i = = r = R = e = E 3 = P = B 0 =

                                        = M             - =

t = U 6 = r = N 8 = o = = p = = e

                         .R

g -, , _ _ _ _ _ . - _ . THIS PAGE INTENTIONALLY LEFT BLANK PAGE 2-111 l l l - - - - - - _ _ _ _ - _ - _ _ _

1. Docket 50-331 0PERATIW0 STATUS nu unm M u r r u x x m M p u m M M x:s s n g: M M nu n e n r u n x u DUANE ARNOLD M
2. Reporting Period: 04/01/ti_ Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

BRADFORD THOMAS (319) 851-7359 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 1658 DURNE RRNOLD
5. Nameplate Rating (Gross MHe): 663 X 0.9 = 597
6. Design Electrical Rating (Net MHe): 538
7. Maximum Dependable Capacity (Gross MHe): 545 1sm)
8. Maximum Dependable Capacity (Net MHe): 51 5 DESIGN ELEC. RATING - 538
                                                                                 .___.. MAX.                     DEPENO. CRP. -     515 (100%1
9. If Changes Occur Above Since Last Report, Give Peasons:

NONE

10. Power Level To Which Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any:

NONE 1003-MONTH YEAR CUMULATIVE ca

12. Report Period Hrs 719.0 2,879.0 98,567.0 LJ 2,353.8 o
13. Hours Reactor Critical 587.0 69,649.1
14. Rx Reserve Shtdwn Hrs
15. Hrs Generator On-Line
                                      .0 2,338.0
                                                  .0         130.3 j

577.9 67,897.5 f

16. Unit Reserve Shtdwn Hrs .0 .0 .O t-* tec onn ac exrmynrn Lamot orfim. cose!TIONS
17. Cross Therm Ener (MHH) 2,946,996 Id a 805.980 85,553,199 .. ....... . < ,--_ .....____.....
                                                                                                                                                      . goo
18. Gross Elec Ener (MHH) 271,714 1,004,211 28,660.272 19.73et Elec Ener (MHH) 255,863 943,354 26,837,772
20. Unit Service Factor 80.4 81.2 68.9 - 80
21. Unit Avail Factor 80.4 81.2 68.9
                                                                                                                                                      - 40
22. Unit Cap Factor (MDC Net) 69.1 63.6 52,2
                                                                                                                                                      ~
23. Unit Cap Factor (DER Net) 66.1 60.9 50.6
24. Unit Forced Outage Rate 0 .0 15.5 0 ." . . . . O O 5 10 15 20 25 30
25. Forced Outage Hours .0 .0 12,384.8 DAYS
25. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE RPRIL 1986

27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-112

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M Repsrt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M DUANE ARNOLD MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No, Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 4 CONTINUED SCHEDULED SHUTDONN FOR MAINTENANCE / SURVEILLANCE 2 03/15/86 9 141.1 5 OUTAGE. F 0.0 A 5 BB XFHR LOSS OF CONTROL P0HER TRANSFORMER TO STEAM JET 3 04/17/86 AIR EJECTOR CONDENSATE RETURN PUMPS. NMMMMMMMMMM DUANE ARNOLD RETURNED ONLINE FROM MAINTENANCE ON APRIL 6TH AND OPERATED ROUTINELY ,, M

SUMMARY

M THE REMAINDER OF THE MONT:1. MMMMMMMMMMM Tvoo Reason Method System & Component

 -F-Ferced A-Equip Failure F-Admin                 1-Manual        Exhibit F & H S-Sched    B-Maint or Test G-Oper Error 2-Manual Scra-, Instructions for                                                                                                                                            r C-Refueling             H-Other       3-Auto Scram    Preparation of                                                                                                                                     '

D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination             9-Other         (LER) File (NUREG-0161)

PAGE 2-113 4

         - . _ .                 ._  -                                          .               = _ _ .             - - ~ -

MEMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M DUANE ARNOLD M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Riptrt Peried APR 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE................... 10HA LICENSEE.................IDHA ELECTRIC LIGHT & P0HER ) COUNTY. ....... .........LINN CORPORATE ADDRESS........I E T0HERS, P.O. BOX 351 CEDAR RAPIDS, IDHA 52406 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 8 MI NH OF CONTRACTOR CEDAR RAPIDS, IA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR.... .......BHR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... MARCH 23, 1974 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER...MAY 19, 1974 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... FEBRUARY 1, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD. . COOLING TOWER IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... CEDAR RAPIDS RIVER IE RESIDENT INSPECTOR......J. HEIBE. , ELECTRIC RELIABILITY LICENSING PROJ MANAGER... .M. THADANI COUNCIL., ..............MID-CONTINENT AREA DOCKET NUMBER........... 50-331 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-49, FEBRUARY 22, 1974 PUBLIC DOCUMENT ROOM... ... CEDAR RAPIDS PUBLIC LIBRARY 500 FIRST STREET, S.E. CEDAR RAPIDS, IDHA 52401 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON JANUARY 21 THROUGH MARCH 17 (86002): ROUTINE, UNANNOUNCED INSPECTION BY THE RESIDENT INSPECTORS OF LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, OPERATIONAL SAFETY VERIFICATION, MONTHLY MAlteTENANCE OBSERVATIONS, MONTHLY SURVEILL ANCE OBSERVATION, LICENSEE EVENT REPORT FGLLONUP,-INFORMATION HOTICE FOLLOHUP, TMI ACTION ITEMS, AND ONSITE REVIEH COMMITTEE. THE INSPECTION INVOLVED A TOTAL OF 207 INSPECTOR-HOURS ONSITE BY TH0 NRC INSPECTORS, INCLUDING 54 INSPECTOR-HOURS ONSITE DURING BACKSHIFTS. NO VIOLATIONS HERE IDENTIFIED. ONE UNRESOLVED ITEM HAS IDENTIFIED CONCERNING THE REACTOR HATER CLEANUP DIFFERENTIAL TEMPERATURE LEAK DETECTION SYSTEM. THE SAFETY SIGNIFICANCE.0F THIS UNRESOLVED ITEM IS MINOR BECAUSE OF THE SYSTEM REDUNDANCIES AND THE FACT THAT SYSTEM ISOLATION IS NOT PRECLUDED. AN UNRESOLVED ITEM CONCERNING THE ENVIRONMENTAL' QUALIFICATION OF LIMITORQUE VALVE OPERATORS HAS CLOSED. THE INSPECTOR DETERMINED THAT NO VIOLATION EXISTED AND THAT THERE HAS NO EFFECT ON SAFETY SINCE , ANALYSIS SH0HS THAT THE MATERIAL IN THE VALVE OPERATORS HAD NOT EXCEEDED THEIR SERVICE LIFE. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS PAGE 2-114 ^

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM DUANE ARNOLD M Ripert Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM RIHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS:  ; HONE , PLANT STATUS: OPERATING ROUTINELY LAST IE SITE INSPECTION DATE: 4/18/86 INSPECTION REPORT NO: 86007 REPORTS FR0M LICENSEE 3,

     =================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86 07 Oh/15/86 04/14/86 EACTbRCOREISOLATONCOOLINGISOLATIbNDUETOTEMPERATURESHIhbHDESIGNPROBLEM 86-08 05/25/86 04/24/86 REACTOR PROTECTION SYSTEM TRIP FROM SPURIOUS SIGNAL WHILE IN COLD SHUTDOHN 86-09 03/29/86 04/28/86 STANDBY GAS TREATMENT SYSTEM ACTUATION DURING OUTAGE MAINTENANCE 86-11 04/01/86 05/01/8f MAIN STEAM LINE ISOLATION VALVE FAILURE TO OPEN DUE TO STEM BINDING '

         ===============================================================================================================
                                                                                                                                                                                 +

PAGE 2-115 1

1. Dockst 50-348 0PERATING STATUS nunExunrnunnnunnunnnunnnnunnnnnxxnnu u FARLEY 1 u
2. R:perting Parlsde 04/01/86 Outegn + Dn-lina Hras 719.0 ununununnnnunannnxunnnxunnnxxunnMunn
3. Utility Contact J. D. H00DARD (205) 899-5156 AVERAGE DAILY P0HER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 2652 FRRLEY 1
5. Nameplate Rating (Gross MHe): 1045 X 0.85 = 888
6. Design Electrical Rating (Net MWe): 829
7. Maximum Dependable Capacity (Gross MWe): 873 1500
                                                                                                                 ~
8. Maximum Dependable Capacity (Net MHe): 827 , g
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any NONE 1000 -

MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 73,751.0 g3
13. Hours Reactor Critical 719.0 2.845.2 52,478.3 100
14. Rx Reserve Shtdwn Hrs .0 .0 3,650.7
15. Hrs Generator On-Line 719.0 2.840.5 51,246.1 hf . so
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 1,872,495 7.303,662 130,175,202 500 - - 80
18. Gross Elec Ener (MHH) 621,821 2,427,950 41,630,134
19. Het Elec Ener (MHH) 590.794 2,303,816 39,301,534
                                                                                                                                                  - 40
20. Unit Service Factor 100.0 98.7 69.5
21. Unit Avail Factor 100.0 98.7 69.5
22. Unit Cap Factor (MDC Net) 99.4 96.8 66.5x - 20 l

i

23. Unit Cap Factor (DER Net) 99.1 96.5 64.3
24. Unit Forced Outage Rate .0 1.3 11.2 0 0 5 do is $0 d5 30
25. Forced Outage Hours .0 38.5 6,421.4 DAYS
25. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELING / MAINTENANCE OUTAGE: 10/4/86 8 NEEKS. RPftIL 1986

27. If Currently Shutdown Estimated Startup Dates N/A M Item calculated with a Heighted Average PAGE 2-116

MMMMMMMMHH%HMnu MMZHMEM%C2UMEMi'OMMMM FARLEY 1 M Reptet Period APR 1986 UNIT SHUTD0NNS / R E D U C T I O'N S M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM 5 Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence No. Date N!NE t M%MMMMMMMMM FARLEY 1 DPERATED AT FULL POWER IN APRIL. N

SUMMARY

M MMMMMMMMMMM Reason Melhod Svstem a Component Tvoe F-Forced A-Equip Failure F-Admin 1-Manual -Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                & License Examination         9-Other         (LER) File (NUREG-0161)

PAGE 2-117

ECMMSM%30CUZ2EEM2CMZZZEMMIUU2MM22MMM M FARLEY 1 H c:MEM:=x MMnnun=%MM2 c:MMMMnsMMarn n FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... ALABAMA LICENSEE................. ALABAMA POWER CO. COUNTY................... HOUSTON CORPORATE ADDRESS....... 600 NORTH 18TH STREET BIRMINGHAM, ALABAMA 35203 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 18 MI SE OF CONTRACTOR DOTHAM, ALA ARCHITECT / ENGINEER....... SOUTHERN SERVICES INCORPORATED TYPE OF REACTOR. . . . . . . . . . . .PHR NUC STEAM SYS SUPPLIER...NESTINGHOUSE { DATE INITIAL CRITICALITY... AUGUST 9, 1977 CONSTRUCTOR.............. DANIEL INTERNATIONAL

 !           DATE ELEC ENER IST GENER... AUGUST 18, 1977                            TURBINE SUPPLIER......... WESTINGHOUSE
;            DATE COMMERCIAL OPERATE.... DECEMBER 1, 1977                      REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING T0HER                            IE REGION RESPONSIBLE......II CONDENSER COOLING HATER....CHATAH00CHEE RIVER                        IE RESIDENT INSPECTOR......H. BRADFORD ELECTRIC RELIABILITY                                                LICENSING PROJ MANAGER.....E. REEVES COUNCIL.................. SOUTHEASTERN ELECTRIC                      DOCKET NUMBER........... 50-348 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....NPF-2, JUNE 25, 1977 PUBLIC DOCUMENT R00M.......G.S. HOUSTON MEMORIAL LIBRARY 212 H. BURDESHAN STREET DOTHAN, ALABAMA 36301 INSPECTION            STATUS INSPECTION 

SUMMARY

            + INSPECTION MARCH 24-28 (86-05): THIS SPECIAL, UNANNOUNCED INSPECTION INVOLVED 50 INSPECTOR-HOURS ON SITE IN THE AREAS OF (1)

GATHERING INFORMATI0H DFVIATIONS HERE IDENTIFIEL. PERTAINING TO ALLEGATIONS AND (2) QUALITY CONTROL AND CONFIRMATORY MEASUREMENTS. NO APPARENT VIOLATION I INSPECTION MARCH 11 - APRIL 10 (86-06): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 70 INSPECTOR-HOURS ON SITE IN THE AREAS OF i LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS, MONTHLY SURVEILLANCE OBSERVATION. MONTHLY MAINTENANCE OBSERVATION, OPERATIONAL SAFETY VERIFICATION, AND LICENSEE EVENT REPORTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. I __ ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: PAGE 2-118

n=%s=ungunz:%n=unn=u=nuMM : mun n==s FARLEY 1 M Repsrt Period APR 1986 INSPECTION STATUS - (CONTINUED) N MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM a OTHER ITEMS . NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: NORMAL OPERATIONS. LAST IE SITE INSPECTION DATE: MARCH 11- APRIL 10, 1986 + INSPECTION REPORT NO: 50-348/56-06 + REP 0RTS FR0M LICENSEE

   ========================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT =_ _ _ _ - - - - - --=

                                                                                                                                                                                          -==

86-002 02/14/86 03/14/86 'A' AND 'B' TRAIN POST-ACCIDENT HYDROGEN ANALYZERS ON BOTH UNITS INOPERABLE (THEY HOULD HAVE READ LOW BY 0.83); DUE TO INAPPROPRI ATE DESIGN CHANGE; CAUSE - PERSONNEL ERROR. REACTOR TRIP DUE TO A HIGH NEGATIVE FLUX RATE AS DETECTED BY POWER RANGE NUCLEAR DETECTORS; 86-004 02/28/86 03/28/86 CAUSE - SHORT IN CONTAINMENT PENETRATION.

   ====================================================================================================

i 1 4 i a a PAGE 2-119

1. Dockst 50-364 0PERATING STATUS nunnuMunMMMunuununzunungntunnMMMMEcu u FARLEY 2 n
2. Rypreting Parittd: 04/01/86 Outtg3 + On-lina Hrs: 719.0 MMMMXHXE%MUMMXEMMMMMMEMMMMMMMMMMMMMM
3. Utility

Contact:

J. D. H00DARD (205) 899-5156 AVERAGE DAILY P0HER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2652 FARLEY 2
5. Nameplate Rating (Gross MHe): 860
6. Design Electrical Rating (Net MWe): 829
7. Maximum Dependable Capacity (Gross MHe): 872 I"
8. Maximum Dependable Capacity (Net MHe): DESIGN ELEC. RRTING - 829 829
                                                                                ......E                    N.                ORP. - m (1m
9. If Changes Cccur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any NONE
12. Report Period Hrs MONTH 719.0 YEAR 2.879.0 CUMULATIVE 41,664.0 g
13. Hours Reactor Critical 95.9 2,226.1 36,026.7 -100
14. Rx Reserve Shtdwn Hrs .0 .0 138.4
15. Hrs Generator On-Line 95.8 2,218.3 35,610.7 f -so 16 Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 239,320 5,738,093 91.581,491 3ag ,
18. Gross Elec Ener (MHH) 80,822 1,914,824 29,637,434
19. Net Elec Ener (MHH) 71,982 1,818,752 28,107,992
                                                                                                                                            - 40
20. Unit Service Factor 13.3 77.1 85.5
21. Unit Avail Factor 13.3 77.1 85.5
22. Unit Cap Factor (MDC Net) 12.1 76.2 81.4
23. Unit Cap Factor (DER Net) 12.1 76.2 81.4
24. Unit Forced Outage Rate .0 1.7 4.6 0 0 5 1'o l's do IS 30
25. Forced Outage Hours .0 37.5 1,724.3 DAYS

, 2fs . Shutdowns Sched Over Next 6 Months (Type,Date, Duration): NONE I

27. If Currently Shutdown Estimated Startup Date: 05/09/86 PAGE 2-120

o MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FARLEY 2 M

   . R:psrt Period APR 1986                   UNIT       SHUTD0WH$ / REDUCTIONS                        M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Cause a Corrective Action to prevent Recurrence Ng,      Date    Type Hours Reason Method LER Number System Component RC     FUELXX   UNIT HAS TAKEN OFF LINE FOR THE CYCLE IV - V REFUELING 002      04/04/36    S 623.2      C      1 OUTAGE.

i i t ruMMMMMMMMM FARLEY 2 ENTERED REFUELING ON APRIL 4TH. u

SUMMARY

M MMMMMMMMMMM Type Reason Method System 8 Component F-Forced A-Equip Failure F-tdmin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet ' E-Operator Training 5-Reduced Load Licensee Event Report I & License Examination 9-Other (LER) File (NUREG-0161) PAGE 2-121 f 1

m ._ _ nunun=unu=ursuxu=u=====usunnunnunezu u FARLEY 2 u unnuunununuuusunnununununruuuuunnnuu FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... ALABAMA LICENSEE................. ALABAMA PONER CO. COUNTY................... HOUSTON CORPORATE ADDRESS....... 600 NORTH 18TH STREET BIRMINGHAM, ALABAMA 35203 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 28 MI SE OF CONTRACTOR DOTHAN, ALA ARCHITECT / ENGINEER....... SOUTHERN SERVICES INCORPORATED l TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY...MAY 5, 1981 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER...MAY 25, 1981 TURBINE SUPPLIER.... ....HESTINGHOUSE DATE COMMERCIAL OPERATE.... JULY 30, 1981 REGULATORY INFORMATION i CONDENSER COOLING METHOD... COOLING T0HER IE REGION RESPONSIBLE......II CONDENSER COOLING HATER....CHATAH00CHEE RIVER IE RESIDENT INSPECTOR......H. BRADFORD ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....E. REEVES COUNCIL.......... ....... SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-364 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....NPF-8, MARCH 31, 1981 PUBLIC DOCUMENT R00M.......G.S. HOUSTON MEMORIAL LIBRARY 212 H. BURDESHAH STREET DOTHAN, ALABAMA 36301 INSPECTION STATUS INSPECTION

SUMMARY

     + INSPECTION MARCH 24-28 (86-05):       THIS SPECIAL, UNANNDUNCED INSPECTION INVOLVED 49 INSPECTOR-HOURS ON SITE IN THE AREAS OF (1)

GATHERING INFORMATION DEVIATIONS HERE IDENTIFIED.PERTAINING TO ALLEGATIONS AND (2) QUALITY CONTROL AND CONFIRMATORY MEASUREMENTS. NO APPARENT VIOLATIONS OR INSPECTION MARCH 11 - APRIL 10 (86-06): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 70 INSPECTOR-HOURS ON SITE TN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS, MONTHLY SURVEILLANCE OBSERVATION, MONTHLY MAINTENANCE OBSERVATION, OPERATIONAL SAFETY VERIFICATION, AND LICENSEE EVENi REPORTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. _ ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: PAGE 2-122 1

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M N FARLEY 2 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Rspect Period APR 1986 OTHER ITEMS LICENSEE CONTINUES TENDON FIELD ANCHORS INSPECTION. FACILITY ITEMS (PLANS AND PROCEDURES): NONE.

  • MANAGERIAL ITEMS:

2 l NONE.

 )
!            PLANT STATUS:

REFUELING OUTAGE COMMENCED. i l LAST IE SITE INSPECTION DATE: MARCH 11 - APRIL 10, 1986 + INSPECTION REPORT NO: 50-364/86-06 + REPORTS FR0M LICENSEE q

              ==========================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _ 4 _ l 03/31/86 '2A' CONTAINMENT SPRAY PUMP INOPERABLE; DUE TO DEFECTIVE MICROSHITCH IN BREAKER. 86-003 03/02/86 =========================

              ===========================================================================================

l l i I i I, i l I. k . PAGE 2-123 I I _ _ . _ _ _ _ _ _ ____

1

1. Docket: 50-333 0PERATING STATUS ntnu2Cunr.I:20:52 nax2nr:502;%32:22 x m FITZPATRICK U
2. Rrptrting Perisd: 04/01/86 Outrge + On-lina Hros 719.0 unnununuxnux nnzuzun2xxx::cunx nnnna
3. Utility

Contact:

J. COOK (315) 342-3840 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2436 FITZPRTRICK
5. Nameplate Rating (Gross MWe): 981 X 0.9 = 883
6. Design Electrical Rating (Net MWe): 816
7. Maximum Dependable Capacity (Gross MWe): 823 1880
8. Maximum Dependable Capacity (Net MWe): 796 " * " ~
                                                                                        ......tmX. OEPDC. OFF. - 796 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 10mD-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 94.320.0
13. Hours Reactor Critical 692.7 2,524.5 67.940.1
14. Rx Reserve Shtdwn Hrs .0 .0 '

h

                                                                      .0      5
15. Hrs Generator On-Line 686.1 2.434.3 65.960.7 hf
16. Unit Reserve Shtdwn Hrs .0 .0 .0 - so
17. Gross Therm Ener (MHH) 1,563,024 5,767,440 141.480.154
18. Gross Elec Ener (MHH) 532.500 1.968.320 47,999.660 ~*
19. Het Elec Ener (MHH) 514.585 1.901.100 46,465,715
20. Unit Service Factor 95.4 84.6 69.9 - *O
21. Unit Avail Factor 95.4 84.6 69.9
 , 22. Unit Cap Factor (MDC Net)        89.9        82.6           63.7x                                                       - 20
23. Unit Cap Factor (DER Net) 87.7 80.8 60.4
24. Unit Forced Outage Rate 4.6 1.3 12.9 0 0
                                                                                                    ,        ,      ,    ,       0 5      to      15      20
25. Forced Outage Hours 32.9 32.9 9,878.9 25 30 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

SEPTEMBER 1986 - MAINTENANCE - 10 DAYS. RPRIL 1986

27. If Currently Shutdown Estimated Startup Date: N/A x Item calculated with a Heighted Average PAGE 2-124

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M FITZPATRICK Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Number System Component Cause a Corrective Action to Prevent Recurrence No. Date 3 86-010 .TA 33 REACTOR SCRAM DURING TURBINE STOP VALVE TESTING CAUSED REPAIRS 2 04/04/86 F 32.9 B

                                                                                   *BY A FAILURE OF THE 90% LIMIT SHITCH TO RESET.

HERE COMPLETED AND THE PLANT RETURNED TO SERVICE. A r i l a I l I I l, DDMMMMMMMMM THE FITZPATRICK PLANT OPERATED AT NEAR FULL THERMAL POWER FOR THIS REPORTING PERIOD HITH D

SUMMARY

M ONE TRIP DURING TURBINE STOP VALVE TESTING. j DOMMMMMMMMM Method System 8 Component j Tvpe Reason ! F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 3 H S-Sched B-Maint or Test G-Oper Error 2-Manual ScramPreparation Instructionsoffor C-Refueling H-Other 3-Auto Scram Data Entry Sheet D-Regulatory Restriction 4-Continued S-Reduced Load Licensee Event Report E-Operator Training 3

 '                 & License Examination       9-Other            (LER) File (NUREG-0161)                                                       PAGE 2-125 i

_- - . _- _ _ . ._~ ._ . nm==mu=urus :sur===nu=======urrensuu n FITZPATRICK U n==munuunusunnunuxu=n=usz==ussuum :n FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE....................NEW YORK LICENSEE.................NEW YORK P0HER AUTHORITY COUNTY.................. 0SHEGO CORPORATE ADDRESS....... 10 COLUMBUS CIRCLE NEW YORK, NEN YORK 10019 DIST AND DIRECTI0tl FROM t;EAREST POPULATION CTR.. 8 MI NE OF CONTRACTOR OSHEGO, NY ARCHITECT / ENGINEER....... STONE & HEBSTER TYPE OF REACTOR. . . . . . . . . . . .BilR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITI AL CRITICALITY. . . NOVEMBER 17, 1974 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER 1ST GENER... FEBRUARY 1, 1975 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE CottMERCIAL OPERATE.... JULY 28, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I i CONDENSER COOLING HATER.... LAKE ONTARIO IE RESIDENT INSPECTOR. . . . . . A. LUPTAK ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....H. ABELSON COUt4CIL . . ............... NORTHEAST POWER DOCKET NUMBER........... 50-333 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-59, OCTOBER 17, 1974 PUBLIC DOCUMENT ROOM....... STATE UNIVERSITY COLLEGE OF OSHEGO PENFIELD LIBRARY - GOVERNMENT DOCUMENTS COL ] OSHEGO, NY 13126 ' (315) 341-2323 INSPECTION STATUS i If4SPECTION

SUMMARY

l l NO INSPECTION INPUT PROVIDED. ! ENFORCEMENT

SUMMARY

4 HONE __0THER ILEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): i PAGE 2-126 I

M:ntnuMnxnnust=:m rzMaurnM:ntnnc ccu M M FITZPATRICK INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM R:P:rt Period APR 1986 OTHER ITEMS NO INPUT PROVIDED. MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

 ===========================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _ _ . NO INPUT PROVIDED.

 ============================================= ===================================

PAGE 2-127-

1. Dockcts 50-285 0PERATING STATUS unun/zu M2532Mrn t ntuntMZ2MM20 M23 D FORT CALHOUN 1 M
2. Reporting Peried: 04/01/86 Outzge + On-lina Hrs: 719.0 CRZnMM22:22MFMM25CZ EKMMZCMMZZZ52M32
3. Utility

Contact:

T. P. MATTHEWS (402) 536-4733 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MWt): 1500 FORT CRLHOUN 1
5. Nameplate Rating (Gross MWe): 591 X 0.85 = 502
6. Design Electrical Rating (Not MWe): 478
7. Maximum Dependable Capacity (Gross MWe): 502 1883
8. Maxinum Dependable Capacity (Net MWe): 478 DESIGN ELEC. RATING - 478
                                                                                                                                        ...... tex. DEPD O. Cfr. -                           478 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE 10m3-MONTH YEAR CUMULATIVE ca

12. Report Period Hrs 719.0 2.879.0 110.424.0 hd cr;
13. Hours Reactor Critical 719.0 2.683.5 85.149.3 23 cs j@
14. Rx Reserve Shtdwn Hrs .0 .0 1.309.5
15. Hrs Generator On-Line 719.0 2.507.7 83,580.7 hf
16. Unit Reserve Shtdwn Hrs .0 .0 .0

[] z

17. Gross Therm Ener (MWH) 1.062.459 3,018.495 106.769.540 recomat m m era amose
18. Gross Elec Ener (MWH) 357.192 1,002.441 35,298.865 100
19. Net Elec Ener (MWH) 341.198 955.004 33,432.889 - e0
20. Unit Service Factor 100.0 87.1 75.7
                                                                                                                                                                                                        . go
21. Unit Avail Factor 100.0 87.1 75.7

,,22. Unit Cap Factor (MDC Net) 99.3 - 40 69.4 6 5.6 M

23. Unit Cap Factor (DER Net) 99.3 69.4 63.3 - 0
24. Unit Forced Dutage Rate .0 .0 3.4 0 g 0
25. Forced Outage Hours .0 .0 1.750.3 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE I"

27. If Currently Shutdown Estimated Startup Date: N/A N Item calculated with a Heighted Average PAGE 2-128'

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M FORT CALHOUN 1 R: port Period APR 1986 UNIT $HUTD0NNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Number _ System Component Cause & Corrective Action to Prevent Recurrence l N3. _ Date i NOI4E l t 4 I i ? i MMMMMMMMMMM FORT CALHOUN OPERATED AT FULL POWER IN APRIL.

            .M 

SUMMARY

M MMMMMMMMMMM Method System 8 Component

Type Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
                               & License Examination          9-Other          (LER) File (NUREG-0161)                                                              _

i i l

cc:::In====== sm:222 :::::::::: In 7 M FORT CALHOUN 1 M uwum = mum muurn nnun==um : n :: n= % FACILITY DATA Repert Period APR 1983 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... NEBRASKA LICENSEE................ 0MAHA PUBLIC P0HER DISTRICT COUNTY...................HASHINGTON CORPORATE ADDRESS....... 1623 HARNEY STREET OMAHA,, NEBRASKA 68102 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 19 MI N OF CONTRACTOR OMAHA, NEB ARCHITECT / ENGINEER.... ..GIBBS, HILL, DURHAM & RICHARDSON TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER. . COMBUSTION ENGINEERING DATE INITIAL CRITICALITY... AUGUST 6, 1973 CONSTRUCTOR......... ....GIBBS, HILL, DURHAM & RICHARDSON DATE ELEC ENER 1ST GENER...ANGUST 25, 1973 TURBINE SUPPLIER.... .... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JUNE 20, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......IV CONDENSER COOLING HATER.... MISSOURI RIVER IE RESIDENT INSPECTOR.. ...P. HARRELL ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. SELLS COUNCIL..................MID-CONTINENT AREA DOCKET NUMBER........... 50-285 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-40, AUGUST 9, 1973 PUBLIC DOCUMENT R00M.......H. DALE CLARK LIBRARY 215 S. 15TH STREET DMAHA, NEBRASKA 68102 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION CONDUCTED FEBRUARY 1-28, 1986 (86-03) ROUTINE, UNANNOUNCED INSPECTION INCLUDING OPERATIONAL SAFETY VERIFICATION, MAINTENANCE, SURVEILLANCE, PLANT TOURS, SAFETY-RELATED SYSTEM HALKDOWNS, FOLLOHUP DN PREVIOUSLY IDENTIFIED ITEMS, FOLLOHUP DN LJCENSEE EVENT REPORTS, FOLLONUP DN AN IE BULLETIN, FOLLOHUP DN AN NRC HEADQUARTER'S REQUEST ON THE MAINTENANCE OUTAGE TEAM INSPECTION, AND FOLLONUP DN AN NRR ORDER FOR MODIFICATION OF LICENSE. HITHIN TEN AREAS INSPECTED, TH0 VIOLATIONS (FAILURE TO CHECK NONFUNCTIONAL FIRE BARRIERS HOURLY, AND MODIFICATION OF A SAFETY-RELATED SYSTEM HITHOUT AN APPROVED PROCEDURE, HERE IDENTIFIED. INSPECTION CONDUCTED FEBRUARY 18-21, 1986 (86-04) ROUTINE, UNANNOUNCED INSPECTION CONSISTING OF DETECTION AIDS - PA, PHYSICAL BARRIERS - PA, ASSESSMENT AIDS, LIGHTING, LOCK AND KEY CONTROL, AND TESTING AND MAINTENANCE. HITHIH THE SIX AREAS INSPECTED THREE VIOLATIONS HERE IDENTIFIED; DETECTION AIDS - PROTECTED AREA, ASSSESSMENT AIDS, AND LOCK AND KEY CONTROL. IN3PECTION CONDUCTED FEBRUARY 24-28, 1986 (86-06) ROUTINE, UNANNOUNCED INSPECTION OF THE LICENSEE'S AUDIT. HITHIN THE TH0 AREAS INSPECTED NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE PAGE 2-130

   . _ _ _ . . _ _ _ _               .___._.m.             . _ _  _ _ _ _ .._ __    m_ _ m ._ . . _ , _ _ . _ . . _ _ . _ . . _ _                  .     -    _ - - - _ _ - - - - - - - - - - _ - . _ - - - - -

2 i i i nuMMMMMMMuuMMMMwMMwMMuuMMuuMuMMuMMmM > FORT CALHOUN 1 M i Report Period APR 1986 IN5PECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM i i i i, OTHER ITEMS l a SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE l MANAGERIAL ITEMS:  ! NONE

 !            PLANT STATUS:

1 LAST IE SITE INSPECTION DATE: FEBRUARY 24-28, 1986 INSPECTION REPORT NO 50-285/86-06 ' f REPORTS FROM LICENSEE i 4 I J

              ===========================================================================================

1 NUMBER DATE OF DATE OF SUBJECT e t EVENT REPORT . _ _ - - - - _ _ _ - - _ _ l i i , L86-002 05/24/86 04/24/86 CONTAINMENT PRESSURE TEST OVERDUE l-r l NONE 4

              ================================================================================================                                                                                                             I i.

i i I, i i T PAGE 2-131 I i i l i l l , .- - - - -

1. Docket: 50-267 0PERATINO STATUS c::c=c ctaruz_ uscu_SuzanunnMru22:3 M FORT ST VRAIN u
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts FRANK NOVACHEK (303) 785-2224 AVERAGE DAILY P0HER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 842 FORT ST VRRIN
5. Nameplate Rating (Gross MWe): 403 X 0.85 = 343
6. Design Electrical Rating (Net MWe): 330 I'*
7. Mrximum Dependable Capacity (Gross MWe): 342 DESIGN ETIC. RRTING - 330
8. MIximun Dependable Capacity (Not MWe): 330 ......MRX. OEPDO. Crr. - 330 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which kestricted, If Any (Net NHe): 115
11. Rsasons for Restrictions, If Any:

ENVIRONMENTAL _ QUALIFICATION HORK. 2003

12. Raport Period Hrs MONTH 719.0 YEAR 2,879.0 CUMULATIVE 59,904.0 []

m,

13. H urs Reactor Critical 623.1 1,713.6 29,749.8
14. Rx Reserve Shtdwn Hrs .0 .0 .0 c8
15. Hrs Generator On-Line 379.5 379.5 18.843.0 hf
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MWH) 137,250 182,984 9.926.151 500 -
18. Gross Elec Ener (MWH) 30.177 30,177 3.279,065
19. Het Elec Ener (MWH) 25,762 15,618 2.911,664 103
20. Unit Service Factor 52.8 13.2 31.5
                                                                                                                      - 80
21. Unit Avail Factor 52.8 13.2 31.5
                                                                                                                      - 80
22. Unit Cap Factor (MDC Net) 10.9 1.6 14.7 - go
23. Unit Cap Factor (DER Net) 10.9 1.6 14.7 -20
24. Unit Forced Outage Rate 47.2 86.8 59.4 o 5 d3 d5 2'O ' 2's 30
25. Fcrced Outage Hours 339.5 2,499.5 27,589.0 UNTS
25. Shutdowns Sched Over Next 6 Months (Type Date, Duration):

QUALIFICATION HORK MAY 31, 1986, 2016 HOURS. N4tIL 1955

27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-132

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FORT ST VRAIN M Report Period APR 1986 UNIT SHUTD0HN$ / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMyMMMMMMMMMMMMMM Date Type Hours Reason Method LFR Humber System Component cause 8 Corrective Action to Prevent Recurrence Ng, A 4 EC 37 PRIMARY-COOLANT CLEANUP CONTINUES. 86-01 02/07/86 F 325.9 13.6 8 3 86-018 JC 63 SPURIOUS SCRAM SIGNAL DURING TESTING. Sfs-02 04/27/86 F MMMMMMMMMMM FORT ST. VRAIN OPERATED HITH 2 OUTAGES IN APRIL. ,, M SUMr1ARY M MMMMMMMMMMM Reason Method System & Component Tvo* F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Ma.sual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination        9-Other         (LER) File (NUREG-0161)

PAGE 2-133

g==mu=muummuu=muunnu=c =umnusu==umuu u FORT ST VRAIN u unu==muuuuuuuuuuuuuuuuuuuuuuuuuununu FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE....... ...... ..... COLORADO LICENSEE.................PUBLIC SERVICE OF COLORADO COUNTY................... HELD CORPORATE ADDRESS........P.O. BOX 840 DENVER, COLORADO 80201 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 35 MI N OF CONTRACTOR DENVER, COL ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF ret.C'sR... ........HTGR HUC STEAM SYS SUPPLIER... GENERAL ATOMIC CORP. DATE INITIAL CRITICALITY. . JANUARY 31, 1974 CONSTRUCTOR..............EBASCO DATE ELEC ENER 1ST GENER... DECEMBER 11, 1976 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JULY 1, 1979 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING T0HER IE REGION RESPONSIBLE......IV CONDENSER COOLING HATER....S. PLATTE RIVER .IE RESIDENT INSPECTOR......R. FARRELL ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....C. HINSON COUNCIL..................HESTERN SYSTEMS DOCKET NUMBER........... 50-267 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-34, DECEMBER 21, 1973 PUBLIC DOCUMENT ROOM.......GREELEY PUBLIC LIBRARY CITY COMPLEX BUILDING GREELEY, COLORADO 80631 IN$PECTION STATUS INSPECTION

SUMMARY

INSPECTION CONDUCTED JAN.6-10, 1986 (86-02) ROUTINE, UNANNOUNCED INSPECTION OF THE LICENSEE'S RADIATION PROTECTION PROGRAM INCLUDING: ORGANIZATION AND MANAGEMENT CONTROLS, TRAINING AND QUALIFICATIONS, EXTERNAL EXPOSURE CONTROL, INTERNAL EXPOSURE CONTROL, CONTROL OF RADI0 ACTIVE MATERIAL AND CONTAMINATION, FACILITIES AND EQUIPMENT, MAINTAINING EXPOSURES ALARA, AND AUDITS. THE INSPECTION INVOLVED 37 INSPECTOR-HOURS ONSITE BY ONE HRC INSPECTOR. HITHIN THE AREAS INSPECTED, ONE VIOLATION HAS IDENTIFIED. INSPECTION CONDUCTED FEB.1-28, 1986 (86-06) ROUTINE, UNANNOUNCED INSPECTION OF OPERATIONAL SAFETY VERIFICATION, LICENSEE ACTION ON PREVIOUSLY IDENTIFIED INSPECTION ITEMS, AND RESERVE SHUTDOHN SYSTEM. HITHIN THE AREAS INSPECTED, TH0 VIOLATIONS HERE IDENTIFIED IN ONE AREA AND NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN THE REMAINING THQ AREAS. ~ ENFORCEMENT

SUMMARY

10CFR 30.34(C) BY YOUR REQUIRES LICENSE THAT YOU CONFINE YOUR POS SESSION AND USE OF BYPRODUCT MATERIALS TO THE LOC ATIONS AND PURPOSES AUTHORIZED (D PR-34). CONDITION 2.C.(4) 0F YOUR LICENSE REQUIRE S THAT LICENSED MATERIAL BE POSSESSED AND USED AT YOUR FACILITY. CONTRARY TO THESE REQUIREMENTS ON APRIL 16, 1985, LICENSEE POSSESSED FOUR CONTRO L ROD DRIVE END BELLS AND FOUR ORIFICE DRIVE HOUS INGS CONTAINING APPROXIMATELY 348 MICR0 CURIES OF A MIXTURE OF CO-60, MN-54, AND CS-137, AT THE LEN OX CORP., DENVER, COLO., A LOCATION HOT AUTHORIZE D BY LICENSEE. CONTRARY TO TS 3.7.C.1.B AND TS 6.8.1.A. ON JANUARY 29, 1986 HITH UNIT 2 AT POWER OPERATION, THE LICENSEE FAILED TO IMPLEMENT THE REQUIREMENTS OF ADMINISTRATIVE CONTROL PROCEDURE 30AC-0PS-003-OS, IN THAT THE PAGE 2-134

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM N

  • FORT ST VRAIN INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 ENFORCEMENT

SUMMARY

INSPECTOR OBSERVED BOTH AIR LOCK DOORS TO BE OPEN OF THE UNIT REACTOR BUILDI THIS RESULTED IN A LDSS GF UNIT 1 SECONDARY CONTAINMENT INTEGRITY. 1986 AtIDIN ADDITION, ON FEBRUARYTHE 17, LICENSEE AtID IGt10 RING THE INTERL OCK LIGHTS. SECONDARY CONTAINMENT INTEGRITY BREACH IN DIFFERENT LOCATI0tlS ON JANUARY 15 AND 21, IDENTIFIED UNIT 1 1986. 1986, SAFETY-RELATED PROCEDURE, 42IT-TET-091-OS, REVISIDH 1, TO PHEUMATICALLY TEST TiiE CONTRARY ON JANUARY TO TS 28, 6.8.1.C INTEGRITY OF TUBING INSTALLED BETHEEtt THE DRYHELL AND DRYHELL PRESSURE AS SPECIFIEDTRAt4SMITTERS, H SOURCE HAS C0tlNECTED TO THE SYSTEM PRIOR TO VERIFYING THE ISOL ATION OF THE DRYHELL PRESSURE TRANSMITTERS,THIS RESPECTIVELY Ita STEPS 7.2.7.4 AND 7.2.7.1 0F THE PROCEDURE. SHEET, 1-86-016, TO MODIFY THE UNIT 1 SAFETY FEATURES (ESF) EQUIPMEt4T. CONTRARY TO TS 6.8.1.C, THE JUMPER At4D LIFTED HIRE (J&LH) AND PROCEDURE, 575V-E41-003-2, TO CALIBRATE THE Ut41T 2 HIGH PRESSURE COOLANT INJECTION AtlALOG TRAt4SMITTER TRIP SYSTEM (ATTS) THE USE OF THESE PROCEDURES RESULTED IN UNPLArit4ED (HPCI) STEAM lit 1E PRESSURE TRANSMITTERS HERE BOTH INADEQUATELY HRITTEN. ENGINEERIrlG SAFETY FEATURES (ESF) EQUIPMENT ACTUATI0ft Ott FEBRUARY 13, 1986. (8600 4) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: PLANT OPERATING AT 34% POWER L AST IE SITE INSPECTION DATE: FEBRUARY 1-28, 1986 INSPECTION REPORT NO: 50-267/86-06 REP 0RTS FR0M LICENSEE

  ==================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _ _ _ __ =. ==--------==- __-------__ _----- _ 86-016 3/14'86 4/13/86 HYDRAULIC POWER SYSTEM SURVEILLANCE NOT COMPLETED HITHIN SPECIFIED TIME.

   =======================================================================================

PAGE 2-135

1. Dockot 50-244 0PERATING STATUS nun =sann:nnunnnuarnzurwn=nununzunn:n u GINHA u
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 wwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww
3. Utility

Contact:

ANDREW MC NAMARA (315) 524-4446 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thernal Power (MWt): 1520 GINNR
5. Naceplate Rating (Gross MWe): 608 X 0.85 = 517
6. Dssign Electrical Rating (Net MWe): 470 I
7. Maximum Dependable Capacity (Gross MWe): _ 490
8. Maximum Dependable Capacity (Net MWe): _

470 ...... tfDC .- DEPEND. CAP. - 470 (100%)

9. If Changes Occur Above Since Last Report, Glee Reasons:

NONE ,

10. Pewer Level to Which Restricted, If Any (Net MWe): -
11. Rsasons for Restrictions, l' Any:

HOME _ MONTH YEAR CUMULATIVE

12. Report vr.eiod Mrs 719.0 2.879.0- 163.999.0 c3 o
13. Hours Reactor Critical 719.0 1.888.7 110.175.3 ES
14. Rx Reserve Shtdwn Hrs .0 .0 1.687.7
15. Hrs Generator. On-line 719.0 1.859.5 107.853.3 h{ aj ca
16. Unit Reserve Shtdwn Hrs _ma .0 8.5
17. Gross Therm Ener (MHH) 1.091.832 2.d37.016 150.349.241 rec one at r==m tarnt crTrnm. coertrous
18. Gross Elec Ener (MHH) 370.354 883.931 49,194.788
19. Het Elec Ener (MWH) 352.829 839.010 46.642.328 - 80
20. Unit Service Factor 100.0 64.6 74.9 - so
21. Unit Avail Factor 100.0 64.6 74.9 . ,a
22. Unit Cap Factor (MDC Net) 104.4 62.0 70.5m
                                                                                                                                                                                                - 20
23. Unit Cap Factor (DER Net) - 104.4 62.0 70.5w
24. Unit Forced Outage Rate .0 7.0 0
                                                                                            .0 0'        5       dD     $5             do                  is     30
                                     ?5. Forced Outage Hours                   .0           .0      4.243.8                                        DAYS                                                       ,
25. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

RPRIL 1986 NONE

27. If Currently Shutdown Estimated Startup Date: N/A w Item calculated with a Heighted Average PAGE 2-136

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM N Ripsrt Period APR 1986 UNIT SHUTD0WN5 / REDUCTIONS M GINNA MMMMMMMMMMMAMMMMMMMMMMMMMMMMMMMMMMMM

 -No.      Date    Type Hours Reason Method LER Number _ System Component            Cause & Corrective Action to Prevent Recurrence i NONE EM WKMMMMMM       GINNA OPERATED AT FULL POWER IN APRIL.

N

SUMMARY

M MMMMKMMMMMM Type Reason Method System 8 Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                & License F.xamination          9-Other         (LER) File (NUREG-0161)

PAGE 2-137

tw :murusunu===uvacum== na=:w ::=2:n c 2 .

-M                GINNA                            u                                                           s unupuwwwwwunwwwwwumummunwMMMMMMNNNMM                             FACILITY         DATA                       N                                          Report Perled APR 1986 FACILITY DESCRIPTION                                                      UTILITY a CONTRACTOR INFORMATION LOCATI0tl                                                                UTILITY STATE....................NEN YORK                                        LICENSEE................. ROCHESTER GAS & ELECTRIC COUNTY...................HAYNE                                           CORPORATE ADDRESS....... 89 EAST AVENUE ROCHESTER, NEW YORK 14604 DIST AND DIRECTION FROM tlEAREST POPULATION CTR.. 15 MI NE OF                                 CONTRACTOR ROCHESTER, NY                       ARCHITECT / ENGINEER....... GILBERT ASSOCIATES TYPE OF REACTOR . . . . . . . . . . . . Pl!R                           ,    HUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY...HOVEMBER 8, 1969                                 CONSTRUCTOR.,.............BECHTEL                                                   s'
   ~DATE ELEC Ef4ER IST GENER... DECEMBER 2, 1969                                                                                                    #

TURBINE SUPPLIER.........HESTINGHOUSE _' , DATE C0!!MERCIAL OPERATE.... JULY 1, 1970 REGULATORY INFORMATION CufIDENSER COOLING METHOD.. 0tiCE THRU IE REGION RESPONSIBLE.... .I C0tIDEt4SER C00LIrlG HATER. . . . LAKE O!!TARIO IE RESIDENT INSPECTOR......H. COOK ELECTRIC RELIABILITY LICENSING PROJ MANAGER.. 7.M. FAIRTILE COUNCIL.......... ....... NORTHEAST P0HER DOCKET NUMBER........... 50-244 C00RDINATIllG COUNCIL LICENSE & DATE ISSUANCE....DPR-18, DECEMBER 10, 1984 PUBLIC DOCUMENT R00M.......ROCHESTliR PUBLIC LIBRARY BUSINESS AND SOCIAL SCIENCE DIVISION 115 SOUTH AVENUE ROCHESTER, NEH YORK 14604 INSPECTH0N STATUS INSPECTION

SUMMARY

NO IllSPECTION INPUT PRO'VIDED. ENFORCEMENT SUMMARI

    !!Ot4E

,_0THER ITEMS SYSTEMS AND COMPONENTS: HD INPHT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): PAGE 2-138 h

_ _ _ - . . _ . _ . _ - _._ _ .. _.-_ ~ _. . _ _ _ _ _ _ - . _ _ , . _ . _ . . . _ _ _ . . _ _ _ . - . _ m_.. .. _ - i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM GINNA M Rzport Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMhMMMMMMinWMMMMM OTHER ITEMS NO INPUT PROVIDED. MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

          ===========================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT NO INPUT PROVIDED. 4

          =================================================================r,==============================================.===,============

r i r I 1 d PAGE 2-139 l i l

1. Dickst s 50-416 0PERATINC STATUS nuxuu su:MnusuzuununnuuMax=nnnannntu M GRAND GULF 1 u
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

J. G. CESARE (601) 969-7585 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 3833 GRfiND GULE 1
5. Nameplate Rating (Gross MWe): 1373
6. Design Electrical Rating (Net MWe): 1250 I"
7. Maximum Dependable Capacity (Gross MWe): 1157
                                                                                                                                 *                ~ I
8. Maximum Dependable Capacity (Not NHe): 1108
                                                                                      ...... mX . DEPDC. Crr. - 1108 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:
10. Power Level To Which Restricted, If Any (Not MWe): 700
                                                                                     ' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~                          ~
11. Reasons for Restrictions, If Any ECONOMIC AND LOAD DISPATCH CONSIDERATIONS. 1000 -
12. Report Period Hrs MONTH 719.0 YEAR 2.879.0 CUMULATIVE

_ 7,296.0 g e_. -so

13. Hours Reactor Critical 633.2 2,556.2 5,439.6
14. Rx Reserve Shtdwn Hrs .0 .0 .0 3 2,450.6 5,143.1
15. Hrs Generator On-Line 608.7 f .go
16. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Ener (MHH) 1,472,892 6.225,433 15,306,264 500 -
18. Gross Elec Ener (MHH) 432,360 1,860,420 4,653,310 -40
19. Het Elec Ener (MHH) 403,299 1,754,086 4,408,235
20. Unit Service Factor 84.7 85.1 70.5
21. Unit Avail Factor 84.7 85.1 70.5 - 20
 ,22. Unit Cap Factor (MDC Net)        51.3         55.0           54.5
23. Unit Cap Factor (DER Net) 45.4 48.7 48.3 I
24. Unit Forced Outage Rate 15.3 14.9 12.6 0 0 5 1'O l's lo is 30
25. Forced Outage Hours 110.3 428.4 738 1 DfW S
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELING OUTAGE SCHEDULED FOR SEPTEMBER, 1986. frMIL 1986

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-140

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM3 GRAND GULF 1 M R pgrt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Y95e ihngji Reason Method LER Number _ System Component Cause & Corrective Action to Prevent Recurrence Ng, Date 2 86-011 SB RV A MAIN STEAM LINE SAFETY RELIEF VALVE INADVERTENTLY 85-07 04/07/86 F 110,3 G LIFTED AS A RESULT OF A MAINTENANCE HORK ACTIVITY. THE SRV COULD NOT BE VERIFIED CLOSED HITHIN 2 MINUTES HHICH MANDATED A TECHNICAL SPECIFICATION REQUIRED SHUTDOHN. f uuxnMMMMMMM GRAND GULF 1 OPERATED HITH 1 OUTAGE IN APRIL.

 ,u 

SUMMARY

M HHHMMMMMMMM Method Svstem 8 Component Tvpe Reason ' F-Ftrced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test C*Oper Error 2-Manual Scram Instructions for C-Refueling r.-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination           9-Other         (LER) File (NUREG-0161)

PAGE 2-141 l --__---_ - -

usurmruunx=unnuuuurunsunnatuunxxnuxu M GRAND GULF 1 u

  • xxxuxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILIfY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE....................NISSISSIPPI LICENSEE................. MISSISSIPPI POWER & LIGHT COMPANY COUNTY...................CLAIB0RNE CORPORATE ADDRESS........P.O. BOX 1640 JACKSON, MISSISSIPPI 39205 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 25 MI S OF CONTRACTOR VICKSBURG, MISS ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC i

DATE INITIAL CRITICALITY... AUGUST 18, 1982 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER.. 0CTOBER 20, 1984 TURBINE SUPPLIER.........ALLIS-CHALMERS DATE COMMERCIAL OPERATE.... JULY 1, 1985 REGULATORY INFORMATION I CONDENSER COOLING METHOD...CCHNDCT IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......R. BUTCHER ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....L. KINTNER COUNCIL..................SOUTHHEST P0HER POOL DOCKET NUMBER........... 50-416 LICENSE & DATE ISSUANCE....NPF-29. NOVEMBER 1, 1984 PUBLIC DOCUMENT ROOM....... HINDS JUNIOR COLLEGE MC LENDON LIBRARY RAYMOND, MISSISSIPPI 39154 INSPEC1 ION

SUMMARY

INSPECTION STATUS

   + INSPECTION MARCH 10-13 (86-05): THIS UNANNOUNCED PHYSICAL SECURITY INSPECTION INVOLVED 42 INSPECTOR-HOURS (2 1/2 HOURS ON BACKSHIFT) INSPECTING: SECURITY PLAN; MANAGEMENT EFFECTIVENESS - SECURITY PROGRAM; SECURITY ORGANIZATION; RECORDS AND REPORTS; PHYSICAL BARRIERS - PROTECTED AREA; PHYSICAL BARRIERS - VITAL AREAS; COMPENSATORY MEASURES; ASSESSMENT AIDS; ACCESS CONTROL -

PERSONNEL, PACKAGES AND VEHICLES; DETECTION AIDS - PROTECTED AREAS AND VITAL AREAS; ALARM STATIONS; AND COMMUNICATIONS. NO VIOLATIDHS OF REGULATORY REQUIREMENTS HERE IDENTIFIED IN THE 15 AREAS INSPECTED. INSPECTION MARCH 10-14 (86-06): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 32 INSPECTOR-HOURS ON SITE INSPECTING THE AREAS OF REVIEH OF STARTUP TEST RESULTS, REVIEW OF REACTOR OPERATIONS, REVIEH OF CORE PERFORMANCE MONITORING, AND FOLLOHUP OF DUTSTANDING ITEMS. ONE VIOLATION HAS IDENTIFIED: FAILURE TO FOLLOH AN OPERATING PROCEDURE. INSPECTION MARCH OPERATIONAL SAFETY VERIFICATION, 18 - APRIL 14 MAINTENANCE (86-08): THIS ROUTINE INSPECTION ENTAILED 155 RESIDENT INSPECTOR-HOURS AT THE SITE IN THE AREAS OF OBSERVATION, SURVEILLANCE OBSERVATION, ENGINEERING SAFETY FEATURE SYSTEM HALKDOWN, REPORTABLE OCCURRENCES, OPERATING REACTOR EVENTS, INSPECTOR FOLLOHUP AND UNRESOLVED ITEMS, AND DESIGN CHANGES AND MODIFICATIONS. ONE BEINGVIOLATION DECLARED OPERABLE. - FAILURE TO CHANGE OPERATING PROCEDURES AFFECTED BY A DESIGN CHANGE TO A SAFETY RELATED SYSTEM PRIOR TO PAGE 2-142. i k

MMMMMMMMMMMMMMMMMMMMMMMMMMMEMMMMMMMM M GRAND GULF 1 M Rsport Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: OPERATING AT 100% POWER. LAST IE SITE INSPECTION DATE: MARCH 18 - APRIL 14, 1986 + INSPECTION REPORT NO: 50-416/86-08 + REPQRTS FR0M LICENSEE

   ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT - 86-004 02/12/86 -- A SEAL ON REACTOR RECIRCULATION PUMP 'B' DETERIORATED CAUSING REACTOR COOLANT UNIDENTIFIED LEAKAGE TO EXCEED TECHNICAL SPECIFICATION LIMITS; DURING SHUTDONN 'B' REACTOR FEEDHATER PUMP TRIPPED DUE TO LON SUCTION FLOW. 86-005 02/15/86 03/17/86 STANDBY GAS TREATMENT FILTER TRAIN HEATER FAILS SURVEILLANCE; CAUSE - TECHNICAL SPECIFICATION NOT REVISED TO REFLECT A NOMINAL VALUE OF 48 KH AS PART OF THE DESIGN CHANGE PROCESS. 86-006 02/14/86 03/17/86 FOUR FIRE RATED SEALS IN CONTROL ROOM ENVELOPE FOUND VIOLATED. 86-007 02/20/86 03/21/86 RHR 'B' PUMP AND SSH3 'B' PUMP AUTOMATICALLY STARTED DUE TO AN ELECTRICAL TECHNICIAN CONNECTING A TEST SHITCH TO THE HRONG TERMINALS OF THE K98 RELAY. 86-008 02/24/86 03/26/86 COMPLETE RESPONSE TIME OF EOC-RPT SYSTEM NOT MEASURED; CAUSE - FOOTNOTE ADDED TO TECHNICAL SPECIFICATION 4.3.4.2.3 NOT CLEAR IN HHETHER BREAKER OPERATING TIME INCLUDED IN 12 MSEC. ' ARC SUPPRESSION TIME'.

   ==================================================================================================================================

+ PAGE 2-143

1. Dockst: 50-213 0PERATING STATUS unnM:nnuntruunnunnuununnanuztMraMtnu H HADDAM NECK u
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

J. P. DRAGO (203) 267-2556 X452 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licens. Thermal Power (MHt): 1825 HRODRM NECK
5. Nameplate Rating (Gross Mue): 667 X 0.9 = 600
6. Design Electrical Rating (Het MHe): 582
7. Maximum Dependable Capacity (Gross MHe): 596 1500 DESIGN EXEC. ImTING = 582
8. Maximum Dependable Capacity (Het MHe): 569 ,
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any: -

NONE g MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 160.679.0 E3 p

c3

13. Hours Reactor Critical .0 86.8 136,486.2 j@
14. Rx Reserve Shtdwn Hrs .0 .0 1.221.5 $F
15. Hrs Generator On-Line .0 76.2 130,876.9 (J

g b gg NO NET POWER OUTPUT THIS MONTH a_

16. Unit Reserve Shtdwn Hrs .0 .0 398.0

____________.___________________________ - taa

17. Gross Therm Ener (MHH) 0 117,556 227,233,468
18. Gross Elec Ener (MHH) 0 38,277 74.568.715 - 80
19. Het Elec Erter (MHH) -3.342 24.250 70,925,341
                                                                                                                                   - 80
20. Unit Service Factor .0 2.6 81.5
21. Unit Avail Factor .0 2.6 81.7 - to
22. Unit Cap Factor (MDC Net) .0 1.5 81.0M
                                                                                                                                   - 20
23. Unit Cap Factor (DER Het) .0 1.4 75.9M
24. Unit Forced Outage Rate .0 .0 5.6 0 , ,, , , , o 0 5 10 15 20 25 30
25. Forced Outage Hours .0 _ .0 1,326.1 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

~ NONE " I' I "

27. If Currently Shutdown Estimated Startup Date: 05/15/86 M Item calculated with a Heighted Average PAGE 2-144

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M Rspert Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M HADDAM NECK MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Number - "vstem Component Cause 8 Corrective Action to Prevent Recurrence No. Date C 4 RC FUELXX CONTINUATION OF CORE 13 - 14 REFUELING. 86-01 01/04/86 S 719.0 MMMMMMMMMMM CONNECTICUT YANKEE HADDAM HECK REMAINS SHUTDOHN FOR-REFUELING. ,M

SUMMARY

M MMMMMMMMMMM Type Reason Method }vstem & Component F-Forced A-Equip Failure F-Admin 1-Manual *hibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination         9-Other           (LER) File (NUREG-0161)                                              PAGE 2-145

waaaaaaaaaawaaucaucaxaaaaaaaaawanawa a HADDAM NECK a accaccacaxacaawaaaaxmanaccaaaaaaaaaa FACILITY DATA Repar? **eled APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... CONNECTICUT LICENSEE. . . . . . . . . . . . . . . . . CONNECTICUT YANKEE ATOMIC POWER COUNTY...................MIDDLESEX CORPORATE ADDRESS........P.O. BOX 270 HARTFORD, CONNECTICUT 06101 DIST AND DIRECTION FROM NEAREST POPULATION CTR. .13 MI E OF CONTRACTOR MERIDEN, CONN ARCHITECT / ENGINEER....... STONE 8 NE3 STER TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...HESTINGWOUSE DATE INITIAL CRITICALITY... JULY 24, 1967 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER IST GENER... AUGUST 7, 1967 TURBINE SUPPLIER.........H'ESTINGHOUSE DATE COMMERCIAL OPERATE.... JANUARY 1, 1968 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER.... CONNECTICUT RIVER IE RESIDENT INSPECTOR......P. SHETLAND ELECTRIC RELIABILITY LICENSING PROJ MANAGER. . . . .F. AKSTULENICZ COUNCIL.................. NORTHEAST P0HER DOCKET NUMBER........... 50-213 COORDINATING COUNCIL LICENSE & DATE ISSUANCE. . . .DPR-61, DECEMBER 27, 1974 PUBLIC DOCUMENT ROOM....... RUSSELL LIBRARY 123 BROAD STREET MIDDLETOHN, CONNECTITCUT 06457 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. PAGE 2-146

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M HADDAM NECK R prrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

    ================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT ____. _ NO INPUT PROVIDED.

    =========================================================================================================

PAGE 2-147

1. Dack et : 50-321 0PERATING STATUS MMMMMMMMMMMukMMMMMMMMnMMMunnMu=nnxMa M HATCH 1 H
2. Rsperting Pariod 04/01/86 Outagm + On-lina Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

LEE KANIPE (912) 367-7781 X2882 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2436 HATCH 1
5. Nameplate Rating (Gross MHe): 1000 X 0.85 = 850
6. Design Electrical Rating (Not MNe): 777
7. Maximum Dependable Capacity (Gross MHe): 801 15m3
8. Maximum Dependable Capacity (Net MWe): 768 DESIGN ELCO. RATING - 777
                                                                                                                               --.... rmX. DCPDO. Cfr. -    768 t100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hh*ch Restricted, If Any (Net MHe):

t1. Reasons for Restrictions, If Any: NONE 10m3-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.Q 90,551.0 E3, p
13. Hours Reactor Critical .0 .0 62,052.0 NO NET POWER OUTPUT THIS MONTH h!
14. Rx Reserve Shtdwn Hrs .0 .0 .0 5 ---------------------------- ---------- -100
15. Hrs Generator On-Line .0 .0 58,566.3 $
16. Unit Reserve Shtdwn Hrs .0 .0 .0 - 80
17. Gross Therm Ener (MHH) 0 0 124,432,255
18. Gross Elec Ener (MHH) 0 0 40,232,840 - 80
19. Het Elec Ener (MHH) 0 0 38,209.178
20. Unit Service Factor .0 .0 64.7 - to
21. Unit Avail Factor .0 .0 64.7
22. Unit Cap Factor (MDC Net) .0 .0 54.9 - 30
23. Unit Cap Factor (DER Net) .0 .0 54.3
24. Unit Forced Outage Rate .0 .0 15.5 0 .

0 5

                                                                                                                                           .       .     .     .         0 10      15    30    35     30
25. Forced Outage Hours .0 .0 10,520.0 DAYS i Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE IFRIL 1986

27. If Currently Shutdown Estimated Startup Date: 05/11/86 PAGE 2-148 l

[ MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M HATCH 1 Rapset Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM f Cause & Corrective Action to prevent Recurrence flo . Date Type Hours Reason Method LER Humber System Component C 4 RC FUELXX REFUELING OUTAGE CONTINUES. 86-004 11/27/85 S 719.0 MMMMMMMMMMM HATCP 1 REMAINS SHUTDOHN FOR REFUELING. ,,M

SUMMARY

M MMMMMMMMMMM Method System & Component Type Reason F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Traininq 5-Reduced Load Licensee Event Report

               & License Examination         9-Other          (LER) File (NUREG-Of61)                                           PAGE 2-149

MMMMMMMMMMM2EMMMEMMMNEMEMWMMMMMNEMMM M HATCH 1 M unuxxxumummmuumuunuunnaxunxx=MuuxxxM FACILITY DATA Report Perlad APR 1986 i FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... GEORGIA LICENSEE................. GEORGIA P0HER. COUNTY...................APPLING CORPORATE ADDRESS. . . . . . . 333 PIEDMONT AVENUE ' ATLANTA, GEORGIA 30308 DIST AND DIRECTION FROM l NEAREST POPULATION CTR.. 11 MI N OF CONTRACTOR BAXLEY, GA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR......... ..BHR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... SEPTEMBER 12, 1974 CONSTRUCTOR.............. GEORGIA P0HER CO.

DATE ELEC ENER 1ST GENER... NOVEMBER 11, 1974 TURBINE SUPPLIER.........'ENERAL G ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 31, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TONER IE REGION RESPONSIBLE......II CONDENSER COOLING HATER....ALTAMAHA RIVER IE RESIDENT INSPECTOR......P. HOLMES RAY ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....G. RIVENBARK C0 UllC I L . . . . . . . . . . . . . . ... SOUTHEASTERN ELECTRIC DOCKET NUMBER......... .50-321 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-57, 3CTOBER 13, 1974 PUBLIC DOCUMENT ROOM.......APPLING COUNTY PUBLIC LIBRARY 301 CITY HALL DRIVE BAXLEY, GEORGIA 31563 IN!PECTION

SUMMARY

INSPECTION STATUS

        + INSPECTION FEBRUARY 24-28 (86-05): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 20 INSPECTOR-HOURS ON SITE IN THE AREAS OF INSERVICE INSPECTION, OBSERVATION OF HORK ACTIVITIES, DATA REVIEH, AND EVALUATION CUNIT 1). ONE VIOLATION HAS IDENTIFIED -

FAILURE TO HAVE A PROCEDURE FOR CONDUCTING ACID ETCH EXAMINATIONS ON SAFETY-RELATED COMPONENTS. INSPECTION FEBRUARY 24 - MARCH 3 (86-08): REVIEH OF MAINTENANCE PROGRAMS AND PRACTICES.THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 60 INSPECTOR-HOURS AT THE SITE, IN A DOCUMENT CONDITIONS ADVERSE TO QUALITY; (2) FAILURE TH0 VIOLATIONS TO IMPLEMENT HERE IDENTIFIED EXISTING PLANT- PROCEDURES (1) FAILURE TOPROPERLY.IMPLEMENT MAINTENANCE CONTROLS AND ' INSPECTION FEBRUARY 22 - MARCH 21 (86-09):

  • 0F OPERATIONAL SAFETY VERIFICATION, THIS ROUTINE INSPECTION ENTAILED 92 RESIDENT INSPECTION HOURS AT THE SITE IN THE AREAS l

FEATURE (ESF) SYSTEM HALKDOWN, MAINTENANCE OBSERVATION, PLAtlT MODIFICATION AND SURVEILLANCE OBSERVATION, ENGINEERING SAFETY l REFUELING OPERATIONS. REPORTABLE OCCURRENCES, OPERATING REACTOR EVENTS, INSPECTOR FOLLOHUP, UNRESOLVED ITEMS, AND INSPECTION APRIL 1-4 (86-10): THIS SPECIAL, PROGRAMS AND PRACTICES. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. UNANNOUNCED INSPECTION ENTAILED 48 INSPEC  ; + INSPECTION MARCH 24-27 (86-11): THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 16 INSPECTOR-HOURS ON SITE IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS; INSERVICE INSPECTION (ISI); AND INSPECTION FOLLOHUP ITEMS. ONE VIOLATION HAS IDENTIFIED FAILURE TO PERFORM SECTION XI PRESSURE TESTS. PAGE 2-150 l

MuununnMuzzMzu=ununu:M=nunM:unMMnnzM M HATCH 1 M

, Ripsrt Period APR 1986             INSTECTION            STATUS - (CONTINUED)              MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION 

SUMMARY

r ENFORCEMENT

SUMMARY

CONTRARY TO TECHNICAL SPECIFICATION 6.8.1.E, THE LICENSEE FAILED TO IMPLEMENT EMERGENCY IMPLEMENTING PROCEDURE 63-EP-EIP-07'-05, MAINTENANCE OF THE EMERGENCY ORGANIZATION, AS INDICATED BY THE FOLLDHING: (1) THE MANAGEMENT

SUMMARY

REPORT HAS NOT AVAILA>LE AS DESCRIBED IN SECTION 7.1.5, AND (2) THE SYSTEM ELEMENTS HAD NOT BEEN ISSUED AND REVISED AS INDICATED IN SECTIONS 7.2.1, 7.2.2, AND 7.2.4 0F THE PROCEDURE. (8600 5) OTHER ITEMS i

!    SYSTEMS AND COMPONENT PROBLEMS:

NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: A NEW SITE MANAGER OF ENGINEERING HAS SELECTED. PLANT STATUS: UNIT IS UNDER GOING A REFUELING AND MAINTENANCE OUTAGE, WHICH COMMENCED 11-30-85. LAST IE SITE INSPECTION DATE: MARCH 24-27, 1986 + INSPECTION REPORT NO: 50-321/86-11 + i l l PAGE 2-151 l

EMXM1f%%MM%%M%MMMMM%2EM5"UUU22CCTM220 RYpirt Pcried APR 1985 REPORTS FR0M LICENSEE H HATCH 1 u MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

                ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT ___ ___ _= _ ._ 86-005 01/30/86 02/28/86 GRID FLUCTUATIONS CAUSE UNPLANNED ESF ACTUATION DURING REFUELING OUTAGE; TO PREVENT RECURRENCE VOLTAGE REGULATOR HILL BE INSTALLED DURING FUTURE REFUELING OUTAGE. 86-009 02/07/86 03/07/86 AUTO START OF STANDBY GAS TREATMENT FANS DUE TO EkOHN FUSE; CAUSE OF BLOHN FUSE NOT DETERMINED; ! FUSE REPLACED. 86-010 03/04/86 04/03/86 SPURIOUS RPS TRIP HHILE CHANGING 600V BUS POWER SOURCES; CAUSE COULD NOT BE DETERMINED. 86-011 02/13/86 03/14/86 PERSONNEL ERROR CAUSES ESF ACTUATION; TEMPORARY MODIFICATION HORK INSTRUCTIONS HERE HRITTEN INCORRECTLY. 86-012 02/22/86 03/27/86 SCRAM DISCHARGE VOLUME HI LEVEL THERMAL SENSOR 1C11-N060A VALVED OUT AND THEREFORE INOPERABLE FAILING TO MEET TECHNICAL SPECIFICATION; CAUSE - PERSONNEL ERROR. 86-013 03/05/86 04/04/86 UNEXPLAINED REACTOR HATER CLEANUP ISOLATION; CAUSE COULD NOT BE IDENTIFIED.

                ==================================================================================================================================

l ) PAGE 2-152 l l

1 THIS PAGE INTENTIONALLY LEFT BLANK PAGE 2-153

1. Dacket : 50-366 0PERATING STATUS nuuuuxuuunnununMMuuuunnunnununuununu M HATCH 2 u
2. Reporting Period 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

L EE KANIPE (912) 367-7781 X2882 AVERAGE DAILY P0HER LEVEL (MWe) PLOT 2436 HRTCH 2

4. Licensed Thermal Power (MHt):
5. Nameplate Rating (Gross MHe): 1000 X 0.85 = 850
6. Design Electrical Rating (Not MWe): 784 ISUU
7. Maximum Dependable Capacity (Gross MHe): 804 DESIGN E2EC. RRTING = 784
8. Maximum Dependable Capacity (Not MWe): 777 .--... MRX. DEPEND. CAP. - 777 (ICR)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any GNet MWe):
11. Reasons for Restrictions, If Anyt

_ NONE goog MONTH YEAR CUMULATIVE E3

12. Report Period Hrs 719.0 2.879.0 58,320.0 ><

634.7 2,725.9 40,446.6

13. Hours Reactor Critical ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ' ' ' " - - - ' ~ - -

5

14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line 605.9 2,650.7 38,661.4 hf gj
                                                                                                                                                         -80  A
                                                         .0                                                        I
16. Unit Reserve Shtdwn Hrs .0 .0
17. Gross Therm Ener (MHH) 1,197,696 5.418,352 83,951,599 500-
                                                                                                                                                         - 80
18. Gross Elec Ener (MHH) 389.100 1,778,760 27,693,750
19. Not Elec Ener (MHH) 369,101 1,694,283 26,364,476
                                                                                                                                                         - to
20. Unit Service Factor 84.3 92.1 66.3 92.1 66.3 l
21. Unit Avail Factor 84.3
                                                                                                                                                         - 20
22. Unit Cap Factor (MDC Not) 66.1 75.7 58.2
23. Unit Cap Factor (DER Net) 65.5 75.1 57.7 0
24. Unit Forced Outage Rate 15.7 7.9 9.6 0 5 1'O l's '20 25 30 00TS
25. Forced Outage Hours 113.1 228.3 4.114.3
 , 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                                 RPRIL 1996 REFUELING OUTAGE, SEPTEMBER 6, 1986 - 8 HEEKS.
27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-154 f

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM HATCH 2 M Raport Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Ivpe Hours Reason Method LER Number __ System Component Cause & Corrective Action to Prevent Recurrence (Jo , Date HIGH ZZ ZZZZZZ MANAGEMENT DECISION TO REDUCE PDHER TO 85%. 86-016 04/01/86 S 0.0 H 5 OFFGAS ACTIVITY IN RX. AND TURBINE BUILDING CAUSED BY LEAKING FUEL HAS SLOHING DOHN UNIT ONE OUTAGE HORK.

 '                                                                 HF      ELECON     4160 VOLT BUS 2A, RECIRC PUMP 2A, AND CIRC 86-017 04/12/86      F    0.0    A      5 HATER PUMP 2A TRIPPED.

MANAGEMENT DECISION TO REDUCE POWER TO 85%. HIGH 0.0 H 5 ZZ ZZZZZZ l 1 86-01C 04/13/86 S OFFGAS ACTIVITY IN RX. AND TURBINE BUILDING CAUSED BY LEAKING FUEL HAS SLONING DOWN UNIT ONE OUTAGE HORK. 3 2-86-9 IA INSTRU RX SCRAM ON ERRONEOUS MSR A HIGH LEVEL. 86-019 04/20/86 F 28.1 A 5 2-86-9 IA INSTRU SCRAM RECOVERY. 86-020 04/21/86 S 0.0 B A 5 CH TURBIN RFPT 2B TRIPPED. 86-021 04/21/86 F 0.0 A 3 2-86-10 HA GENERA EXCESSIVE CONDENSATION IN THE GENERATOR EXCITOR 36-022 04/24/86 F 85.0 CAUSED A GENERATOR FIELD GROUND AND SUBSEQUENT TURBINE TRIP. SOURCE OF CONDENSATION HAS AN"A" APPROXIMATELY 18" RUPTURE IN THE 6TH STAGE EXTRACTIDH LINE. 2-86-10 HA GENERA SCRAM RECOVERY. 86-023 04/28/86 S 0.0 B 5 ZZZZZZ MANAGEMENT DECISION TO REDUCE P0HER TO 85%. HIGH 5 ZZ 86-024 04/29/86 S 0.0 H OFFGAS ACTIVITY IN RX. AND TURBINE BUILDING CAUSED BY LEAKING FUEL HAS SLOHING DOHN UNIT ONE OUTAGE HORK. f MMMMMMMMMMM HATCH 2 OPERATED WITH 7 REDUCTIONS AND 2 OUTAGES IN APRIL. M SUl1 MARY M MMMMMMMMMMM e Method System & Component Type Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                       & License Examination         9-Other          (LER) File (NUREG-0161)                                                                 PAGE 2-155

uvvuuuuumxuzuunuzxrunxxxnnunnurununu m HATCH 2 u xxxxwuxwwwurunumxxxxxxuxxurrunsxx%KM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE........ ...........GLORGIA LICENSEE................. GEORGIA P0HER COUNTY...................APPLING CORPORATE ADDRESS....... 333 PIEDMONT AVENUE ATLANTA, GEORGIA 30308 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 11 MI N OF CONTRACTOR BAXLEY, GA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BWR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... JULY 4, 1978 CONSTRUCTOR.............. GEORGIA P0HER CO. DATE ELEC EllER 1ST GEllER... SEPTEMBER 22, 1978 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... SEPTEMBER 5, 1979 REGULATORY INFORMATION CONDENSER COOLING METHOD. . . COOLING TOHER IE REGION RESPONSIBLE......II CONDENSER COOLING HATER....ALTAMAHA RIVER IE RESIDENT INSPECTOR......P. HOLMES RAY ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....G. RIVENBARK COUNCIL..... . ......... SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-366 RELIABILITY COUtiCIL LICENSE 8 DATE ISSUANCE....NPF-5, JUNE 13, 1978 PUBLIC DOCUMENT ROOM.......APPLING COUNTY PUBLIC LIBRARY 301 CITY HALL DRIVE BAXLEY, GEORGIA 31563 INSPECTION STATUS INSPECTION

SUMMARY

   + INSPECTION FEBRUARY 24-28 (86-05): THIS ROUTINE, UNAtlNOUNCED INSPECTION ENTAILED 20 INSPECTOR-HOURS ON SITE IN THE AREAS OF INSERVICE INSPECTION, OBSERVATIOt4 0F HORK ACTIVITIES, DATA REVIEH, AND EVALUATION (UNIT 1).

INSPECTION FEBRUARY 24 - MARCH 3 (86-08): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 60 INSPECTOR-HOURS AT THE SITE, IN A REVIEH OF MAINTEt4ANCE PROGP.At1S At4D PRACTICES. INSPECTION FEBRUARY 22 - MARCH 21 (86-09): THIS ROUTINE INSPECTION ENTAILED 92 RESIDENT INSPECTION HOURS AT THE SITE IN THE AREAS OF OPERATI0tJAL SAFETY VERIFICATION,11AINTENANCE OBSERVATION, PL ANT MODIFICATI0fl AND SURVEILL ANCE OBSERVATION, ENGINEERING SAFETY FEATURE (ESF) SYSTEM HALKDOHN, REPORTABLE OCCURRENCES, OPERATING REACTOR EVENTS, INSPECTOR FOLLONUP, UNRESOLVED ITEMS, AND REFUELING OPERATI0t4S. OllE VIOLATION HAS IDENTIFIED - FAILURE TO RETURN CORE SPRAY (CS) JOCKEY PUMP TO SERVICE. INSPECTION MARCH 24-27 (86-11): ACTI0tl DN PREVIOUS ENFORCEMEt4T MATTERS; AND INSPECTION FOLLONUP ITEMS.THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 17 INSPE XI PRESSURE TESTS. ONE VIOLATION HAS IDENTIFIED - FAILURE TO PERFORM SECTION ENFORCEMEt4T

SUMMARY

PAGE 2-156

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M M HATCH 2 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM R:psrt Period APR 1986 I ENFORCEMENT

SUMMARY

SHEET, 1-86-016, TO MODIFY THE UNIT 1 ANALOG TRANSMITTER TRIP SYSTEM CONTRARY TO TS 6.8.1.C, THE JUMPER AND LIFTED HIRE (J8LH) STEAM LINE PRESSURE (ATTS) AND PROCEDURE, 57SV-E41-003-2, TO CALIBRATE THE UNIT 2 HIGH PRESSURE COOLANT INJECTION (HP TRANSMITTERS HERE BOTH INADEQUATELY HRITTEN. EQUIPMENT ACTUATION ON FEBRUARY 13, 1986. (8500 4) CONTRARY TO TECHNICAL SPECIFICATION 6.8.1.E, THE LICENSEE (1)FAILED TO IMPLEMENT EMERGENCY IMPLEMENTIN 7.2.1, 7.2.2, AND MAINTENANCE OF THE EMERGENCY ORGANIZATION, AS INDICATED BY THE FOLLOHING:THE SYSTEM ELEMENTS HAD NOT BEEN ISSUED DESCRIBED IN SECTIDH 7.1.5, AND (2) 7.2.4 0F THE PROCEDURE. (8600 5) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): MANAGERIAL ITEMS: A NEN SITE MANAGER OF ENGINEERING HAS SELECTED. PLANT STATUS: UNIT IS OPERATING AT 85%. LAST IE SITE INSPECTION DATE: MARCH 24-27, 1986 + INSPECTION REPORT NO: 50-366/86-11 + REPORTS FR0M LICENSEE

    =================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _ ___ __. _- . _ - = _ 86-002 01/15/86 02/14/86 OPERATIDHS PERSONNEL ERROR CAUSES UNPLANNED ESF ACTUATION. 86-007 02/13/86 03/14/86 DEFECTIVE PROCEDURE (DRAHING NOT SH0HING dLECTRICAL LINK JJ32) CAUSES UNPLANNED ESF AC l ACTUATION; CAUSE '2A' FILTER / DEMINERALIZER DUTLET 86-008 02/18/86 03/20/86 HIGH DIFFERENTIAL FLOH CAUSES RHCU (ESF) ISOLATION VALVE OPENED TOO Q'JICKLY HHEN ITS AIR OPERATOR HAS MANUALLY ASSISTED.

     ================================================================================================_=====_====_,===__===

PAGE 2-157

1. Docket: 50-247 0PERATING STATUS urununnuntrxxxuruzauxxwnzunnnnnu2xzn u INDIAN POINT 2 u
2. Rsperting Ptriod 04/01/86 Outtga + On-lins Hrcs 719.0 uuuuuuuuuuuuuxnuar xusunn:xrunnzngnx
3. Utility

Contact:

K. KRIEGER (914) 526-5155 AVERAGE DAILY P0HER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2758 INDIAN POINT 2
5. Nameplate Rating (Gross MHe): 1126 X 0.9 = 1013
6. Design Electrical Rating (Net MHe): 873
7. Maximum Dependable Capacity (Gross MHe): 885 'UU
8. Maximum Dependable Capacity (Net MWe): 849 DESIGN ELEC. W INS = 873

__ g, , ,

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

_ NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 103.728.0 NO NET POWER OUTPUT THIS MONTH
13. Hours Reactor Critical .0 321.3 69,491.4 ~~~~~~~~~~~~~~~~~~~~~~~~~~~ = - -
                                                                                                                                                                     ~100 hh
14. Rx Reserve Shtdwn Hrs .0 .0 2.497.6
15. Hrs Generator On-Line .0 295.1 67.431.6 hf - e0
16. Unit Reserve Shtown Hrs .0 .0 .0 hj
17. Gross Therm Ener (MHH) 0 799.337 175,633,544 500- - so
18. Gross Elec Ener (MH9) 0 252.760 54.503,236
19. Net Elec Ener (NHH) -2.820 224.325 51,403,183
20. Unit Service Factor - 40
                                                   .0                                     10.3           65.0
21. Unit Avail Factor .0 10.3 65.0
22. Unit Cap Factor (MDC Net) .0 9.1 58.4x ~ 00
23. Unit Cap Factor (DER Net) .0 8.9 56.8 24 Unit Forced Outage Rate .0 4.3 O 9.1 o' g- -

gg 3,- g, ,. - 0

25. Fsrced Outage Hours .0 13.3 6,487.1 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE I' 3 "

27. If Currently Shutdown Estimated Startup Date: 05/14/86 x Item calculated with a Heighted Average PAGE 2-158

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INDIAN POINT 2 M Rep 1rt Period APR 1986 UNIT SHUTD0WNS / KEDUCTIONS M . MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No, Date lYEg Hours Reason LER Number System Component Cause & Corrective Action to Prevent Recurrence

 ,1        01/13/86      S 719.0      C           4                  RC    FUELXX     CYCLE 7/8 REFUELING OUTAGE CONTINUES.

I l MMMMMMMMMMM INDIAN POINT 2 REMAINS SHUTDONN FOR REFUELING. M

SUMMARY

M

  ,MMMMMMMMMMM Tvna        Reason                                Method           Svstem & Component F-Ferced A-Equip Failure F-Admin                   1-Manual        Exhibit F & H S-Sched     B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling         H-Other            3-Auto Scram    Preparation of D-Regulatory Restriction               4-Continued     Data Entry Sheet E-Operator Training                    5-Reduced Load Licensee Event Report
                   & License Examina+ ion             9-Other          (LER) File (NUREG-0161)

PAGE 2-159

          .-_      .-         --           . . _ -                                -~            . - -             .-    - - . . .

MaanDMMacDDDDDDDDDDONDacuRDanaDM0000 M INDIRtl POItiT 2 0 cancDDDMuuuMMnMRDuDDunUDDDDDDOCUDDMD FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATI0tl UTILITY , STATE. ... ... ....... .NEH YORK LICENSEE................. CONSOLIDATED EDISON COUNTY...................HESTCHESTER CORPORATE ADDRESS....... 4 IRVING PLACE NEW YORK, NEW YORK 10003 DIST AND DIRECTI0tl FROM f3EAREST POPULATION CTR.. 25 MI N OF CONTRACTOR flew YORK CITY, NY ARCHITECT / ENGINEER....... UNITED ENG. & CONSTRUCTORS TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY...MAY 22, 1973 CONSTRUCTOR..............HESTINGHOUSE DEVELOPMENT CORP I DATE ELEC Et1ER 1ST GEllER. .JutlE 26, 1973 TURBINE SUPPLIER. . . . . . . . .HESTINGHOUSE DATE COMMERCIAL OPERATE.... AUGUST 1, 1974 REGULATORY INFORMATION CONDEllSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER. ..HUDS0tl RIVER IE RESIDENT INSPECTOR......L. ROSSBACH ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....M. SLOSSON COUNCIL.... .. . ... . . NORTHEAST P0HER DOCKET NUMBER........... 50-247 C00RDIllATING COUt1CIL LICENiC & DATE ISSUANCE....DPR-26, SEPTEMBER 28, 1973 PUBLIC DOCUMEllT ROOM.. ....HHITE PLAINS PUBLIC LIBRARY 100 MARTINE AVENUE , HHITE PLAINS, NEW YORK 10601 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. i ENFORCEMEtiT

SUMMARY

110NE l l QIHER ITEMS SYSTEMS AND COMPONENTS: l NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. l PAGE 2-160 l l

l MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INDIAN POINT 2 M R2ptrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS l MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: HD INPUT PROVIDED. REPORTS FR0M LICENSEE

     =====================================-=====================-_=================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT -- _ NO INPUT PROVIDED.

     =================================================================================================================,================

I. PAGE 2-161 I

l l

1. Docket 50-286 0PERATING STATUS uxunnunnuunuM:uurxMuMnMxMMz;MMMMnM n M INDIAN POINT 3 u
2. R: porting Perled: 04/01/86 Outtga + Dn-lins Hrca 719.0 MMMEMMMMMMMZHM%%%MHERMO 23%C3M%%MZHM
3. Utility Contact L. KELLY (914) 739-8200 AVERAGE DAILY P0HER LEVEL (MWe) FLOT
4. Licensed Thermal Power (MHt): 3025 INDIAN POIbn: 3
5. Nameplate Rating (Gross MHe): 1126 X 0.9 = 1013
6. Design Electrical Rating (Net MWe): 965 3883
7. M:ximum Dependable Capacity (Gross MHe): 1000 DESIGN ELEC. RRTINS - 965
8. Mrximum Dependable Capacity (Net MHe): 965
                                                                                                                          ...... FmX. DEPDC. Orr. - 385 1100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MHe) _
11. Rsasons for Restrictions, If Any:

NONE 1000 - I E M 171 m

                                                                                                                                                                                                    - 300 MONTH                                            YEAR      CUMULATIVE
12. Raport Period Hrs 719.0 2,879.0 84,744.0
13. H2urs Reactor Critical 601.2 2,746.3 50.,01J 1 h
14. Rx Reserve Shtdwn Hrs .0 .0 .q - 80
15. Hrs Generator On-Line 600.2 2,741.2 48,371.1 hf
16. Unit Reserve Shtown Hrs .0 .0 .0
                                                                                                                                                                                                   - 80
17. Gross Therm Ener (MHH) 1,801,432 G ,201,167 126. 9 23,131 500-
18. Gross Elec Ener (MHH) 595.520 2,716,830 40,321 ?16
19. Het Elec Ener (MHH) 575,648 2,626,148 38,640,539 * *O
20. Unit Service Factor 83.5 95.2 57.1
21. Unit Avail Factor 83.5 95.2 57.1
22. Unit Cap Factor (MDC Net) 83.0 94.5 47.3
23. Unit Cap Factor (DER Net) 83.0 94.5 47.3
24. Unit Forced Outage Rate .0 .7 18.9 0- -= ,.
o S l0 15' $0 is 30

! 25. Forced Outage Hours .0 19.0 11,212.0 DAYS

25. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE RPRIL 1986

27. If Currently Shutdown Estimated Startup Date: 05/21/86 PAGE 2-162 i

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMhM INDIAN POINT 3 M R: port Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason LER Number System Component Cause & Corrective Action to Prevent Recurrence No. Date ZZ ZZZZZZ UNIT IN A SCHEDULED MID-CYCLE STEAM GENERATOR 02 04/26/85 S 118.8 H 1 INSPECTION DUTAGE. I unuMMMMMMMM INDIAN POINT 3 OPERATED HITH 1 OUTAGE IN APRIL. M

SUMMARY

M MMMMMMMMMMM Method System a Component Type Reeson F-Forced A-Equip Failure F-Admin 1-Manual Exhtbit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatcry Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                  & License Examination        9-Other         CLER) File (NUREG-0161)

PAGE 2-163

(nizzuscxumnuswunnwrutturn nnxuunan:t 4 INDIAN POINT 3 u tummunnunxuuuxxxuununxummuxxxmuuMMux FACILITY DATA Report Period APR 1986 ACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY > STATE....................NEH YORK LICENSEE.................NEW YORK P9HER AUTHDRITY COUNTY...................HESTCHESTER CORPORATE ADDRESS. . . . . . . 10 COLUMBUS CIRCLE HEN YORK, NEW YORK 10019 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 25 MI N OF CONTRACTOR

  • NEW YORK CITY, NY ARCHITECT / ENGINEER. . . . . . . UNITED ENG. & CONSTRUCTORS ,

TYPE O F REACTOR. . . . . . . . . . . .PHR NUC STEAM SYS SUPPLIER...NESTINGHOUSE DATE INITIAL CRITICALITY... APRIL 6, 1976 C0dSTRUCTOR..............HESTINGHOUSE DEVELOPMENT CORP DATE ELEC ENER 1ST GENER... APRIL 27, 1976 TURBINE SUPPLIER. . . . . . . . .NESTINGHOUSE DATE COMMERCI AL OPERATE. . . . AUGUST 30, 1976 REGULATORY INFORMATION CONDENSER COOLING METHOD.. .ONCE THRU IE REGION RESPONSIBLE. . . . . .I CONDENSER' COOLING HATER.... HUDSON RIVER IE RESIDENT INSPECTOR......P. KOLTAY ELECTRIC RELIA 3ILITY LICENSING PROJ MANAGER.....D. NEIGHBORS

                                                                                                                                          ~

COUNCIL.... .... ........ NORTHEAST P0HER DOCKET NUMBER........... 50-286 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-64, APRIL 5, 1976 PUBLIC DOCSMENT ROOM....... WHITE PLAINS PUBLIC LIBRARY 100 MARTINE AVENUE MHITE PLAINS, NEN YORK 106C# INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE , l OTHER ITEMS s SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): e-NO INPUT PROJIDED. PAGE 2-164

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M INDIAN POINT 3 M R ptrt Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM . OTHER ITEMS MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. A INSrECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

 ===============================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT NO INPUT PROVIDED.

 ====================================================================================================

PAGE 2-165

1. Docket: 50-305 0PERATING STATUS N 1:i::M : Mu MMMnM MMM : 2 2 : MMM:r:2 M KEHAUNEE M
2. Reporting Period 04/ 01/8L Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

G.RUITER (414) 388-2560 X207 AVERAGE DAILY POWER LEVEL (MWe) PLOT l 4. Licensed Thermal Power (MHt): 1650 KEHAUSEE

5. Nameplate Rating (Gross MHe): 622 X 0.9 = 560
6. Design Electrical Rating (Not MHe): 535
7. Maximum Dependable Capacity (Gross MHe): 529 1500
8. Maximum Dependable Capacity (Net MHe): 503 EIM . MIM - 535
                                                                                                                                                                                 ...... ImX . DEPDO. Cfr. - 503 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Not MWe):
11. Reasons for Restrictions, If Any NONE 1000 - l MONTH YEAR CUMULATIVE
12. Report Period Hrs 719.0 2.879.0 104,088.0
13. Hours Reactor Critical 289.8 1,705.6 87,722.7 h
14. Rx Rosarve Shtdwn Mrs .0 .0 2,330.5
15. Hrs Generator On-Line 27.L_q 1.638.5 86.194.1 g
16. Unit Reserve Shtdwn Hrs .0 .6 10.0 peo cres se rwernm uent tertreu. Omettrasse
17. Gross Therm Ener (MHH) 267,903 2,552;802 135,260,535
18. Gross Elec Ener (MHH) 88.100 853,300 44,591.800
19. Het Elec Ener (MHH) 8 L 122 814,045 42,455,257
20. Unit Service Factor 31.0 56.9 82.8 - s0
21. Unit Avail Factor 31.0 56.9 82.8
22. Unit Cap Factor (MDC Net) 23.0 56.2' 78.8M
23. Unit Cap Factor (DER Net) 21.6 52.9 76.2
24. Unit Forced Outage Rate 9.8 1.5 ~ 3.3 0 -

0 0 5 to 15 20 25 30

25. Forced Outage Hours 24.2 24.2 2.815.6 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE fiPRIL 1906

27. If Currently Shutdown Estlanated Startup Date: N/A N Item calculated with a Heighted Average PAGE 2-166
  .       ~        .                 .   . - - - .      - - - -      - --         -                            - --            .

unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum N R2p;trt Period APR 1986 . UNIT SHUTD0NNS / REDUCTIONS N KEHAUNEE MNNMMNNNMMNNMMMMMMMMMENNNNNNNNNNMMMK No. Date Type Hours BRA 22n Method LER Number System domponent Cause & Corrective Action to Prevent Recurrence 2 02/28/86 S 465.4 C 4 RC FUELXX CONTINUED CYCLE II-III REFUELING OUTAGE. THE OUTAGE HAS CONCLUDED ON APRIL 20, 1986. 3 04/20/86 F 13.3 A 3 86-006. CH VALVEX A REACTOR / TURBINE TRIP OCCURRED ON HIGH S/G LEVEL HHILE TRANSFERRING TO THE FEED REG VALVES FROM THE BYPASS VALVES HHEN BINDING IN DNE FEED REG VALVE CAUSED IT TO OPEN SUDDENLY. 4 04/21/86 S 6.4 3 1 ZZ ZZZZZZ A SHORT OUTAGE HAS TAKEN TO PERFORM TURBINE OVERSPEED TRIP TESTS AND A TORSION TEST. 5 04/24/86 F 10.9 A 3 86-007 CH VALVEX A REACTOR / TURBINE TRIP OCCURRED 0 LON S/G LEVEL HITH SF/FF MISMATCHED HHILE TRANSFERRING ' FEED REG VALVE CONTROL BETHEEN MANUAL AND AUTOMATIC MODES FOR SURVEILLANCE TESTING HHEN ONE FEED REG VALVE FAILED TO RESPOND PROPERLY. a l 1 , MuruMwwwMux KEHAUNEE OPERATED WITH 4 OUTAGES IN APRIL.

    ,,u  

SUMMARY

M MMMMMMMMMMM Tvpe Reason Method Svstem & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8.H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for-C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entrv Sheet E-Operator Training 5-Reduced Load Licensee Cvent Report

                     ' & License Examination           9-Other            (LER) FIIe (NUREG-0161)-

PAGE 2-167

1 uunnuuuuuuuuuuuuuunamununnunuuuuuuuu N KEHAUNEE m , unummuuuurkuwwxxxxxummuuxxuuuuuuuuuu FACILITY DATA Report Period APR 1986

FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE....................HISC0NSIN LICENSEE.................HISCONSIN PUBLIC SERVICE 4

. COUNTY...................KEHAUNEE CORPORATE ADDRESS........P.O. BOX 19002 ! GREEN BAY, HISCONSIN 54307 . DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 27 MI E OF CONTRACTOR j GREEN BAY, HI, ARCHITECT / ENGINEER....... PIONEER SERVICES & ENGINEERING TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...NESTINGHOUSE j DATE INITIAL CRITICALITY... MARCH 7, 1974 CONSTRUCTOR.............. PIONEER SERVICES & ENGINEERING DATE ELEC ENER IST GENER... APRIL 8, 1974 TURBINE SUPPLIER.........HESTINGHOUSE

DATE COMMERCIAL OPERATE.... JUNE 16, 1974 REGULATORY INFORMATION l'

CONDLNSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... LAKE MICHIGAN IE RESIDENT INSPECTOR......R. NELSON , ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....M. FAIRTILE COUNCIL..... ............MID-AMERICA DOCKET NUMBER........... 50-305 INTERPOOL NETHORK LICENSE & DATE ISSUANCE....DPR-43, DECEMBER 21, 1973 PUBLIC DOCUMENT ROOM....... UNIVERSITY OF HISCONSIN LIBRARY LEARNING CENTER 2420 NICOLET DRIVE  ; , GREEN BAY, HISCONSIN 54301-INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON FEBRUARY 16 THROUGH APRIL 15 (86003): ROUTINE UNANNOUNCED INSPECTION BY RESIDENT INSPECTOR OF PREVIOUS INSPECTION FINDINGS; OPERATIONAL SAFETY; SURVEILLANCE; MAINTENANCE; LICENSEE EVENT REPORTS; CALIBRATION; ACCESS CONTROL-PERSONNEL; AND IE , l BULLETINS. ONE OPEN ITEM AND TH0 NOTICES OF VIOLATION HERE CLOSED FROM PRIOR NRC INSPECTIONS. ONE ITEM OF VIOLATION HAS IDENTIFIED DURING THIS INSPECTION. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE PAGE 2-168

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM KEWAUMEE N Ripsrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: UNIT OPERATING NORHALLY FOLLOHING REFUELING OUTAGE LAST IE SITE INSPECTION DATE: 6/15/86 INSPECTION REPORT NO: 86004 REP 0RTS FR0M LICENSEE

   ========================================================================================================================,==,=,,===

NL'MB ER DATE OF DATE OF SUBJECT EVENT REPORT __ 86-02 03/18/86 04/17/86 LOCAL LEAK RATE TEST RESULTS EXCEED TECH SPEC LIMIT DUE TO DEGRADED COMPONENT PERFORMANCE AT THREE PENETRATIONS 86-03 03/26/86 04/25/86 DETERIORATION OF FLOATING BUSHING ON BOTH EMERGENCY AC' DIESEL GENERATORS

   ==========================================================================r========u========================,====,==,=,,,,,,,,,==,

PAGE 2-169

{ 0PERATINO STATUS ununnunannunnunununnnnunnunnnunnzuxc

1. Docket 50-409 n LA CROSSE x 04/01/86- Outage + On-line Hrs: 719.0 xxxxxxxxxxunuxunnun/Inunnunnznxunann
2. Reporting Period AVERAGE DAILY P0HER LEVEL (MHe) PLOT
3. Utility

Contact:

LOREE MALIN (608) 689-2331 165 LA CROSSE

4. Licensed Thermal Power (MHt):
5. Nameplate Rating (Gross MWe): 76.8 X 0.85 = 65
6. Design Electrical Rating (Not MWe): 50 1883
7. Maximum Deps-ndable Capacity (Gross MHe): 50 DESIGN ELEO. ITITING = 50
8. Maximum Dependable Capacity (Net MHe): 48 ......rMX. 32T20. ORP. - 48 (10ZC)
9. If Changes Occur Above Since Last Report, Give Reasons: yg NONE
10. Pcwer Level To Hhich Restricted, If Any (Not MWe):
11. Reasons for Restrictions, If Any NONE MONTH YEAR CUMULATIVE A
12. Report Period Hrs 719.0 2.879.0 144.602.0 p 1,340.8 97.279.4 h
13. Hours Reactor Critical .0
                                                        .0           478.0  5
14. Rx Reserve Shtdwn Ers .0 90,791.1 gg
15. Hrs Generator On-Line .0 1.289.9 hf o.
                                         .0              .0           79.0
16. Unit Reserve Shtdwn Hrs 0 176,225 12 635,172 500-
17. Gross Therm Ener (MHH) 0 54,826 3,794,035
18. Gross Elec Ener (MHH)
19. Het Elec Ener (MHH) -615 50.339 3.519.087
                                         .0         44.8              62.8
20. Unit Service Factor 44.8 62.8
21. Unit Avail Factor .0
22. Unit Cap Factor (MDC Net) .0 36.4 50.7
                                          .0        35.0              48.7               NO NET POWER Ot1TPl1T THIS MONTH                  ggg
23. Unit Cap Factor (DER Net) 0
24. Unit Forced Outage Rate .0 18.5 9.8 0 5 1'o 1's 2'o iS' 30 8,887.6 DAYS
25. Forced Outage Hours .0 291.9
26. Shutdowns Sched Over Next 6 Months (Type.Date, Duration): PPRIL 1986 NONE PAGE 2-170
27. If Currently Shutdown Estimated Startup Date: 05/06/86 l

HMMEKEMM%%%MZM%CCEMM3MUZHEMMZEM3MHZ3 Ripsrt Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M LA CROSSE M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Ng, Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 86-04 03/07/86 S 719.0 C 4 86-06 RC FUELXX REFUELING OUTAGE CONTINUES. i i MMMMMMMMMMM LA CROSSE REMAINS SHUTDOWN FOR REFUELING. M

SUMMARY

M MMMMMMMMMMM Tvoo Reason Method System 8 Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint er Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operater Training 5-Reduced Load Licensee Event Report

                    & License Examination          9-Other         (LER) Flie (NUREG-0161)

PAGE 2-171 t,- _

            . Da, m m m u m m m m m m m m a m m ,

O LA CROSSE D . 1

            -DDDOMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM                          FACILITY         DATA                                            Report Period APR 1986 FACILITY DESCRIPTION                                                   UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                              UTILITY i

STATE....................HISC0NSIN LICENSEE ................DAIRYLAND PDHER COUNTY...................VERNON CORPORATE ADDRESS....... 2615 EAST AVENUE SOUTH LACROSSE, HISCONSIN 54601 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 19 MI S OF CONTRACTOR LACROSSE, HISC ARCHITECT / ENGINEER.......SARGENT & LUNDY. TYPE OF REACTOR............BWR NUC STEAM SYS SUPPLIER...ALLIS-CHALMERS DATE INITIAL CRITICALITY... JULY 11. 1967 CONSTRUCTOR.............. MAXON CONSTRUCTION COMPANY DATE ELEC ENER 1ST GENER... APRIL 26, 1968 TURBINE SUPPLIER.........ALLIS-CHALMERS ! DATE COMMERCIAL OPERATE.... NOVEMBER 1, 1969 REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0NCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......I. VILLALVA , ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....J. STANG COUNCIL..................MID-CONTINENT AREA DOCKET NUMBER........... 50-409 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-45, AUGUST 28, 1975 I PUBLIC DOCUMENT R00M.......LA CROSSE PUBLIC LIBRARY i 800 MAIN STREET

LA CROSSE, HISCONSIN 54601 1 INSPECTION STATUS INSPECTION

SUMMARY

l INSPECTION FROM FEBRUARY 17 THROUGH APRIL 4 (86002): ROUTINE, UNANNOUNCED INSPECTION BY THE RESIDENT INSPECTOR OF LICENSEE + ACTIONS ON PREVIOUS INSPECTION FINDINGS; OPERATIONAL SAFETY VERIFICATION; MAINTENANCE ACTIVITIES; LICENSEE EVENT REPORTS FOLLOHUP; I PLANT TRIPS; REFUELING ACTIVITIES; AND ONSITE REVIEW COMMITTEE. THE INSPECTION INVOLVED A TOTAL OF 102 INSPECTOR-HOURS ONSITE BY i THE NRC RESIDENT INSPECTOR INCLUDING A TOTAL OF 12 INSPECTOR-HOURS DURING BACK SHIFTS. NO VIOLATIONS OF NRC REQUIREMENTS HERE NOTED. ENFORCEMENT

SUMMARY

TECHNICAL' SPECIFICATION 6.11 REQUIRES THAT PROCEDURES FOR PERSOHNEL RADIATION PROTECTION BE PREPARED CONSISTENT WITH THE REQUIREMENTS OF 10 CFR 20 AND SHALL BE APPROVED, MAINTAINED, AND ADHERED T

O. PROCEDURE

HSP-02.6. SECTION 5.9, REQUIRES THAT BETA DOSE EQUIVALENT RATES BE DETERMINED ALONG HITH GAMMA DOSE EQUIVALENT RATES IF PIPING OR COMPONENTS OF SYSTEMS ARE OPENED, DRAINED, OR IN AREAS HHERE SURFACE CONTAMINATION IN EXCESS OF 500,000 DPM/FT SQUARED SMEARABLE IS EVIDENT OR EXPECTED. CONTRARY TO THE ] ABOVE, BETA DOSE EQUIVALENT RATES HERE NOT DETERMINED OR KNOWN HHILE WORKERS PERFORMED TASKS IN THE REACTOR HEAD CAVITY AREA HHERE i SMEARABLE CONTAMINATION LEVELS ON THE CAVITY HALLS HERE UP TO 7,000,000 DPM/FT SQUARED. i (8600 4) , I i 4 PAGE 2-172 1 ! t i _ _ _ _ _ _ _ _ _ _ _ _ - . . _ _ - . _ _

MMMMMMMMMMMMMMMMDMcMOMMMcMDOOMcMGMON N M LA CROSSE Ropert Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTNER ITEMS SYSTEMS AND COMPONENT PROBLEMS: i NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE , MANAGERIAL ITEMS: NONE PLANT STATUS: REFUELING OUTAGE.

;     LAST IE SITE INSPECTION DATE: 6/16/86 INSPECTION REPORT NO: 86007 REPORTS                FR0M   LICENSEE
=================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT

                                                                                                                                                                                 =

86-08 04/03/86 04/24/86 AUTO START OF EMERGENCY DIESEL GENERATORS AND CONTAINMENT ISOLATION 86-09 04/03/86 04/24/86 RETENTION TANK PUMP DISCHARGE VALVE TYPE C TEST FAILURE i 86-10 04/04/86 04/24/86 CONTAINMENT VENTILATION ISOLATION DUE TO INSTRUMENT MALFUNCTION 86-11 04/03/86 04/30/86 HIGH PRESSURE CORE SPRAY BUNDLE l 86-12 04/9/86 04/24/86 MONITORED DISCHARGE OF UNSAMPLED HASTE HATER HITH ANALYZED HASTE HATER l

       ==========================================================================================

i i i i 4 PAGE 2-173 i i h

1. Dockota 50-373 0PERATING STATUS c:MunnMMM:nnM MMZanuunMMMn nMMM MMMM u LASALLE 1 M
2. Reporting Period 04/01/86 Outage + On-line Hrs 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l 3. Utility

Contact:

JAMES P. PETERS (815) 357-6761 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3323 LfMHiLLE: 1
5. Nameplate Rating (Gross MWe): 1078
6. Design Electrical Ratino (Not MHe): 1078 I"'
7. Maximum Dependable Capacity (Gross MWe): 1078
8. Maximum Dependable Capacity (Not MWe): 1036 DCSION DEC. RRTING - 1078
                                                                                                                                                                                  ......W. DEPDC. CRP. - 1038 (100X3
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MWe):

NO NET POWER OUTPUT THIS MONTH

11. Reasons for Restrictions, If Any:

NONE ~~~ 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.0 20,423.0
13. Hours Reactor Critical .0 .0 12.037.5 - so h
14. Rx Reserve Shtown Hrs .0 .0 1,640.9
15. Hrs Generator On-Line .0 .0 11.639.9
16. Unit Reserve Shtdwn Hrs .0 .0 1.0 ~'

hj

17. Gross Therm Ener (MHH) 0 0 38,349,668 gag.
18. Gross Elec Ener (MHH) 0 0 10,499.394
                                                                                                                                                                                                                                                            - to
19. Het Elec Ener (MHH) -10,967 -36,437 9.979.167
20. Unit Service Factor .0 .0 57.0
21. Unit Avail Factor 2 0 .0 57.0 - 30
22. Unit Cap Factor (MDC Net) .0 .0 47.2
23. Unit Cap Factor (DER Not) .0 .0 45.3
24. Unit Forced Outage Rate .0 0
                                                                                                                                                      .0           17.4        0'      5'    1'O     l's    3'O ' 3's                                     30
25. Forced Outage Hours .0 .0 2,458.4 UOYO
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE PPRIL 1988

27. If Currently Shutdown Estimated Startup Date: 06/18/86 PAGE 2-174

MMMMMMMMMMMMMMMMMMMMMMMMMMM)MMMMMMMM Ripsrt Period APR 1986 UNIT S_H U T D 0 H N S / REDUCTIONS M LASALLE 1 MMMMMMMMMMMWMMMMMMMMMMMMMMMMMMMMMFMM M N*. Date Tvie Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 18 10/18/85 3 719.0 C 4 REFUELING CONTINUES. MMMMMMMMMMM LA SALLE 1 REMAINS SHUTDONN FOR REFUELING. u

SUMMARY

M MMMMMMMMMMM Type Reason Method System & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report 8 License Examination 9-Other (LER) File (NUREG-0161) PAGE 2-175

ruunusunununuununsunumannuuuuuuuux n u LASALLE 1 m un=unxxx=nuunnunummuunuxuxxunxxzuunu FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE....................ILLIN0IS LICENSEE.................COMMONNEALTH EDIS0N COUNTY...................LA SALLE CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINOIS 60690 DIST AND DIRECTION FROM NEAREST PC'ULATION CTR.. 11 MI SE OF CONTRACTOR OTTAHA, ILL ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... JUNE 21, 1982 CONSTRUCTOR..............COMMONNEALTH EDISON DATE ELEC ENER IST GENER... SEPTEMBER 4, 1982 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCI AL OPERATE. . . . JANUARY 1, 1984 REGULATORY INFORMATION CONDENSER COOLING METHOD... POND IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... RESERVOIR IE RESIDENT INSPECTOR......M. JORDAN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....A. BOURNIA COUNCIL..................MID-AMERICA DOCKET NUMBER........... 50-373 INTERPOOL NETHORK LICENSE & DATE ISSUANCE....NPF-11, AUGUST 13, 1982 PUBLIC DOCUMENT R00M.......ILLINDIS VALLEY COMMUNITY COLLEGE RURAL ROUTE NO. 1 OGLESBY, ILLINOIS 16348 INSPECTION

SUMMARY

INSPECTION ON APRIL 7-10 (86001; 86001): ROUTINE INSPECTION OF THE LASALLE STATION EMERGENCY PREPAREDNESS EXERCISE, INVOLVING OBSERVATIONS BY EIGHT NRC REPRESENTATIVES, FOUR NRC INSPECTORS AND FOUR CONSULTANTS, OF KEY FUNCTIONS AND LOCATIONS DURING THE EXERCISE. NO VIOLATIONS OF NRC REQUIREMENTS HERE IDENTIFIED. HOWEVER, SEVERAL HEAKNESSES THAT WILL REQUIRE CORRECTIVE ACTION ARE 1 IDENTIFIED IN THE TEXT OF THIS REPORT AND ARE SUMMARIZED IN THE APPENDIX TO THE REPORT'S TRANSMITTAL LETTER. INSPECTION ON FEBRUARY 13 THROUGH MARCH 12 (86007; 86008): ROUTINE, UNANNOUNCED INSPECTION CONDUCTED BY RESIDENT INSPECTORS OF LICENSEE ACTIONS ON PREVIOUS INSPECTION FINDINGS; OPERATIONAL SAFETY; SURVEILLANCE; MAINTENANCE; UNIT TRIPS: REGION REQUESTS; LICENSEE EVENT REPORTS; TRAINING; TMI ACTION PLAN REQUIREMENT FOLLOHUP; AND FOLLONUP OF 10 CFR 50.54(F) REQUEST FOR INFORMATION. 1 ( THE THE 10 AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN EIGHT AREAS; THQ VIOLATIONS HEREINCLUDING INSPECTION INVOLVED A TOTAL OF 300 INSPECTOR-HOURS ONSITE BY 6 NRC INSPECTORS IDENTIFIED IN60 HOURS ONSITE THE OF D } REMAINING THQ AREAS REQUIRED SURVEILLANCE). (FAILURE TO FOLLOH PROCEDURES AND HAVE ADEQUATE PROCEDURES, AND FAILURE TO PERFORM A TECHNICAL SPECIFICATION ! THE LICENSEE TH0 SCRAMS DURING THE INSPECTION CONTINUED TO EXPERIENCE A PROBLEM IN RECOGNIZING SYSTEM INOPERABILITY. UNIT 2 EXPERIENCED PERIOD. THE LICENSEE EXPERIENCED A NUMLER OF PERSONNEL ERRORS AND PROCEDURAL PROBLEMS. i INSPECTION ON FEBRUARY 24-28 AND MARCH 4, 5, 19, 21, 24, 25 AND 31 (86008; 86009): ROUTINE UNANNOUNCED INSPECTION OF (1) THE i CONFIRMATORY MEASUREMENTS PROGRAM INCLUDING COMPARISON OF RESULTS OF SAMPLES SPLIT, AND ANALYZED BY THE LICENSEE AND ONSITE i REGION III MOBILE LABORATORY; (2) QUALITY CONTROL OF ANALYTICAL MEASUREMENTS; AND (3) LICENSEE ACTION ON A VIOLATION AND AN OPEN ITEM IDENTIFIED DURING PAST INSPECTIONS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED DURING THIS INSPECTION. PAGE 2-176

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M LASALLE 1 Reprrt Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

INSPECTION ON MARCH 6 THROUGH 27 (86010): SPECI AL ANNOUNOED INSPECTION OF INSERVICE INSPECTION AND FUNCTIONAL DEFICIENCY REPORT. NO TESTING SAFETY-RELATED SNUBBERS AND LICENSEE ACTIONS IN RESPONSE 10 PREVIOUS INSPECTION FINDINGS AN VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INCLUDED SECURITY PLAN AND IMPLEMENTATION PROCEDURES; RECORDS AND REPORTS; AND TESTING AND INSPECTION ON MARCH 24-27 (86012; 86012): ACCESS CONTROL - PERSONNEL; LICENSEE'S ACTIONS ON PREVIOUS INSPECTION FINDINGS;THE LICENS MAINTENANCE; COMPENSATORY MEASURES;THE INSPECTION HAS INITIATED DURING THE DAY SHIFT.

INDEPENDENT INSPECTION EFFORT.

> HITH NRC REQUIREMENTS HITHIN THE AREAS EXAMINED. ROUTINE, ANNOUNCED INSPECTION BY ONE REGIONAL INSPECTOR OF PART 21 ' INSPECTION ON MARCH 27 AND APRIL 3 (86013; 86013): NO NOTIFICATION ON SOR PRESSURE SHITCHES. IT HAS CONDUCTED IN ACCORDANCE HITH NRC INSPECTION PROCEDURES 92700 AND 90712. VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE

,     FACILITY ITEMS (PLANS AND PROCEDURES):

! NONE MANAGERIAL ITEMS: NONE PLANT STATUS: ! SHUT DOWN FOR ITS FIRST REFUELING ON OCTOBER 18, 1985 LAST IE SITE INSPECTION DATE: 6/f.<c6 INdPECTION REPORT NO: 86021 PAGE 2-177 i f

12snMunnMM2MrMM22M;rc M :M;im.z::".r_1 Report Period APR 1986 REPORTS FR0M LICENSEE u LASALLE 1 3 EMMZEMO UMMNZOMNZMHMZMZZ33"MZZMMZZM3

            =============================================================================================================================

NUMBER DATE OF DATE 0F SUBJECT EVENT REPORT 86-11 03/17/86 04/11/86 PERSONNEL ERROR PRIMARY CONTAINMENT ISOLATION

  • 86-12 04/02/86 04/30/86 ESF ACTUATION DUE TO SPURIOUS HI RAD MONITOR ON VC TRAIN 86-13 04/03/86 05/02/86 LOSS OF BUS 141Y AND AUTO-START OF DIESEL ODG01K DUE TO PERSONNEL ERROR 86-14 04/12/86 04/28/86 BROKEN CHEMCASSETTE IN AM: JNIA DETECTOR UNIT CAUSES ESF ACTUATON
            =====================================================================================================================

6 r PAGE 2-178 I

l l 3 THIS PAGE INTENTIONALLY LEFT BLANK i ) j i l l t 1 I

.i i

I i 1 l 1 1 1 l i i i ) l PAGE 2-179 , l

1. Dockst: 50-374 0PERATING STATUS cnumuxxunun nuunuununnunzuz nnM n:Mu u LASALLE 2 u
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 Muumm x :HnunMuMxxIn rKMunsunKM:nz:n
3. Utility

Contact:

JAMES P. PETERS (815) 357-6761 AVERAGE DAILY POWER LEVEL (MHo) PLOT

4. Licensed Thermal Power (MHt): 3323 LRSRLLE 2
5. Nameplate Rating (Gross MWe): 1078
6. Design Electrical Rating (Net MWe): 1078
7. Maximum Dependable Capacity (Gross MHe): 1078 1800 DESIGN ELDO. RRTING = 1078
8. Maximum Dependable Capacity (Net MHe): 1036
                                                                                    ...... MAX. DE7DO. Crr. - 1038 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:
10. Power Level To Which Restricted, If Any (Net MHe):

190 Ome EC rwwn tpMR OPf1ffL 036171t36

11. Reasons for Restrictions, If Any:

E27;--- --------- -- -- --- -100 NONE 1000- '*] MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 13.415.0 h)
13. Hours Reactor Critical 719.0 2.775.5 8.164.9 - 80 h
14. Rx Reserve Shtdwn Hrs .0 29.8 1.716.7
15. Hrs Generator On-Line 719.0 2.748.4 7.985 1 gl gj
                                                                                                                                             ~
                                                                                                                                       ' 80
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener t riHH ) 2,218,512 8.171.616 23.680.167 500-i l
18. Gross Elec Ener (MHH) 740.608 2.731.931 7.842,000
                                                                                                                                       - 40
19. Net Elec Ener (MHH) 717.755 2.651.337 7.474.352
20. Unit Service Factor 100.0 95.5 59.5
21. Unit Avail Factor 100.0 95.5 59.5 - 20
 ,,22. Unit Cap Factor (MDC Net)        96.4        88 2          53.8
23. Unit Cap Factor (DER Net) 92.6 85.4 51.7 0 . . 0
24. Unit Forced Outage Rate .0 9.5 19.8 . .

20 25 30 0 5 to 15

25. Forced Outage Hours .0 130.6 1.971.3 DRYS
 ,,26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

i REFUELING: 09/01/86. I

27. If Currently Shutdown Estinated Startup Date: N/A PAGE 2-180

i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM LASALLE 2 N Reptrt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM t19, Date lygg Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 5 CONTROL ROD MANIPULATIONS. I 18 04/12/86 S 0.0 H l l l J e i i l l

KMIMMMMMMMF LASALLE 2 OPERATED HITH 1 REDUCTION IN APRIL.

l u

SUMMARY

M KEMMMMMMMMM Tvpe Reason Method Svstem 8 Component i

F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H

! S-Sched B-Maint or Test G-Oper Error 2-Manuel Scram Instructions for 1 C-Refueling H-Other 3-Auto Occam Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet l E-Operator 1 raining 5-Reduced Load Licensee Event Report

                                    & License Examination                 9-Other         (LER) File (NUREG-0161)                                                                _

Swawmun :: wt_...m._ ' wnrmitra u LASALLE 2 x carrnzw :::: nnt:::::nnuw :::::::: u FACILITY DATA Rep rt Peri:d APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY I I STATE....................ILLIN0!S LICENSEE............. ...COMMONNEALTH EDISON COUNTY...................LA SALLE CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINDIS 60690 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 11 MI SE OF CONTRACTOR OTTAHA, ILL ARCHITECT / ENGINEER. . . . . . .SARGENT & LUNDY TYPE OF REACTOR............BHR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... MARCH 10, 1984 CONSTRUCTOR..............COMMONHEALTH EDISON DATE ELEC ENER IST GENER... APRIL 20, 1984 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCI AL OPERATE. . . 0CTOBER 19, 1984 REGULATORY INFORMATION CONDENSER COOLING METHOD... POND IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... RESERVOIR 1E RESIDENT INSPECTOR......M. JORDAN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....A. BOURNIA COUNCIL.. ... ........ ..MID-AMERICA DOCKET NUMBER........... 50-374 INTERPOOL NETHORK LICENSE & DATE ISSUANCE. ..NPF-18, MARCH 23, 1984 PUBLIC DOCUMENT R00M.......ILLINDIS VALLEY COMMUNITY COLLEGE RURAL ROUTE NO. 1 OGLESBY, ILLINDIS 16348 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON APRIL 7-10 (86001; 86001): ROUTINE INSPECTION OF THE LASALLE STATION EMERGENCY PREPAREDNESS EXERCISE, INVOLVING OBSERVATIONS BY EIGHT NRC REPRESENTATIVES, FOUR NRC INSPECTORS AND FOUR CONSULTANTS, OF KEY FUNCTIONS AND LOCATIONS DURING THE EXERCISE. NO VIOLATIONS OF NRC REQUIREMENTS HERE IDENTIFIED. H0HEVER, SEVERAL HEAKNESSES THAT HILL REQUIRE CORRECTIVE ACTION ARE IDENTIFIED IN THE TEXT OF THIS REPORT AND ARE SUMMARIZED IN THE APPENDIX TO THE REPORT'S TRANSMITTAL LETTER. INSPECTION ON FEBRUARY 13 THROUGH MARCH 12 (86007; 86008): ROUTINE, UNANNOUNCED INSPECTION CONDUCTED BY RESIDENT INSPECTORS OF LICENSEE ACTIONS ON PREVIOUS INSPECTION FINDINGS; OPERATIONAL SAFETY; SURVEILLANCE; MAINTENANCE; UNIT TRIPS; REGION REQUESTS; LICENSEE EVENT REPORTS; TRAINING; THI ACTION PLAN REQUIREMENT FOLLOHUP; AND FOLLOHUP OF to CFR 50.54(F) REQUEST FOR INFORMATION. THE INSPECTION INVOLVED A TOTAL OF 300 INSPECTOR-HOURS ONSITE BY 6 NRC INSPECTORS INCLUDING 60 HOURS ONSITE DURING OFF-SHIFTS. OF THE 10 AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN EIGHT AREAS; TH0 VIOLATIONS HERE IDENTIFIED IN THE REMAINING THO AREAS (FAILURE TO FOLLOH PROCEDURES AND HAVE ADEQUATE PROCEDURES, AND FAILURE TO PERFORM A TECHNICAL SPECIFICATION REQUIRED SURVEILLANCE). THE LICENSEE CONTINUED TO EXPERIENCE A PROBLEN IN RECOGNIZING SYSTEM INOPERABILITY. UNIT 2 EXPERIENCED TH0 SCRAMS DURING THE INSPECTION PERIOD. THE LICENSEE EXPERIENCED A NUMBER OF PERSONNEL ERRORS AND PROCEDURAL PROBLEMS. INSPECTION ON FEBRUARY 24-28 AND MARCH 4, 5, 19, 21, 24, 25 AND 31 (86008; 86009): ROUTINE UNANNOUNCED INSPECTION OF (1) THE CONFIRMATORY MEASUREMENTS PROGRAM INCLUDING COMPARISON OF RESULTS OF SAMPLES SPLIT, AND ANALYZED BY THE LICENSEE AND ONSITE IN THE REGION III MOBILE LABORATORY; (2) QUALITY CONTROL OF ANALYTICAL MEASUREMENTS; AND (3) LICENSEE ACTION ON A VIOLATION AND AN OPEN ITEM IDENTIFIED DURING PAST INSPECTIONS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED DURING THIS INSPECTION. PAGE 2-182

 - . = _ _ . -                 -                 -   _ _ -         -                         -         - - -

EM :cMMMan:MnentenrunnMM2 M;:Tr.:c==:n INSPECTION STATUS - (CONTINUED) M LASALLE 2 M Report Period APR 1986 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMNMMM INSPECTION

SUMMARY

IOSPECTION ON MARCH 24-27 (86012; 86012): INCLUDED SECURITY PLAN AND IMPLEMENTATION PROCEDURES; RECORDS AND REPORTS; TESTING AND MAINTENANCE; COMPENSATORY MEASURES; ACCESS CONTROL - PERSONNEL; LICENSEE'S ACTIONS ON PREVIOUS INSPECTION FINDINGS; AND INDEPENDENT INSPECTION EFFORT. THE INSPECTION HAS INITIATED DURING THE DAY SHIFT. THE LICENSEE HAS FOUND TO BE IN COMPLIANCE HITH NRC REQUIREMENTS HITHIN THE AREAS EXAMINED, INSPECTION ON MARCH 27 AND APRIL 3 (86013; 86013): ROUTINE, ANNOUNCED INSECTION BY ONE REGIONAL INSPECTOR OF PART 21 NOTIFICATION ON SOR PRESSURE SHITCHES. IT HAS CONDUCTED IN ACCORDANCE HITH NRC INSPECTION PROCEDURES 92700 AND 90712. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

CONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: OPERATING NORMALLY. LAST IE SITE INSPECTION DATE: 6/06/86 i INSPECTION REPORT NO: 86020 REPORTS FR0M LICENSEE ! ================================================================================================================================== NUMBER DATE OF DATE OF SUBJECT EVENT REPORT I l NONE

             ==============================================================================================3s==================================

PAGE 2-183 l i

1. Dockcts 50-352 0PERATINO STATUS nunns :Mn e r "m M :Mur:MM :M:nt:MM u LIMERICK 1 R
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMhMMMMM
3. Utility

Contact:

BILL ALDEN (215) 841-5022 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3293 LIMIM 1
5. Nameplate Rating (Gross MHe): 1092
6. Design Electrical Rating (Not MHe): 1055 1092 120
7. Maximum Dependable Capacity (Gross MHe):

DESIGN E1.EC. MRTING - 1055

8. Maximum Dependable Capacity (Net MWe): 1055 ...... PWDC. OEPDC. Orr. - 1055 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:
10. Power Level To Hhich Restric+ d, If Any (Net MHe):

peo opus as: CMMED taWDt cPTIf55. cWSITISS

11. Reasons for Restrictions, If Any: _

NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.135.0 2,135.0
13. Hours Reactor Critical 719.0 2,114.1 2.114.1
                                                                                                                                                                                ~"
14. Rx Reserve Shtchn Hrs .0 .0 .0
15. Hrs Generator On-Line 719.0 2,108.6 2,108.6 h -80
16. Unit Reserve Shtchn Hrs .0 .0 .0 g
17. Gross Therm Ener (MHH) 2.367,257 6.920,909 6,920,909 500-
18. Gross Elec Ener (MHH) 786,570 2,301,61q 2.301,600 ,,
19. Het Elec Ener (MHH) 758,191 2,217,774 2,217,774
20. Unit Service Factor 100.0 98.8 98.8
21. Unit Avail Factor 100.0 98.8 98.8 - 30

_22. Unit Cap Factor (MDC Net) 100.0 98.5 98.5

23. Unit Cap Factor (DER Net) 100.0 98.5 98.5
24. Unit Forced Outage Rate 0
                                                                          .0                         1.2           1.2         0'       5       l'O      l's    $0      IE    30

) 25. Forced Outage Hours .0 26.4 26.4 DAYS _24. Shutdowns Sched Over Next 6 Months (Type,Date, Duration): frftIt.1988 SURVEILLANCE. TESTING 8 MAINTENANCE: 05/02/86 - 6 HEEKS.

!    27. If Currently Shutdown Estimated Startup Date:                                                      N/A                                                                      PAGE 2-184 i

MMMMMMMMMMMMMAMMMMMMMMMMMMMMMMMMMMMM LIMERICK 1 M Report Period APR 1986 U N I.T SHUTD0NN$ / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence N9, Date l NONE i b umMM:MMMMMM LIMERICK OPERATED AT FULL PO:iER IN APRIL. M

SUMMARY

M MMMMMMMMMMM Type Reason Method System & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-operator Training 5-Reduced Load Licensee Event Report

                              & License Examination                   9-Other          (LER) File (NUREG-0161)                                           PAGE 2-185:

1

m c wunnumn:rxnux tuunnarrnzarksrca u LIMERICK 1 M crwuumuwuxuuuuwwxmuunnunumMMMMMMMMMM FACILITY DATA Report Period APR 1986' FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... PENNSYLVANIA LICENSEE................. PHILADELPHIA ELECTRIC COUNTY...................MONTG0MERY CORPORATE ADDRESS....... 2301 MARKET STREET PHILADELPHIA, PENNSYLVANIA 19105 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 21 MI NH OF CONTRACTOR PHILADELPHIA,PA ARCHITECT / ENGINEER.......BECHTEL 4 TYPE OF REACTOR............BWR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... DECEMBER 22, 1984 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST O*NER... APRIL 13, 1985 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... FEBRUARY 1, 1986 REGULATORY INFORMATION CONDENSER COOLING METHOD...CC HNDCT IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....SCHUYLKILL RIVER IE RESIDENT INSPECTOR......G. KELLY ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....R. MARTIN COUNCIL..........,.......MID-ATLANTIC DOCKET NUMBER........... 50-352 AREA COUNCIL LICENSE & DATE ISSUANCE....NPF-39, AUGUST 8, 1985' PUBLIC DOCUMENT ROOM.......POTTSTOWN PUBLIC LIBRARY 500 HIGH STREET POTTSTOHN, PENNSYLVANIA 19464 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

t NONE ' OTHER ITEMS SYSTEMS AND COMPONENTS: HQ INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. PAGE 2-186

_ m . .. . .. ... __ _. _ _ ._ . . . _ . . . . _ _ _ . _ . _ __ ___ 4 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION STATUS - (CONTINUED) M LIMERICK 1 M Report Period APR 1986 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS i MANAGERIAL ITEMS: i

NO INPUT PROVIDED.

i ' PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. l INSPECTION REPORT NO NO INPUT PROVIDED. REP 0RTS FR0M LICENSEE

               ==================================================================================================================================

' DATE OF SUBJECT NUMBER DATE OF EVENT REPORT ___ 1 NO INPUT PROVIDED.

               ==================================================================================================================================

I 4 I i . PAGE 2-187 1 1 i I

1. Docket 50-309 0PERATINO STATUS mw' -
                                                                                                                                                                               -'""MMn In m "" m "~~MM:!nN n              MAINE YANKEE                M
2. Reportins Period 04/01/86 Outage + On-lins Hect 719.0 UMnMnMnCMunnunMi:M:r n'nMnCMir"E:nunna
3. Utility Contacts STEVEN L. JACOBS (207) 623-3521 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MHt): 2630 NAINE Y M EE
5. Nameplate Rating (Gross MWe): 864
6. Design Electrical Rating (Net MHe): 825
7. Maximum Dependable Capacity (Gross MWe): 850 1500
8. Maximum Dependable Capacity (Net MWe): 810 . DESIGN ELEO. RRTINS - 825
                                                                                                                                                                ... . PftX. DEPDC. Cfr. - 810 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any NONE 1f100 -

MONTH YEAR CUMULATIVE

12. Report Peried Mrs 719.0 2.879.0 118.1154 ma ases at === taaR orfins. Domitrous
13. Hours Reactor Critical 683.7 2.418.4 94.755.8 ,..................'------C
14. Rx Reserve Shtdwn Hrs .0 M-- -100
                                                                                                                               .0           .0
15. Hrs Generator On-Line 652.4 2.361.9 91.910.6 h
16. Unit Reservo Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Ener (MHH) 1.625,888 5.837.119 207.837.803 500-
18. Gross Elec Ener (MHH) 549.760 1.966.460 68.206,180 -80
19. Net Elec Ener (MHH) 531.284 1.901.257 65.091.549
20. Unit Service Factor 90.7 82.0 77.8
21. Unit Avail Factor 90.7 82.0 77.8
!   22. Unit Cap Factor (MDC Net)                                                                               91.2        81.5         69.9M                                                              ~
23. Unit Cap Factor (DER Net) 89.6 80.0 68.0M
24. Unit Forced Outage Rate 6.3 17.3 7.2 0 0 5' io is Io d5
                                                                                                                                                                                                         ~

30

]   25. Forced Outage Hours                                                                                     44.0       494.5      6.267.0                                       DFiYS t
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE

27. If Currently Shutdown Estimated Startup Dates N/A M Item calculated with a Heighted Average PAGE 2-188
                                                                                                          ~                  _ . _ - _ _ - .

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM N MAINE YANKEE Repert Period APR 1986 UNIT SHUTD0WNS / REDUCfIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Number System Conponent Cause & Corrective Action to Prevent Recurrence N9, Date HA GENERA REDUCED POWER TO PEPFORM GENERATOR BALANCE, TO 9-86-9 04/16/86 S 22.6 B 1 REDUCE VIBRATION. A 3 86-002 HH PUMPXX TURBINE DRIVEN FEED PUMP CONTROLLER FAILED RESULTING 10 04/17/86 F 44.0 IN FEEDWATER FLOW TRANSIENT CLUMINATING IN HIGH STEAM GENERATOR LEVEL TRIP. REPAIRED CONTROLLER. 8 5 HA GENERA REDUCED POWER FOR HESTINGHOUSE GENERATOR TESTING. > LR-68% 04/24/86 F 0.0 0.0 B 5 HH PUMPXX REDUCED POWER TO REMOVE P-2C FROM SERVICE DUE TO FAULTY LR-72% 04/27/86 F CONTROLLER. I i i l DDDMMMMMMMM MAINE YANKEE OPERATED HITH 2 OUTAGES AND 2 REDUCTIONS IN APRIL. i ,,0

SUMMARY

M DOOMMMMMMMM l Method System & Component Type Reason f ! F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for [ C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet

   -            E-Operator Training              5-Seduced Load Licensee Event Report
                   & License Examination         9-Other         (LER) File (NUREG-0161)                                                     PAGE 2-189

n==nanuuaemc.anc;una_m;a;a_wr"m ncura n MAINE YANKEE u cc Currnanuncur ctruru""r 2000 n: Mas FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION STATE....... .......... MAINE UTILITY LICENSEE. . . . . . . . . . . . . . . . . MAINE YANKEE ATOMIC PONER COUNTY................... LINCOLN CORPORATE ADDRESS....... 83 EDISON DRIVE DIST AND DIRECTION FROM AUGUSTA, MAINE 04366 NEAREST POPULATION CTR.. 10 MI N OF CONTRACTOR BATH, ME ARCHITECT / ENGINEER....... STONE & HEBSTER TYPE OF REACTOR............PHR ' HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY...CCTOBER 23. 1972 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER IST GENEK...N0VEMBER 8, 1972 TURBINE SUPPLIER.........NESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 28, 1972 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....BACK RIVER l IE RESIDENT INSPECTOR......C. HOLDEN ELECTRIC RELIABILITY COUNCIL..................N0RTHEAST PONER LICENSING PROJ MANAGER.....P. SEARS COORDINATING COUNCIL DOCKET NUMBER........... 50-309 LICENSE & DATE ISSUANCE....DPR-36, JUNE 29, 1973 PUBLIC DOCUMENT R00M.......NISCASSET PUBLIC LIBRARY HIGH STREET INSPECTION HISCASSET, MAINE 04S78 INSPECTION

SUMMARY

STATUS NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS 1 SYSTEMS AND COMPONENTS: } NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. i PAGE 2-190 l l

   .-       . _  - -       . _ - - ~ - -                   .  -     . . _ - - . _      . .-     . . - _ - . _ _ _ . - . . -          . _ . - - .-            ~ _ -

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMM%MMMZ3 MAINE YANKEE N Report Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. i l LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. i , INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

        ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT 3 EVENT REPORT __ ___ 1 l NO INPUT PROVIDED. 5

        ==================================================================================================u===============================

4 1 a i i l l i i 4 1 1 PAGE 2-191 i {' c

1. Dock,t 50-369 0PERATING STATUS unzznurtMMZuna M22 nMn=Mx nnn ZMMZa u MCGUIRE 1 M
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 MMwMMMMaMMMMMMMKMMMMMMMMMMMMMMMMMMMM
t. . REAVIS (704) 373-7567
3. Utility

Contact:

J. AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3411 MCGUIRE 1
5. Nameplate Rating (Gross MHe): 1305
6. Design Electrical Rating (Nat MHe): 1150
7. Maximum Dependable Capacity (Gross MHe): 1225 l
8. Maximum Dependable Capacity (Net MHe): - DESIGN E1EC. PATING - 1150 1159 -
                                                                                                                                                ......NRX.        DEPEND. Cfr. - 1150 1100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NME feo ofte BE: EXCEEDED tacER OPTDn. 00Be!TIONS

10. Power Level To Which Restricted, If Any (Net MHe):
                                                                                                                                                                                                                      -100
11. Reasons for Restrictions, If Any:

NONE gogo . - - -

                                                                                                                                                                                                                  \

MONTH YEAR CUMULATIVE 8'

12. Repert Period Hrs 719.0 2.879.0 38.687.0 H '*
13. Hours Reactor Critical 699.6 2.746.7 28.208.2
14. Rx Reserve Shtdwn Hrs _0
                                                                                                                .0            .0
15. Hrs Generator On-Line + 693.4 __ 2,729.0 27.440.8 * '
16. Unit Reserve Stitdwn Hrs ' .0
17. Gross Therm Ener (MHH)
                                                                                                                .0           .0' h

2.204.598 8.788,059 76,153.472 500 -

18. Gross Elec Ener (MHH) 764.125 *3,069.520 26.380,173 s ""
19. Het Elec Ener (MHH) 733,658 2.947.780 25,099,705
20. Unit Service Factor 96.4 94.8 70.9
21. Unit Avail Factor 96d 94.8 70.9 -20

_?2. Unit Cap Factor (MDC Net) 88.7 89.0 56.4 l

23. Unit Cap Factor (DER Net) 88.7 89.0 56.4
24. Unit Forced Outage Rate 3.6 5.2 0 13.4 0 5 1'o l's ' io is 30
25. Forced Dutage Hours 25.6 150.0 4.261.5 OPTS
25. Shutdowns Sched Over N2xt 6 Months (Type Date, Duration):

REFUELING - MAY 16, 1986 - 11 HEEKS.

27. If Currently Shutdown Estimated Startup Date N/A PAGE 2-192

i iMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMkMM M Rapsrt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MCGUIRE 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMA No,_ Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence CB VESSEL REPAIR LEAK ON' INSTRUMENT LINE FOR PRESSURIZER LEVEL. 5 .04/15/86 F 20.9 A 1 04/16/86 F 4.7 A 9 CC VALVEX REPAIR (84) GOVERNOR VALVE. 6 5 HG ZZZZZZ HOLD FOR SECONDARY CHEMISTRY. 14-P 04/16/86 F 0.0 F 0.0 H 5 RC FUELXX CORE COASTD9HN. 15-P 04/17/86 S 5 RC FUELXX CORE COASTDOHN. 16-P 04/30/86 S 0.0 H EMEMMMMMMMM MCCUIRE 1 OPERATED HITH 2 OUTAGES AND 3 REDUCTIONS IN APRIL.

  ,,M 

SUMMARY

M MMMMMMMMMMM Type Reason Mothed System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for i C-Refueling H-Other 3-Auto Scram Praparation of D-Regulatory Restriction 4-Continued Data Entry Sheet l 5-Reduced Load Licensee Event Report E-Operator Training

                   & License Examination        9-Other         (LER) Flie (NUREG-0161)

PAGE 2-193

txInn=:i:nrum'm--N-*==nn:Wia:nt=3 u MCGUIRE 1 M cc Iun:Enn:M:=nunnunn:Onn:Mnn:ctn;:2 FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION 6 LOCATION UTILITY ' STATE.................... NORTH CAROLINA LICENSEE................. DUKE PDHER COUNTY...................MECKLENBURG CORPORATE ADDRESS....... 422 SOUTH CHURCH STREET CHARLOTTE, NORTH CAROLINA 28242 DIST AND DIRECTION FROM HEAREST POPULATION CTR.. 17 MI N OF CONTRACTOR CHARLOTTE, NC ARCHITECT / ENGINEER....... DUKE PONER TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... AUGUST 8, 1981 CONSTRUCTOR. . . . . . . . . . . . . . DUKE P0HE F: DATE ELEC ENER 1ST GENER... SEPTEMBER 12, 1981 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 1, 1981 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGIDH RESPONSIMLE......II CONDENSER COOLING HATER.... LAKE NORMAN IE RESIDENT INSPECTOR......H. ORDERS ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. HOOD COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-369 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....NPF-9, LULY 8, 1981 PUBLIC DOCUMENT R00M.......MS. DAW 9 HUBBS ATKINS LIBRARY UNIVERSITY OF NORTH CAROLINA - CHARLOTTE UNCC STATION, CHARLOTTE, NC 28223 INSPECTION STATUS INSPECTION

SUMMARY

    + INSPECTION MARCH 17-20 (86-09):        THIS ROUTINE, UNANNOUNCED PHYSICAL SECURITY INSPECTION ENTAILED 16 INSPYCTOR-HOURS ON SITE (1.5 HOURS ON BACKSHIFT) INSPECTING: SECURITY          ORGANIZATION, RECORDS AND REPORTS, TESTING AND MAINTENANCE, PHYSICAL BARRIERS - VITAL AREAS, SECURITY SYSTEM P0HER SUPPLY, LIGHTING, ACCESS CONTROL - PERSONNEL AND PACKA3ES, DETECTION AIDS - PROTECTED AND VITAL AREAS, AND PERSONNEL TRAINING AND QUALIFICATIONS - GENERAL REQUIREMENTS.

DURING THIS INSPECTION. ND VIOLATICWS OF RECULATORY REQUIREMENTS HERE IDENTIFIED _ ENFORCEMENT

SUMMARY

CONTRARY TO SPECIFICATION 6.8.1, THE POST TRIP REVIEH PRECEDING UNIT 1 REACTOR STARTUP OF NOVEMEER 2, 1985, NAS DEFICI AT IN THAT IT DID 4) (8504 NOT EVALUATE AND RESOLVE THE ABNORMAL RESPONSE NOTED ON PRESSURIZER HEATER BANK A. OTHER ITEMS PAGE 2-194

M M M M M M M M M M M M M M M M M M ML* 20L""""""'"M MCGUIRE 1 M Report Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: POWER OPERATION. ' LAST IE SITE INSPECTION DATE: MARCH 17-20, 1986 + INSPECTION REPORT NO: 50-369/86-09 + REPORTS FR0M LICENSEE

    ==============================================================================================================

NUMBER DA1E OF DATE OF SUBJECT EVENT REPORT _- 86-005 02/07/86 03/07/86 MISSED SURVEILLANCE FOR CONTAINMENT SUMP ISOLATION VALVES 1NI-1848, 1NI-185A, 2NI-1848 AND 2NI-185A; DUE TO A PROCEDURAL DEFICIENCY. l ==============================================='==============r======================================================= 1 l i t i 1 PAGE 2-195

1. Docket 50-370 0PERATING STATUS c ::: :MOIC35: C:nnzzt2 ZM w:M = = a a MCGUIRE 2 C
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 EM"" m :arux: C:M ::MMZM : Cuccrzu
3. Utility

Contact:

J. A. REAVIS EXT (704) 373-7567 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licrensed Thermal Power (MHt): 3411 MCGUIRE 2
5. Nameplate Rating (Gross MHe): 1450 X .9 = 1305
6. Design Electrical Rating (Net MHe): 1180 1500
7. Maximum Dependable Capacity (Gross Mite): 1225 DESIGN E2.EO. RftTING - 1100
8. Maximum Dependable Capacity (Net MHe): 1150 .-
                                                                                                                                                            ...... E                   m.                 m- 1150 (1 E
9. If Changes Occur Above Since Last Report, Give Reasons:

NO NET POWER OUTPUT THIS MONTH

0. Power Level To Hhich Restricted, If Any (Not MWe): , , , , , , , , , , , , , , , , . _ _ __====,,,,,,,,,,,,,,,

_ -100

1. Reasons for Restrictions, If Any:

NONE 1000-MONTH YEAR CUMULATIVE -s0

62. Report Period Hrs 719.0 2.879.0 18,983.0
13. Hours Reactor Critical .0 1.685.1 13,313.9 E
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line .0 1,680.4 12,946.2
16. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Enar (MHH) 0 5,617,497 41,768.527 500-14,682,868 #
18. Gross Elec Enor (MHH) .

0 1.982.876

19. Het Elec Ener (MHH) -3,473 1,902,699 14.056.352
20. Unit Service Factor .0 58.4 68.2
21. Unit Avail Factor .0 58.4 68.2 ~#
22. Unit Cap Factor (MDC Net) .0 57.1 64.4
23. Unit Cap Factor (DER Het) .0 56.5 62.8
24. Unit Forced Outage Rate .0 2.9 16.3 0 0 5 1'O ' 1's ~$0 is 30
25. Forced Outage Hours .0 50.7 2,518.2 DAYS

,26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration): frRIL 1988 NONE

27. If Currently Shutdown Estimated Startup Date: 06/24/86 PAGE 2-196

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM hCGUIRE 2 M Reprrt Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMPMMMMM Type Hours Reason Method LER Number _ System Component- Cause a Corrective Action to Prevent Recurrence Ho. Date 4 RC- FdELXX END OF CYCLE 2 REFUELING OUTAGE CONTINUES. 2 03/14/86 S 719.0 C MMMMMMMMMMM MCGUIRE 2 REMAINS SHUTDOHN FOR RErUELING. M

SUMMARY

M MMMMMMMMMMM i Tvoo Reason Method System 8 Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued . Data Entry Sheet E-Operator Training 5-Red sced Load Licensee Event Report

                 & License Examination        9-Other           (LER) File (NUREG-0161)

PAGE 2-197

                                                                                                       ,           .s

mux:nnnz:nnuununsuus2==nzunnmanzrEMu n MCGUIRE 2 H cums x:Muurru urmasumunnn:M22335:2Zu FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORhATION LOCATION UTILITY STATE.................... NORTH CAROLINA LICENSEE................. DUKE PONER COUNTY...................MECKLENBURG CORPORATE ADDRESS. . . . . . . .P0HER BL DG. , BOX 2178 CHARLOTTE, NORTH CAROLINA 28201 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 17 MI N OF CONTRACTOR CHARLOTTE, NC ARCHITECT / ENGINEER....... DUKE P0HER TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY...MAY 8, 1983 CONSTRUCTOR.............. DUKE POWER DATE ELEC ENER 1ST GENER...MAY 23, 1983 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCI AL OPERATE. . . . MARCH 1, 1984 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER....LAKF NORMAN IE RESIDENT INSPECTOR......H. ORDERS ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. HOOD COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-370 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....NPF-17, MAY 27, 1983 PUBLIC DOCUMENT R00M.......MS. DANN HUBBS ATKINS LIBRARY UNIVERSITY OF NORTH CAROLINA - CHARLOTTE UNCC STATION, CHARLOTTE, NC 28223 INSPECTION STATUS INSPECTION

SUMMARY

     + INSPECTION MARCH 17-20 (86-09): THIS ROUTINE, UNANNOUNCED PHYSICAL SECURITY INSPECTION ENTAILED 16 INSPECTOR-HOURS ON SITE (1.5 HOURS ON BACKSHIFT) INSPECTING: SECURITY ORGANIZATION, RECORDS AND REPORTS, TESTING AND MAINTENANCE, PHYSICAL BARRIERS - VITAL AREAS, SECURITY SYSTEM PDHER SUPPLY, LIGHTING, ACCESS CONTROL - PERSONNEL AND PACKAGES, DETECTION AIDS - PROTECTED AND VITAL AREAS, AND PERSONNEL TRAINING AND QUALIFICATIONS - GENERAL. REQUIREMENTS. NO VIOLATIONS OF REGULATORY REQUIREMENTS HERE IDENTIFIED DURING THIS INSPECTION.

_ ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: PAGE 2-198

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMrMMMM M M MCGUIRE 2 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Reptrt Period APR 1986 OTHER ITEMS NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: REFUELING OUTAGE. LAST IE SITE INSPECTION DATE: MARCH 17-20, 1986 + INSPECTION REPORT NO: 50-370/86-09 + REPORTS FR0M LICENSEE

  ===========================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _ NONE.

   ==================================================================s.4===================================

PAGE 2-199

l 1. Docket 50-245 0PERATING STATUS EM 222E2U;!:MM MMZN2n2M22M20252MZZMMM [ n MILLSTONE 1 n l 2. R p;rting P risd 04/01/86 Outcge + On-lina Hrs: 719.0 EMXEMEMMMHHUM %Run:UN32 MNZMEERCCM3 l

3. Utility

Contact:

GEORGE HARRAN (203) 447-1791 X4194 AVERAGE DAILY PONER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2011 MILI. STONE 1
5. Nameplate Rating (Gross MWe): 735 X 0.9 = 662
6. Design Electrical Rating (Net MHe): 660
7. Maximum Dependable Capacity (Gross MHe): 684 1500 DESIGN ELEC. RATING = 800
8. Maximum Dependable Capacity (Net MWe): 654
                                                                                                                             ...... ff0C. DEPDO. Cfr. = 854 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Mrs 719.0 2.879.0 135.167.0
13. Hours Reactor Critical 719.0 2.844.3 103.923.4
14. Rx Reserve Shtdwn Hrs .0 .0 2.834.5
15. Hrs Generator On-Line 719.0 2.837.7 101.026.9 f - - -- ----

gan

16. Unit Reserve Shtdwn Hrs .0 .0 93.7
17. Gross Therm Ener (MHH) 1.423.115 5.636,653 186.250.851 ~e 500-
18. Gross Elec Ener (MHH) 487.300 1.932.500 62.633.796
19. Net Elec Ener (MHH) ~ *U 466.371 1.849.019 59.741.532
20. Unit Service Factor 100.0 98.6 74.7
                                                                                                                                                                                             - to
21. Unit Avail Factor 100.0 98.6 74.8

_22. Unit Cap Factor (MDC Net) 99.2 98.2 67.6 _a

23. Unit Cap Factor (DER Net) . 98.3 97.3 67.0
24. Unit Forced Outage Rate .0 1.4 12.1 0 0 5 1'o l's do is 30
25. Forced Outage Hours .0 41.3 5.855.6 DAYS

_26 . Shutdowns Sched Over Next 6 Months (Type,Date, Duration): NONE M IL 1986

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-200

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM. M MILLSTONE 1 RYport Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence N9, Date NONE unMMMMMMMMM MILLSTONE 1 OPERATED AT OR NEAR FULL PONER IN APRIL. _u

SUMMARY

M MMMMMMMMMMM Method Svstem & Component Tvpo Reason F-Forced A-Equip Failure F-Admin t-Manual Exhibit F S H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for Preparation of C-Refueling H-Other 3-Auto Scram 4-Continued Data Entry Sheet D-Regulatory Restriction 5-Roduced Load Licensee Event Report E-Operator Training

               & License Examination         9-Other         (LER) File (NUREG-0161)                                           PAGE 2-201

U%MIM2%ME%MIMM EMUAENZM MMMMMHMMM3:3 M MILLSTONE 1 M MM MMMMMMn:MMMMMMMznMMMMMnMMMMMMMMMM FACILITY DATA Report Pected APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... CONNECTICUT LICENSEE................. NORTHEAST NUCLEAR ENERGY COUNTY...................NEH LONDON CORPORATE ADDRESS........P.O. BOX 270 HARTFORD, CONNECTICUT 06101 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI SH OF CONTRACTOR NEH LONDON, CONN ARCHITECT / ENGINEER.......EBASCO TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITI AL CRITICALITY. . .DCTOBER 26, 1970 CONSTRUCTOR..............EBASCO DATE ELEC ENER IST GENER... NOVEMBER 29, 1970 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH 1, 1971 REGULATORY INFORMATION i CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....LONG ISLAND SOUND IE RESIDENT INSPFCTOR......J. SHEDLOSKY ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....J. SNEA COUNCIL.................. NORTHEAST P0HER DOCKET NUMBER........... 50-245 COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-21, OCTOBER 26, 1970 PUBLIC DOCUMENT R00M.......HATERFORD PUBLIC LIBRARY 45 ROPE FERRY ROAD ROUTE 156 HnTERFORD, CONNECTICUT 06385 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE _0THER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): PAGE 2-202

s 3 s s 0 s = 2
                                                =                     =    -
                                                =                     =   2 MMM                                         =                     =

M M = = E M M = = G M M = = A M M = = P M M = = M M = = M M = = M M = = M M = = M M = = M M = = M M = = M M = = M1M = = M M = = MEM = = MNM = = MOM = = MTM = = MSM = = MLM = = MLM = - = MIM = = MMM = = M M = = M M = = M M = = M M = = M M = = M M = = M M = = M M = = M M = - = M M = = MMM = =

                                                =                     =
                                                =                     =
                                                =                     =
                                                =                     =
                                                =                     =

E = =

                                                =                     =
      )                                     E =                       =

D = = E S = = U = = N N = = I = = T E = _ = N = _ = O C = = C = = ( I = =

                                                =                      =

L = =

       -                                        =                      =
                                                =                      =
                                                =                      =

S M = _ =

                                                =                      =

U 0 = =

                                                =                      =

T R = =

                                                =                      =

A F = =

                                                =                      =

T = =

                                                 =                     =

S S = =

                                                 =                     =

T = =

                                                 =                     =

R = =

                                                 =                     =

N O = =

                                      .          =                     =

O D P = = E = = I D E = = I = = T V R = = O = = C R = = P . = T = E D = C = T E = E = P~ U D = J = P I = B = S N V = U = I O = S = N' R = = O P = = I N = = T = = U = FT =

P = OR =

E N = O = T I = EP = A = TE = D O = AR = N = D .

                                                                       =

N = = O = = I  : = = 6 T O = . = 8 C N = F D = 9 . . . E = OT E = 1 D  : D D P T = N D = E S E E S R = EE . I = R D M D D N O = TV V = P I E I I I P = AE O = A V T V  : V E = D R = O I O S O E R = P = d R R U R T = = o P L P T P I N = T = i S A A S O = U = r M T I T T T I = R P = e E U R U S U E T = E _ N = P T P E P P I C = B I = I N G N T N E = M = t I A I N I T P = U O =

 -        r  R     N       A        S S           =   N           N =

o E O A O L O A N = = p H N M N P N L I = _ _ = e T R O

1. Docket 50-336 0PERATING STATUS nununnuxunnxuunun=unnununnamu2xxuxna n MILLSTONE 2 x
2. R:psrting Paried: 04/01/86 Outtga + on-lins Hrs: 719.0 unnuxxuxxxxuunuuunannunuxnnununuznun
3. Utility

Contact:

R. BORCHERT (203) 447-1791 X4418 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2700 MILLSTONE 2
5. Nameplate Rating (Gross MWe): 1011 X 0.9 = 910
6. Design Electrical Rating (Het MHe): 870 I8"
7. Maximum Dependable Capacity (Gross MHe): 889 OESIGN ELEO. Rf1 TING = 870
8. Maximum Dependable Capacity (Net MHe): 857 ...... fmX . OEPDC. Ofr. - 857 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWo):
11. Reasons for Restrictions, If Any NONE gg ,3, MONTH YEAR CUMULATIVE A
12. Report Period Hrs 719.0 2,879.0 90.695.0 W
                                                                                                                                                                                             - 100 Q
13. Hours Reactor Critical 719.0 2.879.0 64.301.4 .....-..--......................-h2*" T E
14. Rx Reserve Shtdwn Mrs .0 .0 2,166.9
15. Hrs Generator On-Line 719.0 2,879.0 61,596.4 ~ "3 l

hf

16. Unit Reserve Shtdwn Hrs .0 .0 468.2 g
17. Gross Therm Ener (MHH) 1,940,693 7,739,172 156,647,681 500 - so
18. Gross Elec Ener (MHH) 628,400 2,507,500 50,839,973
19. Net Elec Ener (MHH) 606.216 2.418,553 48,741,334

_ ,a

20. Unit Service Factor 100.0 100.0 67.9
21. Unit Avail Factor 100.0 100.0 68.4
22. Unit Cap Factor (MDC Net) 98.4 98.0 63.8x
23. Unit Cap Factor (DER het) 96.9 96.6 62.7x
24. Unit Forced Dutage Rate .0 .0 16.7 0 o j g'a g's do 2's 30
25. Forced Outage Hours .0 .0 11,062.8 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELINGT SEPTEMBER 1986, 14 HEEKS. frftIL 1986

27. If Currently Shutdown Estimated Startup Date N/A x Item calculated with a Heighted Average PAGE 2-204

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MILLSTONE 2 M Ripsrt Period APR 1986 UNIT SHUTDDHNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM T76e Hours Rearon Method LER Number System Component Cause & Corrective Action to Prevent Recurrence No. . Date NONE i M"MMMMMMMMM MILLSTONE 2 OPERATED AT NEAR FULL POWER IN APRIL.

 .M 

SUMMARY

M M2MEMMMMMMM Type Reason Method Svstem & Component F-Ftrced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training ' 5-Reduced Load Licensee Event Report a License Examination 9-Other (LER) File (NUREG-0161) PAGE 2-205

M%MEMU%%MZMM5%EMMHOMEMHMMHHEUU%%M%MH u MILLSTONE 2 H MxMn:M MMMMMMMx MxnMntz:MMn:MMM%2M3 FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... CONNECTICUT LICENSEE................. NORTHEAST NUCLEAR ENERGY COUNTY'...................NEH LONDON CORPORATE ADDRESS........P.O. BOX 270 HARTFORD, CONNECTICUT 06101 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI SH OF CONTRACTOR NEN LONDON, CONN ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY.. 0CTOBER 17, 1975 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... NOVEMBER 9, 1975 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 26, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....LONG ISLAND SOUND IE RESIDENT INSPECTOR......D. JAFFE ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....T. REBELONSKI COUNCIL.................. NORTHEAST POWER DOCKET NUMBER........... 50-336 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-65, SEPTEMBER 30, 1975 PUBLIC DOCUMENT R00M.......HATERFORD PUBLIC LIBRARY 45 R0PE FERRY ROAD ROUTE 156 HATERFORD, CONNECTICUT 06385 INSPECTION STATUS INSPECTION SUMMAg1 NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE __0THER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): PAGE 2-206

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMmMMMMM STATUS - (CONTINUED) M MILLSTONE 2 M - Reptrt Period APR 1986 INSPECTION MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM i OTHER ITEMS NO INPUT PROVIDED. MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FROM LICENSEE

   ====================================================================================================================

f NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _ _ l NO INPUT PROVIDED.

   ============================================================================================================================,====,

I I 4 ] PAGE 2-207

1. Dockota 50-423 0PERATING STATUS nuMnManMuMuxumunuMMI:MuuMit:IM;:5::MM nn:1 u MILLSTONE 3 M
2. Reporting Period 04/01/86 Outage + On-line Hrs: 191.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts A. ELMS (203) 444-5388 AVERAGE DAILY P0HER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MHt): 3411 MILLSTONE 3
5. Nameplate Rating (Gross MWe): 1253
6. Design Electrical Rating (Net MWe): 1154
7. Maximum Dependable Capacity (Gross MWe): 1197 1500
8. Maximum Dependable Capacity (Net NHe): 1149 I
  • I ~ II
                                                                                                                                                               .... PftX. DEPD O.                                              Cfr. - 1149 t100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

too om st ==wn Laent arrima, com!T!cus

10. Power Level To Hhich Restricted, If Any (Net MWe):

_y 3,

11. Reasons for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE o

12. Report Period Hrs 191.0 191.0 191.0 p -so
13. Hours Reactor Critical 179.5 179.5 179.5
14. Rx Reserve Shtdwn Hrs .0 .0 .0 3
15. Hrs Generator On-Line 172.2 172.2 172.2 g -so
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 532.830 532,830 532.830 500 -
18. Gross Elec Ener (MWH) 185,191 185,191 185.191 - 40
19. Het Elec Ener (MHH) 176.087 176.087 176.087
20. Unit Service Factor 90.2 90.2 90.2
21. Unit Avail Factor 90.2 90.2 90.2 - 30
22. Unit Cap Factor (MDC Net) 80.2 80.2 80.2
23. Unit Cap Factor (DER Net) 79.9 79.9 79.9
24. Unit Forced Outage Rate 9.8 9.8 9.8 0 0
                                                                                                                                                                    .             .                           .-                      .-      .-    0 5            10
25. Forced Outage Hours 18.8 18.8 18.8 15 30 25 30 DAYS 2?. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE M IL 1988

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-208

l MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Rep;rt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MILLSTONE 3 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l Ng, Date Type Hours Reason Method LER Number System Component Caure & Corrective Action to Prevent Recurrence l 86-01 04/23/86 -F 18.8 A 3 86-032 SB MSR MSR MANHAY STEAM LEAK. i l MMMMMMMMMMM MILLSTONE 3 DECLARED COMMERCIAL OPERATION ON APRIL 23, 1986. _,M

SUMMARY

M MMMMMMMMMMM Tvoo Reason Method System 8 Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                          & License Examination       9-Other         (LER) File (NUREG-0161)

PAGE 2-209

CMMMMZMMMICMMMZMEMUMMMMZMMMMM%M:MZZM n MILLSTONE 3 u MMMMcMM:M M M2MMMMM%CM MM2:3MMMMnMMa FACILITY DATA Report Perlad APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... CONNECTICUT LICENSEE................. NORTHEAST NUCLEAR ENERGY COUNTY...................NEN LONDON CORPORATE ADDRESS. . . . . . . .P.O. BOX 270 DIST AND DIRECTION FROM HARTFORD, CONNECTICUT 06101 NEAREST POPULATION CTk.. 3.2 MI WSW OF CONTRACTOR NEH LONDON CT. ARCHITECT / ENGINEER. . . . . . . STONE & HEBSTER TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY. . , JANUARY 23,1986 CONSTRUCTOR..+............ STONE & HEBSTER DATE ELEC ENER 1ST GENER. . .FEBRU ARY 12,1986 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE. . . . APRIL 23,1986 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER CCDLING HATER....NIANTIC BAY IE RESIDENT INSPECTOR......T. REBELOWSKI ELECTRIC RELIABILITY COUNCIL..................N0RTHEAST P0HER LICENSING PROJ MANAGER.....E. DOOLITTLE COORDINATING COUNCIL DOCKET NUMBER........... 50-423 LICENSE & DATE ISSUANCE. . . .NPF-49, JAN' JAR Y 31.1986 PUBLIC DOCUMENT R00M....... ROUTE 156 HATERFORD, CONNECTICUT 06385 INSPECTION

SUMMARY

INSPECTION STATUS INFO. NOT SUPPLIED BY REGION ENFORCEMENT

SUMMARY

NONE OTHER ITEMS

                 ~ SYSTEMS AND COMPONEHT PROBLEMS:

INFO. NOT SUPPLIED BY REGION FACILITY ITEMS (PLANS AND PROCEDURES): INFO. NOT SUPPLIED BY REGION TMANAGERIAL ITEMS: INFO. NOT SUPPLIED BY REGION PAGE 2-210 i I

U2HMMMU%MM EMiinrMuMI HKEZZZiinMZ55HMEM MILLSTONE 3 M R:pirt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM I PLANT STATUS: INFO. NOT SUPPLIED BY REGIDH LAST IE SITE INSPECTION DATE: INFO. NOT SUPPLIED BY REGION INSPECTION REPORT NO: INFO. NOT SUPPLIED BY REGION REP 0RTS FR0M LICENSEE

  ==================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT

                                                                  ~

e_ _ _ _ e en eum _ _ f INFO. NOT SUPPLIED BY REGION 1

   ===============================s==========================================================================

t 1

I 1

J f PAGE 2-211

1. Docksts 50-263 0PERATING STATUS unzin!KuzMutunMMMMM ZunMZnMMM32MMxnMM u MONTICELLO n
2. Rsp:rting Psris'd: 04/01/86 Outtg3 + On-lins Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts A. L. Mvrebo (612) 295-5151 AVERAGE DAILY P0HER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 1670 MONTICELLO
5. Nameplate Rating (Gross MHe): 632 X 0.9 = 569
6. Design Electrical Rating (Not MWe): 545
7. Maximum Dependable Capacity (Gross MWe): 564 I"
8. Maximum Dependable Capacity (Not MWe): 536 DESIGN ELEC. RRTING - 545
                                                                                    ......W. DEPDO. Cfr. -                             538 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Het MHe):
11. Reasons for Restrictions, If Any:

NONE 1000-MONTH YEAR CUMULATIVE g

12. Report Period Hrs 719.0 2,879.0 130,032.0
13. Hours Reactor Critical 709.6 2.869.6 100,948.1
14. Rx Reserve Shtdwn Hrs .0 .0 940.7
15. Hrs Generator On-Line 707.7 2.867.7 98,901.3
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 817,471 3,919,334 158,212,844 " " ' " " " ~ ~ ~ ^ " ' ~ " " " " ' '"" ~

500 -

18. Gross Elec Ener (MHH) 275,767 1,333,608 50,984,885
                                                                                                                                                  -80
19. Het Elec Ener (MHH) 262,483 1,277,316 48,739,727
20. Unit Service Factor 9Lft 99.6 76.1
21. Unit Avail Factor 98.4 99.6 76.1
                                                                                                                                                  -to

_22. Unit Cap Factor (MDC Net) 68.1 82.8 69.9

23. Unit Cap Factor (DER Net) 67.0 81.4 -20 68.8
24. Unit Forced Outage Rate .0 .0 4.8 0 _

0 5 1'O l'5 ' do' 2's

25. Forced Outage Hours 30
                                          .0          .0       1,335.0                                DfWS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE I

27. If Currently Shutdown Estimated Startup Date: 06/24/86 PAGE 2-212 l

1 l l

MMMMMMMMMMMMMMMMMMMMMNZ23Z ZMMMM2203 R: port Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MONTICELLO MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M No, ~~Eate Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 04/30/86 S 11.3 C 1 ZZ ZZZZZZ PLANT SHUTDOHN FOR 1986 REFUELING OUTAGE. 1 EuMMMMMMMMM MONTICELLO BEGAN A REFUELING OUTAGE ON APRIL 30.

,)2 

SUMMARY

M MMMMMMMMMMM Method System a Component Tvoo Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                      & License Examination                            9-Other          (LER) Flie (NUREG-0161)                                                         PAGE 2-213

i N ME2CMHE%%%%%%%%%%%H%%MMEM%%MM%HMMM F MONTICELLO M EMHun%%%MauununauMxxMHaz%%%%MuREMM22 FACILITY DATA Report Period APR 1906 FACILITY DESCRIPTION UTILITY & CONTRACT 0P INFORMATION LOCATION UTILITY STATE....................MINNES0TA LICENSEE................. NORTHERN STATES PDHER COUNTY...................HRIGNT CORPORATE ADDRESS. . . . . . . 414 NICOLL ET MAL L DIST AND DIRECTION FROM a MINNEAPOLIS, MINNESOTA 55401 NEAREST POPULATION CTR.. 30 MI NH OF CONTRACTOR MINNEAPOLIS, MINN ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY. . . DECEMBER 10, 1970 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... MARCH 5, 1971 4 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JUNE 50, 1971 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING T0HER IE REGION RESPONSIBLE......III CONDENSER COOLING !!ATER. . . . MISSISSIPPI RIVER IE RESIDENT INSPECTOR......P. HARTMAN ELECTRIC RELIABILITY COUNCIL..................MID-CONTINENT AREA LICENSTNG PROJ MANAGER.....R. AULUCK RELIABILITY COORDINATION DOCKET NUMBER........... 50-263 AGREEMENT LICENSE & DATE ISSUANCE....DPR-22, JANUARY 9, 1981 L PUBLIC DOCUMENT ROOM....... ENVIRONMENTAL CONSERVATION LIBRARY MINNEAPOLIS PUBLIC LIBRARY 300 NICOLLET MALL MINNEAPOLIS, MINNESOTA 55401 INSPECTION

SUMMARY

INSPECTION STATUS INSPECTIONFINDINGS; INSPECTION ON JAN. JtY 21 THROUGH MARCH 24 (86001): A ROUTINE, UNANNDUNCED INSPECTION BY THE RESIDENT INSPECTOR OF PREVIOUS INSPECTION INVOLVED A TOTAL OF 133 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR INCLUDING THE 24 INS OFF-SHIFTS. NO VIOLATIONS OR SAFETY CONCERNS HERE IDENTIFIED IN THE SIX AREAS INSPECTED. ENFORCEMENT

SUMMARY

  ,    NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:                                                                                                                                      '
  . NONE i

PAGE 2-214

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MONTICELLO M R ptrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: OPERATING ROUTINELY LAST IE SITE INSPECTION DATE: 5/26/86 INSPECTION REPORT NO: 86003 REPORTS FR0M LICENSEE

   ================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-09 04/01/86 04/30/86 EFT ACTUATI9N DUE TO RAD. MONITOR SPIKE

   ===============================================================================,==,=,,==,==,,,=,,,,,,==,,,,,,,,,,,,,,,,,,,,,,,,,,,

a PAGE 2-215

1. Dockot 50-220 0PERATINO STATUS U23:::MMMMMuunnnMannnMMZM 22x22332 M M NINE MILE POINT 1 u
2. R:ptrting Pcried: 04/01/8t_ Out:ge + On-lins Hrcs 719.0 MMM2MEMMMMMMM xMrunMM MMM:MMMM:M Mun
3. Utility Contacts THOMAS H. ROMAN (315) 349-2422 AVERAGE DAILY P0HER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 1850 NIhE: MILE POINT 1
5. Nameplate Rating (Gross MHe): 755 X 0.85 = 642
6. Design Electrical Rating (Net MWe): 620
7. Maximum Dependable Capacity (Oross MHe): 630 190D
8. Maximum Dependable Capacity (Not MHe): 610

_____ [ g

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MHe):

I

11. Reasons for Restrictions, If Any NONE 1000-MONTH YEAR CUMULATIVE
12. Report Period Hrs 719.0 2.879.0 144,599.0
13. Hours Reactor Critical .0 1,434.0 102,674.5 h
14. Rx Reserve Shtdwn Hrs .0 .0 1.204.2
15. H.s Generator On-Line .0 1,422.,1 99,670.1
                                                                                      $                        NO NET POHER OUTPUT THIS MONTH
16. Unit Reserva Shtdwn Hrs .0 .0 20.2 ------------ -------------------------- -100
17. Cross Therm Ener (MHH) 0 2,062,461 166,558,136 50D- , 3g
18. Gross Elec Ener (MHH) 0 683.171 55,152,627 1 ^
19. Het Elec Ener (MHH) 0 657.164 53.419,491
                                                                                                                                                        . go
20. Unit Service Factor .0 49.4 68.9
21. Unit Avail Factor .0 49.4 68.9 ~ *8
22. Unit Cap Factor (MDC Net) .0 37.4 60.6
                                                                                                                                                       - 20
23. Unit Cap Factor (DER Net) 1 36.8 59.6
24. Unit Forced Outage Rate mg 10.3 ?5.4 0 ,- .. . .. .- -

0 0 5 to 15 20 25 30

25. Forced Outage Hours .0 163.2 13-539.7 DAYS
 ,26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE M IL 1988

27. If Currently Shutdown Estimated Startup Date: 06/11/86 PAGE 2-216

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 UNIT SHUTD0HHS / REDUCTIONS M NINE MILE POINT 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMmMMMMMMM pp, Date Tyre Fours Reason fethod LER Number kygtgm Compenent Cause & Corrective Action to Prevent Recurrence 03/08/86 S 719.0 C 1 RC FUELXX UNI' SHUTDOHN FOR BI-ANNUAL REFUELING AND DVERHAUL. l l DuMMMMMMMMM NINE MILE POINT 1 REMAINS SHUT DOWN FOR REFL4ELING AND OVERHAUL. O

SUMMARY

M UDMMMMMMMMM Type Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Tert G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                                       & License Examination         9-Other         (LER) File (NUREG-0161)

PAGE 2-217

DDxonnnnnnnua00Dwuouuuwax0000Moww0x0 l M HINE MILE FOINT 1 a l 000MD00000M00000aM0000accacmi r s u a s a n FACILITY DATA Repsrt Period APR 1986 l FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE...... .............NEH YORK LICENSEE................. NIAGARA MONANK PodER CORP. COUNTY.................. 0SHEGO CORPORATE ADDRESS....... 300 ERIE BOULEVARD NEST SYRACUSE, NEN YOPK.13202 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 8 MI NE OF CONTRACTOR OSHEGO, NY ARCNITECT/ ENGINEER....... NIAGARA MOHANK POWER CORP. TYPE OF REACTOR............BHR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... SEPTEMBER 5, 1969 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER IST GENER... NOVEMBER 9, 1969 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 1, 1969 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER.... LAKE ONTARIO IE CESIDENT INSPECTOR......S. HUDS6 ELECTRIC RELIABILITY COUNCIL..................HORTHEAST POWER LICENSING PROJ MANAGER.....R. HERMANN COORDINATING COUNCIL DOCKET NUMBER........... 50-220 LICENSE & DATE ISSUANCE....DPR-63, DECEMBER 26. 1974 PUBLIC DOCUMENT ROOM....... STATE UNIVERSITY COLLEGE OF OSHEGO PENFIELD LIBRARY - DOCUMENTS OSHEGO, NY 13126 INSPECTION (315) 341-2323 INSPECTION

SUMMARY

STATUS NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE 0THER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): PAGE 2-218

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM NINE MILE POINT 1 M Report Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM DINER ITEMS NO INPUT PROVIDED. I MANAGERIAL ITEMS: l HO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATES , NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REP 0RTS FR0M LICENSEE l 1 i -------=======-=========================================================================================== NUMBER DATE OF DATE OF SUBJECT E/ENT REPORT -- NO INPUT PROVIDED.

     ====================================================================================================

PAGE 2-219 1

1. Docket 50-338 0PERATING STATUS l n:M:nnnanM::

4 urMM::MMMMMM M MMM ctna i 2. R psrting Pcriad 04'01/86 Outtge + On-lina Hros 719.0 NORTH ANNA 1 n MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

3. Utility

Contact:

B. GARNER (703) 894-5151 X2527 AVEPAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2775
                                                                                                                                       >KNtTlH FW44R 1
5. Nameplate Rating (Gross MHe): 947 l 6. Design Electrical Rating (Not MHe): 907 l
7. Maximum Dependable Capacity (Gross MHe): 941 183D
8. Maximum Dependable Capacity (Not MHe): 893 _ DESIGN ELCO. RRTING = 007 l'
9. If Changes Occur Above Since Last Report, Give Reasons: ...... FWlX. DEPDC. CRP. - 333 (100X)

NONE

10. Power Level To Which Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any NONE -

1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 m OM K ENOWED M GPTM OWWITIONS 2.879.0 69.764.0 - -
13. Hours Reactor Critical
                                                                                                                                                                                               -100 719.0    2.435.1      47,720.9                                                          Y                     Y.          R y
14. Rx Reserve Shtdwn Hrs .0 443.9 4,450.5
                                                                                                                                                                                                               /
15. Hrs Generator On-Line 719.0 2.383.0 46.295.1
16. Unit Reserve Shtdwn Hrs .0 .0 ll
                                                                                                       .0
17. Gross Therm Ener (MHH) 1,991,093 6,426,177 121,402,729
                                                                                                                                                                                              - 90
18. Gross Elec Ener (MHH) 500-670,265 2,164,935 39.642,561
19. Net Elec Ener (MHH) 637,073 2,056,168 37.471.116
20. Unit Service Factor 100.0 82.8
                                                                                                                                                                                              .m                      <

66.8

21. Unit Avail Factor 100.0 82.8 66.4
22. Unit Cap Factor (MDC Net) 99.2 80.0 60.6 ~
23. Unit Cap Factor (DER Net) 97.7 78.7 59, i
24. Unit Forced Outage Rate .0 17.1 12.4 0 .. , , ,- ,- 0
25. Forced Outage Hours 0 5 to 15 30 25 30
                                                                             .0      492.0       6.476.5                                                           DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE frRIL 1988

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-220 l

l

MMMMNNEMMMMMMNNMMMNNNMMMMMMMNNNNNNNM M NORTH ANNA 1 Report Period AP~R 1986 UNIT SHUTD0WNS / REDUCTION $ N MMMMMMMMMMMMMMMMMMMMMMMMMMMNNNNNMMMM Cause & Corrective Action to Prevent Recurrence

  .No. Date    IEEg Hours Reason Method ~LER Number igging Component 5

COMMENCED RAMPDOWN TO 61% POWER TO REPAIR GENERATOR LEAD 86-04 04/11/86 S 0.0 H COOLING FAN. REPAIRS HERE COMPLETED AND UNIT RETURNED TO 100 PERCENT P0HER. L J RONMMMMMMMM NORTH ANNA 1 OPERATED ROUTINELY IN APRIL.

 ,,0 

SUMMARY

M COMMMMMMMMM Method Svstem & Component Tvoo Reason F-Forced A-Equip Failure F-Admin i-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual ScramPreparation Instructionsoffor C-Refueling H-Other 3-Auto Scram Data Entry Sheet D-Regulatorv Restriction 4-Continued 5-Reduced Load Licensee Event Report E-Operator training (LER) File (NUREG-0161)

                 & License Examination       9-Other                                                                                                    PAGE 2-221 1
  - . . . - _ - - - -              - -          .    -   .       -     --     - -   . ~         - ---          .-      -      -                     - _.            .

4 E2%M2MM%NM3M%EHM:MEUZKHMHMHOMRFKHMMM N NORTH ANNA 1 u i tunxummutunxumuunnunzurmux nanamuuMM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTR%CTOR INFORMATION LOCATION UTILITY STATE.................... VIRGINIA LICENSEE................. VIRGINIA POWER COUNTY...................LOUISA CORPORATE ADDRESS........P.O. BOX 26666 DIST AND DIRECTION FROM RICHMONC VIFGINIA 23261 !- NEAREST POPULATION CTR. .40 MI NH OF CONTRACTOR RICHMOND,.VA ARCHITECT / ENGINEER....... STONE & HEBSTER TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... APRIL 5, 1978 CONSTRUCTOR.............. STONE a HEBSTER

DATE ELEC ENER 1ST GENER... APRIL 17, 1978 TURBINE SUPPLIER.........HESTINGHOUSE '

DATE COMMERCIAL OPERATE.... JUNE 6, 1978 REGULATORY INFORMATION

  • CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSFR COOLING HATER.... LAKE ANNA IE RESIDENT INSPECTOR......M. BRANCH ELECTRIC RELIABILITY COUNCIL.................. SOUTHEASTERN ELECTRIC LICENSING PROJ MANAGER.....L. ENGLE DOCKET NUMBER........... 50-338 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....NPF-4, APRIL 1, 1978 PUBLIC DOCUMENT R00M....... ALDERMAN LIBRARY / MANUSCRIPTS DEPT.

UNIV. OF VIRGINIA / CHARLOTTESVILLE VA 22901 a LOUISA COUNTY COURTHOUSE,- LOUISA, VA 23093 INSPECTION

SUMMARY

INSPECTION STATUS l

               + INSPECTION MARCH 3 - APRIL 6 (86-06):

IN THE AREAS OF LICENSEE EVENT REPORT CLER) MONTHLY MAINTENANCE, AND MONTHLY SURVEILLANCE. THIS ROUTINE INSPECTIGN BY THE RESIDENT INSPECTORS INVOLVED 111 INSPECTOR-H REVIEH, ENGINEERING SAFETY FEATURES (ESF) HALKDOHN, OPERATIONAL SAFETY VERIFICATION, OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. kNFORCEMENT

SUMMARY

CONTRARY THROUGH TO 10 NOVEMBER 1, CFR PART 50, APPENDIX B, CRITERION V, AND 10 CFR PART 50, APPENDIX B, CRITERION XVII, DURING THE P 1985, MODIFICATION TO THE SERVICE HATER INTAKE STRUCTURE HHICH IS LISTED ON THE NORTH ANNA 0-LIST HAS NOT . l bY THE FOLLOHING EXAMPLE: ALHAYS ACCOMPLISHED IN ACCORDANCE WITH INSTRUCTIONS OR PROCEDURES AND SUFFICIENT RE ! THE TEMPERATURE REQUIREMENTS OF SPECIFICATION NAS 2029. TEST CYLINDER CURED IN THE FIELD AND TESTI APPENDIX B, CRITERION XVII, DURING THE PERIOD OF JUNE 17 THROUGH NOVEMBER 1, CONTRARY To to CFR PART 50, APPENDIX B, CRITFRION V, AND i 1985, MODIFICATION TO THE SERVICE HATER INTAKE i ! SUFFICIENT 27 SEPTEMBER 18, 19RECORDS AND 25, 1985 HENE NOT ALHAYS MAINTAINED AS EVIDENCED BY THE FOLLO

  • HAS NOT CONTROLLED IN ACCORDANCE HITH SPECIFICATION NAS 3003. MOISTURE CONTENT OF i APPENDIX B, CRITERION V, AND 10 CFR PART 50, APPENDIX B, CRITERION XVII, DURING THE PERIOD OF JUNE 171985, ,

THROUGH NOV ) PAGE 2-222 l

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M NORTH ANNA 1 N Reprrt Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMNFMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT

SUMMARY

MODIFICATION TO THE SERVICE HATER INTAKE STRUCTURE HHICH IS LISTED ON THE NOR1H ANNA Q-LIST HAS NOT ALHAYS ACCOMPL ACCORDANCE HITH INSTRUCTIONS OR PROCEDURES AIR, AGGREGATE ANDAMOUNTS GRADATIONS, AND SUFFICIENT RECCRDS OF SPECIFIED HERE COARSE ANDNOT FINEALHAYS MAINTAINED AGGREGATE AND HATERAS ONEVIDENCED BATCH AND BY THE F EXAMPLE: TESTS FOR SLUMP, TICKETS HERE NOT MADE AND RECORDED AS REQUIRED BY SPECIFICATION NAS 2014. CONTRARY TO 10 CFR PART 50, APPENDIX B, CRITERION V, AND t o CFR PART 50, APPENDIX B, CRITERION XVII, DURING THE PERIOD OF JUNE 17 THROUGH NOVEMBER 1, 1985, MODIFICATION TO THE SERVICE NATER INTAKE STRUCTURE HHICH IS LISTED ON THE NORTH ANNA Q-LIST HAS NOT ALHAYS ACCOMPLISHED IN ACCORDANCE HITH INSTRUCTIONS OR PROCEDURES AND SUFFICIENT RECORDS HERE NOT ALHAYS MAINTAINED BY THE FOLLUHING EXAMPLE: PROCEDURE QC 10.1 CIVIL INSPECTION HAS NOT APPROPRIATE FOR THE CIRCUMSTANCES IN THAT IT DID NOT REFERENCE CURRENT SPECIFICATIONS BEING USED TO CONTROL CONCRETE AND SOILS ACTIVITIES. (8502 3) CONTRAR1 TO 10 CFR 50.54(Q), THE LICENSEE'S ENERGENCY PLAN FAILED TO DESCRIBE A SPECIALIZED TRAINING PROGRAM FOR THE DAMAGE CONTROL TEAM. MORE0VER, NO SPECIALIZED EMERGENCY TRAINING FOR SUCH PEP.SONNEL COULD BE IDENTIFIED IN THE LICENSEE'S TRAINING PROGRAM. (8600 5) OTPER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: NORMAL OPERATION. LAST IE SITC INSPECTION DATE: MARCH 3 - APRIL 6, 1986 + INSPECTION REPORT NO: 50-338/66-06 + PAGE 2-223

LCIEMMMUEM ZMZZMZMZMZZM:'E"GE"ZMHZMZZMJ - Rep;rt Perled APR 1985 REP 0RTS FR0M LICENSEE u NORTH ANNA 1 u UZ2MEMMnMMdMMMMMMM2MZMIWZM2MMMCIMuit

                               ==cs====s==========ss====
                                                                                                           ===z==z=============s==========s=======s========s====saz=====s==s===ssz==ss====szzzs==amasazz=suzassassa NUMBER        DATE OF                                                 DATE OF    SUBL!CT EVENT                                             REPORT 86-002        02/23/86                                                03/17/86   REA., TOR / TURBINE TRIP GENERATED BY A LOW-LOW LEVEL IN "B" STEAM GENERATOR, CAUSED BY CLOSURE OF THE TURBINE GOVERNOR VALVES; CAUSE - NOT DETERMINED BUT BELIEVED TO HAVE BEEN A SPORADIC OCCURRENCE.

86-004 02/22/86 03/10/86 THE "A" MAIN STEAM LINE RADIATION MONITOR FAILED; CAUSE - LOW VOLTAGE POWER SUPPLY. 86-005 03/13/86 03/18/86 AN AUTHORIZED CONSTRUCTION WORKER GAINED ACCESS TO PROTECTED AREA WITHOUT BEING SEARCHED OR OBTAINING HIS SECURITY BADGE; FrUR METHODS OF CORRECTIVE ACTION HAVE BEEN IMPLEMENTED.

                               ==========================================================================================================s==================
                                                                                                                                                             =

PAGE 2-224

_w_-_-__._ _ _ - _ _ I THIS PACE INTENTIONALLY LEFT BLANK PAGE 2-225 h r I l

1. Dockst 50-339 0PERATING STATUS E:12MZEntEZ":nnM:'Miin:MMurannt:IMMMZun n U NORTH ANNA 2 M
2. Rrpvrting P:risd 04/01/86 Outcge + On-lina Hrs: 719.0 Unznr2MunZnMansnMnanMMZZMMMMMIMZMMun
3. Utility Contacts B. GARNER (703) 894-5151 X2527 AVERAGE DAILY P0HER LEVEL (MNe) PLOT
4. Licensed Thermal Power (MHt): 2775 NORTH ANNA 2
5. Naaeplate Rating (Gross MWe): 947
6. Dosisn Electrical Rating (Not MHe): 907
7. Maximum Dependable Capacity (Gross MHe): 941 1500
8. Maximum Dependable Capacity (Not MWe): 893 _ DESIGN ELEO. MITING = 907
9. If Changes Occur Above Since Last Report, Give Reasons:
                                                                                                             ......E         DEP A                E=     mum NONE
10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any NONE 1000-MONTH YEAR CUMULATIVE
12. Report Period Hrs 719.0 2,879.0 47,135.0
                                                                                                           .._____-----------------------                 -- -    -100
13. Hours Reactor Critical 585.9 1.800.5 36.117.8 h
14. Rx Reserve Shtdwn Hrs 133.1 1.078.5 3,650.6
15. Hrs Generator On-Line 532.1 1,746.4 35,178.5 k
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 1,072.787 4,269,316 91.418,705 gan_ -80
18. Gross Elec Ener (MHH) 350,448 1,420.115 30,322,297
19. Net Elec Encr (MHH) 328.413 1,343.892 28,726.752 J
20. Unit Service Factor _ 74.0 60.7 74.6-
21. Unit Avail Factor 74.0 60.7 74.6
22. Unit Cap Factor (MDC Net) 51.1 52.3 68.2
23. Unit Cap Factor (DER Net) 50.4 51.5 67.2
24. Unit Forced Outage Rate 18.2 6.3 11.1 0 _
                                                                                                                              \

0 5

                                                                                                                  ,       ,.       .                  .-   .-      0 to       15                 20   25   30
25. Forced Outage Hours 118.3 118.3 4.398.1 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE IL 1986

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-226

MMFMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M R1 port Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M NORTH ANNA 2 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Number System Component Cause 8 Corrective Action to Prevent Recurrence Ng, Date N2-86-02 CONTINUATION FROM FEBRUARY AND MARCH 1986, hHEN UNIT 85-02 02/20/86 S 58.9 C 4 HAS TAKEN OFF LINE FOR A REFUELING OUTAGE. REFUELING HAS COMPLETED AND UNIT RETURNED ON LINE APRIL 3, 1986. APRIL 5, 1986 AT 0517, UNIT HAS TAKEN OFF LINE TO PERFORM 86-03 04/05/86 S 9.7 B 1 TURBINE OVERSPEED TRIP TEST. TEST HAS COMPLETED AND UNIT RETURNED ON LINE APRIL 5, 1986 AT 1458. 3 LER N2-86-08 REACTOR TRIP OCCURRED AT 70% P0HER DUE TO MAIN ELECTRICAL 86-04 04/11/86 F 118.3 A GENERATOR PNG EXCITER FAILURE. 1 MMMMMMMMMMM NORTH ANNA 2 EXPERIENCED 3 OUTAGES AND 2 POWER REDUCTIONS IN APRIL. M

SUMMARY

M MMMMMMMMMMM Type Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                & License Examination       9-Other          (LER) File (NUREG-0161)

PAGE 2-227 l

Urunca:Utuur;MOU NSO rMnM;I%CCMH M UN H NORTH ANNA 2 M tenruunnunnunnuunnurunnuw32nzumMMMZM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... VIRGINIA LICENSEE................. VIRGINIA PDHER COUNTY...................LOUISA CORPORATE ADDRESS........P.O. BOX 26666 DIST AND DIRECTION FROM RICHMOND, VIRGINIA 23261 NEAREST POPULATION CTR.. 40 MI NH OF CONTRACTOR RICHMOND, VA ARCHITECT / ENGINEER....... STONE a HEBSTER TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... JUNE 12, 1980 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER IST GENER... AUGUST 25, 1980 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 14, 1980 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... LAKE ANNA IE RESIDENT INSPECTOR......M. BRANCH ELECTRIC RELIABILITY COUNCIL.................. SOUTHEASTERN ELECTRIC LICENSING PROJ MANAGER.....L. ENGLE RELIABILITY COUNCIL DOCKET NUMBER........... 50-339 LICENSE & DATE ISSUANCE....NPF-7, AUGUST 21, 1980 PUBLIC DOCUMENT ROOM....... ALDERMAN LIBRARY / MANUSCRIPTS DEPT. UNIV. OF VIRGINIA / CHARLOTTESVILLE VA 22901 8 LOUISA COUNTY COURTHOUSE, LOUISA, VA 23093 INSPECTION

SUMMARY

INSPECTION STATUS

    + INSPECTION MARCH 3 - APRIL 6 (86-06):

IN THE AREAS OF LICENSEE EVENT REPORT (LER)THIS ROUTINE INSPECTION BY THE RESIDENT INSPECTORS INVOLVED 111 INSPECTOR-HOURS ON SITE MONTHLY MAINTENANCE, MONTHLY SURVEILLANCE, AND REVIEH, ENGINEERIHG OBSERVATION SAFETY OF THE FEATURES UNIT 2 REFUELING. (ESF) HALKDONN, OPERATIONAL SAFETY VERIFICATION, DEVIATIONS HERE IDENTIFIED. OF THE AREAS INSPECTED, NO VIOLATIONS OR t l ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: DIESEL GENERATOR RELIABILITY PROBLEM - LICENSEE IS INVESTIGATING. PAGE 2-228 i - _ _ .

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M NORTH ANNA 2 M Report Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: REFUELING OUTAGE COMMENCED 2-20-86. ALSO, INSPECTION OF STEAM GENERATORS IS PLANNED. LAST IE SITE INSPECTION DATE: MARCH 3 - APRIL 6, 1986 + INSPECTION REPORT NO: 50-339/86-06 + 7EP0RTS FR0M LICENSEE

 ========================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT -- 86-001 02/21/86 03/21/86 EIGHT MAIN STEAM LINE CODE SAFETY VALVES IHOPERABLE AFTER FAILING FUNCTIONAL TESTING; CAUSE NOT DETERMlHED. 86-002 02/20/86 03/13/86 REACTOR TRIP HHILE IN MODE 3 DN SOURCE RANGE NEUTRON DETECTOR HIGH FLUX FAILURE; INVESTIGATION OF FAILURES IS ONGOING.

 ====================================s=============================================================================================

PAGE 2-229

1. Docket _50-269 0PERATINO STATUS I:cMM t MunMMMn:MMMnie'MMMM:nnnMMMMcM:7
2. Reptrting Parlsde 04/01/86 II OCONEE 1 M Outrge + On-lina Hro 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

J. A. REAVIS (704) 373-7567 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2568 OCONEE 1
5. Nameplate Rating (Gross MWe): 1038 X 0.9 = 934
6. Design Electrical Rating (Not MHe): 887
7. Maximum Dependable Capacity (Gross MWe): 899 1500
8. Maximum Dependable Capacity (Not MHe): 860 DESIM m . M M - W
                                                                                                                                                                                  ......MRX. DEPDe. CMP. -    880 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MHo):
11. Reasons for Restrictions, If Any:

NONE 10o0 - MONTH YEAR CUMULATIVE o

12. Report Period Hrs 719.0 2.879.0 NO NET POWER OUTPUT THIS NONTH 112.128.0 N
13. Hours Reactor Critical .0 1.040.7 81.487.4 ~"~~~"~~~~~~~~~~~~~~~
14. Rx Reserve Shtdwn Hrs .0 .0 .0 3
15. Hrs Generator On-Line .0 1.029.5 78.159.6 g -so
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 0 2,624.291 188.924.491
                                                                                                                                                                                                                             -so
18. Gross Elec Ener (MHH) 0 914.950 65.661.790
19. Net Elec Ener (MHH) -6.664 863.091 62.261.340
20. Unit Service Factor .0 35.8 69.7
                                                                                                                                                                                                                             - 40
21. Unit Avail Factor .0 35.8 69.7

_22. Unit Cap Factor (MDC Net) 34.9

                                                                                                                                .0                         64.4M                                                             ~
23. Unit Cap Factor (DER Net) .0 33.8 62.7M
24. Unit Forced Outasa Rate .0 1.1 14.7 o 0
25. Forced Outage Hours g g g g, g.
                                                                                                                                .0       11.6      12.551.1                                         DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE MPRIL 1986

27. If Currently Shutdown Estimated Startup Date: 05/08/86 M Item calculated with a Heighted Average PAGE 2-230

1 I MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM x OCONEE 1 Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMhMMMMM l Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence N9, Date C RC FUELXX END OF CYCLE 9 REFUELING OUTAGE. 2 02/13/86 S 240.0 1 NJ TURBIN DUTAGc CAL ~NSION DUE TO INCREASED SCOPE OF TURBINE 3 04/10/86 5 47 9.0 A 9 INSPECTION AND SUBSEQUENT REPAIR. DDDMMMM=MMM OCONEE 1 COMPLETED REFUELING AND EXTENDEL THE SHUTDONN FOR TURBINE INSPECTION AND REPAIR.

 ,JJ 

SUMMARY

M ODMMMMMMMMM Method Svstem & Component Type Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling N-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued " Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination       9-Other           (LER) File (NUREG-0161)                                                          PAGE 2-231

nn=nannarnnus5wrunnnnnucun 05HMHn:H2

u OC0 ZEE 1 M l unnsumununtznunxnannzennz:MunuscNunu FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION l

l LOCATION UTILITY l STATE.................... SOUTH CAROLINA LICENSEE................. DUKE P0HER COUNTY.................. 0CONEE CORPORATE ADDRESS....... 422 SOUTH CHURCH STREET l CHARLOTTE, NORTH CAROLINA 28242 l DIST AND DIRECTION FROM l NEAREST POPULATION CTR.. 30 MI H OF CONTRACTOR GREENVILLE, SC ARCHITECT / ENGINEER....... DUKE & BECHTEL l TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... BABCOCK & HILCOX DATE INITIAL CRITICALITY... APRIL 19, 1973 CONSTRUCTOR.............. DUKE POWER DATE ELEC ENER 1ST GENER...MAY 6, 1973 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JULY 15, 1973 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE. . . . . .II CONDENSER COOLING HATER.... LAKE KE0 HEE IE RESIDENT INSPECTOR......J. BRYANT ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....H. NICOLARAS l COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-269 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-38, FEBRUARY 6, 1973 PUBLIC DOCUMENT R00M...... 0CONEE COUNTY LIBRARY 501 H. SOUTH BROAD ST. HALHALLA, SOUTH CAROLINA 29691 INSPECTION STATUS I INSPECTION

SUMMARY

l l

             + INSPECTION FEBRUARY 11 - MARCH 10 (86-04): THIS ROUTINE, ANNOUNCED INSPECTION ENTAILED 101 INSPECTOR-HOURS ON SITE IN THE AREAS OF OPERATIONS, SURVEILLANCE, MAINTENANCE, VERIFICATION OF ENGINEERED SAFETY FEATURES LINEUPS, AND REFUELING ACTIVITIES. OF THE FIVE APEAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED.

INSPECTION MARCH 3-7 (86-08): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 13 INSPECTOR-HOURS IN THE AREAS OF UNIT 1 EDDY CURRENT EXAMINATION (EC) 0F ONCE THROUGH STEAM GENERATOR (OTSG) TUBES; SLUDGE CLEANING OF OSTGCS) BY THE HATER SLAP METHOD; INSTALLATION OF THE RE/CTOR VESSEL LEVEL INSTRUMENTATION SYSTEM (RVLIS); IE BULLETIN 82-02 FOR UNIT 3; CLOSING OF OPEN ITEMS. NO VIOLATIDHS OR DEVIATIONS HERE IDENTIFIED. INSPECTION MARCH 31 - APRIL 4 (86-12): THIS ROUTINE, UNANNOUNCED INSPECTION HAS IN THE AREA 0F THE ANNUAL EMERGENCY PREPAREDNESS EXERCISE. OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

CONTRARY TO 10 CFR 20.103(B)(2) THE REQUIREMENT TO USE PRECAUTIONARY PROCEDURES TO MAINTAIN INTAKE OF RADIDACTIVE MATdRIAL BY ANY INDIVIDUAL AS FAR BELOH THAT INTAKE OF RADI0 ACTIVE MATERIAL HHICH HOULD RESULT FROM INHALATION OF SUCH MATERIAL FOR 40 HOURS AT THE UNIFORM CONCENTRATIONS SPECIFIED IN APPENDIX B, TABLE I, COLUMN 1, AS IS REASONABLY ACHIEVABLE HAS NOT MET IN THAT ON MARCH 28 PAGE 2-232

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M OCONEE 1 M Rspirt Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT

SUMMARY

AND 29, 1985, ELEVEN INDIVIDUALS HERE ALLOWED TO PERFORM HORK IN UNIT 3 CONTAINMENT HITHOUT USING PROPER RESPIRATORY PROTEC EQUIPMENT TO REDUCE THE INTAKE OF RADIDACTIVE MATERIAL. THE INDIVIDUALS HAD INTAKES RANGING FROM FIVE TO THIRTY TIMES THEFOR ONE QUANTITY THAT HOULD RESULT FROM INHALING AIR CONTAINING UNIFORM CONCENTRATIONS SPECIFIED IN APPENDIX B, TABLE I, COLUMN 1 HOUR. CONTRARY TO TS 6.4.1, CN FEBRUARY 4, 1986, PROCEDURE IP/2/A/305/3C, RPS CHANNEL "C" CALIBRATION AND FUNCTIONAL TEST HAS NOT "C" BREAKERS AS FOLLOWED, IN THAT INSTRUMENT AND ELECTRICAL TECHNICIANS TRIPPED THE CHANNEL "D" BREAKERS INSTEAD OF THE CHANNEL SPECIFIED BY THE PROCEDURE. THESE STEPS REQUIRE INDEPENDENT VERIFICATION BY THE PROCEDURE AND HERE SIGNED INDICATING THE ACTIONS TAKEN HERE INDEPENDENTLY VERIFIED TO BE CORRECT. THIS ACTION RESULTED IN A REACTOR TRIP FROM 100 PERCENT P0HER. CONTRARY TO 10 CFR 20.103(B)(2) THE REQUIREMENT TO USE PRECAUTIONARY PROCEDURES TO MAINTAIN INTAKE OF RADI0 ACTIVE MATERIAL BY ANY INDIVIDUAL AS FAR BELOW THAT INTAKE OF RADI0 ACTIVE MATERIAL HHICH HOULD RESULT FRDM INHALATION OF SUCH MATERIAL FOR 40 HOURS AT THE UNTr?RM CONCENTRATIONS SPECIFIED IN APPENDIX B, TABLE I, COLUMN 1, AS IS REASONAELY ACHIEVABLE HAS NOT MET IN THAT ON MARCH 28 AND 29, 1985, ELEVEN INDIVIDUALS HERE ALLONED TO PERFORM HORK IN UNIT 3 CONTAINMENT HITHOUT USING PROPER RESPIRATORY PROTECTIVE EQdIPMENT TO REDUCE THE INTAKE OF RADIDACTIVE MATERIAL. THE INDIVIDUALS HAD INTAKES RANGING FROM FIVE TO THIRTY TIMES THE QUANTITY THAT HOULD RESULT FROM INHALING AIR CONTAINING UNIFORM CONCENTRATIONS SPECIFIED IN APPENDIX B, TABLE I, COLUMN 1 FOR ONE HOUR. CONTRARY TO 10 CFR 20.103(B)(2) THE REQUIREMENT TO USE PRECAUTIONARY PROCEDURES TO MAINTAIN INTAKE OF RADI0 ACTIVE MATERIAL BY ANY INDIVIDUAL AS FAR BELOW THAT INTAKE OF RADI0 ACTIVE MATERIAL HHICH HOULD RESULT FROM INHALATION OF SUCH MATERIAL FOR 40 HOURS AT THE UNIFORM CONCENTRATIONS SPECIFIED IN APPENDIX B, TABLE I, COLUMN 1, AS IS REASONARI.Y ACHIEVABLE HAS NOT MET IN THAT ON MARCH 28 AND 29, 1985, ELEVEN INDIVIDUALS HERE ALLOHED TO PERFORM HORK IN UNIT 3 CONTAINMENT HITHOUT USING PROPER RESPIRATORY PROTECTIVE EQUIPMENT TO REDUCE THE INTAKE OF RADIDACTIVE MATERIAL. THE INDIVIDUALS HAD INTAKES RANGING FROM FIVE TO THIRTY TIMES THE QUANTITY THAT HOULD RESULT FROM INHALING AIR CONTAINING UNIFORM CONCENTRATIONS SPECIFIED IN APPENDIX B, TABLE I, COLUMN 1 FOR ONE HOUR. (8500 4) _0THER ITEMS SYSTEMS AND COMPONENT PROBLEMS

  • NONE.

FACILITY ITEMS (PLAMS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: PONER OPERATION. LAST IE SITE INSPECTION DATE: MARCH 31 - APRIL 4, 1986 + INSPECTION REPORT NO: 50-269/86-12 + PAGE 2-233!

nun:Ec = MMM r M:nMnc = MntrMMIx n n ::a Repect Perlod APR 1986 REP 0RTS FR0M LICENSEE 4 OCONEE 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ass a s s a a rn a a m m a a s s a n z a s s = m = s s = s s = = = = s a s s a s s a s s = = = = = s a s = z = s s s = s = = s a s s s s s s s s = = = = = s z a s: s s = = a z z = s = s s = s s y s = = s = s z a s s m a s s a s s a a n z z m a s a s s u s NUMBER DATE OF DATE OF SUSJECT EVENT REPORT i l 86-001 01/31/86 03/03/86 GENERATOR / REACTOR TRIP DUE TO FAILURE OF PCB-20 IN 230 KV SHITCHYARD; FAILURE OF PCB-20 CAUSED i BY DEGRADED BREAF.ER CONTACTS. 86-002 02/03/86 03/05/86 EFH AND LPSH PIPING AND VALVES NOT IN FULL COMPLIANCE WITH FSAR SEISMIC CRITERIA REQUIREMENTSs ATTRIBUTABLE TO DESIGN DEFICIENCY. 86-003 02/08/86 03/10/86 CTP LIQUID EFFLUENT COMPOSITE SAMPLER INOPERABLE, GRAB SAMPLE MISSEDs CAUSED BY PERSONNEL ERROR.

   ======================================s======================================================s====================================

l l PAGE 2-234

THIS PAGE INTENTIONAL'Y LEFT BLANK l 1 l l PAGE 2-235

                                               ^- - _ - _ -__ _ _ _ _ _
1. Dockst 50-270 0PERATING STATUS un:Muux nuxzunanun Muzt xzzncunanunn u OCONEE 2 0
2. Repsrting Pscled: 04/01/81_ Outtg2+ On-lina Hros 719.0 unsrur xx:stunnuzunnsnanum2xxxxxxxxx
3. Utility

Contact:

J. A. REAVIS (704) 373-7567 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2568 DCONEE 2
5. Nameplate Rating (Gross MWe): 1038 X 0.9 = 934
6. Design Electrical Rating (Not MHe): 887
7. Maximum Dependable Capacity (Gross MWe): 899 __

1883

8. Maximum Dependable Capacity (Not MHe): 860

_ [

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any NONE 10m3-MONTH YEAR CUMULATIVE
12. Report Period Hrs 719.0 2.879.0 102.048.0
13. Hours Reactor Critical 719.0 2.871.0 75.709.1
                                                                                              ~I~~~~~~~~~~~(~~~~~~~~~~~~~~~~~~~21~~~~
                                                                                                                                                               -.        h!
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line 719.0 2.857.9 74.459.7 - so lf
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 1.839.099 7.287.984 177.691.886 ,mg, 30
18. Gross Elec Ener (MHH) 624.320 2,488.960 60.541.301
19. Het Elec Ener (MHH) 598.170 2.383.566 57.551.127
                                                                                                                                                                    - 40
20. Unit Service Factor 100.0 99.3 73.0
21. Unit Avail Factor 100.0 99.3 75.0
 .,22. Unit Cap Factor (MDC Net)               96.7       96.3         65.4x                                                                                       " *U
23. Unit Cap Factor (DER Net) 93.8 93.3 63.7x
24. Unit Forced Outage Rate .0 .7 13.4 0 -
                                                                                                                                                            .-        0 0        5               10                        15     20   25     30
25. Forced Outage Hours .0 21.1 10.694.9 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELING - AUGUST 14. 1986 - 9 HEEKS. PPRIL 1986

27. If Currently Shutdown Estimated Startup Date: N/A x Item calculated with a Heighted Average PAGE 2-236

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l Report Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M OCONEE 2 M i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date IEEE Hours Reason Method LER Number $vstem Component Cause & Corrective Action to Prevent Recurrence 22-P 04/01/86 F 0.0 A 5 HB HTEXCH PROBLEMS DUE TO SECOND STAGE REHEATER TUBE LEAKS. 23-P 04/11/86 S 0.0 B 5 CC VALVEX CONTROL AND STOP VALVE MOVEMENT PT'S. 24-P 04/11/86 F 0.0 A 5 HB TURBIN SECOND STAGE REHEATER VALVED OUT. , 4 MunrMMMMMMM OCONEE 2 OPERATED ROUTINELY IN APRIL. n

SUMMARY

M MMMMMMMMMMW Tvoe Rp eso.; Method System & Component F-Fe'rced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Opar Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                    & License Examination         9-Other         (LER) File (NUREG-0161)

PAGE 2-237

UZ0%% E%Mn3 Unum %%%HEUMM%%%ECMHEMMMU u OCONEE 2 H CMMMMMMMFMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... SOUTH CAROLINA LICENSEE................. DUKE POWER COUNTY.................. 0CONEE CORPORATE ADDRESS....... 422 SOUTH CHURCH STREET DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 30 MI N OF CONTRACTOR GREENVILLE, SC ARCHITECT / ENGINEER....... DUKE & BECHTEL TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... BABCOCK & HILCOX DATE INITIAL CRITICALITY... NOVEMBER 11, 1973 CONSTRUCTOR.............. DUKE POWER DATE ELEC ENER 1ST GENER... DECEMBER 5, 1973 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... SEPTEMBER 9, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... LAKE KE0 HEE IE RESIDENT INSPECTOR......J. BRYANT ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....H. NICOLARAS COUNCIL.... ............ SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-270 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-47, OCTOBER 6, 1973 PUBLIC DOCUMENT R00M.......DCONEE COUNTY LIBRARY 501 H. SOUTH BROAD ST. HALHALLA, SOUTH CAROLINA 29691 INSPECTION STATUS INSPECTION SUMMARX

   + INSPECTION FEBRUARY 11 - MARCH 10 (86-04): THIS ROUTINE, ANNOUNCED INSPECTION ENTAILED 101 INSPECTOR-HOURS ON SITC IN THE AREAS OF FIVEOPERATIONS,  SURVEILLANCE, AREAS INSPECTED,               MAINTENANCE, NO VIOLATIONS               VERIFICATION OR DEVIATIONS       OF ENGINEERED SAFETY FEATURES LINEUPS, AND REFUELING ACTIVITIES. OF THE HERE IDENTIFIED.

INSPECTION MARCH 3-7 (86-08): CURRENT EXAMINATION (EC) 0F ONCETHIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 13 INSPECTOR-HOURS IN THE AREAS OF UNIT 1 EDDY THROUGH STEAM GEN 2RATOR COTSG) TUBES; SLUDGE CLEANING OF OSTGCS) BY THE HATER SLAP METHOD; INSTALLATION VIOLATIONS OROF THE REACTOR DEVIATIONS HEREVESSEL IDENTIFIED. LEVEL INSTRUMENTATION SYSTEM (RVLIS); IE BULLETIN 82-02 FOR UNIT 3; CLOSING OF OPEN ITEMS. NO INSPECTION MARCH 31 - APRIL 4 (86-12): EXERCISE. OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED.THIS ROUTINE, UNANNOUNCED INSPECTION HAS IN ENFORCEMENT

SUMMARY

NONE i PA05 2-238

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM STATUS - (CONTINUED) M OCONEE 2 M Repsrt Period APR 1986 INSPECTION MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): i NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: POWER OPERATION. LAST IE SITE INSPECTION DATE: MARCH 31 - APRIL 4, 1986 + INSPECTION REPORT NO: 50-270/86-12 + REPORTS FR0M LICENSEE

    ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-002 02/04/86 03/06/86 REACTGR TRIP BECAUSE OF PERSONNEL ERROR (FAILING TO FOLLOH PROCEDURES) DURING ON-LINE CRD BREAKER TESTING.

    ================================================================================================================================,=

i i i i PAGE 2-239 i.

+

4 I r

1. Docket: 50-287 0PERATINO STATUS u=nt:Huur%:Cann:nnntM:nu:MMarnM;Mncn u OCONEE 3 M
2. Reporting Period 04/01/86 Outage + On-1tne Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

J. A. REAVIS (704) 373-7567 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (HHt): 2568 OCC24]C 3
5. Nameplate Rating (Gross MHe): 1038 X 0.9 = 934 I
6. Design Electrical Rating (Not MHe): 887
7. Maximum Dependable Capacity (Gross MWe): 899 1833 DESIGN ELDO. RRTING = 887
8. Maximum Dependable Capacity (Not MWe): 860
                                                                                         ......tmX. DEPDO. Cfr. -                800 (100%)                               j
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any NONE 1003-MONTH YEAR CUMULATIVE
12. Report Period Hrs 719.0 2.879.0 99,695.0
                                                                                              - ~~~~~~~~~                                     "
                                                                                                                           ~~~~~~~~IO~'""""*
13. Hours Reactor Critical 719.0 2.875.8 72,247.3
14. Rx Reserve Shtdwn Hrs .0 .0 .0
                                                                                                                                              - 80
15. Hrs Generator On-Line 719.0 2,855.3 70,988.5 ll
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 1,839,099 7,255,319 173,923,764 . ao
18. Gross Elec Ener (MHH) 637,700 2,514,690 60,042,744
19. Net Elec Ener (MHH) 612,043 2,411,940 57,191.297
                                                                                                                                              - 40
20. Unit Service Factor 100.0 99.2 71.2
21. Unit Avail Factor 100.0 99.2 71.2
                                                                                                                                             ~

_22. Unit Cap Factor (MDC Net) 99.0 97.4 66.6M

23. Unit Cap Factor (DER Net) 96.0 94.4 57.6M f
24. Unit Forced Outage Rate .0 .8 14.1 0 0 0 is ib' 2S 30
25. Forced Outage Hours .0 23.7 11,789.1 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

r10NE

27. If Currently Shutdown Estimated Startup Date: N/A M Item calculated with a Heighted Average PAGE 2-240

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M OCOMEE 3 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date liii Hours Reason Method LER Number 8vstem domponent Cause & Corrective Action te Prevent Recurrence 8-P 04/25/86 S 0.0 5 5 CC VALVEX TURBINE VALVE PT'S. l l MunuuMMMMMM OCONEE 3 OPERATED ROUTINELY IN APRIL. _u

SUMMARY

M MMMMMMMMMMM Type Reason Method Svstem 8 Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                   & License Examination          9-Other          (LER) File (NUREG-0161)

PAGE 2-241

ex rtmananzann=2 wnwannuwannunn:Enun u OCONEE 3 n tauxxx: munuwwummunwwwwuuuwwuwwwuwME FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... SOUTH CAROLINA LICEhSEE................. DUKE PDHER COUNTY.................. 0CONEE CORPORATE ADDRESS. . . . . . . 422 SOUTH CHURCH STREET DIST AND DIRECTION FROM CHARLOTTE, NORTH CAROLINA 28242 NEAREST POPULATION CTR.. 30 MI H OF CONTRACTOR GREENVILLE, SC ARCHITECT / ENGINEER....... DUKE & BECHTEL TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... BABCOCK & HILCOX DATE INITIAL CRITICALITY... SEPTEMBER 5, 1974 CONSTRUCTOR.............. DUKE POWER DATE ELEC ENER IST GENER... SEPTEMBER 18, 1974 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 16, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... LAKE KE0 HEE IE RESIDENT INSPECTOR......J. BRYANT ELECTRIC RELIABILITY COUNCIL.................. SOUTHEASTERN ELECTRIC LICENSING PROJ MANAGER.....H. NICOLARAS RELIABILITY COUNCIL DOCKET NUMBER........... 50-287 LICENSE & DATE ISSUANCE....DPR-55, JULY 19, 1974 PUBLIC DOCUMENT R00M...... 0CONEE COUNTY LIBRARY 501 H. SOUTH BROAD ST. HALHALLA, SOUTH CAROLINA 29691 INSPECTION

SUMMARY

INSPECTION STATUS

       + INSPECTION OF  OPERATIONS,  FEBRUARY 11 - MARCH 10 (86-04): THIS ROUTINE, ANNOUNCED INSPECTION ENTAILED 101 INSPECTOR-HOURS ON SITE IN FIVE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. SURVEILLANCE, MAINTENANCE, VERIFICATION                            OF THE OF ENGINE INSPECTION MARCH 3-7 (86-08):

CURRENT EXAMINATION (EC) 0F ONCE THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 13 INSPECTOR-HOURS IN THE AREAS OF UNIT 1 EDDY THROUGH STEAM GENERATOR (OTSG) INSTALLATION OF THE REACTOR VESSEL LEVEL INSTRUMENTATION SYSTEM (RVLIS); TUBES; SLUDGE CLEANING OF OSTGCS) BY THE HATER SLAP METHOD; VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. IE BULLETIN 82-02 FOR UNIT 3; CLOSING OF OPEN ITEMS. NO INSPECTION MARCH 31 - APRIL 4 (86-12): EXERCISE. OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED.THIS ROUTINE, UNANNDUNCED INSPECTION HAS i { ENFORCEMENT

SUMMARY

NONE PANE 2-242

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OCONEE 3 M Report Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: P0HER OPERATION. LAST IE SITE INSPECTION DATE: MARCH 31 - APRIL 4, 1986 + t INSPECTION REPORT NO: 50-287/86-12 + PEP 0RTS FR0M LICENSEE

   =====================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT - ._ . _. NONE.

   =================================================================================================================================

l PAGE 2-243 I } i

1. Dacket 50-219 0PERATING STATUS xxurmumunumumununummuunzunnnannuunnu u OYSTER CREEK 1 M
2. Raporting Period 04/01/86 Outzgs + On-lins Hrs: 719.0 KEsMMuuurxtumuuuu xumnusunununnunnus
3. Utility

Contact:

JOSEPH R. MOLNAR (609) 971-4699 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 1930 OYSTER CREEK 1
5. Nameplate Rating (Gross MWe): 722 X .9 = 650
6. Design Electrical Rating (Not MWe): 650
7. Maximum Dependable Capacity (Gross MWe): 650 1803
8. Maximum Dependable Capacity (Not MWe): 620 DCSION ELCO. RRTING = 850
                                                                                                       ----- MRX. DEPDC. Cr. -      820 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE 1000-MONTH YEAR CUMULATIVE o

12. Report Period Hrs 719.0 2.879.0 143,351.0 N

2,311.5 95,453.9

13. Hours Reactor Critical 270.5 ff
14. Rx Reserve Shtdwn Hrs 448.5 448.5 1,208.0 5
15. Hrs Generator On-Line 266.2 2,273.9 92.332.0 hf
16. Unit Reserve Shtdwn Hrs 452.8 452.8 1,761.4 --------------------------------------- -100
17. Gross Therm Ener (MHH) 429,438 4,074,338 153,028,338
18. Gross Elec Ener (MHH) 139,010 1,371,480 51,662,165
19. Net Elec Ener (MHH) 133,091 1,317,153 49,627,646 _ go
20. Unit Service Factor 37.0 79.0 64.4
21. Unit Avail Factor 100.0 94.7 65.6 ~ *O
22. Unit Cap Factor (MDC Net) 29.9 73.8 55.8x
                                                                                                                                                - 20
23. Unit Cap Factor (DER Net) 28.5 70.4 53 ,1 0 '
24. Unit Forced Outage Rate .0 6.3 12.3 , ,. , ,. , ,

o O 5 10 15 30 25 30

25. Forced Outa3e Hours .0 152.3 11,057.5 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE M IL 1986

27. If Currently Shutdown Estimated Startup Date: 10/12/86 M Item calculated with a Heighted Average PAGE 2-244

t MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM000M M Report Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M OYSTER CREEK 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Date lidi Hours Esason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence No. PLANT SHUT DONN FOR REFUELING & MAINTENANCE. 43 04/12/86 S 452.8 C 1 I 1 l DDDDMMMMMMM OYSTER CREEK 1 EXPERIENCED 1 SHUTDOHN IN APRIL. l , ,,D

SUMMARY

M DDDDMMMMMMM Type Reason Method System 8 Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scr am Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                        & License Examination         9-Other         (LER) File (NUREG-0161)

PAGE 2-245

un=unzuunnuunnuruunununnunusmunuunux M OYSTER CREEK 1 M unuuuuuuuuuuurzuuuuuuuuuuuuumunuzuMM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION i LOCATION UTILITY STATE . . . . . . . . . . . . . . . . . . . . NEW J ERS EY L.ICENSEE.................GPU NUCLEAR CORPORATION COUNTY.................. 0CEAN CDRPORATE ADDRESS....... 100 INTERPACE PARKHAY PARSIPPANY, NEW JERSEY 07054 DIST AND DIRECTION FROM i NEAREST POPULATION CTR.. 9 MI S OF CONTRACTOR TOMS RIVER, NJ l ARCHITECT / ENGINEER....... BURNS & ROE { TYPE OF REACTOR............BWR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY...MAY 3, 1969 CONSTRUCTOR.............. BURNS & ROE j DATE ELEC ENER IST GENER... SEPTEMBER 23, 1969 TURBINE SUPPLIER......... GENERAL ELECTRIC l DATE COMMERCI AL OPERATE. . . . DECEMBER 1, 1969 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....BARNEGAT BAY IE RESIDENT INSPECTOR......H. BATEMAN ELECTRIC .tELIABILITY LICENSING PROJ MANAGER.....J. DON 0 HEN COUNCIL..................MID-ATLANTIC DOCKET NUMBER........... 50-219 AREA COUNCIL i LICENSE & DATE ISSUANCE....DPR-16, AUGUST 1, 1969 I PUBLIC DOCUMENT ROOM....... OCEAN COUNTY LIBRARY 101 HASHINGTON STREET TDMS RIVER, NEN JERSEY 08753 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

i TECHNICAL SPECIFICATION 7.2 0F PROCEDURE NUMBER6.8.1 REQUIRES, 915.26, REV. IN PART, THAT HRITTEN PROCEDURES BE ESTALBISHED, IMPLEMENTED, AND MAINTAINED. PARAGRAPH PROCEDURE MANUAL, REQUIRES THAT ALL PERSONAL 2, RELEASE SURVEYS, CONTAINED WITHIN THE OYSTER CREEK RADIOLOGICAL CONTROLS POLICY AND ITEMS, SUCH AS CLIPBOARDS, DRAHINGS, NOTEBOOKS, ETC., BE RADI0 LOGICALLY SURVEYED PRIOR TO RELEASE OF THESE ITEMS FROM THE RADIATION CONTROL AREA. CONTRARY TO THE ABOVE, AS OF NOVEMBER 6, 1985, PERSONNEL HERE 1 OBSERVED LEAVING THE RCA HITHOUT PERFORMING A RADIOLOGICAL SURVEY OF CARRY-ALONG ITEMS. 10 CFR 50, APPENDIX B, CRITERION III AND SECTION 4 0F THE OYSTER CREEK OPERATION QUALITY ASSURANCE PLAN REQUIRE, IN PART, THAT DESIGN REQUIREMENTS BE CORRECTLY TRANSLATED

 )                                               INTO SPECIFICATIONS, DRANINGS, PROCEDURES, AND INSTRUCTIONS. FURTHER, 10 CFR 50, APPENDIX B, CRITERION V AND SECTION 3 0F THE OPERATION QA PLAN REQUIRE, IN PART, THAT ACTIVITIES AFFECTING QUALITY BE ACCOMPLISHED IN ACCORDANCE WITH PROCEDURES. ATTACHMENT TO  GPUN STANDARD REQUIRE,  IN PART, THAT          MTHA-001, TECHNICAL       GPU SYSTEM HELDING PROGRAM, AND PARAGRAPH 4.2 0F PROCEDURE 6150-QAP-7220.01, GPUNC NELDING MANUAL, l                                                 CONTRARY TO THE ABOVE, AS OF OCT0EER                       FUNCTIONS 26,      ENGINEERING SPECIFY HELD JOINT CONFIGURATIONS IN APPROPRIATE PROCEDURES AND DRA
 ;                                                                                                                    1985, TECHNICAL FUNCTIONS ISSUED FCR-C-039642 TO GPUN DRAHINGS SN 15081.02-ES-04 AND ES-05 SPECIFYING THAT STRUCTURAL STEEL PIECES BE JOINED TOGETHER USING A PARTIAL PENETRATION                                                                                HELD.

NO INFORMATION HAS SPECIFIED ON THE FCR AS TO THE HELD JOINT CONFIGURATION REQUIRED TO ACHIEVE THE DESIGN STRENGTH. THIS OMISSION RE 1 1 PAGE 2-246

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OYSTER CREEK 1 M Raptrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l i ENFORCEMENT

SUMMARY

CONTRARY TO 10 CFR 50, APP B, CRIT V AND SECTION 3 0F THE OYSTER CREEK OPERATION QA PL AN, OF NOVEMBER 6, BEING MADE IN THE FIELD. 1985, (1) SOME QC INSPECTION PERSONNEL EXHIBIT FAILED

                                                            #6; (2) MCF FAILED TOTO   FULLY FOLLON THEDOCUMENT FABRICATION THEIR     INSPECTION REQUIREMENTS              ACTIVITIES OF DRANINGS           ON INSPECTION R SN 15081.02-ES-04 GPUN PROCEDURE 6130-QAP-7210.03,                                                                                                                      THE USE AND ES-05 AS EVIDENCED BY: (A) SUBSTITUTION OF A SEAL HELD FOR A PARTIAL PENETRATION HELD IN SIX(C)                            SEPARATE INADEQUATELOCATIONSs BOLTING (B) 0F A BEARING CONNECTION IN LIEU OF A FRICTION CONNECTION FOR FOUR PIECES OF BOLTED. STRUCTURAL                                              STEEL:

THE USE OF UNDERSIZED FILLET

INCLUDING LACK OF FULL THREAD ENGAGEMENT OF HUTS AND BOLTS AND HASHERS NOT USED AS SPECIFIED; AND (D)MCF AL O, INSTRUMENT HELDS TO ATTACH A STIFFENER PLATE.

IT HAS INSTALLED UPSIDE DOHN, CONTRARY TO THE REQUIREMENTS OF DRAHING 15081.02-CC-13, REV. LI-622-916 ON RK01. RACA RK01 PHASE I MODIFICATION PIPING SCHEMATIC. (3) A MCF JOB SUPERVISOR FAILED TO SIGN OFF PRODUCTION HO l REPAIR RECORD ASSOCIATED HITH (4) MCF MNCR FAILED 85-233 AND TO IMPLEMENT SHORT FORM PREREQUISITE 31529 4.7.3 IN GPUNAS REQUIRED PROCEDURE BY PARAGRAPH A15B-G1136.010, REV. 4.2RK01 O, 0F EXHIBIT RACK 4 0 6150-QAP-7220.05, REV. 0-00. MODIFICATIONS-ELECTRICAL. THIS PREREQUISITE HAS NOT REQUIRED BASED ON EMERGENCY CHANGES TO THE TECHNICAL SPECIFICATIONS BU NOT ADDRESSED IN ANY FASHION BY THE LICENSEE. 10 CFR 50, APPENDIX B, CRITERION IX AND SECTION 6 0F THE OYSTER CREEK OPERATION QUALITY ASSURANCE PLAN REQUIRE, IN PART, THAT SPECIAL PROCESSES, SUCH AS HELDING, BE ACCOMPLISHED CONTRARY TO IN ACCORDANCE THE ABOVE, AS OF HITH APPLICABLE NOVEMBER CODES AND THAT PROCEDURES BE ESTABLISHED TO MEET THE REQUIREMENTS OF THE APPLICABLE CODES. STRUCTURAL HELDING CODE AS 1985, 6, IT HAS IDENTIFIED THAT THE GPUN HELDING PROGRAM REGARDS PARTI AL AND FULL PENETRATION STRUCTURAL WELDS. DID50,NOT 10 CFR ADDRESS APPENDIX THE REQUIREMENTS B CRITERION X, AND SECTION 6 0F OF THE AHS D1 AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF STEEL STRUCTURES.IN PART, THAT INSPECTIONS BE PERFORMED TO VERIFY CONFORMANCE H OYSTER CREEK OPERATION QUALITY ASSURANCE PLAN REQUIRE, CONTRARY TO THE ABOVE, AS OF NOVEMBER 6, 1985, QC INSPECTIONS FAILED TO DOCUMENTED INSTRUCTIONS, PROCEDURES,(1) AND DRANINGS.THE UNDERSIZED FILLET HELDS DISCUSSED IN PARAGRAPH C.(2)(D) 0F THIS NOTICE OF VIOLATION; IDENTIFY THE FOLLONING DEFICIENCIES: > (2) THE INADEQUATE PARTIAL PENETRATION HELDS DISCUSSED IN PARAGRAPHS A, B, AND C.(2)(A) 0F THIS NOTICE OF VIOLATION; (3) THE INADEQUATE BOLTING DISCUSSED IN PARAGRAPH C.(2)(B) 0F THIS NOTICE OF VIOLATION; AND (4) THE UPSIDE DOHN 3-VALVE MANIFOLD DISCUSSED IN THE SECOND PARAGRAPH OF C.(2) 0F THIS NOTICE OF VIOLATION. (8503 4) SHALL BE OPERABLE DURING ALL MODES OF TECHNICAL OPERATION SPECIFICATION EXCEPT COLD SHUTDOWN AND3.5.A.8.A REFUEL. REQUIRES THAT ALL HYDRAULIC SNUBBERS LISTED IN TABLE 3.5.1 SEVENTY-T SNUBBER IS DETERMINED TO BE INOPERABLE. CONTRARY TO THE ABOVE, AS OF JANUARY 24, 1986. DURING FULL POWER OPERATIONS, AN OPERABLE SNUBBER LISTED IN TABLE 3.5.1 (NQ-2-57) HAS MADE INOPERABLE TO REPLACE A PADDLE IN ORDER TO FACILITATE REPATRS TO A NON-TE ! SNUBBER. THIS ACTION VIOLATED TH2 ABOVE TECH SPEC REQUIREMENTS IN THAT SNUBBER NQ-2-S7 HAS OPERABLE AND HAD NOT BEEN DETERMI TO BE INOPERABLE PRIOR TO THE PADDLE REPLACEMENT. (8600 4) OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. MANAGERIAL ITEMS: NO INPUT PROVIDED. PAGE 2-247 l _____

                      ._.._m.        _ _ . .      ..  - . _ _       _ _ .   . _ _            _       .

Report Periad APR 1986 INSPECTION M %MZ %MEH3%MM2 MMH 22: %C22%MZIMENUM3 STATUS - (CONTINUED) U OYSTER CREEK 1 M MHMM%ECM5%MMM"Z2MEMMMMMMM"MM32MMMM M OTHER ITEMS PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

    =EEE3==33===E=====E=E==E=E===E====EE=EE==E==3E=E=====E==3====3=====3333:E=3====s3E==3323=3333333==Ja=3sE=

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT NO INPUT PROVIDED.

=========================================: ==== ============================33 ===========sas s====sassassas=====ss===sasass i

i 1 J I } i 1 i l I PAGE 2-248

  - - - -- a  - - - - - .   - - - - - - -   -   - - - - - -

THIS PAGE INTENTIONALLY LEFT BLANK a i I I I l i I I i PAGE 2-249 l L . _ - - - ----- - - - -

1. Dacket 50-255 0PERATING STATUS MMMMMMMMuMMMMMunuxxMMumwxuuuuMuununu M PALISADES M
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719,0 MMMMMMMMMMMMMMMMMMMMMMMuuuuuMM=uxuxu
3. Utility

Contact:

P. A. SMITH (616) 764-8913 AVERAGE DAILY POWER LEVTL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2530 PRLISRDES
5. Nameplate Rating (Gross MWe): 955 X 0.85 = 812
6. Design Electrical Rating (Net MWe): 805 1500
7. Maximum Dependable Capacity (Gross MWe): 770
8. Maximum Dependable Capacity (Net MWe): 730 ,__, [
9. If Changes Occur Above Since Last Report, Give Reasons:
10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 125.918.0
13. Hours Reactor Critical 678.5 1.005.8 69.306.2
14. Rx Reserve ';htdwn Hrs .0 .0 .0 ij--- ----- - 100
15. Hrs Generator On-Line 647.2 878.1 65.837.3 f
16. Unit Reserve Shtdwn Hrs .0 .0 .0 80
17. Gross Therm Ener (MWH) 1.321.872 1.653.264 137.255.304
18. Gross Elec Ener (MHH) 433.190 538.600 42.756.000 .ao
19. Not Elec Ener (MWH) 406.978 501.486 40.242.846
20. Unit Service Factor 90.0 30.5 52.3 - so
21. Unit Avail Factor 90.0 30.5 52.3 77.5 23.9 43.8 -20

_22. Unit Cap Factor (MDC Net)

23. Unit Cap Factor (DER Net) 70.3 21.6 39.7 l

31.4 0

24. Unit Forced Outage Rate 10.0 37.3 0 5 10 15 20 25 30
25. Forced Outage Hours 71.8 523.4 16.079.5 DRYS
26. Shutdowns Sched Over Next 6 Months (Type Date, Duration):

fFRIL 1986 NONE

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-250

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM PALISADES M Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Number System Component Cause a Corrective Action to Prevent Recurrence No. Date 3 REPAIR LETDOWN LINE RELIEF VALVE. 6 04/10/86 F 71.8 1 N:MMMMMMMMM PALISADES HAD 1 OUTAGE IN APRIL FOR VALVE REPAIR.

 ,,M 

SUMMARY

M MMMMMMMMMMM Type Egason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                  & License Examination       9-Other         (LER) File (NUREG-0161)

PAGE 2-251

l uxummunun . .an===se = m .surn 23 PALISADES u

 ,~munsuunnu==rc :c:::::::: n m::==u                         FACILITY            DATA                                                 Report Period APR 1986 FACILITY DESCRIPTION                                                   UTILITY & CONTRACTOR INFORMATION LDCATION                                                                UTILITY STATE.................... MICHIGAN                                      LICENSEE................. CONSUMERS POWER COUNTY...................VANBUREN                                       CORPORATE ADDRESS....... 212 NfST MICNIGAN AVENUE JACKSON, MICHIGAN 49201 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI S OF                                   CONTRACTOR SOUTH HAVEN, MI                    ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR. . . . . . . . . . . .PHR                                 NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY...MAY 24, 1971                                   CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... DECEMBER 31, 1971                             TURBINE SUPPLIER. . . . . . . . .NESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 31, 1971                        REGULATORY INFORMATION CONDENSER COOLING METHOD. . . COOLING TOWERS                            IE REGION RESPONSIBLE......III CONDENSER COOLING NATER.... LAKE MICHIGAN                               IE RESIDENT INSPECTOR......E. SHANSON ELECTRIC RELIABILITY                                                    LICENSING PROJ MANAGER.....T. HAMBACH COUNCIL.................. EAST CENTRAL AREA                             DOCKET NUMBER. . . . . . . . . . . 50-255 RELIABILITY COORDINATION AGREEMENT                    - LICENSE & DATE ISSUANCE. . . .DPR-20, DCTOBER 16, 1972 PUBLIC DOCUMENT R00M....... VAN Z0EREN LIBRARY HOPE COLLEGE HOLLAND, MICHIGAN 49423     49007 INSPECTION 

SUMMARY

INSPECTION STATUS INSPECTION DN JANUARY 19 THROUGH MARCH 13 (86005): ROUTINE, ANNOUNCED INSPECTION BY A REGION-BASED INSPECTOR OF CONTAINMENT INTEGRATED LEAK RATE TEST (CILRT) ACTIVITIES; CILRT RESULTS REVIEN; LOCAL LEAK RATE TEST RESULTS; AND AS FOUND CILRT RESULTS. NRC INSPECTION MODULES CDMPLETED DURING THIS INSPECTION PERIOD HERE 70307, 70313, 70323 AND 61720. OF THE FOUR AREAS INSPECTED, NO VIOLATIONS TYPE A TEST ASHERE IDENTIFIED REQUIRED IN THREE BY TECHNICAL AREAS. IN THE REMAINING AREA ONE VIOLATION HAS IDENTIFIED - FAILURE To PERFORM AN AS SPECIFICATIONS. INSPECTION DN UNRESOLVEDONITEMJANUARY 15 THROUGH MARCH 14 (86008): SPECIAL INSPECTION BY RESIDENT INSPECT 0P AND REGIONAL SPECIALIST NO. 255/85034-06 ISOLATION VALVES. RELATED TO AN APPARENT FAILURE TO ADEQUATELY EVALUATE IDENTIFIED LEAKAGE OF TH0 CONTAINMENT THE REGIONAL OFFICE.THE INSPECTION INVOLVED A TOTAL OF 25 INSPECTOR-HOURS BY THO NRC INSPECTORS INCLUDING EIGHT INSPECTCR-HOURS OF THE AREAS INSPECTED ONE VIOLATION AND NO DEVIATIONS HERE IDENTIFIED. ACTION FOR A CONTAINMENT ISOLATION VALVE LEAKAGE EVENT IDENTIFIED IN MAY AND AUGUST 1985 RESULTED IN THE OPERATE AN OUTAGE ONHITH CONTAINMENT NOVEMBER 30, 1985. ISOLATION VALVE LEAKAGE IN EXCESS OF THE TECHNICAL SPECIFICATION LIMIT UNTIL THE PLANT H INSPECTION ON MARCH 12-14, 18, 20, AND 24 (86011): ROUTINE,ANNOUNCEDkNSPECTIONOF (1) WATER CHEMISTRY CONTROL PROGRAM INCLUDING NONRADIOLOGICAL CHEMISTRY AND RADI0 CHEMISTRY, QUALITY ASSURANCE / QUALITY CONTROL OF SAMPLING AND ANALYSIS IN THE HOT AND COLD LABORATORIES, OBSERVATIONS OF TECHNICIAN PERFORMANCE, MANAGEMENT CONTROLS AND TRAINING AND QUALIFICATIONS OF CHEMISTRY STAFF AND TECHNICIANS; (2) CONFIRMATORY MEASUREMENTS PROGRAM, INCLUDING COLLECTION OF ONE SAMPLE FOR COMPARISON OF ANALYSES HITH THE NRC PAGE 2-252

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M PALISADES M Report Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

REFERENCE LABORATORY; AND (3) LICENSEE ACTION ON PREVIOUSLY IDENTIFIED FINDINGS. NO VIOLATIONS OR DEVIATIONS NERE IDENTIFIED. ENFORCEMENT

SUMMARY

10 CFR 50.73(A) REQUIRES THAT A LICENSEE SUBMIT A LICENSEE EVENT REPORT (LER) WITHIN 30 DAYS AFTER THE DISCOVERY OF SPECIFIED, INCLUDING: (2)(I)(B) ANY OPERATION OR CONDITION PROHIBITED BY THE PLANT'S TECHNICAL SPECIFICATIONS AND (2)(IV) ANY EVENT OR CONDITION THAT RESULTED IN MANUAL OR AUTOMATIC CONTRARY TO THEACTUATION ABOVE, THEOF ANY ENGINEERED LICENSEE SAFETY FAILED TO SUBMIT FEATURE LERS FOR THE EXCLUDING TH OF A PREPLANNED SEQUENCE DURING TESTING DR OPERATION. FOLL0HING: (A) FIRE DOORS FOUND OPEN ON JANUARY 6 AND 8, 1986, WITHOUT COMPENSATORY MEASURES ESTABLISHED. TECHNICAL SPECIFICATION 3.22.5 REQUIRES THAT All FIRE BARRIERS PROTECTING SAFETY-RELATED AREAS BE FUNCTIONAL AT ALL TIMES OR APPROPR COMPENSATORY ACTIONS, SUCH AS FIRE HATCHES, BE TAKEN; AND (B) CONTAINMENT ISOLATIONS OCCURRED ON DECEMBER 14 AND 15,1985, NHICH HERE NOT PART OF A PREPLANNED SEQUENCE. (8600 5) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: JR SCHEPERS IS THE CHEMISTRY SUPERINTENDENT IN THE OPERATIONS DEPARTMENT. PLANT STATUS: THE UNIT IS DPERATING NORMALLY LA;T IE SITE INSPECTION DATE: 5/12/86 INSPECTION REPORT NO 86016 l PAGE 2-253

QM'*""'"""3 C:'M uaauAA4'M.2R,.w Report Period AP2 1986 REPORTS FRCM LICED5EE IJ PALISADES 12

                                                                                                                       .               c~rummu;n=Me+ -                J zzzz===ss=szzzz=zzass=z=zz==z=mazzzazzzzz=szzamazzzzazz===ss=sasazzazazzz=szzssamass=sazzazzazzzzazazzassanzzassexas s=ssassassass NUMBER            DATE OF     DATE OF         SUBJECT EVENT     REPORT J

85-32 12/15/85 04/17/86 MOVEMENT OF RADI0 ACTIVE MATERIAL RESULTS IN CONTAINMENT ISOLATION 86-15 05/26/86 04/25/86 REACTOR TRIP DUE TO LOSS OF LOAD 86-16 05/10/86 05/06/86 INADVERTENT LPSI PUMP START DUE TO CLEANING CONTACTS { ===sas======s=== sass =========ssazzmuss=z=sss==sas==szass==usan=ss===zzass========ss=sasazzzsazzs===sas==szzzs==sammassamassassassa l l J 4 i l t 2 l 1 PAGE 2-254 I

l l THIS PAGE INTENTIONALLY LEFT BLANK l I i I i

  )

i i i r i a PAGE 2-255 1 1

1. Dock t 50-528 0PERATIOO $TATUS CN"~m an w.axxn a PALO VERDE 1 0
2. Reporting Period 04/01/86 Outage + On-line Hros 719.0 CC-- a cas:CD Tm :nt Zu L1
3. Utility Contact MARY p. RICHARDSON (602) 932-5300 AVERAGE DAILY POWER LEVEL (MHe) PLOT
4. Licensec Thermal Power (MHt): 3800 PfMJO VE7HMC 1
5. Nameplate Rating (Gross MWe): 1403
6. Design Electrical Rating (Net MHe): 1221
7. Maximum Dependable Capacity (Gross MHe)s 1303 1880
8. Maximum Dependable Capacity (Not MWe): 1221 . IM - 1221
9. If Changes Occur Above Since Last Report, Give Reasons: .--. lWIX. (EPDO. OlF. - 1221 (100Z)

DER CHANGED TO REFLECT LIC. THERM. PHR.

                                                                                                                                -100
10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE 1000-MONTH YEAR CUMULATIVE

12. Report Period Mrs 719.0 1.847.0 1.847.0 i 13. Hours Reactor Critical .0 547.0 547.0 h!
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Mrs Generator On-Line .0 547.0 547.0 hf
16. Unit Reserve Shtdwn Mrs .0 .0 .0
17. Gross Therm Ener (MWH) 0 2.012.800 2.012.800
18. Gross Elec Ener (MHH) 0 689.400 689.400 - to
19. Net Elec Ener (MWN) 0 642.752 642.752
20. Unit Service Factor .0 29.6 29.6
21. Unit Avail Factor .0 29.6 29.6 - 30
22. Unit Cap Factor (MDC Net) .0 28.8 28.5
23. Unit Cap Factor (DER Net) .0 27.8 28.5
24. Unit Forced Outage Rate 100.0 70.4 70.4 0 0

5 0 to 15 3D,. 35,-

25. Forced Outage Hours 719.0 1.300.0 1.300.0 30 DRYS
26. Shutdowns Sched Over Next 6 Months (Type.Date, Duration):

SURVEIttANCE TEST GUTAGE - 3/86. 49 DAYS. M IL I E

27. If Currently Shutdown Estimated Startup Date: 05/15/86 PAGE 2-256

l 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M Repart Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M PALO VERDE 1 MMMMMMMMMMMMMMMMMMMMMNMMMMMMMMMMMMMM Date E Heurs Reason Fethod LER Number Systent Component Cause & Corrective Action to Prevent Recurrence Pe9_ 03/07/86 F 719.0 A 4 86-018-00 SJ PMC REACTOR TRIP DN LON S/G LEVEL. 2 ) i l 4 } i I i I l } t 1 1 i unu=MMMMMMM PALO VERDE 1 NAS SHUT DOWN DURING ALL OF APRIL. l . 5

SUMMARY

M MEEMMuumMMM Tye Reason Method System 8 Commenent l t

!              F-Forced A-Equip Failure F-Admin                                  1-Manual                              Exhibit F S H

< S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for } C-Refueling H-Other 3-Auto Scram Preparation of

D-Regulatory Restriction 4-Continued Data Entry Sheet
!                                E-Operator Training                             5-Reduced Load Licensee Event Report

, & License Examination 9-Other (LER) File (NUREG-8161) j PAGE 2-257 - t i i v- = w w e ---iy e * * .- --

ct mnr======rrr-r-~~rr-~~~===r3 u PALD VERDE 1 a c--~nr:r-r---ern rm- --"5""as FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... ARIZONA LICENSEE................. ARIZONA PUBLIC SERVICE COUNTY...................MARICOPA CORPORATE ADDRESS. .. . . . . .P.O. BOX 21666 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 36 MI H OF CONTRACTOR PHOENIX, AZ ARCHITECT / ENGINEER.......BECHTEL TYPE OF R EACTOR. . . . . . . . . . . .PHR NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY...MAY 25, 1985 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... JUNE 10, 1985 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... FEBRUARY 15, 1986 REGULATORY INFORMATION CONDENSER COOLING METHOD. . . TREATED SEHAGE IE REGION RESPONSIBLE......V CONDENSER COOLING HATER. . . .SENAGE TREATMENT IE RESIDENT INSPECTOR......R. ZIMMERMAN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....E. LICITRA COUNCIL..................HESTERN SYSTEMS DOCKET NUMBER........... 50-52F COORDINATING COUNCIL LICENSE & DATE ISSUANCE....NPF-41, JUNE 1, 1985 PUBLIC DOCUMENT R00M.......MS STEFANIE MORITZ DOCUMENTS LIBRARIAN PHOENIX PUBLIC LIBRARY 12 EAST MCDOWELL ROAD PHOENIZ, ARIZONA 85004 INSPECTION STATUS INSPECTION

SUMMARY

     + INSPECTION ON SEPTEM3ER 16, 1985 - FEBRUARY 1, 1986 (REPORT NO.

PERFORMANCE. LETTER TO LICENSEE ISSUED ON APRIL 11, 1986. 50-528/85-36 YEARLY SYSTEMATIC ASSESSMENT OF LICENSEE

     + INSPECTION ON MARCH 10 - APRIL 15, 1986 (REPORT NO.                50-528/86-09) REPURT BEING PREPARED; TO BE REPORTED NEXT MONTH.
     + INSPECTION ON MARCH 10-28, 1986 (REPGRT NO.

INSPLCTOR OF LICENSEE EVENT REPORTS (LERS). 50-528/86-10) AREAS INSPECTED: UNANNOUNCED INSPECTION BY A REGIONALLY BASED DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED. RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

     + INSPECTION ON MARCH 24 - APRIL 11, 1986 (REPORT NO. 50-528/86-11) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTIDH BY A REGIONALLY THIS  INSPECTION,BASED   INSPECTOR VARIOUS      INSPECTIONOF LICENSEE ACTION PROCEDURES HEREON  50.55CE) CONSTRUCTION DEFICIENCIES AND ON INSPECTOR-IDENTIFIED ITEMS. DURING UTILIZED.

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. I + INSPECTION ON APRIL 14 - MAY 2, 1986 (REPORT NO. 50-528/86-12) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH. PAGE 2-258

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM PALO VERDE 1 M Report Period APR 1986 INSPECTION $TATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l INSPECTION SbMMARY 50-528/86-13) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF ACTION ON

     + INSPECTION ON APRIL 14-25, 1986 (REPORT NO.                                                                                                            REVIEW OF LICENSEE REPORTS, FOLLDHUP PREVIOUS INSPFCTION FINDINGS, OCCUPATIONAL EXPOSURE DURING EXTENDED OUTAGES, TRANSPORTATION,DURING THIS INSPECTION, VARIOUS ON INFORMATION NOTICES AND GENERIC LETTERS, AND PLANT TOURS.

j RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. DNE UNRESOLVED ITEM RELATING TO CLASSIF SHIPMENT HAS IDENTIFIED.

     + ENFORCEMENT CONFERENCE ON APRIL 10,1986 (REPORT No. 50-528/86-14) 

SUMMARY

AN ENFORCEMENT CONFERENCE WAS HELD ON APRIL 10, i 1986, AT PALO VERDE NUCLEAR GENERATING STATION TO DISCUSS THE FOLLONING: (1) DESCRIPTION 50-528/86-07 OF THE VIOLATIONS (IE-V-737) ASSOCIATED DATED WITH APRIL 2, THE(2) 1986; FEBRUARY 11-14, 1986, DNSITE INSPECTION AND DOCUMENTED IN INSPECTION REPORT NO.

NRC CONCERNS; AND (3) LICENSEE CORRECTIVE ACTION PLANNED AND IMPLEMENTED. t + INSPECTION ON MAY 19-23, 1986 (REPORT No. 50-528/86-15) INSPECTION TO BE COMPLETED IN MAY, 1986.

     + INSPECTION 04 APRIL 14 - MAY 26, 1986 (REPORT NO. 50-528/86-16) INSPECTION CONTINUING; TO BE COMPLETED IN MAY,1986.

l j ENFORCEMENT

SUMMARY

I NONE i OTHER ITEMS l l SYSTEMS AND COMPONENT PROBLEMS:

      + AUXILIARY SPRAY SYSTEM SAFETY GRADE ISSUE IS BEING RESOLVED BY NRR.

) FACILITY ITEMS (PLANS AND PROCEDURES): I NONE MANAGERIAL ITEMS: A7.NUAL SALP BOARD MEETING HELD ON NOVEMBER 14, 1985; SALP REPORT TRANSMITTED TO THE LICENSEE ON DECEMBER 19, 1985. PLANT STATUS:

      + THE PLANT ACHIEVED INITIAL CRITICALITY ON MAY 25, 1985. THE PLANT ACHIEVED 100% P0HER ON DECEMBER 9,1985. POWER ASCENSION TESTING IS COMPLETED. COMMERCIAL OPERATION HAS DECLARED ON FEBRUARY 13, 1986. CURRENTLY, THE PLANT IS IN MODE 5 AFTER A KAINTENANCE OUTAGE.

{ LAST IE SITE INSPECTION DATE: 04/14-05/26/86+ l I SPECTION REPORT NO: 50-528/86-16+ l PAGE 2-259

]

1 Report Period APR 1986 REP 0RTS F R 0 Al LICENSEE cm rurarum =m=mm:arca:::a D PALO VERDE 1 u g==c-n--",-n-m ran--"r5 m mmmmmmmumm I i NUMBER DATE OF DATE OF SUBJECT j EVENT REPORT I, __ - --- - CS-01-X0 04-25-85 05-25-85 DIESEL GENERATOR 'B' FAILURE TO START (SPECIAL REPORT) CS-02-XO 08-07-85 09-06-85 DIESEL GENERATOR 'A' FAILURE TD START (SPECIAL REPORT) l 85-68-L1 10-18-85 11-18-85 ASME SECTION XI QUARTERLY SURVEILLANCE NOT PERFORMED j 85-70-Lo 09-24-85 10-25-85 AZIMUTHAL PONER TILT NOT VERIFIED ( 86-04-Lo 01-28-86 02-27-86 ENTRY INTO A CONDITION CONTRARY TO TECH SPEC 3.0.4 1 86-07-LO 02-26-86 03-28-86 j PARTICULATE TECHNICIAN AIR SAMPLE FROM RU-143 DISCARDED PRIOR TO GROSS ALPHA AND SR-89 AND 90 ANALYSIS - ERROR j 86-08-LO 02-18-86 03-20-86 THREE INDPERABLE CHARGING PUMPS 86-11-LO 02-17-86 03-19-86 INADEQUATE RADIATION MONITORING DURING RU-141 INOPERABILITY 86-20-LO 02-03-86 03-05-86 REACTOR TRIP INITIATED BY FEEDWATER ANOMALY ! 86-21-LO 02-06-86 03-10-86 LON PRESSURE TRANSMITTERS CROSS-CONNECTED 86-23-LO 02-11-86 03-13-86 POST ACCIDENT SAMPLING SYSTEM DECLARED INOPERABLE DUE TO PUMP DEFICIENCIES 4 4 86-24-LO 02-07-86 03-10-86 REACTOR TRIP DUE TO LOW STEAM GENERATOR LEVEL i

                  ==================================3====3=========33==3========333=================3==3=====================3=3=3=3=====3=====3

) l k ,1 i 3 1 1 s PAGE 2-260 k i )

l i w Y i l " W O 4 L t W 2 at a M

   >=

La. W

   .a
   >  e a

84 2 O M 2 W H 2 M W O at A M M 2

    >=
1. Dockst: 50-277 0PERATICO STATUS r . .. . x _ -A - wa 5 PEACH BOTTOM 2 n
2. Reporting Periods C4/01/86 Outage + On-line Hrs: 719.0 unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum
3. Utility

Contact:

H. M. Alden (215) 841-5022 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3293 PERCH BOTTOM 2
5. Nameplate Rating (Gross MWe): 1280 X 0.9 = 1152_
6. Design Electrical Rating (Not f*We): 1065
7. Ma-imum Dependable Capacity (Gross MWe): 1098 1808
8. Maxinum Dependable Capacity (Net MHe): 1051

[

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Het MWe):

Mac em EE EMalussa taeum artisan, rumm171em

11. Reasons for Restrictions, If Any:
                                                                                                                               ~ .. p ......p.....                               ... .......        -100 1000-MONTH       YEAR     CUMULATIVE
12. Report Period Mrs 719.0 2.879.0 103.631.0
13. Hours Reactor Critical 652.6 2.337.7 67.531.3 .
                                                                                                                                                                                                    - 80 h
14. Rx Reserve Shtchn Mrs .0 .0 .0 I
15. Hrs Generator On-Line 642.7 2.272.2 65.401.0 f
16. Unit Reserve Shtchn Mrs .0 .0 .0 -80
17. Gross Therm Ener (MWH) 1.972.992 6.731.174 192.997.689
18. Cross Elec Ener (MWM) 664.640 2.226,820 63.439.780
                                                                                                                                                                                                   -to
10. Net Elec Ener (MWH) 643.562 2.153.055 60,745.350
20. Unit Service Factor 89.4 78.9 63.1
21. Unit Avail Factor 89.4 78.9 63.1
                                                                                                                                                                                                   ,. gg
22. Unit Cap Factor (MDC Net) 85.2 71.2 55.8
23. Unit Cap Factor (DER Net) 84.0 70.2 55.3
24. Unit Forced Outage Rate 10.6 0
                                                                                                                                                                                             )

17.6 13.2 -

                                                                                                                                    .         .       .-                          ..        . ' - -0 0        5        10      15                          30        m     30
25. Forced Outage Hours 76.3 485.2 9.897.7 DRYS
25. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE E IL 1888

27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-262

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM PEACH BOTTDM 2 M Report Period APR 1986 UNIT $HUTD0WNS / REDUCTI0N5 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Neason Method LER Number 8vstem demponent Cause & Corrective Action to Prevent Recurrence No. Date 04/05/85 5 0.0 5 5 RS CRCRVE LOAD REDUCTION TO 800MME WITH CONTROL R3D 06-35 PREVIOUSLY 17 BLOCKED AT THE FULL-IN POSITION TO ACCDMMODATE HYDRAULIC CONTROL UNIT NORK. 04/12/86 5 0.3 5 5 HF HTEXCH LOAD REDUCTION TO 700MME TO ACCDMMODATE B-1 18 NATERBOX REPAIRS. 04/14/86 F 0.0 H 5 ZZ ZZZZZZ LOAD REDUCTION TO 600MME FOR TRANSMISSION STABILITY AT 19 THE REQUEST OF THE LOAD DISPATCHER AS A RESULT OF THE NORTH SUBSTATION FIRE ON APRIL 15. 04/16/86 F 0.0 A 5 CJ VALVEX CONTROLLED SHUTDOWN INITIATED IN ACCORDANCE HITH 20 LCD DUE TO T:iE INOPERABILITY OF THE "A" CORE SrRAY PUMP CAUSED BY THE FAILURE OF "A" MINIMUM FLON VALVE WHILE BEING TESTED, COINCIDENT WITH THE OPERABILITY OF THE E-2 DIESEL GENERATOR. 04/23/86 F 76.3 5 3 2-86-13 HA VALVEX AUTOMATIC SCRAM AS A RESULT OF COMBINED INTERMEDIATE 21 VALVE (civet ) CLOSURE DURING TESTING OF CIVS2 CAUSING GENERATOR LOCK OUT. 22 04/30/86 5 0.0 H 5 RC CONROD LOAD REDUCTION TO 700MME FOR CONTROL ROD PATTERN I ADJUSTMENT, i J i n===MuuMuuM PEACH BOTTOM 21 INCURRED 1 OUTAGE AND 4 PDHER REDUCTIONS IN APRIL AS DISCUSSED AB0VE.

  ,,u  

SUMMARY

M anunuuuuuuM Type Reason Method System & Component

F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
                                 & License Examination              9-Other           (LER) FlIe (NUREG-0161)

PAGE 2-263

_ - _ - _ _ _ _ _ _ _ - _ _ - _ . _ _ - _ . _ . . . - - _ - . . . - _ _ - - - - _ _ - _ .. ~ _- - . - _ - _ _ . . . __ m-n-re-- qn===c:::= -- ~~ c====cs a PEACH BOTTOM 2 a c22 aan==c==:muruuuuuuuuuuuuuuuuuunu FACILITY DATA R* Port Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION

!               LOCATION                                                                                       UTILITY STATE.................... PENNSYLVANIA                                                          LICENSEE................. PHILADELPHIA ELECTRIC i                      COUNTY................... YORK                                                                  CORPORATE ADDRESS....... 2301 MARKET STREET

, DIST AND DIRECTION FROM PHILADELPHIA, PENNSYLVANIA 19105 i KEAREST POPULATION CTR..19 MI S OF CONTRACTOR LANCASTER, PA ARCHITECT /EPGINEER.......BECHTEL 4 T)PE OF REACTOR............BNR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... SEPTEMBER 16, 1973 CONSTRUCTOR..............BECHTEL l DATE ELEC ENER IST GENER... FEBRUARY 18, 1974 i TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JULY S, 1974 REGULATORY INFORMATION

CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I

! CONDENSER COOLING HATER....SUSQUEHANNA RIVER i IE RESIDENT INSPECTOR......T. JOHNSON ELECTRIC RELIABILITY COUNCIL..................MID-ATLANTIC LICENSING PROJ MANAGER.....G. GEARS AREA COUNCIL DOCKET NUMBER........... 50-277 LICENSE & DATE ISSUANCE. . . .DPR-44, DECEMBER 14, 1973 I i PUBLIC DOCUMENT ROOM....... GOVERNMENT PUBLICATIONS SECTION STATE LIBRARY OF PENNSYLVANIA FORUM BUILDING COMMONWEALTH AND HALNUT STREET INSPECTION HARRISBURG, PENNSYLVANIA 17105

IN3PECTION

SUMMARY

STATUS i NO INSPECTION INPUT PROVIDED. i j ENFORCEMENT

SUMMARY

NONE l j OTHER ITEMS ' 4 4 l , SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. \ FACILITY ITEMS (PLANS AND PROCEDURES):

PAGE 2-264 I

l i l

4 4 I  ! < MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMun 1 PEACH BOTTOM 2 M INSPECTION STATUS - (CONTINUED) M l RePert Period APR 1986 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM 1  : e ,i i OTHER ITEMS j NO INPUT PROVIDED. t MANAGERIAL ITEMS: l NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. I LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. 4 i j t INSPECTION REPORT NO: NO INPUT PROVIDED. i REPORTS FR0M LICEN5EE  ;

    ================================================3=================================================================================  ,

4 NUMBER DATE OF DATE OF SUBJECT i EVENT REPORT _ NO INPUT PROVIDED.

    =================3==33======3===3=======3==3====3:333===3==E333===============3====3====3=3:33=33E========3=======S=============E=

h i } j l 4 4 , PAGE 2-265 1 1 L 4 e 1

1. Dockot: 50-278 OPERATING $TATUS cr"~"""""rrunnn.. ant:M : nnan"ntnzzzM u PEACH BOTTOM 3 u
2. Reperting Peried: 04/01/86 Out:ge + On-lina Hro 719.0 CM:rR M ZC ZMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

H. M. Alden (215) 841-5022 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3293 PERCH BOTTOM 3
5. Nameplate Rating (Gross MHe): 1Z80 X 0.9 = 115?
6. Design Electrical Rating (Net MHe): 1065
7. Maximum Dependable Capacity (Gross MHe): 1098 1500
8. Maximum Dependable Capacity (Net MHe): 1035 DESIGN M. MIM = 1005
9. If Changes Occur Above Since Last Report, Give Reasons: ---~~~fmX. DEPDC. Cfr. - 1035 (100Z)

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE - - ----- --------------------------~~ -100 1000-MONTH YEAR CUMULATIVE

12. Report Period Mrs 719.0 2,879.0 99,527.0
13. Hours Reactor Critical 404.1 1.325.9 69,639.4
14. Rx Reserve Shtdwn Hrs .0 .0 .0
                                                                                                                                                                                                            .gg  h
15. Hrs Generator On-Line 374.7 769.3 67,623.7
16. Unit Reserve Shtdwn Hrs .0 .0 .0 -80
17. Gross Thern Ener (MHH) 942,936 1,535,765 196.532,429
18. Gross Elec Ener (MHH) 299,720 500-464,950 64,458,620
19. Net Elec Ener (MH51) 287.811 433.359 61.826.100
20. Unit Service Factor 52.1 26.7 67.9
21. Unit Avail Factor 52.1 26.7 67.9

_22. Unit Cap Factor (MDC Net) -30 38.7 14.5 60.0

23. Unit Cap Factor (DER Net) 37.6 14.1 58.3
24. Unit Forced Outage Rate 9.1 13.5 7.2 0 0
                                                                                                                                                    ,.      ,                                     ,  ,  ,     0
25. Forced Outage Hours 5 to 15 30 M 30 37.4 119.7 5,246.3 DAYS
                             ,_25.                   Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE frRlt. 1986

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-266

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M PEACH BOTTOM 3 MMMMMMMMhMMMMMMMMMMMMMMMMMMMMMMMMMMM M No, Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 3 04/02/86 5 0.0 8 5 HF HTEXCH LOAD REDUCTION TO 600MNE TO ACCOMODATE C-2 HATERBOX REPAIRS AND CONTROL ROD PATTERN ADJUSTMENT. 4 04/09/86 5 0.0 B 5 HF HTEXCH LOAD REDUCTION TO 700MHE TO ACCOMMODATE A-2 AND B-1 HATERBOX REPAIRS. 5 04/11/86 S 306.9 A 3 3/86-10 CH VALVEX AUTOMATIC REACTOR SCRAM SIGNAL RECEIVED DURING HOT SHUTDOHN ON LOW LEVEL. REPAIRS MADE TO "A" AND "C" REACTOR FEED PUMP MINIMUM FLOW VALVES. DUTAGE EXTENDED DUE TO EXPLOSION OF THE 81 TRANSFORMER AND SUBSEQUENT OIL FIRE HHICH CAUSED DAMAGE TO THE NORTH SUBSTATION. 6 04/26/86 F 37.4 3 3 3-86-12 XX CKTBRK TURBINE TRIP AND AUTOMATIC SCRAM DURING TESTING OF 865 BREAKER IN THE NORTH SUBSTATION. wuzuMMMMMMM PEACH BOTTOM 3 INCURRED 2 SHUT DOWNS AND 2 POWER REDUCTIONS IN APRIL. ._ M

SUMMARY

M MMMMMMMMMMM Iypa Reason Method System 8 Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                & License Examination       9-Other         (LER) File (NUREG-0161)

PAGE 2-267

       . _ - . - ___ - - .                           -        ~ -      _ _ . -    . - - _ =                         .  .             . --         - - ~

Dr5: U"MNFW J n=20EE==%uuMHU Mr:355M2M u PEACM BOTTOM S u w=n=unnuwwununununummununuwwMuMMwwwd FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY ST AT E. . . . . . . . . . . . . . . . . . . .P ENNSYLV ANI A LICENSEE................. PHILADELPHIA ELECTRIC ] COUNTY................... YORK CORPORATE ADDRESS....... 2301 MARKET STREET r PHILADELPHIA, PENNSYLVANIA 19105 l DIST AND DIRECTION FROM i NEAkEST POPULATION CTR.. 19 MI S OF CONTRACTOR LANCASTER, PA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITI AL CRITICALITY. . . AUGUST 7, 1974 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER...SEPTEM3ER 1, 1974 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 23, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....SUSQUEHANNA RIVER IE RESIDENT INSPECTOR......T. JOHNSCN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....G. GEARS

 'i                  COUNCIL..................MID-ATLANTIC                                                 DOCKET NUMBER...........       50-278 AREA COUNCIL LICENSE & DATE ISSUANCE. . . .DPR-56, JULY 2, 1974 PUBLIC DOCUMENT ROOM....... GOVERNMENT PUBLICATIONS SECTION STATE LIBRARY DF PENNSYLVANIA FORUM BUILDING I                                                                                                                                          COMMONNEALTH AND WALNUT STREET HARRISBURG, PENNSYLVANIA 17105 INSPECTION 

SUMMARY

INSPECTION STATUS N3 INSPECTION INPUT PROVIDED. i' ENFORCEMENT

SUMMARY

l NONE l 'OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): PAGE 2-268 b

i J MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 INSPECTION 5TATUS - (CONTINUED) M PEACH BOTTDM 3 M i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM I OTHER ITEMS 1 NO INPUT PROVIDED. i MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. f LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. J INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE )

                                      ===============E=====E=============================================E===23===============================E=====E=E=====E======E====

j NUMBER DATE OF DATE OF SUBJECT

EVENT REPORT
 ;                                        NO INPUT PROVIDED.

E==E====EEE=== EWE =E========E=E===E==E==EE=E==================E==================================================================== l 6 1 t I 1 i 4 l l 4 PAGE 2-269 i M 4-

1. Docket: 50-293 0PERATING STATUS cc:MEM:nMtnn=3%22can MZntMunMunzanna u PILGRIM 1 n
2. Rzptrting Peried: 04/01/86 Outags + On-lina Hrs: 719.0 n:MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
5. Utility

Contact:

P. HAMILTON (617) 746-7900 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 1998 PILGRIM 1
5. Nameplate Rating (Gross MHe): 780 X 0.87 = 678
6. Design Electrical Rating (Not MHe): 655
7. Maximum Dependable Capacity (Gross MWe): 690 18"3
8. Maximum Dependable Capacity (Net MWe): 670
                                                                                   ,,,,,,                     [
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MWe):
11. Reasons for Restrictions, If Any:

NONE 10GD-MONTH YEAR CUMULATIVE

12. Report Period Mrs 719.0 2.879.0 _112,383.0
15. Hours Reactor Critical 138.0 1.715.5 79.773.7
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line 116.0 1.646.0 77.216.9 hf ,--------------------------------------- -100
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 177.888 3,094.416 135.480.048 - 80
18. Gross Elec Ener (MHH) 59.760 1.068.000 45.444.604
19. Het Elec Ener (MHH) 57.330 1.027.531 43.675.429
20. Unit Service Factor 16.1 57.2 65.8
21. Unit Avail Factor 16.1 57.2 65.8 i
22. Unit Cap Factor (MDC Net) 11.9 53.3 55.5 j
                                                                                                                                  - 20
25. Unit Cap Factor (DER Net) 12.2 54.5 Ei g
24. Unit Forced Outage Rate 83.9 41.6 10.2 0 i 25. Forced Outage Hours 0 5' $3 d5' $0' 2's ' 'as 603.0 1.170.5 8.714.7 DAYS l
 ,_25.

Shutdowns Sched Over Next 6 Months (Type,Date. Duration): l HONE Mft!!. 1988 i

27. If Currently Shutdown Estimated Startup Date: 05/16/86 PAGE 2-270 l

i i I

  - . _ _ _ - _ _                _ _ _ . _ . _ . . _      __.__._...m.           . - . _ _ _ . _ . . . _ . . _ _             ___,m _    _ _ . _     .._ _ _ _ _ . _ _ _ . .            . _ _ _ _ _ _ _ _ . ._ _ . . . .   . _   - _

1 MNMMMkMMMMMMMMMMMMMNNNNMMMNMMNNNMMMN

Repset Period APR 1986 UNIT SHUTD0NNS / REDUCTION $ .M PILGRIM 1 N MMNNMMMMMMMMMMMMMMMMNNNNNNNMMMMMMMMM j No . _ Date Type Hours Reason Method LER Number System Component Cause a Corrective Action to Prevent Recurrence 06 03/15/86 F 11.0 A 4 86-006 JC PSF CAUSE - NELD LEAK ON RX. MATER LEVEL INSTRU. LINE.

CORRECTIVE ACTION REPAIR AND SLEEVE AFFECTED AREA 0F LINE. 07 04/04/86 F 137.5 A 1 86-008 ZZ ' ZZZ UNPLANNED MSIV ISOLATION AND REACTOR SCRAM CAUSE 1 AND CORRECTIVE ACTION UNDER INVESTIGATION. 08 04/12/86 F 454.5 A 1 86-008 ZZ ZZZ UNPLANNED MSIV ISOLATION AND REACTOR SCRAM CAUSED AND CORRECTIVE ACTION UNDER INVESTIGATI3N. 1 1 1 i i i 1 a l n

)

1 i NMuudmuuuMM PILGRIM 1 EXPERIENCED 4 OUTAGES IN APRIL AS DESCRIBED ABOVE. ) ,,M

SUMMARY

M MmMMumununu Type Reason Method Svstem 8 Component F-Forced A-Equip F.ilure F-Admin 1-Manual Exhibit F 8 H l S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for i C-Refueling H-Other 3-Auto Scram Preparation of 4 D-Regulatory Restriction 4-Continued Data Entry Sheet j E-Operator Trzining 5-Reduced Load Licensee Event Report . & License Examination 9-Other (LER) File (NUREG-0161) l PAGE 2-271 i k l

c========n ::=u==s==n==u:Un===u===us u PILGRIM 1 m cc :=====2==m=:csur====nnunnuur:ntsu FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY

!         STATE.................... MASSACHUSETTS                             LICENSEE................. BOSTON EDISON COUNTY...................PLYM0UTH                                   CORPORATE ADDRESS. . . . . . . 800 BOYLSTON STREET BOSTON, MASSACHUSETTS 02199 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 4 MI SE OF                              CONTRACTOR PLYMOUTH, MASS ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BHR                                         HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... JUNE 16, 1972                              CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... JULY 19, 1972 TURBINE SUPPLIER......... GENERAL ELECTRIC i

DATE COMMERCIAL OPERATE.... DECEMBER 1, 1972 REGULATORY INFORMATION CONDENSER COOLING METHOD. . .ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER.... CAPE CDD BAY IE RESIDENT INSPECTOR......M. MCBRIDE 4 ELECTRIC RELIABILITY 1 COUNCIL.................. NORTHEAST POWER LICENSING PROJ MANAGER.....P. LEECH COORDINATING COUNCIL DOCKET NUMBER........... 50-295 LICENSE & DATE ISSUANCE....DPR-55, SEPTEMBER 15, 1972 1 PUBLIC DOCUMENT ROOM....... PLYMOUTH PUBLIC LIBRARY l 11 NORTH STREET j PLYMOUTH, MASSACHUSETTS 02560

=

INSPECTION

SUMMARY

INSPECTION STATUS NO INSPECTION INPUT PROVIDED. 1 ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. o FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. PAGE 2-272 i

                                              =           _        ,                3
                                              =           _        ,                7
                                              =           _        ,                2
                                              =                    ,                 -
                                              =                    =                2 MMM                                        =         _
                                                                   =

M M = _ = E M M = _ = G M M = M M =

                                                                   =,               A M     M                                    =                                     P

_ = M M = = M M = = M M = _ = M M = _ = . M M = = M M = = M M = = M M = = M M = = M1M = = M M = = MMM = = MIM = = - MRM = = MGM = . = MLM = = MIM = = MPM = = M M = = M M = = M M = = M M = = M M = _

                                                                   =

M M = = M M = _ = M M = _ = M M = _ = M M = = M M = = MMM = =

                                              =                    =
                                              =                    =
                                              =                    =
                                              =                    =
                                              =                    =

E = =

                                              =                    =
     )                                    E =                      =

D = = E S = = U = = N N = = I = = T E = = N = = O C = = C = = ( I = =

                                              =                    =

L = =

      -                                       =                    =
                                              =                    =
                                              =                    =

S M = =

                                              =                    =

U 0 = _ =

                                              =                    =

T R = =

                                              =                    =

A F = =

                                              =                    =

T = =

                                              =                    =

S S = =

                                              =                    =

T = =

                                              =           _
                                                                   =

R = _ =

                                              =                    =

N O = =

                                              =                    =

O D. P = = E = = I D E = = I = = T V R = _ = O = = C R = = P . = T = E D = C = T E = E _ = P U D = J _ = P I = B _ = S N V = U = I O = S = N R = = O P = = I N = = T = _ = U = FT _ =

P = OR- =

E N = O- = T I = EP- = A = TE- = D O = AR- = N = D = N = = O = = I = = 6 T O = . = 8 C N = F _ D = 9 . . E = OT- E = 1 8 D D P T = N- D = S E E S R = EE I = R M D D N O = TV V = P E I I I P = AE O = A T V  : V E = D R = I O S O E R = P = d R U R T = = o L P T P I N = T = i S A A S O = U = r M I T T T I = R P = e E R U S U E T = E N = P T E P P I C = B I = I G N T N E = M = t A I N I T P = U O = r R N A S S = N _ N = o E A O L O A N = - = p H M N P N L I = - = e T R O i til I j ,I a l i 4 a %

1. Docket: 50-266 0PERATINO STATUS unununnnnnunnnunuxununnuunn:MMunniina

, u POINT BEACH 1 u

2. RrP1rting Pericds 04/01/86 Outcge + On-lino Hras 719.0 unnxxrnunuunnxunwaxnununuununxxtumun
3. Utility' Contacts C. H. KRAUSE (414) 277-2001 AVERAGE DAILY P0HER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt), 1518 POINT BCJhDH 1
5. Nameplate Rating (Gross MHe): 582 X 0.9 = 524
6. Design Electrical Rating (Net MHe): 497
7. Maximum Dependable Capacity (Gross MHe): 509 1500
8. Maximum Dependable Capacity (Net MHe): 485 BN . NO = 487
                                                                                     ...--. MRX . DEPDO. CAP. -                 485 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any:

NONE 10m3-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.9 135,719.0 ,
13. Hours Reactor Critical 296.3 2,456.5 109,929.3
14. Rx Reserve Shtdwn Hrs 4.0 4.0 638.4
15. Hrs Generator On-Line 292.3 2.452.3 107,359.1 hf
16. Unit Reserve Shtdwn Hrs .0 .0 804.0
17. Gross Therm Ener (MHH) 398,147 3,653,411 146,821,355 fec ORN Et v tae Dt OPf!IWE. CO W ITIONS 500
18. Gross Elec Ener (MHH) 3------------------------- - 100 135,200 1.249.290 49,400,970
19. Net Elec Ener (MHH) 128,140 1,197.470 47,028,736 - s0
20. Unit Service Factor 40.7 85.2 79.1
                                                                                                                                            -en
21. Unit Avail Factor 40.7 85.2 79.7
22. Unit Cap Factor (MDC Net) - to 36.7 85.8 70.9x
23. Unit Cap Factor (DER Net) 35.9 83.7 69.7 " 3U
24. Unit Forced Outage Rate .0 .0 2.4 0 .
                                                                                                       ,        ,      ,.                    0
25. Forced Outage Hours .0 .0 2.413.4 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE APRIL 1986

27. If Currently Shutdown Estimated Startup Date: 05/23/86 x Item calculated with a Heighted Average PAGE 2-274

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M Rapsrt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M POINT BEACH 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date__ Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 04/12/86 S 426.7 C 1 ZZ ZZZZZ UNIT SHUTDOWN TO COMMENCE THIRTEENTH REFUELING AND 2 MAINTENANCE OUTAGE. MMMMMMMMMMM POINT BEACH 1 BEGAN REFUELING ON APRIL 12. _M

SUMMARY

M MMMMMMMMMMM Tvoo Reason Method System & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report 8 License Examination 9-Other (LER) File (NUREG-0161) PAGE 2-275

MMMMMMMMMMECMu%MMMMM%MrMMEMi!MMMMMMM2 U POINT BEACH 1 M EM z M M M 2 M a xI:nu ruununruunnu x M M M E M MEEE N FACILITY DATA Report Period APR 1986 l FACILITY DESCPIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE....................HISC0NSIN LICENSEE.................HISCONSIN ELECTRIC POWER COMPANY COUNTY...................MANIT0 HOC CORPORATE ADDRESS. . . . . . . 2:31 NEST MICHIGAN STREET MILHAUKEE, HISCONSIN 53201 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 15 MI N OF CONTRACTOR MANITOHOC, HISC ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... NOVEMBER 2, 1970 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... NOVEMBER 6, 1970 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 21, 1970 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... LAKE MICHIGAN ?T RESIDENT INSPECTOR......R. HAGUE ELECTRIC RELIABILITY COUNCIL..................MID-AMERICA LICENSING PROJ MANAGER.....T. COLBURN INTERPOOL NETHORK DOCKET NUMBER........... 50-266 LICENSE & DATE ISSUANCE....DPR-24, OCTOBER 5, 1970 PUBLIC DOCUMENT ROOM....... JOSEPH MANN PUBLIC LIBRARY 1516 16TH ST. TH0 RIVERS, HISCONSIN 54241 INSPECTION

SUMMARY

INSPECTION STATUS INSPECTION ON FEBRUARY 1 THROUGH MARCH 31 (86003; 86003): ACTION ON PREVIOUS INSPECTION FINDINGS; OPERATIONAL SAFETYs SURVEILLANCE: ROUTINE, UNANNOUNCED INSPECTION BY RESIDENT INSPECTORS OF L REFUELING; IE BULLETIN FOLLOH-UP; AND LICENSEE EVENT REPORT FOLLOH-UP. MAINTENANCE; 0FFSITE REVIEH COMMITTEE PREPARATION FOR THE INSPECTION INVOLVED A TOTAL OF 288 INSPECTOR-HOURS ONSITE BY TH0 INSPECTORS INCLUDING 52 INSPECTOR-HOURS ON OFF-SHIFTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE PAGE 2-276

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Rrpsrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M POINT BEACH 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: THE UNIT IS IN REFUELING OUTAGE. LAST IE SITE INSPECTION DATE: 5/09/86 INSPECTION REPORT NO: 86007 REPORTS FR0M LICENSEE

                 ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT NONE

                 ==================================================================================================================================

PAGE 2-277 l

1. Dockst 50-301 0PERATING 3TATUS runumMMuxumMuxmmmuunuMunnummmmxmuunn M POINT BEACH 2 M
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

C. H. KRAUSE (414) 277-2001 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 1518 POINT BEACH 2
5. Nameplate Rating (Gross MWe): 582 X 0.9 = 524
6. Design Electrical Rating (Not MHe): 497 509 1833
7. Maximum Dependable Capacity (Gross MWe):
8. Maximum Dependable Capacity (Not MHe): 485 _ ,,,,

[ g

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Not MWe):
11. Reasons for Restrictions, If Any:

NONE ), MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.0 120.504.0
13. Hours Reactor Critical 715.2 2,875.2 106,423.8 h
14. Rx Reserve Shtdwn Hrs .0 .0 207.4 2,855.2 104,655.9
15. Hrs Generator On-Line 705.3 hf
16. Unit Reserve Shtdwn Hrs 9.9 9.9 244.2 peo om a mwen m orfist counTroms
17. Gross Therm Ener (MHH) 1.037,164 4,255,986 147,135,856 500 .# --.-__--_____y ______ ,. -300
18. Gross Elec Ener (MHH) 353,990 1,447,740 49,863,590
                                                                                                                                         - so
19. Net Elec Ener (MHH) 337,690 1,384,872 47,505,591 98.1 99.2 86.8 - so
20. Unit Service Factor
21. Unit Avail Factor 99.5 99.5 87.1 p,,,
22. Unit Cap Factor (MDC Net) 96.8 99.2 80.3M
                                                                                                                                         - 20
23. Unit Cap Factor (DER Net) 94.5 96.8 79.3 0 0
24. Unit Forced Outage Rate 1.9 .8 1.3 0 5 io is 'N $5 30 13.7 23.8 768.7 DAYS
25. Forced Outage Hours
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
  • frRIL 1986 REFUELING OUTAGE: SEPTEMBER 26. 1986.
27. If Currently Shutdown Estimated Startup Dates N/A N Item calculated with a Heighted Average PAGE 2-278 l

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M POINT BEACH 2 R:psrt Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM System Component Cause & Corrective Action to Prevent Recurrence No. Date lyER MIEC2 Reason Method _LER Number 86-00f ZZ ZZZZZZ REACTOR TRIP DUE TO TECHNICIAN ERROR DURING 2 04/29/86 F 13.7 0 2 REACTOR PROTECTION LOGIC TESTING. i i l l 1 MMMMMMMMMMM POINT BEACH 2 OPERATED ROUTINELY IN APRIL. r n

SUMMARY

M MMMMMMMMMMM Method System & Component Tvpe Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination         9-Other           (LER) File (NUREG-0161)                                           PAGE 2-279 i

l

nrn :sx::cuwnxuzun:Enrurunnnurcu 2xu u POINT BEACH 2 u nruunux2:Exuruunumxxguuunzununn3xxr3 FACILITY DATA Report Perlsd APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE....................HISC0NSIN LICENSEE. . . . . . . . . . . . . . . . .HISCONSIN EL ECTRIC PDHER COMPANY COUNTY...................MANIT0 HOC CORPORATE ADDRESS. . . . . . . 231 NEST MICHIGAN STREET MILHAUKEE, HISCONSIN 53201 DIST AND DIRECTION FROM NEAREST POPULATION CTR. .15 MI N OF CONTRACTOR MANITOHOC, HISC ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY...MAY 30, 1972 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... AUGUST 2, 1972 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE... 0CTOBER 1, 1972 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... LAKE MICHIGAN IE RESIDENT INSPECTOR......R. HAGUE ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....T. COLBURN COUNCIL........ .........MID-AMERICA DOCKET NUMBER........... 50-301 INTERPOOL NETWORK LICENSE & DATE ISSUANCE....DPR-27, MARCH 8, 1973 PUBLIC DOCUMENT ROOM....... JOSEPH MANN PUBLIC LIBRARY 1516 16TH ST. TH0 RIVERS, HISCONSIN 54241 INSPECTION

SUMMARY

INSPECTION STATUS INSPECTION ON FEBRUARY 1 THROUGH MARCH 31 (86003; 86003): ACTION ON PREVIOUS INSPECTION FINDINGS; OPERATIONAL SAFETY; SURVEILLANCE: ROUTINE, UNANNOUNCED INSPECTION BY RESIDENT INSPECTORS OF L MAINTENANCE; 0FFSITE REVIEW COMMITTEES PREPARATION FOR REFUELING; IE BULLETIN FOLLOH-UP; AND LICENSEE EVENT REFORT FOLLOH-UP. THE INSPECTION INVOLVED A TOTAL OF 288 INSPECTOR-HOURS ONSITE BY TH0 INSPECTORS INCLUDING 52 INSPECTOR-HOURS ON OFF-SHIFTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE PAGE 2-280

                                                =                o 1
                                                =                = 8
                                                =                = 2
                                                =                =   -
                                                =                = 2 MMM                                          =                =

M M = = M M = E -

                                                                 = G      -

M M = = M M = = A - M M = = P ~ M M = = - M M = = M M = = M M = = M M = = M M = = M M = = M2M = = M M = = MHM = = MCM = = MAM = = MEM = = MBM = = M M = = MTM = = MNM = = MIM = = MOM = = MPM = = M M = = M M = = M M = = M M = = M M = = M M = = M M = = M M = = M M = = MMM = =

                                                =                =
                                                =                =
                                                =                =
                                                =                =
                                                =                =

E = =

                                                =                =
     )                                      E =                  =

D = = E S = = U = = N N = = I c = T E = = N = = O C = = C = = ( I = =

                                                =                =

L = =

      -                                         =                =
                                                =                =
                                                =                =

S M = =

                                                =                =

U 0 = =

                                                =                =

T R = = . = = A F = =

                                                =                =

T = =

                                                =                =

S S = =

                                                =                =

T = =

                                                =                =

R = =

                                                =                =

N O = =

                                                =                =

O P = = - = = I E = =

                                                =                =

T R = =

                                                =                =

C = =

                                                = T              =

E = C =

                                                =    E           =

P  : 6 = J =

                )                     8         =    B           =

S S / = U = E 9 = S = N R . 0 = = U Y / = = I D L 5 = = E L = = C A = FT = O M  : = OR = R R E 7 = O = P O T 0 = EP = N A 0 = TE = D D 6 = AR = N G 8 = D = A N N = = . I O = = S T I  : = = 6 N A T O = = 8 A R C N = F = 9 L E E = OT = 1 P  : P P T = N = ( S O S R = EE = R M N O = TV = P S E S I P = AE = A M T  : I E = D = E I S E R = = d T U S T = = o I L T I I N = = i S A A S O = = r M Y I T T I = R = e E T R S I E T = E E = P T I E N I C = B N =

.           I   L     G     T U           E     = M          O   =
. t         I  E A E N            T P       =    U       N =

r R C N N N A E S S = N = op E A O A O L H A N = = H F N M N P T L I = = e T R O il ll l.

1. Docket: 50-282 0PERATING STATUS EMass nM:nt:M:xuznuuMnnanM22MMMZMunM u PRAIRIE ISLAND 1 M
2. R ptrting Period: 04/01/86 Outage + On-line Hrs 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts DALE PUGSTAD (612) 388-1121 AVERAGE DAILY P0HER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 1650 PRAIRIE ISLffe 1
5. Nameplate Rating (Gross MWe): 659 X 0.9 = 593
6. Design Electrical Rating (Net MWe): 530
7. Maximum Dependable Capacity (Gross NHe): 534 1500
8. Maximum Dependable Capacity (Not MWe): 503 _OESIGN ELEC. RRTING = 530
                                                                                                                                                                   ......MRX. OEPDC. Dr. - 503 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE A

12. Report Period Hrs 719.0 2.879.0 108,455.0 W
13. Hours Reactor Critical 519.8 2,031 .4 89.388.9
14. Rx Reser ve Shtdwn Hrs .0 __ .0 5,571.1 5
15. Hrs Generator On-Line 497.5 2,008.5 88,011.0 l
16. Unit Reserve Shtdwn Hrs .0 .0 .0 m m K - m min m!T!m
17. Gross Therm Ener (MHH) 760,857 2,638,473 138,007.086 500 - ---------------- - -- -_A --
18. Gross Elec Ener (MHH) 247,370 877,730 45,079,000 y- 100 V
19. Het Elec Ener (MHH) 228,921 819,843 42,247,677
20. Unit Service Factor 69.2 69.8 81.1 - so
21. Unit Avail Factor 69.2 69.8 81.1

_g

22. Unit Cap Factor (MDC Net) 63.3 56.6 77.4
23. Unit Cap Factor (DER Net) 60.1 53.7 73.5
24. Unit Forced Outage Rate 1.2 .3 7.4 0
25. Forced Outage Hours o' 5' 1'o l's do 3Is 30 6.1 6.1 3,396.8 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE #R I"

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-282

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM PRAIRIE ISLAND 1 M R pset Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM lyp3 Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence Ng, Date 4 CYCLE to TO 11 REFUELING OUTAGE. 1 03/04/86 S 214.1 C 1.3 8 TURBINE OVERSPEED TRIP TEST. 2 04/10/86 S 1 6.1 3 TRIPPED DUE TO STEAM GENERATOR LO LO LEVEL HHEN 3 04/10/86 F G RETURNING THE UNIT TO SERVICE. 0.0 5 AXIAL OFFSET CALIBRATION. 4 04/23/86 S B 0.0 5 AXIAL OFFSET CALIBRATION. 5 04/28/86 S B MMMMMMMMMMM PRAIRIE ISLAND 1 INCURRED 3 OUTAGES AND 2 POWER RED'JCTIONS IN APRIL. _M

SUMMARY

M MMMMMMMMMMM Tvoo Reason Method Systen & Com>onent F-Fcrced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Lead Licensee Event Report

               & License Examination         9-Other         (LER) File (NUREG-0161)

PAGE 2-283

  . - . . --- -_ .- . . _ _ _ _                 _ .     - - - . - - - -              - . - - . - .                   _- . - _ _ . - . . _      ~. .    . - . - .        - _. ---      _ . . . .    - -

t munumruzzuummmuuuwum=nsunununusuunnu M PRAIRIE ISLAND 1 R muxuzzumzummununzuxxummuunnunnunuu%u FACILITY DATA R* Port Period APR 1986 FACILITY DESCRIPTION UTILITY a CONTRACTOR INFORMATION j LOCATION UTILITY STATE....................MINNES0TA LICENSEE................. NORTHERN STATES PDHER 1 COUNTY...................G00DNUE CORPORATE ADDRESS. . . . . . . 414 NICOLL ET MALL { DIST AND DIRECTION FROM MINNEAPOLIS, MINNESOTA 55401 1 HEAREST POPULATION CTR.. 28 MI SE OF CONTRACTOR MINNEAPOLIS, MINN ARCHITECT / ENGINEER....... FLUOR PIONEER, INC. TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE f DATE INITIAL CRITICALITY... DECEMBER 1, 1973 CONSTRUCTOR.............. NORTHERN STATES POWER COMPANY DATE ELEC ENER 1ST GENER... DECEMBER 4, 1973 TURBINE SUPPLIER.........HESTINGHOUSE DATE CD:tMERCIAL OPERATE.... DECEMBER 16, 1973 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWERS IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......J. HARD ELECTRIC RELIABILITY l' COUNCIL..................MID-CONTINENT AREA LICENSING PROJ MANAGER.....D. DIIANNI

DOCKET NUMBER........... 50-282 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-42, APRIL 5, 1974

[ t PUBLIC DOCUMENT ROOM....... ENVIRONMENTAL CONSERVATION LIBRARY i MINNEAPOLIS PUBLIC LIBRARY-1 300 NICOLLET MALL INSPECTION MINNEAPOLIS, MINNESOTA 55401 INSPECTION

SUMMARY

STATUS INSPECTION ON FEBRUARY 9 THROUGH APRIL 12 (86005): i j INSPECTION FINDINGS, PLANTEVENT OPERATIONAL ROUTINE UNANNOUNCED INSPECTION BY RESIDENT INSPECTORS OF PREVIOUS SAFETY, MAINTENANCE, SURVEILLANCE, ESF SYSTEMS, FACILITY MODIFICATION ACTIVITIES, FDLLOHUP OF LICENSEE REPORTS (LERS), VIOLATIONS NERE IDENTIFIED IN THE 10 AREAS INSPECTED. CORPORATE MANAGEMENT CONCERNS, AND IE BULLETIN AND PART 21 FOLLONUP. NO ENFORCEMENT

SUMMARY

l NONE l i OTHER ITEMS l [ l SYSTEMS AND COMPONENT PROBLEMS: NONE PAGE 2-284

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM PRAIRIE ISLAND 1 M R;pirt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: THE UNIT IS OPERATING NORMALLY. LAST IE SITE INSPECTION DATE: 6/21/86 INSPECTION REPORT NO: 86007 REP 0RTS FR0M LICENSEE

   ====================================a=============================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT -

   - - _ - _ .   ------ __          _--- __          . = _ _ _              __

86-02 03/16/86 04/16/86 CORE EXIT THERMOCOUPLE CONNECTORS FOUND ASSEMBLED INCORRECTLY 86-03 03/24/86 04/23/86 START OF BOTH DIESEL GENERATORS DUE TO LOSS OF ONE SOURCE OF OFFSITE POWER RESULTING FROM TECHNICIAN ERROR 86-04 03/28/86 04/25/86 BOTH DIESEL GENERATORS STARTED HHEN RELAY ACTUATION CAUSED LOSS OF ONE SOURCE OF OFFSITE POWER.

   ===============================================================================================-==================================

l [ PAGE 2-285

1. Dockot 50-306 0PERATINO STATUS nrm::MMManUM 5:nt:MZZZMn:MCtnMMMMn33 u PRAIRIE ISLAND 2 M
2. Riparting Paried: 04/01/86 Outtg3 + On-lins Hros 719.0 MM 2%2CMZ 22 ZEEM32MHRInu%M 332MMMrs
3. Utility

Contact:

DALE DUGSTAD (612) 388-1121 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 1650 PRRIRIE ISLf943 2
5. Nameplate Rating (Gross MHe): 659 X 0.9 = 593
6. Design Electrical Rating (Net MWe): 530
7. Maximum Dependable Capacity (Gross MHe): 531 1sm3
8. Maximum Dependable Capacity (Net MWe): 500 DESIGN ELEO. RRTING - 530
9. If Changes Occur Above Since Last Report, Give Reasons: .... rmX. DEPDO. CFP. - 500 (100%)

NONE

10. Power Level To Hhich Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any NONE 10mD-MONTH YEAR CUMULATIVE
12. Report Period Hrs 719.0 2.879.0 99.573.0
13. Hours Reactor Critical 719.0 2.879.0 86,381.9
14. Rx Reserve Shtdwn Hrs .0 .0 1,516.1 l
15. Hrs Generator On-Line 719.0 2.879.0 85.381.5
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 1.179.881 4,715,256 134,387,647 * *
18. Gross Elec Ener (MHH) 389,380 1,585.100 43.644.540 '#
19. Het Elec Ener (MHH) 367,366 1,506,715 40,996,032 - 00
20. Unit Service Factor 100.0 100.0 85.7
                                                                                                                             - 80
21. Unit Avail Factor 100.0 100.1 85.7
22. Unit Cap Factor (MDC Net) 102.2 104.7 82.3
23. Unit Cap Factor (DER Net) 96.4 98.7 77.7 - 30
24. Unit Forced Outage Rate .0 .0 3.6 0 -

0 5

                                                                                         ,       ,     ,.              ,       o
25. Forced Outage Hours to 15 30 36 30
                                      .0          .0      3,!;3.5 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE fFRIL 1986

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-286

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM PRAIRIE ISLAND 2 M Rrpset Period APR 1986 U N-I T SHUTD0HNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM TYP9 Nours Reason Method LER Number System Component Cause a Corrective Action to Prevent Recurrence No. Date 5 AXIAL OFFSET CALIBRATION. 04/16/86 S 0.0 B 5 TURBINE OVERSPEE3 TRIP TEST. 1 04/19/86 S 0.0 B MMMMMMMMMMM PRAIRIE ISLAND OPERATED ROUTINELY IN APRIL. M

SUMMARY

M MMMMMMMMMMM Svstem & Component Tvpe Reason Haihod F-Farced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

              & License Examination         9-Other         (LER) File (NUREG-0161)

PAGE 2-287

unuruxuunns=umum=ucumumumzuuuuuummun u PRAIRIE ISLAND 2 H mu=uxuwwwunumrunummm=mummunsruutmuun FACILITY DATA R:ptrt Perled APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRnCTOR INFORMATION LOCATION UTILITY STATE........... ........ MINNESOTA LICENSEE.................HORTHERN STATES PONER COUNTY.... . . ...GOODHUE CORPORATE ADDRESS....... 414 NICOLLET MALL MINNEAPOLIS, MINNESOTA 55401 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 28 MI SE OF CONTRACTOR MINNEAPOLIS, MINN ARCHITECT / ENGINEER....... FLUOR PIONEER, INC. TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... DECEMBER 17, 1974 CONSTRUCTOR.............. NORTHERN STATES POWER COMPANY DATE ELEC ENER 1ST GENER... DECEMBER 21, 1974 TURBINE SUPPLIER... .....HESTINGHOUSE , DATE COMMERCIAL OPERATE.... DECEMBER 21, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWERS IE REGION RESPONSIBLE......III CONDENSER COOLING HATER., . MISSISSIPPI RIVER IE RESIDENT INSPECTOR......J. HARD ELECTRIC RELIABILITY LICENSING PROJ MANAGER.. ..D. DIIANNI COUNCIL.... . ..... ..MID-CONTINENT AREA DOCKET NUMBER. ... ... 50-306 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-60, OCTOBER 29, 1974 PUBLIC DOCUMENT ROOM....... ENVIRONMENTAL CONSERVATION LIBRARY MINNEAPOLIS PUBLIC LIBRARY 300 NICOLLET MALL MINNEAPOLIS, MINNESOTA 55401 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON FEBRUARY 9 THROUGH APRIL 12 (86005): ROUTINE UNANNOUNCED INSPECTION BY RESIDENT INSPECTORS OF PREVIOUS INSPECTION FINDINGS, PLANT OPERATIONAL SAFETY, MAINTENANCE, SURVEILLANCE, ESF SYSTEMS, FACILITY MODIFICATIONS, REFUELING ACTIVITIES, FOLLOHUP OF LICENSEE EVENT REPORTS (LERS), CORPORATE MANAGEMENT CONCERNS, AND IE BULLETIN AND PART 21 FOLLOHUP. NO VIOL ATIONS HERE IDENTIFIED IN THE 10 AREAS INSPECTED. ENFORCEMENT

SUMMARY

HONE OTHER ITEMS  ; SYSTEMS AND COMPONENT PROBLEMS: NONE PAGE 2-288

_m __..__.____.._.__..m_-. . . _ _ _ . . _ , . _ ..._m_..m ..__._ _ _ .m . . _ _ . _ . ..__ ___.._._._m_ _ . _ _ . _ . _ _ _ _ . _ . . _ _ - - - - - - _ - - - - _ - - - - _ - _ - - - - - - - - - i i 4 i I ' MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 INSPECTION STATUS - (CONTINUED) M PRAIRIE ISLAND 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: UNIT IS OPERATING NORMALLY , LAST IE SITE INSPECTION DATE: 6/21/86 INSPECTION REPORT NO: 86007 REP 0RTS FR0M LICENSEE

      ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT h i NONE

      ================1J================================================================================================================                                                                                                         ,

t l [ t t l 1 4 1 l PAGE 2-289 t I

1. Dockst: 50-254 0PERATING STATUS n=zur=nunner=n=urununnnanzuz u
                                                                                                                                    =nnruna
2. Rrparting Period 04/01/86 Outage + On-line Hrs: 719.0 QUAD CITIES 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contact CAROL KRONICH (309) 654-2241 X193 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Lice, sed Thermal Power (MHt): 2511 QUP.D CITIES 1
5. Nameplate Rating (Gross MHe): 920 X 0.9 = 828
6. Design Electrical Rating (Not MHe): 789
7. Maximum Dependable Capacity (Gross MWe): 813 leDD
8. Maximum Dependable Capacity (Net MWe): 769 _OESI9N ELEO. MrtTING - 700
                                                                                 ,,,,,, g             ,      ,

g

9. If Changes Occur Above Since Last Report, Give Reasons:

N0hE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 A 2.879.0 122.447.0 W
13. Hours Reactor Critical 632.5 752.5 97.414.0 m W K N m cPrinm. coMDIT!aMe h
14. Rx Reserve Shtdwn Hrs .0 .0 3,421.9 G '************-

v#" ~~ ~^iar ~~ *----- -

                                                                                                                                           -100$7
15. Hrs Generator On-Line 595.6 715.6 93.994.3 hf
16. Unit Reserve Shtdwn Hrs .0 .0 909.2 - 80
17. Gross Therm Ener (MHH) 1,340.571 1,581.056 196.546.213 5,,,
18. Cross Elec Ener (MHH) 433.782 514.404 63.635.891 - so
19. Net Elec Ener (MHH) 412.407 481.632 59.508.911
20. Unit Service Factor 82.8 24.9 76.8 - 40
21. Unit Avail Factor 82.8 24.9 77.5

_22. Unit Cap Factor (MDC Net) 74.6 21.8 63.2 - 3D

23. Unit Cap Factor (DER Net) 72.7 21.2 61.6
24. Unit Forced Dutage Rate 3.7" 3.1 5.6 0 .
25. Forced Outage Hcurs 0 s' 1'o l's $0 is' 30 22.8 __ 22.8 3.204.4 DNYS
25. Shutdowns Sched Over Next 6 Nonths (Type,Date, Duration):

NONE fFRIL 1986

27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-290

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M R: port Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M QUAD CITIES 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No 7 Date E Hours Reason Method LER Pumber System Component Cause & Corrective Action to Prevent Recurrence 01/05/86 S 100.6 C 4 RC FUELXX REFUELING OUTAGE CONCLUDES. 86-2 86-3 04/05/86 F 22.8 A 3 86-21 CH VALVEX dEACTOR SCRAF DURING STARTUP DN LOW REACTOR ' HATER LEVE! JUE TO MINIMUM FLOW CONTROL VALVE FAILURE. l 86-4 04/06/86 S 0.0 B 5 HA ZZZZZZ LDAD DROP *ED IOR TURBINE OVERSPEED TEST. l 86-5 04/07/86 F 0.0 A 5 RA INSTRU REDUCED LOAD TO 170 MNE FOR IRM INSPECTION. 86-6 04/13/86 S 0.0 B 5 CD VALVEX REDUCED LOAD TO 700 MHE FOR MSIV TESTING. 86-7 04/15/86 F 0.0 B 5 HD XXXXXX REDUCED LOAD TO 600 MI'E FOR GLAND SEAL EXHAUSTER SYSTEM REPAIRS. 86-8 04/20/86 S 0.0 H 5 ZZ ZZZZZZ REDUCED LOAD TO 670 MHE PER LOAD DISPATCHER. 86-9 04/27/86 S 0.0 H 5 ZZ ZZZZZZ REDUCED LOAD TO 650 MHE PER LOAD DISPATCHER. KNMMMMMMMMM QUAD CITIES 1 EXPERIENCED 1 SHUTDOHN AND 6 P0HER REDUCTIONS IN APRIL AS DISCUSSED ABOVE. _M

SUMMARY

M MMMMMMMMMMM Type Reason Method System 8 Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                                & License Examination                                          9-Other                                 (LER) File (NUREG-0161)

PAGE 2-291 P

i D M:HN3=MEM MUNNEMM:MCUH% MH353 MU 5 u QUAD CITIES 1 m uw=u==uzusunumurusuumMuuustn%2sc2MMM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE....................ILLIN0IS LICENSEE.................CCMMONNEALTH EDISON l COUNTY...................R0CK ISLAND CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINDIS 60690 DIST AND DIRECTION FROM HEAREST POPULATION CTR.. 20 MI NE OF CONTRACTOR MOLINE, ILL ARCHITECT / ENGINEER. . . . . . .SARGENT & LUNDY TYPE OF REACTOR... ........BNR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY.. 0CTOBER 18, 1971 CONSTRUCTOR.............. UNITED ENG. & CONSTRUCTORS DATE ELEC ENER IST GENER... APRIL 12, 1972 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCI AL OPERATE. . . . FEBRUARY 18, 1973 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......A. MADISON ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....R. BEVAN COUNCIL.... . ...........MID-AMERICA DOCKET NUMBER........... 50-254 INTERPOOL NETWORK LICENSE & DATE ISSUANCE....DPR-29, DECEMBER 14, 1972 PUBLIC DOCUMENT ROOM....... MOLINE PUBLIC LIBRARY 504 17TH STREET MOLINE, ILLINDIS 61265 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON MARCH 19 THROUGH 26 (86006; 86006): ACTION ON PREVIOUS INSPECTION FINDINGS (92702), LICENSEE EVENT REPORT FOLLOHUP (92101), CONTAIdMENT INTEGRATED LEAK RATE TEST (CILRT) (70307, 70313, 70323), LOCAL LEAK RATE TEST AND AS FOUND CONDITION OF CILRT RESULTS (61720). NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION ON MARCH 31 THROUGH APRIL 4 (86007; 86007): ROUTINE, UNANNOUNCED, SAFETY INSPECTION OF PREVIOUS INSPECTION FINDINGS, CONTROL ROD DRIVE PERFORMANCE TESTING, SHUTDOWN MARGIN DEMONSTRATION, AND INITIAL CRITICALITY. OF THE FOUR AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. _ ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: l PAGE 2-292

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM R:ptrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M QUAD CITIES 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l OTHER ITEMS NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: H. TOREN, SITE EMERGENCY PL ANNING COORDINATOR SINCE OCTOBER 1985, HILL BE LEAVING QUAD-CITIES NUCLEAR PLANT ON MARCH 21, 1986. HIS REPLACEMENT HAS NOT YET BEEN SELECTED BY MANAGEMENT. PLANT STATUS: OPERATING ROUTINELY LAST IE SITE INSPECTION DATE: 5/31/86 INSPECTION REPORT NO: 86009 REPORTS FR0M LICENSEE

  ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT

  --------------------------------- -___                          ==_     - _-

86-08 03/25/86 04/16/86 1/2 DIESEL GEHERATOR AUTO START DUE TO INADVERTENT RELAY ACTUATION 86-16 03/17/86 04/14/86 UNIT ONE DIESEL GENERATOR INADVERTA;4T AUTO START DUE TO CONTACT HITH REI AY 86-17 03/18/86 04/10/86 ISOLATION OF INSTRUMENT ROOT VALVES DUE TO PERSONNEL ERROR 86-18 03/20/86 04/11/86 DNE REACTOR SCRAM HHILE PERFORMING A 4KV UNDERVOLTAGE TEST DUE TO COINCIDENTAL SPIKE OF IRMS 86-19 03/17/86 04/11/86 ANTICIPATED TRANSISENT HITHOUT SCRAM / ALTERNATE ROD INSERTION SYSTEM ACTt'ATED FOLLONING PERSOHNEL COMING IN CONTACT HITH INSTRUMENTS 86-20 03/28/86 04/22/E6 UNIT 1 SPURIOUS GROUP I ISOLATIONS CAUSED BY INSTRUMENT RACK VIBRATIONS 86-21 04/05/86 04/23/86 UNIT ONE REACTOR SCRAM DUE TO LOW FLON FEEDHATER REG. VALVE LEAKAGE

  ================================================================================2=================================================

PAGE 2-293 i

1. Dockot 50-265 0PERATING STATUS M ZnMM3 :HMMHUMGMMunzMMM DU2%MMMn303 n QUAD CITIES 2 M
2. Ripsrting Paried: 04/01/86 Outtge + On-lins Hrs: 719.0 MM 2M:M5McMMznMM MznMz MrscMMurMM M3
3. Utility Contact CAROL KRONICH (309) 654-2241 X193 AVERAGE DAILY POWER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 2511 QURD CITIES 2
5. Nameplate Rating (Gross MHe): 920 X 0.9 = 828
6. Design Electrical Rating (Not MHe): 789
7. Maximum Dependable Capacity (Gross MHe): 813 ***
8. Maximum Dependable Capacity (Not MHe): 769 DESIGN ELEO. RRTING = 700
                                                                                                                                                               ,,,,, g                     g,        y_       7g, g
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 121.557.0
13. Hours Reactor Critical 719.0 " " " N " MIN DNIN 2.653.3 93.921.3 h
14. Rx Reserve Shtdwn Hrs .0 .0 2.985.8 - ----- -- ---- -'3 ----- --------- - 100
15. Hrs Generator On-Line 719.0 2.628.0 90.925.7 hf
16. Unit Reserve Shtdwn Hrs .0 .0 702.9 g - 80
17. Gross Therm Ener (MHH) 1,685.009 6.227.135 192.336.158 gag ,
18. Gross Elec Ener (MHH) 551.703 2,049.172 61.465.944 - so
19. Het Elec Ener (MHH) 531.072 1.961.945 57,837.610
20. Unit Service Factor 100.0 91.3 74.8 - 40
21. Unit Avail Factor 100.0 91.5 75.4

__22. Unit Cap Factor (MDC Net) 96.1 88.6 61.9 - 30

23. Unit Cap Factor (DER Net) 93.6 86.4 60.3
24. Unit Forced Outage Rate .0 1.5 7.9 0 .

0 5 IID~ l'5 ' $3' d5 30

25. Forced Outage Hours .0 39.4 3,857.6 DAYS -
~
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE I' I "

27. If Currently Shutdown Estimated Startup Date N/A PAGE 2-294

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM N Riptrt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M QUAD CITIES 2 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No, Date Type Hours Reason Method LER Number System Component Cause 5 Corrective Action to Prevent Recurrence 8&-10 04/03/86 S 0.0 5 5 CH HTEXCH REDUCED LDAD TO 600 MHE FOR MSIV SURVEILLANCE AND OUT OF SERVICE HORK ON 2D3 HEATER. ES-11 04/08/86 S 0.0 B 5 CH HTEXCH REDUCED LOAD TO HORK ON "A" MOISTURE SEPARATOR DRAIN TANK TO 2D3 HEATER. 86-12 04/18/86 S 0.0 B 5 RC CONROD REDUCED LOAD TO 400 MWE FOR REQUIRED SCRAM TIMING. 36-13 04/18/86 5 0.0 8 5 HA TURBIN REDUCED LOAD TO 700 MHE TO PERFORM TURBINE SURVEILLANCES. 86-14 04/27/86 S 0.0 H 5 ZZ ZZZZZZ REDUCED LOAD TO 600 MHE PER LOAD DISPATCHER. i mMMMMMMMMMM QUAD CITIES 2 OPERATED ROUTINELY IN APRIL.

 ,_M 

SUMMARY

M MMMMMMMMMMM l Type Reason Method System & Component F-Fe'rced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint er Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                   & License Examination       9-Other                              (LER) File (NUREG-0161)

PAGE 2-295

unum = nun =puxnu=muu=xnnzuruuu=uzuurus M QUAD CITIES 2 u n=guu=murumununuunnunzuzzustrz =runn FACILITY DATA R2part Perled APR 1935 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE....................ILLIN0IS LICENSEE.................COMMONHEALTH EDISON COUNTY...................R0CK ISLAND CORPORATE ADDRESS........P.O. BOX 767 , CHICAGO, ILLINOIS 60690 i DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 20 MI NE OF CONTRACTOR MOLINE, ILL ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF REACTOR............BHR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC i DATE INITIAL CRITICALITY... APRIL 26, 1972 CONSTRUCTOR.............. UNITED ENG. & CONSTRUCTORS ' DATE ELEC ENER 1ST GENER...MAY 23, 1972 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH 10, 1973 REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0HCE THRU IE REGION RESPONSIBLE......III CONDENSER C00LIhG HATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......A. MADISON ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....R. BEVAN COUNCIL.. . ............MID-AMERICA DOCKET NUMBER....... ... 50-265 INTERPOOL NETHORK LICENSE & DATE ISSUANCE....DPR-30, DECEMBER 14, 1972 PUBLIC DOCUMENT ROOM....... MOLINE PUBLIC LIBRARY 504 17TH STREET MOLINE, ILLINDIS 61265 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON MARCH 19 THROUGH 26 (86006; 86006): ACTION ON PREVIOUS INSPECTION FINDINGS (92702), LICEN3EE EVENT REPORT FOLLOHUP (92701), CONTAINME IT INTEGRATED LEAK RATE TEST (CILRT) (70307, 70313, 70323), LOCAL LEAK RATE TEST AND A3 FOUND CONDITION OF CILRT RESULTS (61720). NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION ON MARCH 31 THROUGH APRIL 4 (86007; 86007): ROUTINE, UNANNOUNCED, SAFETY INSPECTION OF PREVIOUS INSPECTION FINDINGS, CONTROL ROD DRIVE PERFORMANCE TESTING, SHUTDOHN MARGIN DEMONSTRATION, AND INITIAL CRITICALITY. OF THE FOUR AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. i __ ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPCNENT PROBLEMS: PAGE 2-296

                                                        . _ _ . . . . - . . - .-               -    __     - - . - .            ._         - _ ~ _ _. .                     ..   . - - - - - - - - - - - . - - - - - - _ = - - - - - _ -

E i i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM R:psrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M QUAD CITIES 2 M. MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS NONE 4 FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: H. TOREN, SITE EMERGENCY PLANNING COORDINATOR SINCE OCTOBER 19E5, HILL BE LEAVING QUAD-CITIES NUCLEAR PLANT ON MARCH 21, 1986. 4 HIS REPLACEMENT HAS NOT YET BEEN SELECTED BY MANAGEMENT. i PLANT STATUS: OPERATING ROUTINELY LAST IE SITE INSPECTION DATE: 5/31/86 INSPECTION REPORT NO: 86008 REPORTS FR0M LICENSEE

        ==========================================================================================================================r=======

NUMBER DATE OF DATE OF SUBJECT l E7ENT REPORT _ _ _ _ - _ = - - _ . _ _ _ _ _ - _ _ _ _ _ _ ___________--______ _____ __ ___ - _ _ _ _ - - _ _____ _ .--- __ _ __ 86-05 04/04/86 04/21/86 SBGTS INITIATION WHILE MOVING CONTAMINATED TRASH DUE TO FAILURE TO FOLLOH PROCEDURE

       ===========================================================================s======================================================

I l

                                                                                                                                                                               .                                                               i PAGE 2-297
1. Docksts 50-312 0PERATING STATUS H5xurMMunn:Muxanwaw M Mzuznn:MnM M:Inr1 n RANCHO SECO 1 x
2. R;ptrting Paried: 04/01/86 Outtge + On-lino Hrs: 719.0 Exaunzmanunnxmm=muuraunn:nnzruxuwwww
3. Utility

Contact:

RON COLOM90 (916) 452-3211 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2772 RRNCHO SECO 1
5. Nameplate Rating (Gross NHe): 1070 X 0.9 = 963
6. Design Electrical Rating (Net MHe): 918
7. Maximum Dependable Capacity (Gross MHe): 917 38U3
8. Maximum Dependable Capacity (Net MHe): 873
9. If Changes Occur Above Since Last Report, Give Reasons:
                                                                             ,,,,,,                        [

NONE

10. Power Level To Hhich Restricted, If Any (Het MHe):
11. Reasons for Restrictions, If Any:

NONE 1033-MONTH YEAR CUMULATIVE NO NET POWER OUTPUT THIS MONTH

12. Report Period Hrs 719.0 2.879.0 96.744.0 h
13. Hours Reactor Critical .0 .0 52.565.0
                                                                            ---------- ..-------------------------- -100 o
14. Rx Reserve Shtdwn Hrs .0 Q
                                                  .0     10.647.7
15. Hrs Generator On-Line .0 .0 50.363.8 - 80 hf
16. Unit Reserve Shtdwn Hrs .0 .0 1,210.2
17. Gross Therm Ener (MHH) R 0 124,228,535 sag. - so
18. Gross Elec Ener (MHH) 0 0 [1,528,149
19. Het Elec Ener (MHH) -2.823 -5.850 39.072.261
20. Unit Service Factor .0 .0
                                                                                                                                     - to 52.1
21. Unit Avail Factor .0 .0 53.3
22. Unit Cap Factor (MDC Net) .0 .0 46.3 - 20
23. Unit Cap Factor (DER Net) .0 .0 44.0
24. Unit Forced Outage Rate 100.0 100.0 32.6 0 -

0 5

                                                                                                  .-    .-                 .-          0
25. Forced Outage Hours to 1s 30 25 30 719.0 2.879.0 24,264.5 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE frRIL 1988

27. If Currently Shutdown Estimated Startup Date: 07/04/86 PAGE 2-298

MuccuMMunx=cuxuMcManu:MarenMz nnas== Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M RANCHC SECO 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 1 12/26/85 F 719.0 A 3 85-25 CB INSTRU REACTOR TRIP DN HIGH PRESSURE PRECECED BY A LOSS OF ICS PONER. CORRECTIVE ACTIONS BEING IMPLEMENTED. 1 i MMMMMMMMMMM RANCHO SECO 1 REMAINS SHUT DOHN FOLLOHING A REACTOR TRIP ON DECEMBER 26, 1985.

          ,, M 

SUMMARY

M MMMMMMMMMMM Tvpe Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report 8 License Examination 9-Other (LER) File (HUREG-0161) PAGE 2-299

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M RANCHO SECO 1 M MMMMMMMMuMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA R:ptet Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY j STATE.............. ..... CALIFORNIA LICENSEE............... . SACRAMENTO MUN. UTIL. DISTRICT COUNTY............... ... SACRAMENTO CORPORATE ADDRESS....... 6201 S STREET P.O. BOX 15830 SACRAMENTO, CALIFORNIA 95813 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 25 MI SE OF CONTRACTOR SACRAMENTO, CA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR HVC STEAM SYS SUPPLIER... BABCOCK 8 HILCOX DATE INITIAL CRITICALITY... SEPTEMBER 16, 1974 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER. . 0CTOBER 13, 1974 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.. . APRIL 17, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING T0HERS IE REGION RESPONSIBLE......V CONDENSER COOLING HATER....FOLSOM CANAL IE RESIDENT INSPECTOR......J. ECKHARD ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....S. MINER COUNCIL..................HESTERN SYSTEMS DOCKET NUMBER........... 50-312 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-54, AUGUST 16, 1974 PUBLIC DOCUMENT ROOM....... BUSINESS AND MUNICIPAL DEPARTMENT SACRAMENTO CITY - COUNTY LIBRARY S28 I STREET SACRAMENTO, CALIFORNIA 95814 INSPECTION

SUMMARY

INSPECTION STATUS

   + INSPECTION ON APRIL 14-25, 1986 (REPORT NO.             50-312/86-02) REPORT CANCELLED.
   + INSPECTION ON JANUARY 16 - FEBRUARY 19, 1986 (REPORT NO.

50-312/86-05) AREAS INSPECTED: ROUTINE, UNANNDUNCED INSPECTION BY A REGIONALLY BASED INSPECTOR ASSOCIATED HITH THE CONTROL OF RADI0 ACTIVE MATERIALS AND CONTAMINATION, SURVEYS, AND MONITORINGs FACILITIES AND EQUIPMENT; TRANSPORTATION OF RADI0 ACTIVE MATERIALS; PROCEDURES; OF RADI0 ACTIVE MATERIALS; FOLLOHUP DN OPEN ITEMS, AND A TOUR OF THE LICENSEE'S FACILITY. AUDITS; RADHASTE DURING ORGANIZATIDN THIS INSPECTION, AND TRAINING; RECEIPT VARIOUS INSPECTION PROCEDURES HERE UTILIZED. RESULTS: IDENTIFIED.IN THE NINE AREAS EXAMINED, ONE VIOLATION INVOLVING THE FAILURE TO PERFORM AN EVALUATION PURSUANT TO 10 CFR 50.59( HAS A)

                                               ~
   + INSPECTION ON FEBRUARY 21 - APRIL 11, 1986 (REPORT NO.

50-312/86-07) AREAS INSPECTED: SPECIAL INSPECTION, BY 11 NRC INSPECTORS (SEVEN OF RANCHOREGIONALLY SECO FOLLOHING BASED, THREE RESIDENT, THE DECEMBER AND ONE 26, 1985, C00LDOWN HEADQUARTERS), AND ONE NRC CONTRACTOR, OF THE LICENSEE'S PREPARATI TRANSIENT. CONDUCTED AT VARIOUS TIMES DURING THE INSPECTION PERIOD. DURING THISTHIS REPORT SUMMARIZES THE INSPECTION ACTIVITIES HHICH HERE INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED. RESULTS: OF THE AREAS INSPECTED, 1985, DVERC00 LING TRANSIENT (NUREG-1195),HHICH HERE IDENTIFIED BY A LIST OF 38 RESTART ISSUES AND THE IIT REPORT ON THE DECEMBER 26, ONE DEVIATION HAS IDENTIFIED RELATING TO ELECTRICAL SHIELDING. DF THE 38 RESTART PAGE 2-300

   -       - - - . . - - .      .- . -            _     ~ - _ - .              - -.          -        . -    .          .-   ..       - - - - _ _ _ - _ _ - - . - . .

unuununnunnnzuunnMr:inrMur:MMacMsMuus R:psrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M RANCHO SECO 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

ISSUES, 20 HERE CLOSED. OTHER ENFORCFMENT ACTION RELATED TO THIS INSPECTION HILL BE THE SUBJECT OF SEPARATE CORRESPONDENCE.

           + INSPECTION ON FEBRUARY 24 - MARCH 14, 1986 (REPORT NO.              50-312/86-11) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION BY A REGIONALLY BASED INSPECTOR OF NUREG-0737, ITEMS II.B.3, " POST ACCIDENT SAMPLING SYSTEM" (PASS) AND II.F.1, " ADDITIONAL ACCIDENT i           MONITORING INSTRUMENTATION," AUDITS, FGLLOHUP ON PREVIOUS INSPECTION FINDINGS, RESTART ITEMS, AND A TOUR OF THE FACILITY. DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE. IDENTIFIED. i + INSPECTION ON MARCH 10 - APRIL 21, 1986 (REPORT NO. 50-312/86-13) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH. i . j + INSPECTION ON APRIL 11 - MAY 15, 1986 (REPORT NO. 50-312/86-14) INSPECTION CONTINUING; TO BE COMPLETED IN MAY, 1986.

          + INSPECTION ON APRIL 1 - MAY 15, 1986 (REPORT NO.            50-312/86-15) INSPECTION CONTINUING; TO BE COMPLETED IN MAY, 1986.
          + INSPECTION ON APRIL 14-18, 1986 (REPORT NO. 312/86-16) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION BY REGIONALLY BASED i

INSPECTORS OF LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, INTERNAL EXPOSURE ASSESSMENT; ALARA; RADIATION PROTECTION ORGANIZATION; OCCUPATIONAL EXPOSURES DURING OUTAGES; RESTART ITEMS, AND A TOUR OF THE LICENSEE'S FACILITY. DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

!         RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.
  • INSPECTION ON APRIL 14 - MAY 16, 1986 (REPORT NO.' 10-312/86-17) INSPECTION CONTINUING; TO BE COMPLETED IN MAY, 1986.

j + INSPECTION ON APRIL 22-26, 1986 (REPORT NO. 50-312/86-18) REPDRT BEING PREPARED; TO BE REPORTED NEXT MONTH. i j ENFORCEMENT

SUMMARY

l 10 CFR PART 50.59(A)(1) STATES: "THE HOLDER OF'A LICENSE AUTHORIZING OPERATION OF A PRODUCTION OR UTILIZATION FACILITY MAY (I)

MAKE CHANGES IN THE FACILITY AS DESCRIBED IN THE SAFETY ANALYSIS REPORT, (II) MAKE CHANGES IN THE PROCEDURES AS DESCRIBED IN THE SAFETY ANALYSIS REPORT, AND (III) CONDUCT TESTS OR EXPERIMENTS NOT DESCRIBED IN THE SAFETY ANALYSIS REPORT, HITHOUT PRIOR COMMISSION APPROVAL, UNLESS THE PROPOSED CHANGE, TEST OR EXPERIMENT INVOLVES A CHANGE IN THE TECHNICAL SPECIFICATIONS INCORPORATED

] IN THE LICENSE CR AN UNREVIEHED SAFETY QUESTION." FIGURE 1.1-2 AND 1.1-3 0F THE FINAL SAFETY ANALYSIS REPORT (FSAR) SH0HS AN CUTD00R RADHASTE STORAGE AREA. FIGURES 1.1-2 AND 1.1-3 DO UOT SHDH ANY BUILDINGS IN THE OUTDOOR RADHASTE STORAGE AREA. SECTION 1t.1.5.1.3 0F THE FSAR DESCRIBES THE AREA SH0HN ON FIGURE 1.1-2 AND 1.1-3 AS AN AREA FOR THE STORAGE OF SOLID HASTE. A BUILDING FOR PROCESSING RADHASTE HAS ERECTED IN THE OUTDOOR RADHASTE STORAGE AREA IN ABOUT JUNE OF 1985. THIS BUILDING IS NOT SH0HN OR DESCRIBED IN THE FSAR. CONTRARY TO THE REQUIREMENT, FROM ABOUT JUNE 1985 THROUGH JANUARY 1986, THE BUILDING HAS USED TO PROCESS RADHASTE AND AN EVALUATION HAL WOT MADE OF THIS CHANGE TO DETERMINE THAT IT DID NOT INVOLVE AN UNREVIEHED SAFETY QUESTION OR RLQUIRE A CMANGE To THE TECHNICAL SPECIFICATIONS. + (E600 4) x . i PTHER ITEMS

                                 ^

b ,

};        SYSTEMS AND COMPONENT PROBLEMS:                                                                                                                   f f                 ,

2 { INTEGRATED CONTROL SYSTEM UNDER REVIEW FOLLGHING EXCESSIVE C00LDOHN RATE PRODUCED HHEN SYSTEM LOST DC PONER AT 100% REACTOR POWER. l PAGE 2-301

 .'                                                                                                                                                                   s                   s r .'    ,

H s __

                                                                                                                                             ,.4 p ,.
                                                                                                                                                                                           /
                                                                                                                                                                                         ~

M %%%M Z M A M M %M Y.M%%M M M M M M M ani2;-n;nM%%%%

                                                                                                                                                                      .            M R:pret Pcrief APR 1986             INSPECTION             STATUS - (CONTINUED)                                                           RANCHO SECO 1                          u MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM                      ,

4 OTHER ITEMS FACILITY ITEMS (PLANS AND PROCEDURES): , NONE MANAGERIAL ITEMS:

     + RESTART ACTION PLAN IMPLEMENTATION IS BEING REVIEHED BY REGION V PRIOR TO RETURN TO OPERATION.
     + ENFORCEMENT CONFERENCE HAS HELD ON MAY 16, 1986, ON VIOLATIONS RELATED TO THE DECEMBER 26, 1985, EVENT AND FOLLOHUP ACTIVITIES.

PLANT STATUS: PLANT REMAINS IN COLD SHUTDOHN FOLLOHING PLANT TRIP FROM 100% DUE TO LOSS OF ICS DC POWER ON DECEMBER 26, 1985. I

 !   LAST IE SITE INSPECTION DATE: 04/14-05/16/86+

i INSPECTION REPORT NO: 50-312/86-17+ REPORTS FR0M LICENSEE NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-02-LO 02-18-86 03-17-86 PINHOLE LEAKS IN CASING DRAIN LINE FOR 'B' DECAY HEAT PUMP

     ============================================================================================,===,===,,=,,,,,,==,,,,,,,=,,,,,,,,,,,

e i 1 1 PAGE 2-302 a

THIS PAGE INTENTIONALLY LEFT DLANK PAGE 2-303

1. Docket: _50-456 0PERATING STATUS MZM:nMMnnKrsiirnK ::Cuzmannunnnnnun:M3 M RIVER BEND 1 M
2. Reperting Pcried: 04/01/86 Outtg3 + On-lina Hrcs flg g nuunmuxCxxxunM MMMunnunummunununnnna
3. Utility

Contact:

J. H. SIMMONS (504) 635-6096 AVERAGE DAILY PONER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2894 RIVER BE}4) 1
5. Nsmoplate Rating (Gross MHe): 2894
6. Design Electrical Rating (Not MHe): 936
7. Maximum Dependable Capacity (Gross MWe): 936 1833
8. Maximum Dependable Capacity (Net MWe): 936 - DESIGN E120. RRTING = 938
                                                                                                                               ,  g gg
9. If Changes Occur Above Since Last Report, Give Reasons:
10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE MONTH YEAR CUMULATIVE -100

12. Report Period Hrs 719.0 2,135.0 2,135.0
13. Hours Reactor Critical 291.9 1,080.6 1,080.6 h!
14. Rx Reserve Shtdwn Hrs .0 .0 .0 - e0
15. Hrs Generator On-Line 258.7 860.7 860.7 ll
16. Unit Reserve Shtown Hrs .0 .0 .0 M E - ep
17. Gross Therm Ener (MHH) 389,615 1,047,535 1,047,535 500 -

! 18. Gross Elec Ener (MHH) 113.532 274,057 274,057

19. Het Elec Ener (MHH) 101.047 239,433 239,483 - e0
20. Unit Service Factor
21. Unit Avail Factor NOT IN
                                                                                                                                          - 20
22. Unit Cap Factor (MDC Net) COMMERCIAL

! 23. Unit Cap Factor (DER Net) OPERATION

24. Unit Forced Outage Rate 0 , , , , ',- 0 0 5 10 15 30 35 30
25. Forced Outage Hours 140.3 377.1 377.1 DAYS
 ~
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE M IL 1888

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-304

2 22HHMSMEM31:2M3 MMMMMMMMMM%MZI H 3HMMI' RIVER BEND 1 M Repart Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Teason Method LER Number System Component Cause a Corrective Action to Prevent Recurrence No. Date S 320.0 B 4 CONTINUED FROM PREVIOUS MONTH MSIV ISOLATION STARTUP TEST. l 1 05/20/86 INVESTIGATION AND CORRECT PROBLEMS HITH THE "B" i 2 04/18/86 F 52.3 A 1 RECIRC PUMP VIBRATION MONITOR. l F 54.0 N 3 MASTER FEEDHATER LEVEL CONTROLLER FAILING TO i 3 04/23/86 RESP 0HD HHILE IN AUTO. 3 SPIKES ON APRM B8F HITH 1/2 DN CHANNEL "C". 4 04/26/86 F 34.0 H RESULTED IN FULL RX SCRAM. I l I i i MMMMMMMMMMM RIVER BEND 1 EXPERIENCED 4 SHUTDOHNS IN APRIL AS DISCUSED ABOVE. 'j M

SUMMARY

M MMMMMMMMMMM Tvoe Reason Method System & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for i t C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report l

                 & License Examination        9-Other         (LER) File (hUREG-0161) j                                                                                                                                        PAGE 2-305

.i

EucE=n n==c==nuru= unum = men curr2nunu u RIVER BEND 1 M unn== muusnxunzuunn=uMzaru==u=n==n n FACILITY DATA Report Perlad AP2 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE..... .............. LOUISIANA LICENSEE................. GULF STATES UTILITIES COUNTY................... HEST FELICIANA CORPORATE ADDRESS........P.O. BOX 2951 BEAUMONT, LOUISIANA 77704 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 24 MI NNH OF CONTRACTOR BATON ROUGE, LA ARCHITECT / ENGINEER....... STONE & HEBSTER TYPE OF REACTOR............BWR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC j DATE INITIAL CRITICALITY.. 0CTC"ER 51, 1985 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER 1ST GENER... DECEMBER 5, 1985 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE....MMMMMMMMMMMMMMMMMM REGULATORY INFORMATION CONDENSER COOLING METHOD...MDCT IE REGION RESPONSIBLE......IV CONDENSER COOLING HATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......D. CHAMBERLAIN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....S. STERN COUNCIL..................SOUTHHEST POWER POOL DOCKET NUMBER........... 50-458 LICENSE & DATE ISSUANCE....NPF-47, NOVEMBER 20, 1985 PUBLIC DOCUMENT ROOM....... GOVERNMENT DOCUMENTS DEPARTMENT i TROY H. MIDDLETON LIBRARY LOUISIANA STATE UNIVERSITY BATON ROUGE, LOUISIANA 70805 INSPECTION

SUMMARY

INSPECTION STATUS INFO. NOT SUPPLIED BY REGION ENFORCEMENT

SUMMARY

l NONE

OTHER ITEMS
                      "* SYSTEMS AND COMPONENT PROBLEMS:

INFO. NOT SUPPLIED BY REGION FACILITY ITEMS (PLANS AND PROCEDURES): INFO. NOT SUPPLIED BY REGION

                      "! MANAGERIAL ITEMS:

INFO. NOT SUPPLIED BY REGION ! PAGE 2-306 l l l i 1

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM RIVER BEND 1 M Reptet Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM PLANT STATUS: INFD. NOT SUPPLIED BY REGION ) i LAST IE SITE INSPECTION DATE: INFO. NOT SUPPLIED BY REGION INSPECTION REPORT NO: INFO. NOT SUPPLIED BY REGION I i REP 0RTS FR0M LICENSEE

                                                                                                   =====3=================s3=E==33====E=333==3
           =============================S=============================3=================33=======3 l

j NUMBER DATE OF DATE OF SUBJECT i EVENT REPORT INFO. NOT SUPPLIED BY REGION

           ==============================================================================sss==================================sasss========s==

1 ) d i i l 1 i a I I

                                                                                                                                          .        PAGE 2-307 i

i

1. Docket: 50-261 0PERATING STATUS EEMMnZZZU:::M%%32K%%M2 M:532c2 5tMM2 m ROBINSON 2 n
2. Riptrting Paried: 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts ANITA E. SCOTT (803) 383-4524 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MHt): 2300 ROBINSON 2
5. Nameplate Rating (Gross MWe): 854 X 0.9 = 769
6. Design Electrical Rating (Net MWe): 700
7. Maximum Dependable Capacity (Gross MWe): 700 182D
8. Maximum Dependable Capacity (Net MWe): 665 . DESIGN ELEO. MRTING - 700
9. If Changes Occur Above Since Last Report, Give Reasons: .. mX. DEPDC. Cfr. - 885 (100%)

NONE

10. Power Level To Which Restricted, If Any (Not MWe):
11. Reasons for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Pericd Hrs 719.0 2.879.0 132.869.0
13. Hours Reactor Critical 719.0 1.527.3 93.583.9
14. Rx Reserve Shtdwn Hrs .0 280.8 hf
                                                              ?.936.4             m W E """"'" m OPTIst omITIcus
15. Hrs Generator On-Line 719.0 1.448.3 _A Mm .=

91.216.2 g{

16. Unit Reserve Shtdwn Hrs .0 .0 23.2
                                                                                ,,,,,,,4
                                                                                            ,,,,,,,,,,;,,, ,, W,,,,,,\ ,,,, ,,,,
17. Gross Therm Ener (MHH) 1.575.523 2.763.172 182.255.085 sob - so
18. Gross Elec Ener (MHH) 529.208 923.276 58.782.767
19. Het Elec Ener (MHH) 504.624 865.434 55.515.008 - en
20. Unit Service Factor 100.0 50.3 68.7
21. Unit Avail Factor 100.0 50.3 68.7 - 40
 .,22. Unit Cap Factor (MDC Net)       105.5       45.2          62.8
23. Unit Cap Factor (DER Net) 100.3 42.9 59.7
                                                                                                                                         - 20
24. Unit Forced Outage Rate .0 14.5 14.2 0 .-

O O

25. Forced Outage Hours 5 10 15 30 35
                                           .0     246.5      9.291.5                                                                    30 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE fFRIL 1986

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-308 i

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M ROBINSON 2 M i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM I No. Date Ivie Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 0401 04/18/86 S 0.0 B 5 CH PUMPXX REDUCED POWER TO PERFORM MAINTENANCE ON MAIN FEED PUMPS AND HEATER DRAIN PUMPS. MAINTENANCE HAS COMPLETED AND PUMPS HERE RETURNED TO SERVICE. UNIT RETURNED TO FULL i P0HER. t l i l l i l T ODOMMMMMMMM ROBINSON 2 OPERATED ROUTINELY IN APRIL.

  ,, M 

SUMMARY

M ODOMhMMMMMM Type Reason Method Svstem a component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet i E-Operator Training 5-Reduced Load Licensee Event Report

                   & License Examination           9-Other          (LER) FIIe (NUREG-0161)

PAGE 2-309

c=rzus=nars====rs=3:numanunnuwumm=mu u ROBINSON 2 M ux=xunn==ntruzzuxusunnuumantunnuzuun FACILITY DATA R* Port Perlsd APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... SOUTH CAROLINA LICENSEE................. CAROLINA POWER & LIGHT COUNTf...................DARLINGTON CORPORATE ADDRESS....... 411 FAYETTEVILLE STREET RALEIGH, NORTH CAROLINA 27601 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI NH OF CONTRACTOR HARTSVILLE, SC ARCHITECT / ENGINEER.......EBASCO TYPE OF REACTOR............PWR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... SEPTEMBER 20, 1970 CONSTRUCTOR..............EBASCO DATE ELEC ENER IST GENER... SEPTEMBER 26, 1970 TURBINE SUPPLIER..........HESTINGHOUSE DATE COMMERCIAL OPERATE.... MARCH 7, 1971 REGULATORY INFORMATI N CONDENSER COOLING METHOD... RECIRCULATION IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... ROBINSON IMPOUNDMENT IE RESIDENT INSPECTOR......P. KRUG ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....G. REQUA COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-261 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-23, SEPTEMBER 23, 1970 PUBLIC DOCUMENT ROOM. . . . . . .HARTSVILLE MEMORIAL LIBRARY 220 N. FIFTH ST. HARTSVILLE, SOUTH CAROLINA 29550 INSPECTION

SUMMARY

IN$PECTION STATUS

                                     + INSPECTION MARCH 16-21 (86-08): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 98 INSPECTOR-HOURS ON SITE IN THE AREAS OF START-UP IDENTIFIED.AFTER REFUELING, LOH PONER PHYSICS TESTING AND FOLLOH-UP TO INSPECTOR IDENTIFIED ITEMS. NO VIOLATIONS OR DEVIATIONS HERE ENFORCEMENT 

SUMMARY

NONE

                                 ~

0THER ITEMS i SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): PAGE 2-310 1

M M M M MM M M.""M70Z M JC?IMII!CIOCMIlM ZX'.2 M M ROBINSON 2 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 OTHER ITEMS l NONE. l MANAGERIAL ITEMS: f NONE. t l PLANT STATUS: I NORMAL OPERATION. LAST IE SITE INSPECTION DATE: MARCH 16-21, 1986 + l

!   INSPECTION REPORT NO: 50-261/86-08 +

REPORTS FR0M LICENSEE

    ===============================================================================

NUMBER DATE OF DATE OF SUBJECT j EVENT REPORT _ 86-005 01/28/86 04/04/86 LOSS OF OFFSITE POWER AND EMERGENCY BUS E-2. 86-008 03/07/86 04/04/86 A DISCREPANCY IDENTIFIED HITH PROCEDURES INTENDED TO SATISFY TECHNICAL SPECIFICATION TA

                                         " PERFORM CHANNEL FUNCTIONAL TEST OF AFH AUTOMATIC INITIATION UNDER A STATION BLACKOUT.

i

    ======================================================================================

I 1 1 l ) PAGE 2-311

1. Dockot 50-272 0PERATING STATUS nuzunuru==u==nuuMnuunnunnun=nn: Max n n SALEM 1 u
2. Reporting Period 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMM*MxMMMMMMMMMMMMMM
3. Utility

Contact:

PEtt WHITE (609) 935-6000 X4451 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3338 SAll21 1
5. Nameplate Rating (Gross MWe): 1300 X 0.9 = 1170
6. Design Electrical Rating (Not MWe): 1090
7. Maximum Dependable Capacity (Gross MHe): 1124 tem 3
8. Maximum Dependable Capacity (Net MWe): 1079 " * " ~
                                                                                            ...... ImX . DEPDO. OM. - 1079 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE 1 10. Power Level To Which Restricted, If Any (Net MHe):

11. Reasons for Restrictions, If Any NO NET POWER OUTPUT THIS NONTH NONE ..___________...........________________ -100 1093-MONTH YEAR CUMULATIVE
12. Report Period Mrs 719.0 2.879.0 77.448.0
13. Hours Reactor Critical .0 1.834.0 46.019.4 '
14. Rx Reserve Shtdwn Hrs .0 hk
                                                                 .0      3.088.1
15. Hrs Generator On-Line .0 1.763.2 44.267.8
16. Unit Reserve Shtdwn Hrs l - 80
                                                     .0          .0            .0
17. Gross Therm Ener (MHH) 0 5.851.424 136.337.659 500-i
18. Gross Elec Ener (MHH) 0 1.872.860 45.166.668
19. Het Elec Ener (MHH) - 40
                                                -4.738 1.785.643 42.891.635
20. Unit Service Factor .0 61.2 57.2
21. Unit Avail Factor .0 61.2 57.2
22. Unit Cap Factor (MDC Net) - 20
                                                     .0       57.5          51 u}
25. Unit Cap Factor (DER Net) .0 56.9 50.8
24. Unit Forced Outage Rate .0 8.1 29.3 0- .-

0 4 0 1

25. Forced Outage Hours 5 to 15 30 35
                                                     .0      154.8     18.643.6                                                                      30 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE MRIL 1988

27. If Currently Shutdown Estimated Startup Date: 06/06/86 PAGE 2-312

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M

   'oport Period APR 1986                  UNIT      SHUTD0NNS / REDUCTIONS                        M             SALEM 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Date    Type Hours Neason Method LER Number System Component             Cause 8 Corrective Action to Prevent Recurrence

_322__ S 719.0 C 4 RC FUELXX NUCLEAR NORMAL REFUELING CONTINUES. 386 03/21/86 l MMEMMMMMMMM SALEM 1 REMAINS SHUT DOWN FOR REFUELING.

 ,,M 

SUMMARY

M EMMMMMMMMMM Type Reason Method Svstem 8 Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                  & License Examination        9-Other          (LER) File (NUREG-0161)

PAGE 2-313 c%

ut=uz=us====unurunnunu==nu=u=uu=u=nu n SALEM 1 u musuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum FACILITY DATA R* Port Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY ST A T E . . . . . . . . . . . . . . . . . . . , N EW J ERS EY LICENSEE. . . . . . . . . . . . . . . . .PUBLIC SERVICE EL ECTRIC 4 GAS COUNTY................... SALEM CORPORATE ADDRESS....... 80 PARK PLACE DIST AND DIRECTION FROM NEWARK, NEN JERSEY 07101 NEAREST POPULATION CTR.. 20 MI S OF CONTRACTOR HILMINGTON, DEL ! ARCHITECT / ENGINEER.......PUBLIC SERVICES & GAS CO.

TYPE OF REACTOR............PHR NUCSTEAMSYSSUPPLIER...NESTIRC9kUSg DATE INITIAL CRITICALITY... DECEMBER 11, 1976 CONSTRUCTOR.............. UNITED ENG. & CONSTRUCTORS l DATE ELEC ENER IST GENER... DECEMBER 25, 1976 TURBINE SUPPLIER.........NESTINGHOUSE-DATE COMMERCIAL OPERATE.... JUNE 30, 1977 REGULATORY INFORMATION l CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....DELANARE RIVER IE RESIDENT INSPECTOR......T. LINVILLE ELECTRIC RELIABILITY I

COUNCIL..................MID-ATLANTIC LICENSING PROJ MANAGER.....D. FISCHER

AREA COUNCIL DOCKET NUMBER........... 50-272 4

' LICENSE & DATE ISSUANCE. . . .DPR-70, DECEMBER 1,1976 PUBLIC DOC'JMENT ROOM. . . . . . . SAL EM FREE PUBLIC LIBRARY 112 WEST BROADHAY SALEM, NEN JERSEY 08079 INSPECTION

SUMMARY

INSPECTION STATUS I NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENTS

NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. j PAGE 2-314 l Q J i

NNNNNNENNNNNNNNNENNNNNENNNNNNNNNENEN N N SALEM 1 IN5PECTION STATU$ - (CONTINUED) NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period APR 1986 OTHER ITEMS MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS

  • NO INPUT PROVIDED.

LAST IE SITE INSPECTIGN DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE 333333======E33=EEEEEE33E=E333333333333333=E=E3E=3335:3

 =====3=3=====3=2:===========3=3=s3333==3E==EEEEEE==EEEEE==333=E=33EE=EsEEE=

NUMBER DATE OF DATE OF SUBJECT REPORT -------------- EVENT - NO INPUT PROVIDED.

                                                       =EE==Es=======E=EszE=EE===E=======E==EEsass=EEzzzEEssE== ssEsssssssss=EszEss=3
 =========================ss========================s PAGE 2-315
1. Dockot 50-311 0PERATING STATUS c ==========u==cc====u===assanasa= a u SALEM 2 a
2. Reporting Period: 04/01/86 Outage + On-line Hes: 719.0 MMMMMMMMMKMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

PELL HMITE (609) 935-6000 X4451 AVERAGE DAILY POWER LEVEL (MWe) PLOT i

4. Licensed Thermal Power (MWt): 3411 SP1J31 2 l

l 5. Nameplate Rating (Gross MMe): 1162 j 6. Design Electrical Rating (Net MWe): 1115

7. Maximum Dependable Capacity (Gross MWe): 1149 1sm
8. Maximum Dependable Capacity (Net MWe): 1106 DCSIW4 ELCO. RRTING - 1115 tWlX. DCPDO. Crr. - 1106 1100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe): a a g n,,,'wn m OPTim m37tm
11. Reasons for Restrictions, If Any: . _ _ _ _ _ _ _ _ _ _ _ ____ _______ ___________ 100 NONE 1000-MONTH YEAR CUMULATIVE
12. Report Period Mrs 719.0 2.879.0 39,864.0 E3
13. Hours Reactor Critical 699.2 2,429.9 22,755.6 ll
14. Rx Reserve Shtdwn Hrs .0 .0 3,533.6
15. Hrs Generator On-Line 690.3 2,403.0 21,939.8 g ,,
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 2,257,325 7,909.386 67,655,084 500-
18. Gross Elec Ener (MHH) 738,530 2.612.350 22.188.830 - 40
19. Het Elec Ener (MWH) 707,443 2,500,130 21,034,985
20. Unit Service Factor 96.0 83.5 55.0
21. Unit Avail Factor 96.0 83.5 55.0 . go
22. Unit Cap Factor (MDC Net) 89.0 78.5 47.7
23. Unit Cap Factor (DER Net) 88.2 77.9 47.3
24. Unit Forced Outage Rate 2.8 16.3 38.5 o , , , , , 0 0 5 to 15 30 35 30
25. Forced Outage Hours 20.0 467.3 13,762.9 D8ys
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELING: 09/20/86. M IL 1966

27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-316
         . ,      _ _ - - - -      . . . . - . _ _ . - - _ _ - -              - - . . .       _ - - . _ - - -  -           -. -- -          -. _ _ - . - . =-       -                                  - - - - - - - - -

l muwummumununuwunuuuuuuuMuuuummuuunnu SALEM 2 M Report Period APR 1986 UNIT SHUTD0WNS / R E D U C T I O P: S M MMMMMMMMMNNMMMMMMMMMNNNNNNuMMMMMNNNN l l I LER Number System Component Cause & Corrective Action to prevent Recurrence No. Date M Hours 8teason 212 04/12/86 F 8.0 A 3 HA GENERA GENERATOR VIBRATION. 214 04/12/86 F 8.0 A 3 HA GENERA GENERATOR VIBRATION. 216 04/13/86 F 4.0 B 4 HC UMPXX CONDENSATE /HOTHELL PUMPS. 1 218 04/13/86 S 8.7 5 4 HC PUMPXX CONDENSATE /MOTHELL PUMPS. s 1 1 i i i l l l I i unu2:MMMMMM SALEM 2 INCURRED 4 SHORT GUTAGES IN APRIL. M

SUMMARY

M f nu=munuuuuu Type Ruson Method Svstem 8 Com onent ! F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H 1 S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for f C-Refueling H-Other 3-Auto Scram Preparation of I D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                        & License Examination                       9-Other              (LER) File (NUREG-0161)

PAGE 2-317

c= c==== stun =====:c===nu====musum=un a SALEM 2 u n=unusu======uu=wu=u=um=n===unu==zmu FACILITY DATA

;        FACILITY DESCRIPTION R* Port Period APR 1986 UTILITY 8 CONTRACTOR INFORMATION LOCATION

) STATE....................NEW JERSEY UTILITY ! LICENSEE.................ruBLIC SERVICE ELECTRIC & GAS 1 COUNTY................... SALEM ' CORPORATE ADDRESS. . . . . . . 80 PARK PL ACE DIST AND DIRECTION FROM NEWARK, NEW JERSEY 07101 NEAREST POPULATION CTR.. 20 MI S OF CONTRACTOR WILMINGTON, DEL ARCHITECT / ENGINEER.......PUBLIC SERVICES & GAS CO. TYPE OF REACTOR. . . . . . . . . . . .PWR I NUC STEAM SYS SUPFLIER. .. WESTINGHOUSE DATE INITIAL CRITICALITY... AUGUST 8, 1980 CONSTRUCTOR.............. UNITED ENG. & CONSTRUCTORS l DATE ELEC ENER 1ST GENER... JUNE 3, 1981 TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE... 0CTOBER 13, 1981 REGULATORY INFORMATION {' CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I i CONDENSER COOLING WATER.... DELAWARE RIVER IE RESIDENT INSPECTOR......T. LINVILLE ELECTRIC RELIABILITY i i COUNCIL..................MID-ATLANTIC LICENSING PROJ MANAGER.....D.'FISCHER DOCKET NUMBER........... 50-511

AREA COUNCIL LICENSE & DATE ISSUANCE....DPR-75, MAY 20, 1981 a

PUBLIC DOCUMENT

 !                                                                                                                    ROOM....... SALEM FREE PUBLIC LIBRARY
 ,                                                                                                                                       112 WEST BROADWAY INSPECTION                                                        SALEM, NEW JERSEY 08079 INSPECTION 

SUMMARY

STATUS I i NO INSPECTION INPUT PROVIDED.

 )

j ENFORCEMENT

SUMMARY

J NONE OTHER ITEMS SYSTEMS AND CDMPONENTS: NO INPUT PROVIDED. i j FACILITY ITEMS (PLANS AND PROCEDURES): i NO INPUT PROVIDED. t I PAGE 2-318

MMMMMMMMMMMMMMMMMMMNNMMMMMMNNNNNNMMMM M SALEM 2 IN5PECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMNNMMMNNNNMMNNMM Report Period APR 1986 OTHER ITEMS MANAGERIAL ITEMS: NO INPUT PR0b!DED. r PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REP 0RTS FR0M LICENSEE l

 ================================================================ ======================

NUMBER DATE OF DATE OF SUBJECT - - - __ - _ _ . REPORT EVENT NO INPUT PROVIDED.

  ============================================================= =,======= ======= =,=,=,=,=,,====,,=

1 I PAGE 2-319

1. Dock t 50-206 0PERATING STATUS rm""-"" Mn :MM MEM 2 m a r -_ n
2. Reporting Pericd 04/01/86 Outage + On-lina Hros 719.0 n SAN ONOFRE 1 0 E3 t2MEU Enn:EMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

E. R. SIACOR (714) 368-6223 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 1347 SN4 ONOFRE 1
5. Nameplate Rating (Gross MWe): 500 X 0.9 = 450
6. Design Electrical Rating (Net NHe): 436
7. Maximum Dependable Capacity (Gross MWe): 456 1M
8. Maximum Dependable Capacity (Net MWe): 436 * ~
9. If Changes Occur Above Since Last Report, Give Reasons: . ..PRX. DEPDC. CFr. - 438 (100%)

NONE

10. Power Level To Which Restricted, If Any (Net MHe): 390 l 11. Reasons for Restrictions, If Any:

STEAM GENERATOR TUBE CORROSION. 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 165.463.0
13. Hours Reactor Critical .0 .0 96,113.2
14. Rx Reserve Shtchn Hrs .0 .0 .0 h
15. Hrs Generator On-Line .0 .0 92.375.5
16. Unit Reserve Shtdwn Hrs .0 l
                                                        .0             .0
17. Gross Therm Ener (MHH) 0 0 117.311.124
18. Gross Elec Ener (MHH) 500-0 0 39.829.634 NO NET P06ER OUTPUT THIS MONTH
19. Het Elec Ener (MHH) -783 -3.714 37.657.363 -100
20. Unit Service Factor .0 .0 55.8 -80
21. Unit Avail Factor .0 0 55.8 -80 l ._22. Unit Cap Factor (MDC Net) .0 .0 52.2 ~"
23. Unit Cap Factor (DER Net) .0 .0 52.2
24. Unit Forced Outage Rate -30
                                            .0         .0           21.1      0   -
25. Forced Outage Hours .0 0 5 to 15 20
                                                                                                                                     ..        0
                                                       .0      12.129.7                                                             25     30 DfWS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE ITftIL 1988

27. If Currently Shutdown Estimated Startup Date:

06/13/86 PAGE 2-320 i I

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M Repsrt Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M SAN ONOFRE 1 RMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM N9, Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevont Recurrence 93 11/21/8S S 719.0 C 4 REFUELING /BACKFIT NORK CONTINUES. i I n=5MMMMMMMM SAN ONOFRE 1 REMAINS SHUT DONN FOR REFUELING AND BACKFIT. _u

SUMMARY

M MEMEMMMMMMM Type Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

               & License Examination        9-Other         (LER) File (NUREG-0161)

PAGE 2-321

U

=============== c:::::::r: xs SAN ONOFRE 1 m
====a= rce :mununuMumMMuwwmMMM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... CALIF 0RNIA LICENSEE................. SOUTHERN CALIFORNIA EDISON COUNTY................... SAN DIEGO CORPORATE ADDRESS....... 2244 HALNUT GROVE AVENUE DIST AND DIRECTION FROM ROSEMEAD, CALIFORNIA 91770 NEAREST POPULATION CTR.. 5 MI S OF CONTRACTOR SAN CLEMENTE, CA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... JUNE 14, 1967 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... JULY 16, 1967 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... JANUARY 1, 1968 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......V CONDENSER COOLING HATER. . . . PACIFIC OCEAN IE RESIDENT INSPECTOR......A. DANGELO ELECTRIC RELIABILITY COUNCIL..... ............HESTERN SYSTEMS LICENSING PROJ MANAGER.....H. PAULSON COORDINATING COUNCIL DOCKET NUMBER......... . 50-206 LICENSE & DATE ISSUANCE. . . .DPR-13, MARCH 27,1967 PUBLIC DOCUMENT R00M....... SAN CLEMENTE BRANCH LIBRARY 242 AVENIDA DEL MAR INSPECTION SAN CLEMENTE, CALIFORNIA 92672 INSPECTION

SUMMARY

STATUS

     + INSPECTION ON FEBRUARY 12 - APRIL 25,1986 (REPORT NO.

50-206/86-07) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.

     + INSPECTION ON FEBRUARY 15 - MARCH 27, 1986 (REPORT NO.

OPERATIONS PROGRAM INCLUDING THE FOLLOHING AREAS: 50-206/86-09) AREAS INSPECTED: ROUTINE, RESIDENT INSPECTION OF SURVEILLANCE ACTIVITIES, MONTHLY MAINTENANCE ACTIVITIES, OPERATIONAL SAFETY VERIFICATION, REVIEH, AND FOLLOHUP OF PREVIOUSLY IDENTIFIED ITEMS. REFUELING ACTIVITIES, INDEPENDENT INSPECTION, EVALUATION OF PLANT TRIPS AND LICENSEE EVENT REPORT DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED. RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

     + INSPECTION ON OCTOBER 1, 1984 - JUNE 18, 1986 (REPORT NO.         50-206/86-10)

INSPECTION CONTINUING; TO BE COMPLETED IN JUNE, 1986. YEARLY SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE.

     + INSPECTION DN APRIL 14-28, 1986 (REPORT NO.        50-206/86-11)

REPORT BEING PREPAREDs TO BE REPORTED NEXT MONTH.

     + INSPECTION DN MARCH 24 - APRIL 16, 1986 (REPORT NO.

50-206/86-12) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF ALLEGATION FOLLOHUP AND LICENSEE ACTION ON RADIOLOGICAL ENVIRONMENTAL MONITORING, OCCUPATIONAL E CGHTROL OF RADIDACTIVE INSPECTION PROCEDURES MATERIALS AND CONTAMINATION, SURVEYS AND MONITORING, AND FACILITY TOURS HERE UTILIZED. PAGE 2-322

                                                                                                              -~

l MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 INSPECTION STATUS - (CONTINUED) M SAN ONOFRE 1 M MMMMMMMMMMMVWMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. O INSPECTION ON APRIL 1-11, 1986 (REPORT NO. 50-206/86-13) REPORT BEING PREPARED; 19 BE REPORTED NEXT MONTH. O INSPECTION C.4 MARCH 17-21,1986 (REPORT NO. 50-206/86-15) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH. O INSPECTION ON MARCH 28 - MA) 12, 1986 (REPORT NO. 50-206/86-16) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH. O INSPECTION ON APRIL 21 - MAY 15, 1986 (REPORT NO. 50-206/86-17) INSPECTION CONTINUING; TO BE COMPLETED IN MAY, 1986. O INSPECTION ON AUGUST 6-9, 1986 (REPORT NO. 50-206/86-18) INSPECTION TO BE COMPLETED IN AUGUST, 1986. O INSPECTION ON APRIL 14 - MAY 6, 1986 (REPORT NO. 50-206/86-19) REPORT BEING PREFARED; TO BE REPORTED NEXT MONTH. ENFORCEMENT

SUMMARY

CONTRARY TO PARAGRAPHS (J) AND (K) 0F to CFR 50.49, SECTION 5.2.2 0F THE " GUIDELINES FOR EVALUATING ENVIRONMENTAL QUALIFICATION FDQ CLASS IE ELECTRICAL EQUIPMENT IN OPERATING REACTORS", AND NUREG-0588 " INTERIM STAFF POSITION ON ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT", FORGALITE TERMDCOUPLE EXTENSION CABLE, AT THE TIME OF THE INSPECTION, THE FILES DID NOT ESTABLISH SIMILARITY BETHEEN THE PLANT EQUIPMENT AND TEST SPECIMEN; SPECIFICALLY, THE PRCCESSES FOR APPLYING INSULATION TO THE CONDUC10RS HERE NOT SH0HN TO BE SIMILAR. CONTRARY TO PARAGRAPH (J) 0F 10 CFR 50.49, FOR ROCKBESTOS FIREHALL EP CABLE, AT THE TIME OF THE INSPECTION, THE FILES DID NOT ADEQUATELY SUPPORT CLAIMED QUALIFICATION TO 10 CFR 50.49; SPECIFICALLY, THE TEST REPORT RELIE3 DN FOR QUALIFICATION HAS ROCKBESTOS GEFORT QR81804, WHICH IS DISCREDITED BY IE INFORMATION NOTICE 84-44. CONTRARY TO PARAGRAPHS (J) AND (K) 0F to CFR 50.49 AND SECTION 5.2.5 0F THE " GUIDELINES", FOR TARGET ROCK SOLENDID VALVE SV119, AT THE TIME OF THE INSPECTION, THE F4LES DID NOT l DETERMINE QUALIFIED LIFE BASED ON NORMAL ENERGIZATION; INSTEAD LIFE HAS DETERMINED HITHOUT CONSIDERATION FOR SELF HEATING EFFECTS l THAT SUBSTANTIALLY REDUCED THE LIFE. CONTRARY TO PARAGRAPHS (J) AND (K) 0F 10 CFR 50.49 AND SECTION 5.1 0F THE " GUIDELINES", FOR i HONEYHELL E/P TRANSDUCER FCV 1115D, AT THE TIME OF THE INSPECTION, QUALIFICATION FOR A STEAM ENVIRONMENT HAS BASED ENTIRELY ON ANALYSIS HITH NO TYPE TEST. CONTRARY TO PARAGRAPHS (J) AND (K) 0F 10 CFR 50.49 AND SECTIONS 2.2(7) AND 2.1(1) 0F NUREG-0588 CATEGORY II, FOR ROCKBESTOS FIREHALL III CABLE, AT THE TIME OF THE INSPECTION: A) THE FILES DID NOT ADEQUATELY SUPPORT CLAIMED QUALIFICATION TO to CFR 50.49; SPECIFICALLY, THE TEST REPORT RELIED ON FOR QUALIFICATION HAS ROCKBESTOS REPORT QRS1803, WHICH IS DISCREDITED BY IE INFORMATION NOTICE 84-44. B) THE FILES DID NOT CONTAIN TEST DATA RELEVANT TO THE REQUIRED OPERATING PERFORMANCE CHARACTERISTICS IN THE PLANT. (8503 4) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: INVESTIGATION FOLLONING THE NOVEMBER 21, 1985, TRIP AND FEEDHATER HAMMER EVENT DISCLOSED FAILURES OF FIVE MAIN FLOW CHECK VALVES IN THE FEEDWATER SYSTEM (BOTH FEEDWASTER PUMP DISCHARGE CHECK VALVES AND ALL fHREE STEAM GENERATOR FEED LINE CHECK VALVES). FACILITY ITEMS (PLANS AND PROCEDURES): NONE PAGE 2-323

   .~ - - - _ . . - . . . .       .-         . . .      - - - . .    . - _ . . _ . - . - - - - . .._.--                    - -.-- - -                   _ - - - . _ . -   - . . -                     . . . - . . . - .

Report Period APR 1986 IOSPECTIOQ $TATUS c==;=======r=LLa m sca;=== rnamacra (CONTINUED) u SAN DNOFRE 1 M i i n==nur======aanan===ust nnrc= c wn=3 OTHER ITEMS MANAGERIAL ITEMS: 1 NOME  ; PLANT STATUS: THE SEISMIC UNIT BEGANAND UPGRADE, A REFUELING EQUIPMENT AND MODIFICATION QUALIFICATION ITEMS. OUTAGE IN LATE NOVEMBER 1985. RETURN TO OPERATION IS SCHEDULED FOR JUNE 1986. MODIFICATIONS HILL INCLUDE t LAST IE SITE INSPECTION DATE: 08/06-09/86+ INSPECTION REPORT NO: 50-206/86-18+  ! I i

!                                                                                               REPORTS               FR0M              LICENSEE                                                                                           r l                        NUMBER      DATE OF        DATE OF                                                                                                                                                                               l 1                                                                      SUBJECT 4

EVENT REPORT  ! 4 86-01-LO 01-07-86 03-03-86 DELINQUENT SURV ON 82 DIESEL GENERATOR VALVES j 86-03-L0 02-10-86 03-12-86 , 1 MISSING PLANT VENT STACK FILTER SAMPLES i I

                   ==========.=======.===.====...======== ============== === = ===.==.===                                                                                                                                               .

4 1 L l l l 1 i , l l 1 i. PAGE 2-324 t 2 1 4 'i l 1

    -              ~~
                                                                 =                                                                     --                                 _ _ _ _ _ _ _ _ _ _ _ _ .
 ,m __., 4 .--- -_..e___aa_ , -.-__.Ax a___, -- .sa- m._- -_-_--uA m*-- -
                                                                          ..a = _ _ . -_ _ ____A__& L _ __ . _ m  -ams   _-

N M i l W l O l et A i F I t w 2 et

                 .a 54 w
                 .J
                 .a ma et 2

O M

                  >=

Z W

                  >=

2 M W O at A M M Z

                   >=
1. Dockct 50-361 0PERATIOO STATUS L" ::w w.=; 2_;_2 - - - - - -
                                                                                                                                           - - - - - - -41 0               SAN ONOF;E 2                                                    0
2. Reporting Period: 04/01/86 Outage + On-line Hes: 719.0 unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum
3. Utility

Contact:

E. R. SIACOR (714) 368-6223 AVERAGE DAILY PONER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3410 SfW ONOFRE 2
5. Naneplate Rating (Gross MWe): 1127
6. Design Electrical Rating (Net MHe): 1070
7. Maximum Dependable Capacity (Gross MHe): 1127 1900
8. Maximum Dependable Capacity (Not MHe): 1070 IE
  • EIE " IE
                                                                          ...      ffDC. DEPDC. Orr. - 1070 (100X3
9. If Changes Occur Above Since Last Report, Give Reasons:
10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any: NO PET PO6ER OUTPUT THIS MONTH
                                                                                                                                                             -300 NONE 1000-MONTH        YEAR     CUMULATIVE
12. Report Period Hrs 719.0 2.879.0 23.928.0
13. Hours Reactor Critical 1.706.5 14.827.4 ~80
                                      .0 h
14. Rx Reserve Sht &n Mrs .0 .0 .0
15. Hrs Generator On-Line .0 1.701.0 14.550.7
16. Unit Reserve Sht&n Mrs .0
                                                                                                                                                             -80
                                                  .0          .0
17. Gross Thern Ener (MHH) 0 5.172.735 46.708.697 300-
18. Gross Elec Ener (MHH) 0 1.726.949 15.697.149
                                                                                                                                                            -to
19. Net Elec Ener (MHH) -3.867 1.630.089 14.826.728
20. Unit Service Factor .0 59.1 60.8
21. Unit Avail Factor .0 59.1 60.8
                                                                                                                                                            - 30
22. Unit Cap Factor (MDC Net) .0 52.9 57.9
23. Unit Cap Factor (DER Net) .0 52.9 57.9
24. Unit Forced Outage Rate 0 3.1 5.0 0 -
                                                                                 .       .                                  .-          .-   .-               0 0         s
25. Forced Outage Hours to 13 m 3 30
                                      .0       54.0        767.9                                DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELING OUTAGE: MARCH 15. 1986. 80 DAYS. fFRll 1988

27. If Currently Shutdown Estimated Startup Date: 06/02/86 PAGE 2-326
                                                                                                           .m               _ . .               _ . -_       .- - . . - _ - -                             _ - - - - -

MNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN N Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS N SAN ONOFRE 2 NNMMMNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Date E E Reason flpthod LER Number $vstem domponent C- = A Corrective Action to Prevent Recurrence No. 4 RC FUELXX REFUELING OUTAGE CONTINUES 25 03/15/86 S 719.0 C N==munuwwww SAN ONOFRE 2 REMAINS SHUT DOWN FOR REFUELING.

 ,_N 

SUMMARY

N MMMMMMMMMMM Type Reason Method System 8 Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                 & License Examination            9-Other                   (LER) File (NUREG-0161)

PAGE 2-327

c~r---  :::::: n =n = -  : ::: nt n u SAN ON m c::: r-r~~~znarre,OFRE 2 r-rrrrrr"- ::::::n FACILITY DATA Report Poritd APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... CALIF 0RNIA LICENSEE............... . SOUTHERN CALIFORNIA EDISON COUNTY...... ............ SAN DIEGO CORPORATE ADDRESS........P.O. BOX 800 ROSEMEAD, CALIFORNIA 91770 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI S OF CONTRACTOR SAN CLEMENTE, CA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY... JULY 26, 1982 CONSTRUCTOR..............BECHTFL DATE ELEC ENER IST GENER... SEPTEMBER 20, 1932 TURBINE SUPPLIER......... GENERAL ELECTRIC COM (ENG VERSION) DATE COMMERCIAL OPERATE.... AUGUST 8, 1983 REGULATORY INFORMATION CONDENSER COOLING METHOD. .ONCE THRU IE REGION RESPONSIBLE......V CONDENSER COOLING MATER.... PACIFIC OCEAN IE RESIDENT INSPECTOR......R. HUEY l ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....H. ROOD COUNCIL....... ..........HESTERN SYSTEMS DOCKET NUMBER....... ... 50-361 C00xDINATING COUNCIL LICENSE & DATE ISSUANCE....NPF-10, SEPTEMBER 7, 1982 i PUBLIC DOCUMENT R00M....... SAN CLEMENTE LIBRARY 242 AVENIDA DEL MAR SAN CLEMENTE, CALIFORNIA INSPECTION STATUS INSPECTION

SUMMARY

   + INSPECTION ON FEBRUARY 15 - MARCH 27, 1986 (REPORT NO.            50-361/86-08) AREAS INSPECTED: ROUTINE, RESIDENT INSPECTION OF OPERATIONS PROGRAM INCLUDING THE FOLL0HING AREAS: OPERATIONAL SAFETY VERIFICATION, EVALUATION OF PLANT TRIPS AND EVENTS, MONTHLY SURVEILLANCE ACTIVITIES, MONTHLY MAINTENANCE ACTIVITIES, REFUELING ACTIVITIES, INDEPENDENT INSPECTION, LICENSEE EVENT REPORT REVIEH, AND FOLLOHUP OF PREVIOUSLY IDENTIFIED ITEMS.           DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

RESULTS: OF THE TEN AREAS EXAMINED, ONE VIOLATION HAS IDENTIFIED INVOLVING FAILURE TO COMPLY HITH APPROVED HOUSEKEEPING AND FIRE PROTECTION PROCEDURES.

   + INSPECTION ON OCTOBER 1,       1984 - JUNE 18, 1986 (REPORT NO.       50-361/86-09) YEARLY SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE.

INSPECTION CONTINUING; TO BE COMPLETED IN JUNE, 1986.

   + INSPECTION ON MARCH 24 - APRIL 26, 1986 (REPORT NO.           50-361/86-10) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF ALLEGATION FOLLOHUP AND LICENSEE ACTION ON RADIOLOGICAL ENVIRONMENTAL MONITORING, OCCUPATIONAL EXPOSURE DURING EXTENDED OUTAGES, CONTROL OF RADI0 ACTIVE MATERIALS AND CONTAMINATION, SURVEYS AND MONITORING, AND FACILITY TOURS.                DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. ONE UNRESOLVED ITEM RELATED TO VENTILATION IN THE RADWASTE AREA HAS IDENTIFIED. PAGE 2-328

uxMuuuununuuuuuuuuu MumMn=ununu=3nnu SAN ONOFRE 2 N R:part Period APR 1986 INSPECTION STATUS - (CONTINUED) N NMMMMMMMNNMMMNNNNNNMMMNNNNNNNNNNNNNN. INSPECTION

SUMMARY

 + INSPECTION ON MARCH 28 - MAY 12, 1986 (REPORT NO.                            50-361/86-11) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
 + INSPECTION ON APRIL 21 - MAY 15,1986 (REPORT NO. 50-361/86-12) INSPECTION CONTINUING; TO BE COMPLETED IN MAY, 1986.
 + INSPECTION ON AUGUST 6-9, 1966 (REPORT NO. 50-561/86-13) INSPECTION TO BE COMPLETED IN AUGUST, 1986.
 + INSPECTION ON tPRIL 14 - MAY 6, 1986 (REPORT NO. 50-361/86-14) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
 + INSPECTION ON MAY 14-16, 1986 (REPORT NO. 50-361/86-15) INSPECTION CONTINUING; TO BE REPORTED IN MAY, 1986.
 + INSPECTION ON APRIL 14-28, 1986 (REPORT NO.                         50-361/86-16) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.

ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: -

 + ON MARCH 15, 1986, THE UNIT ENTERED CYCLE 1 REFUELING OUTAGE. THE OUTAGE IS SCHEDULED TO COMPLETE IN JUNE 1986.
                                                                       ~                                                          '

LAST IE SITE INSPECTION DATE: 08/06-09/86+ j/

                                                                                                                                                 ~s       ,.                .
                                                                                                                                                                                       ~
                                                                                                                                                                                        ,e
                                                                                                  ~
                                                                                                                                           ~ /                            #         '

INSPECTION REPORT NO: 50-361/86-13+ REPORTS FR0M LICENSEE NUMBER DATE OF DATE OF SU5 JECT EVENT REPORT - 86-04-Lo 01-09-86 02-10-86 REACTOR TRIP DUE TO MAIN FEEDWATER VALVE CLOSURE DUE TO HYDRAULIC DUMP VALVE FAILURE 86-05-L0 01-28-86 02-27-86 SIT 7 & 10 PRESSURE LIMIT EXCEEDED 3 =3=E ==3 3 3 33 == ==== E== = 33= 3 == Ek === == EEE E EEE =E2 = = E = = E E=3 333 3 3333333 === E 3 33= 3 333 = ==33 E3 3 3 E 3 3 3 3 3 E3 3 33 =E 33 3 333 3 333 J 33 33333 3333 33 E 33 333 3 PAGE 2-329

                                                                                                                                                 + ' ./
                                                                                                                                           ?
                                                                                                                                                                                                                              /

f'

1. Docket 50-362 , OPERATINO STATUS ImiitMH ::EZ:MMMurMur:rM: ntunnurMunts II SAN ONOFRE 3 11
2. Reprrting Perled: 04/01/8L Outtg2 + On-lina Hros 719.0 Eur:I%MMuMMuunxnxxuM:InM Mn32MNZun:Mun
3. Utility

Contact:

E. R. SIE, CAR (714) 368-6223 AVERAGE DAILY PCHER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt)s. 3390 SAN 0 6 3
5. Nameplate Rating (Gross MWe): 1127
6. Design Electrical Rating (Not MHe): 1080 -
7. Maximum Dependable Capacity (Greiss MHe): 1127 1500
8. Maximum Dependable Capacity (Not MWe): 1080 - I"
  • EI" " IN
                                                                                                                  . ... ImX. DEPDC. Ofr. - 1000 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Nhich Restricted, If Any (Net MHe): mo enn er neumsan uient errIret. omettleus II. Reasons for Restrictions, If Any  %  % r -
                                                                                                                                                                      -100 NONE MONTH                                          YEAR     CUMULATIVE
12. Report Period Hrs 719.0 2.879.0 18.239.0
13. Hours Reactor Critical 608.6 2.090.3 11.275.4
14. Rx Reserve Shtdwn Hrs .0 h
                                                                                    .0  __          .0
15. Hrs Generator On-Line 681 3 1.781.1 10.596.4 h - 80
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MWH) 2.313.945 5.453.199 30.462.763
18. Gross Elec Ener (MHH) 784.013 1.821.373 10.192.775
19. Het Elec Ener (MHH) 743.728 1.691.249 9.498.596
20. Unit Service Factor 94.8 61.9 58.1
21. Unit Avail Factor 94J 61.9 58.1
                                                                                                                                                                     -30
22. Unit Cap Factor (MDC Net) 95.8 54.4 48.2
23. Unit Cap Factor (DER Net) 95.8 54.4 48.2
24. Unit Forced Outage Rate 5.2 30.2 17.3 0 -

0

                                                                                                                                                                      -0 5      to           15    30     as
25. Forced Outage Hours 37.6 772.2 2.221.1 30 DAYS
26. Shutdowns Sened Over Next 6 Months (Type,Date, Duration):

NONE frRIL 1988

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-330

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M RYptet Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M SAN ONOFRE 3 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Ng, Date LYE 2 Hours Reason Method LER Number System Component Cause a Corrective Action to Prevent Recurrence 04/12/86 F 37.6 A 3 86-005 EE INVT THE REACTOR TRIPPED IN RESPONSE TO LOSS OF LOAD TRIP 27 SIGNAL 3 GENERATED AS A RESULT OF A SPURIOUS TURBINE VOLTAGE TRANSIENT DN PHASE "A" 0F THE HON-IE UNINTERRUPTIBLE PCJER SUPPLY INVERTER. MMMMMMMMMMM SAN ONOFRE 3 OPERATED WITH 1 OUTAGE FOR EQUIPMENT FAILURE IN APRIL. M

SUMMARY

M MMMMMMMMMMM Tvne Reason Mithsd System & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Ma,ual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                                                                       & License Examinaticn        9-Ot'her         (LER) File (NUREG-Ot61)

PAGE 2-331

                                                                                     -                  ~            . .-     . _-.~_         - --. - _            - ~. .- _ . - . _.

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M SAN ONOFRE 3 M MMMMMMMMMuMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Feriod APR 1986 FACILITY DESCRIPTIOy UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY

STATE.................... CALIF 0RNIA LICENSEE................. SOUTHERN CALIFORNIA EDISON COUNTY................... SAN DIEGO CORPORATE ADDRESS........P.O. BOX 800 DIST AND DIRECTION FROM i NEAREST PDFULATION CTR.. 5 MI S OF CONTRACTOR
!                                                                           SAN CLEMENTE, CA                     ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR                                              HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY... AUGUST 29, 1983                                 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... SEPTEMBER 25, 1983 TURBINE SUPPLIER. . . . . . . . . GENERAL ELECTRIC COM (ENG VERSION)

DATE COMMERCIAL OPERATE.... APRIL 1, 1984 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......V CONDENSER COOLING HATER.... PACIFIC DCEAN IE RESIDENT INSPECTOR......R. HUEY ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....H. ROOD COUNCIL..................HESTERN SYSTEMS DOCKET NUMBER........... 50-362 COORDINATING COUNCIL . LICENSE & DATE ISSUANCE....NPF-15, NOVEMBER 15, 1982 PUBLIC DOCUMENT R00M....... SAN CLEMENTE LIBRARY 242 AVENIDA DEL MAR SAN CLEMENTE, CALIFORNIA INSPECTION

SUMMARY

INSPECTION STATUS

                                     + INSPECTION ON FEBRUARY 15 - MARCH 27, 1986 (REPORT NO. 50-362/86-08) AREAS INSPECTED: ROUTINE, RESIDENT INSPECTION OF t

OPERATIDHS PROGRAM INCLUDING THE FOLLOHING AREAS: OPERATIONAL SAFETY VERIFICATION, EVALUA1 ION OF PLANT TRIPS AND EVENTS, MONTHLY

SURVEILLANCE ACTIVITIES, MONTHLY MAINTENANCE ACTIVITIES, REFUELING ACTIVITIES, INDEPENDENT INSPECTION, LICENSEE EVENT REPORT REVIEH, AND FOLLOHUP OF PREVIOUSLY IDENTIFIED ITEMS. DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

I RESULTS: PROTECTIONOF THE TEN AREAS EXAMINED, ONE VIOLATION HAS IDENTIFIED INVOLVING FAILURE TO COMPLY HITH APPROVED HOUSEKEEPING AND FIRE PROCEDURES.

                                     + INSPECTION ON OCTOBER 1,1984 - JUNE 18,1986 (REPORT NO.

INSPECTION CONTINUING; TO BE COMPLETED IN JUNE. 1986. 50-362/86-09) YEARLY SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE. l + INSPECTION ON MARCH 24 - APRIL 16. 1986 (REPORT NO.

>                                                                                                      50-362/86-10) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF 1

ALLEGATION FOLLOHUP AND LICENSEE ACTION ON RADIOLOGICAL ENVIRONMENTAL MONITORING, CONTROL OF RADIDACTIVE MATERIALS AND CONTAMINATION, SURVEYS AND MONITORING, AND FACILITY TOURS. OCCUPATIONAL DURING EXPOSURE THIS INSPECTION, DURING EXTENDE VARIOUS INSPECTION PROCEDURES HERE UTILIZED. RESULTS: AREA NO ITEMS HAS IDENTIFIED. OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. ONE UNRESOLVED ITEM RELATED TO VENTI PAGE 2-332

MMMMXhMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM SAN ONOFRE 3 M R:pset Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

  + INSPECTION ON MARCH 28 - MAY 12,1986 (REPORT NO. 50-362/86-11) REPORT BEING PREPARFD; TO BE REPORTED hEXT MONTH.
  + INSPECTION ON APRIL 71 - MAY 15, 1985 (REPORT NO. 50-362/86-12) INSPECTION CONTINUING; TO BE COMPLETED IN MAY, 1986.
 + INSPECTION ON AUGUST 6-9, 1986 (REPORT NO. 50-362/36-13) INSPECTION TO BE COMPLETED IN AUGUST, 1956.
 + INSPECTION ON APRIL 14 - MAY 6, 1986 (REPORT NO. 50-362/86-14) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
 + INSPECTION ON MAY 14-16, 1986 (REPORT NO. 50-362/86-15) INSPECTION CONTINUIN0; TO BE COMPLETED IN MAY, 1986.
 + INSPECTION ON APRIL 14-28, 1986 (REPORT NO. 50-362/86-16) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.

ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS NONE PLANT STATUS:

 + THE UNIT HAS RESTARTED ON MARCH 17, 1986, AND CONTINUED OPERATIONS IN APRIL. ON APRIL 13, WHILE RECOVERING FROM A SPURIOUS TRIP, THE REACTOR HAS TAKEN CRITICAL PREMATURELY DUE TO INACCURATE XENON HORTH ESTIMATES AND OPERATOR INATTENTION.

LAST IE SITE INSPECTION DATE: 08/06-09/86+ INSPECTION REPORT NO: 50-362/86-15+ PAGE 2-333

I:MMIMMMI:MHCO2M M M MH:MZZI'MM2ZZZMZI!!MZU R: port Pcried APR 1986 REP 0RTS FR0M LICENSEE M SAN ONOFRE 3 u MMMMMMMMMMMMMMMMMMMMMMMMMdMMMMMMMMMM NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _ =- __ - -- 86-01-Lo 01-12-86 02-11-86 REACTOR TRIP DUE TO TURBINE TRIP DUE TO OPERATOR ERROR 86-02-LO 02-12-86 03-14-86 CPC CHANNEL 'D' FUNCTIONAL TEST NOT PERFORMED 86-04-LO 02-14-86 04-01-86 FAILURE To COLLECT IODINE SAMPLE CARTRIDGE - TECHNICIAN ERROR - PURGE NOT SAMPLED 9 HOURS - EFFLUENT MONITORED

       ==================================================================================================================================

l I l I i l l l l l PAGE 2-334' l

M M I N W O 4 Q. W Z 4 n m W 6 W d

     >=

a J 4 2 O M H Z W H Z M LAJ O 4 C. M M Z

1. Dacket 50-327 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMuuuuuMEMuusMu M SEQUOYAH 1 M
2. Reporting Periods _04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM -
3. Utility Contacts DAVID DUPREE (615) 870-6544 AVERAGE DAILY P0HER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 3411 SEQUOYAH 1
5. Nameplate Rating (Gross MHe): 1220
6. Design Electrical Rating (Net MHe): 1148 1183 1883
7. Maximum Dependable Capacity (Gross MHe):

DESIGN DLCO. RMTING = 1148

8. Maximum Dependable Capacity (Not MHe): 1148
                                                                                           ...... fftX. DEPDC. Cfr. - 1148 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE NO NET POWER OUTPUT THIS MONTH i

10. Power Level To Which Restricted, If Any (Not MHe): , ,,
11. Reasons for Restrictions, If Any NONE MONTH YEAR CUMULATIVE - so
12. Report Period Hrs 719.0 2,879.0 42.360.0 E,3
13. Hours Reactor Critical .0 .0 24,444.7 hf
14. Rx Reserve Shtdwn Hrs .0 .0 .0 5
                                                                                                                                           - 80
15. Hrs Generator On-Line .0 .0 23.871.0 ll
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 0 0 77,060,921 0 25,978.386 - 40
18. Gross Elec Ener (MHH) 0
                                                      -14.275    24,928,462
19. Net Elec Ener (MHH) -4,111
20. Unit Service Factor .0 .0 56.4
                                                            .0            56.4                                                             - 20
21. Unit Avail Factor .0
22. Unit Cap Factor (MDC Net) .0 .0 51 .3
23. Unit Cap Factor (DER Net) _0 .0 51.3 100.0 100.0 26.3 0 .,_ , , .,, ., .

o

24. Unit Forced Outage Rate 0 5 to 15 20 25 30
25. Forced Outage Hours 719.0 2.879.0 8.506.1 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
    "                                                                                                          IFftIL 1986 NONE 1
27. If Currently Shutdown Estimated Startup Date: 07/04/86 PAGE 2-336 1

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M R purt Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M SEQUOYAH 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date TVPe Hours Reason Method LER Number System Component Cause a Corrective Action to Prevent Recurrence 4 DESIGN CONTROL, CONFIGURATION UPDATING, AND 7 12/20/85 F 719.0 F EMPLOYEE CONCERNS. l l MMMMMMMMMMM SEQUOYAH 11 REMAINS IN AN EXTENDED ADMINISTRATIVE SHUTDOHN.

 .M 

SUMMARY

M MMMMMMMMMMM Tvoe Reason Method Svstem & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination         9-Other         (LER) File (HUREG-0161)

PAGE 2-337

y UEM%MMMMMMMMNhMMMMMMMMMMMMMMMMMENMMM N SEQUOYAH 1 M usrunuxummuuuunumwwwwwwwwwwwwwwumumM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE. ... .......... TENNESSEE LICENSEE............... . TENNESSEE VALLEY AUTHORITY COUNTY.. . . . .... . HAMILTON CORPORATE ADDRESS....... 6 NORTH 38A LOOKOUT PLACE CHATTANDOGA, TENNESSEE 37401 DIST AND DIRECTION FROM NEAREST POPULATION CTR. .9.5 MI NE OF CONTRACTOR CHATTANDOGA, TN ARCHITECT / ENGINEER. .. .. TENNESSEE VALLEY AUTHORITY TYPE OF REACTOR. .. ..PHR NUC STEAM SYS SUPPLIER. .HESTINGHOUSE DATE INITIAL CRITICALITY... JULY 5, 1980 CONSTRUCTOR. ............ TENNESSEE VALLEY AUTHORITY DATE ELEC ENER IST GENER. . JULY 22, 1980 TURBINE SUPPLIER. .. . .HESTINGHOUSE DATE COMMERCIAL OPERATE. .. JULY 1, 1981 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE.. . .II CONDENSER COOLING HATER.. .CHICKAMAUGA LAKE IE RESIDENT INSPECTOR......E. FORD ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....C. STAHLE COUNCIL. .. ..... . SOUTHEASTERN ELECTRIC DOCKET NUMBER.... . ... 50-327 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-77, SEPTEMBER 17, 1980 PUBLIC DOCUMENT ROOM.. ....CHATTANDOGA - HAMI1 TON BICENTENNIAL LIBRARY 1001 BROAD STREET CHATTANOOGA, TENNESSEE 37402 INSPECTION STATUS INSPECTION

SUMMARY

    + INSPECTION FEBRUARY 3-7 (86-11):               THIS SPECI AL, ANNOUNCED INSPECTION INVOLVED 77 INSPECTOR-HOURS ON SITE CONCERNING LICENSEE RESPONSE TO GENERIC LETTER 83-28, REQUIRED ACTIONS BASED ON GENERIC IMPLICATIONS OF SALEM ANTICIPATED TRANSIENT HITHOUT SCRAM (ATHS) EVENTS. AREAS INSPECTED INCLUDED: POST-TRIP REVIEH; EQUIPMENT CLASSIFICATI0H; VENDOR INTERFACE AND MANUAL CONTROL; POST-MAINTENANCE TESTING; AND REACTOR TRIP SYSTEM RELIABILITY. ONE VIOLATION AND DEVIATION HAS IDENTIFIED: INADEQUACIES IN DEVELOPMENT AND IMPLEMENTATION OF MAINTENANCE INSTRUCTION MI-10.9 AND SURVEILL ANCE INSTRUCTION SI-227.1; AND FAILURE TO ESTABLISH l    A FORMALIZED TRENDING PROGRAM FOR REACTOR TRIP BREAKERS.

INSPECTION FEBRUARY 10-14 (86-12): THIS SPECIAL, UNANNOUNCED INSPECTION ENTAILED 66 INSPECTOR-HOURS AT CORPORATE OFFICES AND ON SITE IN THE AREA 0F QUALITY ASSURANCE RELATED COMMITMENTS AND GOALS DELINEATED IN THE CORPORATE NUCLEAR PERFORMANCE PLAN, THE SEQUOYAH HUCLEAR PERFORMANCE PLAN, AND DIVISION OF QUALITY ASSURANCE (DQA) PERSONNEL PERFORMANCE. ONE VIOLATION HAS IDENTIFIED - INADEQUATE RECORD CONTROLS. INSPECTION FEBRUARY 18-28 (86-13): THIS SPECI AL, ANNDUNCED INSPECTION INVOLVED 208 INSPECTOR-HOURS ON SITE TO EVALUATE TVA'S REINSPECTION OF HELDING ACTIVITIES. THE EVALUATION INCLUDED REINSPECTION BY NRC PERSONNEL USING NONDESTRUCTIVE EXAMINATION (NDE) 0F SELECTED HELDS IN PIPING AND STRUCTURAL COMPONENTS. THE NRC INSPECTION SAMPLE INCLUDED ITEMS HHICH HAD BEEN REINSPECTED BY TVA AS HELL AS ITEMS HHICH HAD NOT BEEN REINSPECTED BY TVA. TVA INSPECTION RECORDS HERE COMPARED HITH NRC INSPECTION FINDINGS TO EVALUATE THE TVA REINSPECTION. THE TVA INSPECTION FINDINGS HERE REVIEHED TO DETERMINE THE ADEQUACY OF THE PROCESS USED TO DISPOSITION THOSE FINDINGS. IN ADDITION TO THE ABOVE INSPECTION ACTIVITIES, THE NRC WELD CONSULTING TEAM MET HITH HRC AND TVA TO PERSONALLY OBSERVE HELDING REINSPECTION ACTIVITIES. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. PAGE 2-338

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMhAMMMM SEQUOYAH 1 M R:psrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

THIS ROUTINE, ANNOUNCEC INSPECTION INVOLVED 132 RESIDENT INSPECTOR-HOURS ON SITE IN THE INSPECTIONOPERATIDHAL FEBRUARY 6 SAFETY

                                 - MARCH  5 (86-15):                                                      RADIATION PROTECTION, SAFEGUARDS AND AREAS OF:                        VERIFICATION  (INCLUDING OPERATIONS PERFORMANCE, SYSTEM LINEUPS, HOUSEKEEPING INSPECTIONS); SURVEILLANCE AND MAINTENANCE OBSERVATIONS; REVIEN OF PREVIOUS INSPECTION FINDINGS; FOLLOHUPONE VIOLATION      OF EVENTS; REVIEH OF LICENSEE IDENTIFIED ITEMS; REVIEH OF IE INFORMATION NOTICES; AND REVIEW OF INSPECTOR FOLLOHUP ITEMS.

(FAILURE TO COMPLY HITH TECHNICAL SPECIFICATION 6.2.3, INDEPENDENT SAFETY ENGINEERING GROUP) HAS IDENTIFIED. THIS ROUTINE, ANNOUNCED INSPECTION ENTAILED 80 INSPECTOR-HOURS ON SITE IN THE AREAS OF INSPECTION FEBRUARY 17-21 (86-17): NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED AS LICENSED AND NON-LICENSED OPERATOR TRAINING AND LICENSED REQUALIFICATION TRAINING. A RESULT OF THIS INSPECTION. THIS SPECIAL, ANNOUNCED INSPECTION ENTAILED 112 INSPECTOR-HOURS ON SITE IN THE AREA 0F INSPECTION FEBRUARY 24-28 (86-18): MAINTENANCE ACTIVITIES. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. THIS SPECI AL, ANNOUNCED INSPECTION INVOLVED 177 INSPECTOR-HOURS ON SITE IN THE AREA 0F OPERATIONAL INSPECTIONVERIFICATION, READINESS MARCH 3-14 (86-20): INCLUDING: SELECTED AREAS OF THE SEQUDYAH NUCLEAR PERFORMANCE PLAN, VOLUME II; LICENSEE'S ACTION ON OPEN 327,328/85-46; AND ITEMS FROM THE OPERATIONAL READINESS INSPECTION OF DECEMBER 1985 NHICH HERE DOCUMENTED IN INSPECTION REPORTIN THE AREAS INSP TESTING ASSOCIATED WITH ENVIRONMENTAL QUALIFICATION (EQ) MODIFICATIONS. FUNCTIONAL INPUT CHECK (1) FAILURE TO ESTABLISH AND IMPLEMENT A PROCEDURE FOR THE 18 MONTH MANUAL ENGINEERED SAFETY FEATURE (ESF) OF THE REACTOR TRIP SYSTEM; (2) FAILURE TO VERIFY THE POSITIONS OF CONTAINMENT ISOLATION VALVES; AND (3) IMPROPER PROCEDURAL IMPLEMENTATION OF TECHNICAL SPECIFICATION (TS) REQUIREMENTS FOR THE PLANT OPERATIONS REVIEH COMMITTEE, RESULTING IN QUORUM REQUIREMENTS NOT BEING MET. INSPECTION MARCH 20-21 (86-23): THIS SPECIAL, UNANNOUNCED INSPECTION ENTAILED 7 INSPECTOR-HOURS ON SITE IN THE AREAS OF A 2821 0F JANUARY 24, 1983) IN THE ELECTRICAL AREA HORKER'S ALLEGATION HITH REGARD TO A TVA NONCONFORMING CONDITION REPORT (NCR NO. THAT HAS PURPORTED TO BE DISPOSITIONED BY A PARTY THAT HAS NOT QUALIFIED. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION MARCH 18-21 (86-24): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 15 INSPECTOR-HOURS ON SITE IN THE AREAS OF FOLLOH-UP DN A LICENSEE IDENTIFIED ITEM, IE BULLETIN 80-11, LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, AND THE SNUBBER SURVEILLANCE PROGRAM. ONE VIOL ATION HAS IDENTIFIED - INADEQUATE PROCEDURE AND L ACK OF RECORDS DOCUMENTING FUNCTIONAL TESTING OF MECHANICAL SNUBBERS. ENFORCEMENT

SUMMARY

CONTRARY TO APPENDIX B, CRITERION V 0F 10 CFR 50 AND TVA SEQUOYAH NUCLEAR PLANT 79-02 ANCHOR BOLT INSPECTION PROCEDURE, BETHEEN FEBRUARY 24-28, 1986, ACTIVITIES AFFECTING QUALITY HAD NOT BEEN ACCOMPLISHED IN ACCORDANCE WITH DOCUMENTED INSTRUCTIONS AND PROCEDURES IN THAT THE LICENSEE'S QC INSPECTORS FAILED TO DETECT THE ANCHOR BOLT DEFICIENCIES FOR NINE PIPE SUPPORTS AND ONE PUMP SUPPORT PLATFORM BASEPLATE DURING THEIR INSPECTIONS. THE DEFICIENCIES HERE THE GAPS BETHEEN THE BOLT-HEADS AND THE BASEPLATES. CONTRARY TO APPENDIX B, CRITERION V 0F 10 CFR 50 AND TVA SEQUOYAH NUCLEAR PLANT 79-02 ANCHOR BOLT INSPECTION PROCEDURE, BETHEEN FEBRUARY 24-28, 1986, ACTIVITIES AFFECTING QUALITY HAD NOT BEEN ACCOMPLISHED IN ACCORDANCE HITH DOCUMENTED INSTRUCTIONS AND PROCEDURES IN THAT THE LICENSEE'S QC INSPECTORS FAILED TO DETECT THE ANCHOR BOLT DEFICIENCIES FOR NINE PIPE SUPPORTS AND ONE PUMP SUPPORT PLATFORM BASEPLATE DURING THEIR INSPECTIONS. THE DEFICIENCIES HERE THE GAPS BETHEEN THE BOLT-HEADS AND THE BASEPLATES. (8601 4) OTHER ITEMS PAGE 2-339 t

R pert Paried APR 1985 MZUMZ:EunUMHHMZMM%CZUZZ22%%%HMOGM%%U INSPECTION STATUS - (CONTINUED) u SEQUOYAH 1 M HMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:

               + ENVIRONMENTAL QUALIFICATION OF EQUIPMENT.

FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE PLANT STATUS: MODE 5. LAST IE SITE INSPECTION DATE: MARCH 18-21, 1986 + INSPECTION REPORT NO: 50-327/86-24 + REP 0RTS FR0M LICENSEE

               ====================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-002 02/12/86 03/12/86 PERFORMING SI-197 OVERTEMPERATURE SHITCH 311-5B ACTIVATED HITHOUT TAKING PROPER PREPLANNING ACTION, CAUSING A MAIN CONTROL ROOM VENTILATION ISOLATION; DUE TO PERSONNEL ERROR. 86-003 02/20/86 03/14/86 PERFORMING SI-501 OPERATIONS PERSONNEL TRIPPED HRONG BREAKER ON THE INSTRUMENT POWER DISTRIBUTION VENTILATION PANEL - RADIATION MONITOR RATEMETER LOST P0HER AND CAUSED AN AUXILIARY BUILDIN ISOLATION. 86-004 02/18/86 03/18/86 IMPROPER ENTRANCE, BY A PERSON, INTO A HIGH RADIATION AREA, DUE TO PERSONNEL ERROR. 86-005 02/18/86 03/20/86 MISSED HOURLY FIRE HATCH DUE TO INACCESSIBILITY AND A PERSONNEL ERROR.

               ================================================================================6========== ======================================

PAGE 2-340

84 0 N kJ O 4 L M Z 4 a M C W J

                                 .a
                                 .J 4

2 O ke H Z W H E M W G 4 A t/1 m Z H L_.____._ _ _ _ . _ _ _ _ . . _ _

1. Docksts 50-328 0PERATING STATUS Runn:Muni: nritunnEMnM5MMn2nn : Man:Mn:I H SEQUDYAH 2 M
2. Rip:grting Paried: 04/01/86 Outtgm + On-line Hrs: N MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

DAVID DUPREE (615) 870-6544 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3411 SEQUOYfWI 2
5. Nameplate Rating (Gross MWe): 1220
6. Design Electrical Rating (Not MHe): 1148
7. Maximum Dependable Capacity (Gross MWe): 1183 1500
3. Maximum Dependable Capacity (Not MHe): 1148 DESIGN E1EO. RRTING = 1148
                                                                                                                                   ----..IflX. DEPDe. O!r. - 1148 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any -100 NONE 1000-MONTH YEAR CUMULATIVE
12. Report Period Hrs 719.0 2,879.0 34,320.0
                                                                                                                                                                               - 80
13. Hours Reactor Critical .0 .0 21,984.5
14. Rx Reserve Shtdwn Hrs .0 .0 .0 h
15. Hrs Generator On-Line .0 .0 21,494.4 g - e0
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 0 0 69.127.974 500-
18. Gross Elec Ener (MHH) 0 0 23,536,780
                                                                                                                                                                              - e0
19. Het Elec Ener (MHH) -6,828 -18,330 22.613,628
20. Unit Service Factor .0 .0 62.6
21. Unit Avail Factor .0 .0 62.6
22. Unit Cap Factor (MDC Net) -20
                                                                                              .0 I                                                                                                        .0          57.4

! 23. Unit Cap Factor (DER Net) .0 .0 57.4

24. Unit Forced Outage Rate 100.0 100.0 27.1 0 .- ,.
25. Forced Outage Hours O 5 10
                                                                                                                                                         .          ..  ,. O 719.0    2.879.0        8.002.3                                15         20  25  30 OfWS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE RPRIL 1988

27. If Currently Shutdown Estimated Startup Date: ___QZ404/86 PAGE 2-342

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM SEQUDYAH 2 M Riptrt Period APR 1986 UNIT SHUTD0HNS / RED 0CTIONS M MMMMMMMMMMMMMMMMMMMWMMMMMMMMMMMMMMMM No. Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence F 4 DESIGN CONTROL, CONFIGURATION UPDATING, AND l 7 08/21/85 F 719.0 ' EMPLOYEE CONCERNS. MxMuMMMMMMM SEQUOYAH 2 REMAINS IN AN EXTENDED ADMINISTRATIVE SHUTDOWN. ,,u

SUMMARY

M MMMMMMMMMMM Method Svstem 8 Component Tvpe Reason l F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H 1 S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination        9-Other         (LER) File (NUREG-0161)                                                                  PAGE 2-343

ununuuzuununuuuuuuuuuuuuuuuuununzuun u SEQUOYAH 2 m unuuuuuuuuuuuuuuuuuuuuuuuuuuunnxuxMM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... TENNESSEE LICENSEE. . . . . . . . . . . . . . . . . TENNESSEE VAL L EY AUTHORITY COUNTY...................HAMILT0N CORPORATE ADDRESS....... 6 NORTH 38A LOOK0UT PLACE DIST AND DIRECTION FROM CHATTANOOGA, TENNESSEE 37401 HEAREST POPULATION CTR.. 9.5 MI NE OF CONTRACTOR CHATTANOOGA, TN ARCHITECT / ENGINEER. . . . . . . TENNESSEE VALL EY AUTHORITY TYPE OF REACTOR............PHR CUC STEAM SYS SUPPLIER...HESTINGHOUSE i DATE INITIAL CRITICALITY... NOVEMBER 5, 1981 CONSTRUCTOR. . . . . . . . . . . . . . TENNESSEE VAL L EY AUTHORITY DATE ELEC ENER IST GENER... DECEMBER 23, 1981 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... JUNE 1, 1982 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER....CHICKAMAUGA LAKE IE RESIDENT INSPECTOR......E. FORD i ELECTRIC RELIABILITY COUNCIL.................. SOUTHEASTERN ELECTRIC LICENSING PROJ MANAGER.....C. STAHLE RELIABILITY COUNCIL DOCKET NUMBER........... 50-328 LICENSE & DATE ISSUANCE....DPR-79, SEPTEMBER 15, 1981 PUBLIC DOCUMENT ROOM.......CHATTANDOGA 1001 BROAD STREET

                                                                                                                                                                                           - HAMILTON BICENTENNIAL Igi,*ECTION 

SUMMARY

INSPECTION STATUS CHATTANDOGA, TENNESSEE 37402

       + IWSPECTION FEBRUARY 3-7 (86-11):

RESPGNSE TO GENERIC LETTER 83-28, REQUIRED ACTIONS BASED ON GENERIC IMPLICATIONS (ATHS) EVENTS. AREAS INSPECTED INCLUDED: THOUT SCRAM OF POST-MAINTENANCE TESTING; AND REACTOR TRIPPOST-TRIP REVIENs EQUIPMENT CLASSIFICATION: SYSTEM RELIABILITY. A FORMALIZED TRENDING PROGRAM FOR REACTOR ONE TRIP VIOLATION BREAKERS. ANDDEVELOPMENT DEVIATION HAS AND IDENTIFIED: VENDOR IMPLEMENTATION INADEQUACIES IN INTEO O ESTABLISH j 4 INSPECTION FEBRUARY 10-14 (86-12): SITE IN THE AREA 0F QUALITY ASSURANCE RELATED COMMITMENTS AND GOALSE PLAN, DELINEATED IN SEQUOYAH NUCLEAR INADEQUATE RECORD CONTROLS. PERFORMANCE PLAN, AND DIVISION OF QUALITY ASSURANCE (DQA) THE PERSONNEL PERFORMANCE. DHE VIOLATION HAS IDENTIFIED - i INSPECTION FEBNUARY 18-28 (86-13): REINSPECTIDH OF HELDING ACTIVITIES. THIS SPECIAL, ANNOUNCED INSPECTION INVOLVED 209 INSPECTO CF SELECTED HELDS IN PIPING AND STRUCTURAL COMPONENTS. AS HELL AS ITEMS WHICH HAD NOT BEEN REINSPECTED THE EVALUATE THE TVA REINSPECTION. BY TVA.NRC INSPECTION SAMPLE INCLUDED ITEMS HHICH HAD BEEN RE DISFOSITION THOSE FINDINGS. TVA INSPECTION RECORDS HERE COMPARED HITH NRC INSPECTION PERSONALLY OBSERVE HELDING IN THE ADDITIONTVA INSPECTION REINSPECTION THE ABOVEFINDINGS TOACTIVITIES. INSPECTION HERE ACTIVITIES, REVIEHED THE NRC TO DETERMINE HELD CONSULTING THE ADEQ TEAM NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. PAGE 2-344 l

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM SEQUOYAH 2 M R psrt Period APR 1986 INSPECTIGN STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 133 RESIDENT INSPECTOR-HOURS ON SITE IN THE INSPECTION FEBRUARY 6 - MARCH 5 (86-15): OPERATIONAL SAFETY VERIFICATION (INCLUDING OPERATIONS PERFORMANCE, SYSTEM LINEUPS, RADIATIO AREAS OF HOUSEKEEPING INSPECTIONS); SURVEILLANCE AND MAINTENANCE OBSERVATIONS; REVIEH OF PREVIOUS INSPECTION FINDINGS; FOLLONUP OF EVENTS; REVIEW OF LICENSEE IDENTIFIED ITEMS; REVIEW OF IE INFORMATION NOTICES; AND REVIEH OF INSPECTOR FOLLOHUP ITEMS. ONE VIOLATION (FAILURE TO COMPLY HITH TECHNICAL SPECIFICATION 6.2.3, INDEPENDENT SAFETY ENGINEERING GROUP) HAS IDENTIFIED. INSPECTION FEBRUARY 17-21 (86-17): THIS ROUTINE, ANNOUNCED INSPECTION ENTAILED 80 INSPECTOR-HOURS ON SITE IN THE AREAS OF LICENSED AND NON-LICENSED OPERATOR TRAINING AND LICENSED REQUALIFICATION TRAINING. NO VIOLATIONS OR DEVIATIONS H A RESULT OF THIS INSPECTION. INSPECTION FEBRUARY 24-28 (86-18): THIS SPECIAL, ANNOUNCED INSPECTION ENTAILED 112 INSPECTOR-HOURS ON SITE IN THE AREA 0F MAINTENANCE ACTIVITIES. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION MARCH 3-14 (86-20): THIS SPECIAL, ANNDUNCED INSPECTION INVOLVED 177 INSPECTOR-HOURS ON SITE IN THE AREA 0F OPERATIONAL READINESS VERIFICATION, INCLUDING: SELECTED AREAS OF THE SEQUDYAH NUCLEAR PERFORMANCE PLAN, VOLUME II; LICENSEE'S ACTION ON OPEN ITEMS FROM THE OPERATIONAL READINESS INSPECTION OF DECEMBER 1985 HHICH HERE DOCUMENTED IN INSPECTION REPORT 327,328/85-46; AND TESTING ASSOCIATED HITH ENVIRONMENTAL QUALIFICATION (EQ) MODIFICATIONS. IN THE AREAS INSPECTED, THREE VIOLATIONS HERE IDENTIFIED: (1) FAILURE TO ESTABLISH AND IMPLEMENT A PROCEDURE FOR THE 18 MONTH MANUAL ENGINEERED SAFETY FEATURE (ESF) FUNCTIONAL INPUT CHE OF THE REACTOR TRIP SYSTEM; (2) FAILURE TO VERIFY THE POSITIONS OF CONTAINMENT ISOLATION VALVES; AND (3) IMPROPER PROCEDURAL IMPLEMENTATION OF TECHNICAL SPECIFICATION (TS) REQUIREMENTS FOR THE PLANT OPERATIONS REVIEN COMMITTEE, RESULTING IN QUORUM REQUIREMENTS NOT BEING MET. INSPECTION MARCH 20-21 (86-23): THIS SPECIAL, UNANNOUNCED INSPECTION ENTAILED 7 INSPECTOR-HOURS ON SITE IN THE AREAS OF A 2821 0F J ANUARY 24, 1983) IN THE ELECTRICAL AREA HORKER'S ALLEGATION HITH REGARD TO A TVA NONCONFORMING CONDITION REPORT (NCR NO. THAT HAS PURPORTED TO BE DISPOSITIONED BY A PARTY THAT HAS NOT QUALIFIED. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION MARCH 18-21 (86-24): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 15 INSPECTOR-HOURS ON SITE IN THE AREAS OF FOLLOH-UP DN A LICENSEE IDENTIFIED ITEM, IE BULLETIN 80-11, LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, AND THE SNUBBER SURVEILLANCE PROGRAM. ONE VIOLATION HAS IDENTIFIED - INADEQUATE PROCEDURE AND LACK OF RECORDS DOCUMENTING FUNCTIONAL TESTING OF MECHANICAL SNUBBERS. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:

 + ENVIRONMENTAL QUALIFICATION OF EQUIPMENT.

FACILITY ITEMS (PLANS AND PROCEDURCS): NONE MANAGERIAL ITEMS: PAGE 2-345

                       >                           l                       r   L P [)    .            F
                                               =                         =                      5
                                               =                         =                      4
                                               =                         =                      3
                                               =                         =                       -
                                               =                         =                      2 mum                                        =                         =

M M = = E M M = = G 3 M = = A M M = = P K M = = M M = = M M = = C M = = M M = = 5 M = = 3 M = = 2 M = = M M = = N2M = = E M = = MHM = =

    %AM                                        =                        =

MYM = - = MOM = -

                                                                        =

i

    !UM                                       =                         =
    %GM                                       =                         =

EE% = = KSH = = H M = = - MM = = E X = = U H = - = M M = = M M = = ~ M K = = K E = = N M = = N E = = 2 M = = HuK = =

                                              =                         =
                                              =                         =

. = =

                                              =                         =
                                              =                         =

E = = - = =

        )                              E =                              =
      .D                                      =                         =

E S = = U = = N N = _ = I = __ = T E = = N = = O C = = C

                         '                    =                        =

( I = =

~_.                                          =                         =

L = =

         -                                   =                         =
                                             =                         =
                                             =                         =
  . S                              M =                             =
                                             =                         =

U O = =

                                             =                         =

T R = =

-                                            =                         =

A F = =

                                             =                         =

T = =

                                             =                         =
      .S                               S =                             =

. = = T = r

                                             =                         =

R = =

                                             =                         =

N + O = = ,

                                             =                        =

O 6 P = = 8 = = I 9 E = = 1 = = T R = =

                                 ,           =                        =

C 1 = = 2 = T = - E - = C = 8 = E = P 1 = J - = - + = B = S H = U = C 4 = S = - N R 2 = = A - = = I M 6 = = 8 = =

                                    /       =    FT                   =
8 = OR _ =

E 2 = O = T 3 = EP = A - = TE = D 0 = AR = 5 = D = - N = _ = O = = I  : = = 4 T O = = 8 C N = F = 9 E = OT _ = 1 P T = N = S R = EE = R N O = TV _ s P I P = AE = A  : E = D _ = . S E R = - = d U T = = e T I N = = l S A S O = = r M T I = R = e E S . E T = E . = P T 5 I C = B E = I . T E = M N = . t E N E T P = U O = r R N A D S S = N N = t E O L O A N = - = p H N P M L I = - = .  : T R O I 1 1I 1: 1i

THIS PAGE INTENTIONALLY LEFT BLANK i I I I i l l f l I l \ PAGE 2-347 l t

                                                                         . Docket           50-335          0PERATING              STATUS                   Mwaanunr:M:MnanunMMMunMn:ZM Mun32:2n
2. R:pteting Pcried: 04/01/86 u ST LUCIE 1 0 Outtg2 + On-lina Hros 719.0 MM MMKM:M MMxnMMMM MuunMMMZMMMMMMMMM
3. Utility

Contact:

N. H. GRANT (305) 552-3675 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2700 ST LUCIE 1
5. Nameplate Rating (Gross MHe): 1000 X 0.89 - 890
6. Design Electrical Rating (Net MHe): 330
7. Maximum Dependable Capacity (Gross MHe): 867 1500
8. Maximum Dependable Capacity (Not MHe): 827 DESIGN ELCO. RRTING = B30
                                                                                                                                                             ....tmX. DEPDO. Orr. -                                      827 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any:

NONE 1033-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.0 82,031.0 feo crus st === Leest arrInm cose TieMe
13. Hours Reactor Critical 714.2 2.865.8 60,022.0 r goo hh
14. Rx Reserve Shtdwn Hrs
                                                                                                                     .0         .0         205.3
15. Hrs Generator On-Line 693.3 2.840.9 58,643.7 gf 1J. Unit Reserve Shtown Hrs .0 .0 39.5
                                                                                                                                                                                                                                     - 80
17. Gross Therm Ener (MHH) 1,862.951 7.604,307 148.494,542 SW3-
18. Gross Elec Ener (MHH) 623.410 2.557,740 48,614,245 - 80
19. Het Elec Ener (MHH) 592,207 2,431.052 45,855,266
20. Unit Service Factor 96.4 98.7 71.5 ~
21. Unit Avail Factor 96.4 98.7 71.5
22. Unit Cap Factor (MDC Net) 99.6 102.1 67.6 - 20
23. Unit Cap Factor (DER Net) 99.2 101.7 67.3
24. Unit Forced Outage Rate 1.2 .7 4.2 0,. ,. ,
25. Forced Outage Hours 0 5 to 15
                                                                                                                                                                                   , .                              ,.     ..         0 8.2       20.6                                                                                  30     25     30 2.575.1                              DRYS
                                , 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE I' I

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-348

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ST LUCIE 1 M R:ptrt Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Date Tvie Hours Reason LER Number bvstem Component Cause & Corrective Action to Prevent Recurrence _No. HC HTEXCH UNIT SHUTDOWN TO REPAIR A CONDENSER TUBE LEAK. 02 04/12/86 S 17.5 A 1 86-04 HB HTEXCH HHILE RETURNING THE UNIT TO SERVICE, (AT 17% POWER) 03 04/13/86 F 8.2 0 3 FROM THE CONDENSER TUBE LEAK REPAIR, THE UNIT AUTO-MATICAltY SCRAMMED DUE TO HIGH STEAM GENERATOR LEVEL CAUSED BY AN COGNITIVE PERSONNEL ERROR. l I ! t I MMMMMMMMMMM ST. LUCIE 1 INCURRED 2 SHUTDOHNS IN APRIL. M

SUMMARY

M MMMMMMMMMMM Method Svstem & Component Type Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Errar 2-Manual Scram Preparation Instructionsoffor C-Rafueling H-Other 3-Auto Scram D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination        9-Other             (LER) File (NUREG-0161)                                                                                     PAGE 2-349

cartuus::munc==r:::atununstrur:m: nun n ST LUCIE 1 M murn:x;munnetmax=uaMMexmusunzuns nsu FACILITY DATA R: port Pericd APR 1986 FACILITY DESCRIPTIOq UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... FLORIDA LICENSEE................. FLORIDA P0HER & LIGHT COUNTY...................ST LUCIE CORPORATE ADDRESS. . . . . . . 9250 HEST FL AGLER STREET P.O. BOX 529100 MIAMI, FLORIDA 33152 DIST AND DIRECTION FROM i NEAREST POPULATION CTR..12 MI SE OF CONTRACTOR FT. PIERCE, FLA ARCHITECT / ENGINEER.......EBASCO j TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING ! DATE INITIAL CRITICALITY... APRIL 22, 1976 CONSTRUCTOR..............EBASCO DATE ELEC ENER IST GENER...MAY 7, 1976 TURBINE SUPPLIER.........HESTINGHSUSE DATE COMMERCIAL OPERATE.... DECEMBER 21, 1976 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPUNSIBLE......II CONDENSER COOLING HATER.... ATLANTIC OCEAN IE RESIDENT INSPECTOR......R. CRLENJAK ELECTRIC RELIABILITY COUNCIL. ................ SOUTHEASTERN ELECTRIC LICENSING PROJ MANAGER.....E. TOURIGNY RELIABILITY COUNCIL DOCKET NUMBER........... 50-335 LICENSE 8 DATE ISSUANCE....DPR-67, MARCH 1, 1976 PUBLIC DOCUMENT R03M....... INDIAN RIVER COMMUNITY COLLEGE LIBRARY 3209 VIRGINIA AVENUE FT. PIERCE, FLORIDA 33450 INSPECTION

SUMMARY

INSPECTION STATUS

   + INSPECTION JANUARY 8-9, FEBRUARY 25-26 (86-01): THIS SPECIAL, ANNOUNCED INSPECTION ENTAILED 11 INSPECTOR-HOURS ON SITE IN AREA 0F A POTENTIAL HHOLE BODY RADIATION EXPOSURE IN EXCESS OF 10CFR PART 20TH0                    LIMITS.

ESTABLISH RADIATION PROTECTION PROCEDURES AND TO PERFORM ADEQUATE EVALUATIONS. VIOLATIONS HERE IEENTIFIED: FAILURE TO INSFECTION MARCH 3-7 (86-06): BEACH AND THE ST. LUCIE PLANT IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT REVIEW COMMITTEE, AND TESTS AND EXPERIMENTS. MATTERS, OFFSITE NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION MARCH 11 - APRIL 14 (86-07): SPECIFICATION (TS) COMPLIANCE, OPERATOR PERFORMANCE, DVERALL PLANT OPERATIONS, QUALITY ASSURANCE P STATION AND CORPORATE MANAGEMENT PRACTICES, SURVEILLANCE ACTIVITIES, CORRECTIVE AND REFUELING AND PREVENTIVE ACTIVITIES. ONE VIOLATIONMAINTENANCE HAS IDENTIFIED. ACTIVITIES, SITE SECURITY PROCEDURES, RADIATIO , ENFORCEMENT

SUMMARY

NONE PAGE 2-350

MMMMMMMMMMMDMMMMMMMMMMMMMMMMMMMMMMMM ST LUCIE 1 M R:ptrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMWMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: NORMAL OPERATIONS. L AST IE SITE INSPECTION DATE: MARCH 11 - APRIL 14, 1986 + INSPECTION REPORT NO 50-335/86-07 + REPORTS FR0M LICENSEE

   =============================-.===================r=======================================================

NUMBER DATF OF DATE OF SUBJECT EVENT REPORT _ _-__ - . _ . __ _______ _ _ _ . -

   ------=_-__ __. -                  _

86-002 02/06/86 03/10/86 REACTOR TRIP DURING REACTOR PROTECTION SYSTEM TESTING DUE TO RPS LOGIC MATRIX RELAY TRIP SELECT SHITCH FAILING, ALLOHING A LOGIC MATRIX RELAY TO DE-ENERGIZE OUT OF SEQUENCE. 86-005 02/14/86 03/16/86 IODINE REMOVAL SYSTEM OUT OF SERVICE CREATER THAN 72 HOURS; CAUSE - COMBINATION OF LEAKING CHECK VALVES AND COGNITIVE PERSONNEL ERROR. e

   ====================================================================================*===================================

3 PAGE 2-351 4

1. Docksts 50-389 0PERATING STATUS VnUMMMMM MZM3M M%nMMMMMZ: nun CM2M M
2. Repsrting Pcried: 04/01/86 Outage + On-lina Hros 719.0 M ST LUCIE 2 n n%:MM:MM:MMIMMM MM2MSMZurMMMMMMMMMMa
3. Utility

Contact:

N. H. GRANT (305) 552-3675 AVERAnE DAILY PDHER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2700 ST LUCIE: 2
5. Nameplate Rating (Gross MWe): 0850
6. Design Electrical Rating (Net MWe): 830
7. Maximum Dependable Capacity (Gross MHe): 882 1833
8. Maximum Dependable Capacity (Not MHe): 837 ~

0ESIGN ELCO. RRTING = S30

9. If Changes Occur Above Since Last Report, Give Reasons: ...... PWDC. OEPDC. Cfr. - 837 (100%3 NONE 4
10. Power Level To Which Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any NONE 100D-MONTH YEAR CUMULATIVE
12. Report Period Hrs 719.0 2,879.0 23,928.0 h)
13. Hours Reactor Critical 118.2 2.244.0 __E0,292.9 - -
14. Rx Reserve Shtdwn Hrs .0 .0
                                                                                                                                                           -100h
                                                                     .0 3
15. Hrs Generator On-Line 117.9 2.224.7 19,796.9 g _ ,g
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MNH) 310,321 5.950,413 50,596,968
18. Gross Elec Ener (MHH) 100,740 500- - 80 1,988,760 16,905.440
19. Net Elec Ener (MHH) 92,881 1,882,830 15,953.873
20. Unit Service Factor 16.4 77.3 82.7 - to
21. Unit Avail Facter 16.4 77.3 82.7
22. Unit Cap Factor (MDC Net) 15.4 78.1 79.7 - 20
23. Unit Cap Factor (DER Net) 15.6 78.8 80.3
24. Unit Forced Outage Rate .0 2.3 9.9 0 -
25. Forced Outage Hours 0 ,5
                                                                                                          ,.       ,,                       ,.   ,-         0
                                           .0       53.2                                                 10       15                      20    25      30 2.179.8
 . 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                                 DAYS NONE frRIL 19es
27. If Currently Shutdown Estimated Startup Date: 05/24/86 PAGE 2-352

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM R:psrt Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M ST LUCIE 2 M MMMMMMMMMMMMMMMMMMMMMhMMMMMMMMMMMMMA Cause & Corrective Action to Prevent Recurrence  ! No. Date Type Hours Reasor Method LER Number System Component 04 04/05/86 S 601.1 C 1 RC FUELXX THE UNIT SHUTDOWN FOR REFUELING AND SCHEDULED MAINTENANCE. ,

                                                                                                                                             )

1 i l l MMMMMMMMMMM ST. LUCIE 2 BEGAN A REFUELING OUTAGE ON APRIL 5. M

SUMMARY

M i MMMMMMMMMMM I System a Component Tvo* Reason Method F-Forced A-Equip Fallu-o F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-operator Training 5-Reduced Load Licensee Event Report

                & License Examination         9-Other         (LER) File (NUREG-0161)

PAGE 2-353

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M ST LUCIE 2 M MMMMuwwwunnuununummuuuuxMuMMMMMMMMMM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY l STATE. ................. FLORIDA LICENSEE..... ........... FLORIDA PONER 8 LIGHT COUNTY... . ............ST LUCIE CORPORATE ADDRESS....... 9250 HEST FLAGLER ST., P.O. BOX 529100 MIAMI, FLORIDA 33152 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 12 MI SE OF CONTRACTOR FT. PIERCE, FLA ARCHITECT / ENGINEER.......EBASCO TYPE OF REACTOR... .. ....PHR HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING l DATE INITIAL CRITICALITY... JUNE 2, 1983 CONSTRUCTOR..............EBASCO DATE ELEC ENER IST GENER. . JUNE 13, 1983 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE. .. AUGUST 8, 1983 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER. . ATLANTIC OCEAN IE RESIDENT INSPECTOR......R. CRLENJAK ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....E. TOURIGNY COUNCIL. . .... . . ...<PUTHEASTERN ELECTRIC DOCKET NUMBER.... ...... 50-389 IELIABILITY COUNCIL LICENSE & DATE ISSUANCE. . .NPF-16, JUNE 10, 1983 PUBLIC DOCUMENT ROOM... ... INDIAN RIVER COMMUNITY COLLEGE LIBRARY 3209 VIRGINIA AVENUE FT. PIERCE, FLORIDA 33450 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION MARCH 3-7 (86-05): THIS POUTINE, ANNOUNCED INSPECTION INVOLVED 16 INSPECTOR-HOURS AT FP&L CORPORATE OFFICES IN JUNO BEACH AND THE ST. LUCIE PLANT IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS, OFFSITE SUPPORT STAFF, OFFSITE REVIEH COMMITTEE, AND TESTS AND EXPERIMENTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION MARCH 11 - APRIL 14 (86-06): THIS INSPECTION INVOLVED 123 INSPECTOR-HOURS ON SITE IN THE AREAS OF TECHNICAL SPECIFICATION (TS) COMPLIANCE, OPERATOR PERFORMANCE, DVERALL PLANT OPERATIONS, QUALITY ASSURANCE PRACTICES, STATION AND CORPORATE MANAGEMENT PRACTICES, CORRECTIVE Ar1D PREVENTIVE MAINTENANCE ACTIVITIES, SITE SECURITY PROCEDURES, RADIATION CONTROL ACTIVITIES, SURVEILLANCE ACTIVITIES, AND REFUELING ACTIVITIES. ONE VIOLATION HAS IDENTIFIED. l l l

 "" ENFORCEMENT 

SUMMARY

NONE OTHER ITEMS PAGE 2-354

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M ST LUCIE 2 R:ptrt Period APR 1986 INSPECTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT- PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAI ITEMS: NONE. PLANT STATUS: REFUELING OUTAGE COMMENCED ON 4/7/86. LAST IE SITE INSPECTION DATE: MARCH 11 - APRIL 14,1986 + INSPECTION REPORT NO: 50-389/86-06 + REPORTS FR0M LICENSEE

   ==============================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT .__ _ _.

                                                                                                                                           =__

02/10/86 03/12/86 SURVEILLANCE INTERVAL FOR INCORE ALARM SETPOINTS EXCEEDED THE MAXIMUM ALL0HABLE TIME; CAUSE - 86-004 PERSONNEL ERROR BY UTILITY NON-LICENSED REACTOR ENGINEERING PERSONNEL. 03/10/86 04/08/86 MISSED SURVEILLANCE OF SAFEGUARDS ACTUATION SYSTEM RELAYS; CAUSE - THE RESPONSIBILITY FOR 86-005 TRACKING HAD NEVER BEEN CLEARLY ASSIGNED TO ANY PLANT DEPARTMENT.

   ===================================================================================================

PAGE 2-355 i

1. Dockot .50-395 0PERATING STATUS cunctMcMXHM20 u KM22:3MMNZM32MMn:MZMM3
2. R preting Paricds 04/01/86 Outtga + On-lina Pect 719.0 SUMMER 1 u MM2MM3M::M3 HEM *M%%nMuu;MW M2%MnMMMMM
3. Utility

Contact:

G. A. LOIGNON (803) 345-5209 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2775 Sut#1CR 1
5. Nameplate Rating (Gross MWe). 0900 '
6. Design Electrical Rating (Not MHe): 900
7. Maximum Dependable Capacity (Gross MHe): 900 180 -

c

8. Maximum Dependable Capacity (Net MHe): 885 _ DESIGN ELEO. RATING -
                                                                                                                                                                                                                    ~

900

9. If Changes Occur Above Since Last Report, Give Reasons: ...... iWDr. DEPEND. ORP. - 885 (10m() p
10. Power Level To Which Restricted, If Any (Net MHe)2 '
11. Reasons for Restrictions, If Any:

NONE 8023-12, Report period Hrs MONTH YEAR CUMULATIVE 719.0 2.879.0 20.423.0 mc om se mmn m ortru comirtons

13. hours Reactor Critical
  • 707.1. 2.823.8 14,817.1

_,,,,,,,,,,,,_ _ g ,g c.3

14. Rx Reserve Shtdwn Hrs .0 .0 .0

[3

15. Hrs Generator On-Line $p 702.3 2.805.2 14.445.5 hf - 80 @l
16. Unit Reserve Shtdwn Hrs .0 .0 .0 o
                                                                                                                                                                                                     "g"
17. Gross Thern Ener (MHH) 1.898.100 7.636.908 37.474.474 Sm3 -
18. Gross Elec Ener (MHH) 639.020 2.556.600 12.487.223
19. Het Elec Ener (MHH) 613.419 2 452.555 11,879.602
20. Unit Service Factor 97.7 97.4 70.7 _,,
21. Unit Avail Factor 97.7 97.4 70.7
22. Unit Cap Factor (MDC Net) 96.4 96.3 65.7_ '
23. Unit Cap Factor (DER Net) 94.8 94.7 64.6
24. Unit Forced Outage Rate 2.3 2.6 7.3 0 .
25. Forced Outage Hours 0 5 10
                                                                                                                                                                ,.       ,.     ,.            o 16.7 73.8                                                                        15       20     25 1 134.5                                          DAYS 30
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE RPRIL 1986 27. If Currently Shutdown Estimated Startup Date: __N/A PAGE 2-356

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M R:pirt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M SUMMER 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Tvie Hours Reason Method LER Humber System Component Cause & Corrective Action to Prevent Recarrence 2 04/02/86 F 16.7 A 3 LOSS OF EXCITATION TO MAIN GENERATOR ALTEREX DUE TO HORN 3 RUSHES. l 1 I l l l l l l 7 - t% nXMMMMMMMMM SUMMER 1 INCURRED 1 OUTAGE IN APRIL FOR MAIN GENERATOR PROBLEMS. M

SUMMARY

M '" e MMMMMMMMMMM Method Svstem & Component Type - Reason F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H ~ S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of ' l D-Regulatory Restriction 4-Continued Data Entry Sheet l j E-Dperator Training 5-Reduced Load Licensee Event Report 8 License Examination 9-Other (LER) File (HUREG-0161) PAGE 2-357

accaMaaaaaaaaaaaanaMMM00ananacDaaaaN a SUMMER 1 M acacMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE........ ........... SOUTH CAROLINA LICENSEE.... ............ SOUTH CAROLINA ELECTRIC & GAS CO. COUNTY... ... .... .....FAIRFIELD CORPORATE ADDRESS........P.O. BOX 764 COLUMBIA, SOUTH CAROLINA 29202 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 26 MI NH OF CONTRACTOR COLUMBIA, SC ARCHITECT / ENGINEER....... GILBERT ASSOCIATES TYPE OF REACTOR. ..........PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY.. 0CTOBER 22, 1982 CONSTRUCTOR.............. DANIEL INTERNATIONAL DATE ELEC ENER IST GENER. . NOVEMBER 16, 1982 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JANUARY 1, 1984 REGULATORY INFORMATI0H CONDENSER COOLING METHOD. .ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER....MONTICELLO RESERVOIR IE RESIDENT INSPECTOR......R. PREVATTE ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....J. HOPKINS COUNCIL..... .. ........ SOUTHEASTERN ELECTRIC DOCKET NUMBER...... .... 50-395 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....NPF-12, NOVEMEER 12, 1982 PUBLIC DOCUMENT ROOM ......FAIRFIELD COUNTY LIBRARY GARDEN & HASHINGTON STREETS HINNSBORO, SOUTH CAROLINA 29180 INSPECTION STATUS INSPECTION

SUMMARY

0 INSPECTION FEBRUARY 24-28 (86-05): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 80 INSPECTOR-HOURS ON SITE AND 4 INSPECTOR-HOURS OFFSITE IN THE AREA 0F EMERGENCY PREPAREDNESS. ONE VIOLATION HAS IDENTIFIED - FAILURE TO PROVIDE TRAINING TO A KEY MEMBER OF THE EMERGENCY ORGANIZATION REGARDING THE " FISSION PRODUCT BARRIER APPROACH" TO EVENT CLASSIFICATION. INSPECTION FEBRUARY 1-28 (86-06): THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 218 RESIDENT INSPECTOR-HOURS ON SITE IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS, DNSITE FOLLOHUP OF EVENTS AND SUBSEQUENT HRITTEN REPORTS, MONTHLY SURVEILLANCE OBSERVATIONS, MONTHLY MAINTENANCE OBSERVATIONS, ESF SYSTEM HALKDOHN, OPERATIONAL SAFETY VERIFICATION, DNSITE FOLLOHUP OF EVENTS AT OPERATING REACTORS, PLANT PHYSICAL PROTECTION AND COLD HEATHER PREPARATION. TWO VIOLATIONS HERE IDENTIFIED: (1) LOOP "B" COMPONENT COOLING HATER AND SERVICE HATER PUMPS HERE OUT OF SERVICE FOR A PERIOD OF GREATER THAN 72 HOURS DUE TO INCORRECT ELECTRICAL ALIGNMENT; (2) HOURLY FIRE HATCH NOT MAINTAINED FOR AN INOPERABLE FIRE BARRIER. AN ENFORCEMENT CONFERENCE WAS HELD ON FEBRUARY 28, 1986, IN THE REGION II 0FFICE TO DISCUSS THE FIRST VIOLATION. INSPECTION MARCH 1-31 (86-07): THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 234 RESIDENT INSPECTOR-HOURS ON SITE IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS, DNSITE FOLLOHUP OF EVENTS AND SUBSEQUENT HRITTEN REPORTS, MONTHLY SURVEILLANCE OBSERVATIONS, OFFSITE REVIEW COMMITTEE, ENGINEERED SAFETY FEATURES SYSTEM HALKDOHN, MONTHLY MAINTENANCE OBSERVATION, OPERATIONAL SAFETY VERIFICATION, FIRE PROTECTION / PREVENTION AND OTHER AREAS. ONE VIOLATION HAS IDENTIFIED INADEQUATE CABLE TRAY THERMO-LAG INSTALLATION. PAGE 2-358 I

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM K SUMMER 1 INSPECTION STATUS - (CONTINUED) NMMMMMMMMMMMMMMMMMMMMMMMMMMNNNMMMMMM Report Period APR 1986 ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMP 0hENT PROBLEMS NONE. FACILITY ITEMS (PLANS AND PROCEDURES)* NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: NrpMAL OPERATION. LAST IE SITE INSPECTION DATE: MARCH 1-31, 1986 + INSPECTION REPORT NO: 50-395/86-07 + REP 0RTS FR0M LICENSEE

    ============================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT -- 02/28/86 03/21/86 FAILURE TO PERFORM NOURLY FIR 2 HATCH PATROL; CAUSE - PERSONNEL ERROR AND INADEQUATE REVIEH OF 86-005 LOGS BY FIRE PROTECTION COORDINATOR.

    ===========================================================,========================================================,,===,==,,,,=,

I I I I PAGE 2-359

1. Dockst: 50-280 0PERATING STATUS M:nn 22%MMMMZM2HMMM2r MZZ Mn%MZZn% 3
2. Reparting Pcried: 04/01/P6 n SURRY 1 M Outtge + On-lino Hrcs 719.0 unannnxMMMMMnMunuunn3MMM:nnn: n:MMMu
3. Utility

Contact:

VIVIAN H. JONES (804) 357-3184 AVERAGE DAILY POWER IEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2441 SURRY 1
5. Nameplate Rating (Gross MHe): 192 X 0.9 = 848
6. Design Electrical Rating (Not MHe): 788
7. Maximum Dependable Capacity (Gross MWe): 820 1500
8. Maximum Dependable Capacity (Net MWe): 781 _ DESIGN ELEC. RflTING = 788
                                                                                                                                                                               ... ..MRX. DEPEPE).              (;.tP. - 781 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.0 117,071.0
13. Hours Reactor Critical 719.0 2,510.9 74.839.0
14. Rx Reserve Shtdwn Hrs .0 .0 3,774.5 V '
                                                                                                                                                                                                                        ~~ ~
15. Hrs Generator On-Line 719.0 2,477.7 73,315.8 laJ g
16. Unit Reserva Shtdwn Hrs .0 .0 3,736.2 -80
17. Gross Therm Ener (MHH) 1,723,928 5,857,816 169.214.742 500-
18. Gross Elec Ener (MNH) __574,895 1.949,490 54.721,423 -80
19. Not Elec Ener (MHH) 547,223 1,853,058 51,883.187
20. Unit Service Factor 100.0 86.1 62.6 - 40
21. Unit Avail Factor 100.0 86.1 65.8
                                ,,,,,22.                               Unit Cap Factor (MDC Net)                                     97.5       82.4           56.7
                                                                                                                                                                                                                                        - 20
23. Unit Cap Factor (DER Net) 96.6 81.7 56.2
24. Unit Forced Outage Rate .0 2.2 18.6 0 .

g ,

25. Forced Outage Hours .0 56.0 13,037.3 l0 is $0 is 30 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

l REFUELING 09 48 DAYS. I

27. If Currently Shutdown Estimated Startup Date: __N/A PAGE 2-360

MMMMMMhMMMMMMMMMMMMMMMMMMMMMMMMMMMMM UNIT SHUTD0WNS / 2ELUCTIONS M SURRY t M Reptet Period APR 1986 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No, Date IXEg Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence NONE l 1 SURRY 1 HAD NO OUTAGES OR SIGNIFICANT POWER REDUCTIONS IN APRIL. MMMMMMMMMMM _u

SUMMARY

M MMMMMMMMMMM Type Reason Method Svstem 8 Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Opea Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report 8 License Examination 9-Other (LER) File (NUREG-0161) PAGE 2-361

D2MMMMMMMMMMMMMMMMMNHMMMMMMMMMMMMMMM u SURRY 1 M uM wunuwwwwwwwwuuMuununnwMunumMMMMMM FACILITY DATA R:pgrt Pcried APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE... . ... ...... ... VIRGINIA LIC7NSEE.. ........ .. . VIRGINIA POWER COUNTY.. . . ..... ... ..SURRY CORPORATE ADDRESS........P.O. BOX 26666 RICHMOND, VIRGINIA 23261 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 17 MI NH OF CONTRACTOR NEHPORT NEWS, VA ARCHITECT / ENGINEER.. .. . STONE & HEBSTER TYPE OF REACTOR. . .... .PHR HUC STEAM SYS SUPPLIER...HESTINGHOUSE j DATE INITIAL CRITICALITY... JULY 1, 1972 CONSTRUCTOR.... ......... STONE & HEBSTER DATE ELEC ENER IST GENER... JULY 4, 1972 TURBINE SUPPLIER. .... .HESTINGHOUSE DATE COMMERCIAL OPERATE... 9ECEMBER 22, 1972 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE.... .II CONDENSER COOLING HATER. . JAMES RIVER IE RESIDENT INSPECTOR. ....D. BURKE ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....C. PATEL COUNCIL... ... ...... SOUTHEASTERN ELECTRIC DOCKET NUMBER.......... .50-280 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-32, MAY 25, 1972 PUBLIC DOCUMENT ROOM. .....SHEM IIBRARY COLLEGE OF HILLIAM AND MARY HILLIAMSBURG, VIRGINIA 23185 INSPECTION STATUS INSPECTION

SUMMARY

   + INSPECTION FEBRUARY 10 - 14 AND MARCH 3 (86-03): THIS ANNOUNCED PHYSICAL SECURITY INSPECTION INVOLVED 15 INSPECTOR-HOURS ON SITE INSPECTING: PHYSICAL BARRIERS - PROTECTED AREA DETECTION AIDS - PROTECTED AREA, COMMUNICATIONS, AND ACCESS CONTROL OF PERSONNEL, PACKAGES AND VEHICLES. DURING THIS INSPECTION, THE INSPECTOR REVIEHED THE CIRCUMSTANCES OF A LICENSEE IDENTIFIED AND REPORTED EVENT RELATING TO THE UNDETECTED INTRODUCTION OF A RIFLE INTO THE PROTECTED AREA DN FEBRUARY 5, 1986.                       REVIEN FINDINGS ARE ADDRESSED IN SECTIONS 5 AND 6 0F THE REPORT HHICH CONTAINS SAFEGUARDS INFORMATION. AN ENF09 CEMENT CONFERENCE HAS HELD IN THE REGION II 0FFICE ON MARCH 3,        1986, REGARDING THIS INCIDENT. THE LICEl;SEE HAS FOUND TO BE IN COMPLIANCE HITH REGULATORY REQUIREMENTS IN THE AREAS INSPECTED HITH THE EXCEPTION OF THE FOLLOHING:              (1) FAILURE TO CONTROL ACCESS OF PACKAGES TO THE PROTECTED AREA; AND (2) FAILORE TO MAINTAIN POSITIVE CONTROL OF THE SECONDARY ACCESS CONTROL PORTAL.

INSPECTION FEBRUARY 24-28 (86-05): THIS ROUTINE, UNANNDUNCED INSPECTION ENTAILED 19 INSPECTOR-HOURS IN THE AREAS OF CONTAINMENT ISOLATION VALVE TESTING, SNUBBER SURVEILLANCE PROGRAM, AND FOLLOHUP OF PREVIOUSLY IDENTIFIED INSPECTION FINDINGS. ONE VIOLATION HAS IDENTIFIED - FAILURE TU FOLLOW PFOCEDURES FOR CONTROL OF TESTING AND REVIEN OF TEST RESULTS. INSPECTION MARCH 4 - APRIL 7 (86-07): THIS INSPECTION INVOLVED 75 INSPECTOR-HOURS IN THE AREA 0F PLANT OPERATIONS AND OPERATING RECORDS, PLANT MAINTENANCE AND SURVEILLANCE, PLANT SECURITY, FOLLOHUP OF EVENTS, AND OPEN ITEMS. IN THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION MARCH 17-21, 26 (86-08): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 32 INSPECTOR-HOURS ON STTE IN THE AREA 0F j EMERGENCY PREPAREDNESS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. l PAGE 2-362 l l

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMM'mCZMM a N SURRY 1 M R:pret Period APR 1986 INSP0CTION STATUS - (CONTINUED) MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS NONE. PLANT STATUS: REFUELING OUTAGE i LAST IE SITE INSPECTION DATE: MARCH 17-21 AND 26, 1986 + INSPECTION REPORT NO: 50-280/86-08 + REP 0RTS FR0M LICENSEE NUMBER DATE OF DATE OF SUBJECT EVENT REPORT

   ---.=_     _ -----==_             ==__==-                       --..--------------- ==== ---------==                .-    _......- - =-- ==.....===- _.----.--------......--

86-010 02/07/86 03/07/86 REACTOR TRIP BY TURBINE TRIP ON HIGH STEAM GENERATOR LEVEL CAUSE - FEEDBACK CAM ON VALVE CONTROLLER HAS NOT ADJUSTED FOLLONING MAINTENANCE; A PROCEDURE CHANGE HILL BE MADE, l 86-011 02/27/86 03/27/86 INOPERABLE HIGN RANGE RADIATION MONITORSs CAUSE - DESIGN DEFICIENCY IDENTIFIED BY KAMAN INSTRUMENTATION CORPORATION. ] PAGE 2-363

1. Dsckot 50-281 0PERATING STATUS M:f rnu M xng%nanturan:ct::n u ::n=M M zn Mann::M If SURRY 2 N
2. Reporting Period 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

VIVIAN H. JONES (804) 357-3184 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MWt): 2441 SURRY 2
5. Nameplate Rating (Gross MWe): 942 X 0.9 = 848
6. Design Electrical Rating (Not MWe): 788
7. Maximum Dependable Capacity (Gross MHe): 811 "
8. Maximum Dependable Capacity (Net MHe): 781

__,_ [ g

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any NONE MONTH YEAR CUMULATIVE
12. Report Period Hrs 719.0 2,879.0 113,951.0
13. Hours Reactor Critical 719.0 2,688.9 74,631.3
14. Rx Reservu Shtdwn Hrs .0 .0 23.8 y W
15. Hrs Generator On-Line 719.0 2.672.9 73,438.3 f ~
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MWH) 1,748,640 6,469,872 171,776.899
18. Gross Elec Ener (MHH) 581,240 2,141,295 55,724.599
19. Het Elec Ener (MHH) 552,734 2,035,841 52,824,728
20. Unit Service Factor 100.0 92.8 64.4 *
21. Unit Avail Factor 100.0 92.8 64.4
22. Unit Cap Factor (MDC Net) 98.4 90.7 59.4 -20
23. Unit Cap Factor (DER Net) 97.6 89.7 58.8
24. Unit Forced Outage Rate .0 .0 12.6 0 _

0 D is' $ $ 2

25. Forced Outage Hours .0 .0 7,931.8 DfW S
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELING - 10/10/86 - 58 DAYS. frRIL 1988

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-364

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M Report Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M SURRY 2 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Type Hours Reason LER Number $vstem domponent Cause a Corrective Action to Prevent Recurrence NONE EMMuMMMMMMM SURRY Z - INCURRED NO OUTAGES OR SIGNIFICANT POWER REDUCTIONS IN APRIL. _ M

SUMMARY

M MMMMMMMMMMM Tvom Reason Method System a Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                             & License Examination       9-Other         (LER) File (NUREG-0161)

PAGE 2-365 4

                                                                                                                                                                            -__ _____i

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMENNNNNM M SURRY 2 M DATA Report Period APR 1986 MMMMMMMxMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY UTILITY & CONTRACTOR INFORMATION _ FACILITY DESCRIPTION UTILITY LOCATION LICENSEE................. VIRGINIA P0HER STATE... ................ VIRGINIA CORPORATE ADDRESS........P.O. BOX 26666 COUNTY.......... ........SURRY RICHMOND, VIRGINIA 23261 DIST AND DIRECTION FROM CONTRACTOR NEAREST POPULATION CTR..NEHPORT 17 MI NH HENS, OF VA ARCHITECT / ENGINEER....... STONE & HEBSTER HUC STEAM SYS SUPPLIER...HESTINGHOUSE TYPE OF REACTOR..... .. ...PHR DATE INITIAL CRITICALITY... MARCH 7, 1973 CONSTRUCTOR.............. STONE 8 HEBSTER DATE ELEC ENER IST GENER... MARCH 10, 1973 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCI AL OPERATE. . . .MAY 1,1973 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II IE RESIDENT INSPECTOR......D. BURKE CONDENSER COOLING HATER.... JAMES RIVER LICENSING PROJ MANAGER.....C. PATEL ELECTRIC RELIABILITY DOCKET NUMBER........... 50-281 COUNCIL.. ............... SOUTHEASTERN ELECTRIC RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-37, JANUARY 29, 1973 PUBLIC DOCUMENT ROOM.......SHEM LIBRARY COLLEGE OF HILLIAM AND MARY HILLIAMSBURG, VIRGINIA 23185 INSPECTION STATUS INSPECTION

SUMMARY

   + INSPECTION FEBRUARY 10 - 14 AND MARCH 3 (86-03): THIS             ANNOUNCED PHYSICAL SECURITY INSPECTION INVOLVED 15 INSPECTOR-HOURS ON DETECTION AIDS - PROTECTED AREA, COMMUNICATIONS, AND ACCESS CONTROL OF SITE INSPECTING: PHYSICAL BARRIERS - PROTECTED AREA; PERSONNEL, PACKAGES AND VEHICLES. DURING THIS INSPECTION, THE INSPECTOR REVIEHED THE CIRCUMSTANCES OF A LICENSEE                     IDENTIFIED REVIEH         AND FINDINGS REPORTED EVENT RELATING TO THE UNDETECTED INTRODUCTION OF A RIFLE INTO THE PROTECTED AREA ON FEBRUARY 5, 1986.AN ENFORCEMENT CONFEREN ARE REGIONADDRESSED          IN SECTIONS II 0FFICE ON MARCH                 5 AND 6 0FTHIS 3, 1986. REGARDING      THE   REPORT HHICH CONTAINS SAFEGUARDS INFORMATION.THE LICENSEE HAS FOUND INCIDENT.                 (1) FAILURE TO CONTROL ACCESS OF PACKAGES TO THE REQUIREMENTS PROTECTED     AREA; AND (2)  IN THE AREAS INSPECTED HITH THE EXCEPTION OF THE FOLLOHING: FAILURE TO MAINTAIN P THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 19 INSPECTOR-HOURS IN THE AREAS OF CONTAINMENT INSPECTION ISOLATION VALVEFEBRUARY      24-28 (86-05):

TESTING. SNUBBER SURVEILLANCE PROGRAM, AND FOLLOHUP OF PREVIOUSLY IDENTIFIED INSPECTION FINDINGS. ONE VIO HAS IDENTIFIED - FAILURE TO FOLLOH PROCEDURES FOR CONTROL OF TESTING AND REVIEH OF TEST RESULTS. INSPECTION MARCH 4 - APRIL 7 (86-07): THIS INSPECTION INVOLVED 75 INSPECTOR-HOURS IN THE AREA 0F PLANT OPERATIONS AND OPERATING RECORDS, PLANT MAINTENANCE AND SURVEILLANCE, PLANT SECURITY, FOLLOHUP OF EVENTS, AND OPEN ITEMS. IN THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION MARCH 17-21, 26 (86-08): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 32 INSPECTOR-HOURS ON SITE IN THE AREA 0F EMERGENCY PREPAREDNESS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. PAGE 2-366

                                                                                                                                                              \

l

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Reptrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M SURRY 2 u MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: I NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: REFUELING OUTAGE LAST IE SITE INSPECTION DATE: MARCH 17-21 AND 26, 1986 + INSPECTION REPORT NO: 50-281/86-08 + REPORTS FR0M LICENSEE

 ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT - _ =___ ____ _ _ 86-003 02/16/86 03/18/85 TURBINE TRIPPED DUE TO A HIGH LEVEL IN "B" STEAM GENERATOR WHICH RESULTED IN REACTOR TRIP; CAUSE

                                    - BLOCKAGE IN AIR PILOT RELAY HHICH PREVENTED PROPER AIR FLON TO THE VALVE OPERATOR.
 ==================================================================================================================================

PAGE 2-367

1. Dockott 50-387 0PERATING STATUS cc::nMMU :MZUCH :EnM Munn:Mnt2MMMnMM M SUSQUEHANNA 1 M
2. Repseting Parledi 04/01/86 Outtg3 + On-lina Hro 219.0 uununM nnnzt=nnasunnrMcMutnan:MnMann
3. Utility

Contact:

J. A. HIRT (717) 542-3917 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3293 SUSOUE}fM4NFl 1
5. Nameplate Rating (Gross MHe): 1280 X 0.9 = 1152
6. Design Electrical Rating (Net MWe): 1065
7. Maximum Dependable Capacity (Gross MWe): 1068 1883
8. Maximum Dependable Capacity (Not MHe): 1032 DESIGN ELCO. RATING = 1085
                                                                                 ......MRX.      DEPDC. Dr. - 1032 (100X)
9. If Changes Occur Above Since Last Report, Give Reasons
10. Power Level To Hhich Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE '~--~-~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~ 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 25.392.0
13. Hours Reactor Critical 245.6 1.327.4 17.320.5 . so h
14. Rx Reserve Shtdwn Hrs .0 .0 671.1
15. Hrs Generator On-Line 139.9 1.220.9 16.841.5 i

hf

16. Unit Reserve Shtdwn Hrs .0 .0 .0 - 80
17. Gross Therm Ener (MHH) 232.833 3.653.510 51.233.783 ,,,,
18. Gross Elec Ener (MHH) 75.256 1.194.152 16.693.144
19. Het Elec Ener (MHH) 62.249 1.125.919 16.015.145 - to
20. Unit Service Factor 19.5 42.4 66.3
21. Unit Avail Factor 19.5 42.4 66.3
                                                                                                                          - 30
22. Unit Cap Factor (MDC Net) 8.4 37.9 61.1
23. Unit Cap Factor (DER Net) 8.1 36.7 59.2
24. Unit Forced Outage Rate 24.i 3.5 10.7 0 0 5
                                                                                        ,.      ,.     ,      ,. f      0 to     15     30     35  30
25. Forced Outage Hours 44.4 44.4 2.024.5 DRYS
 ,26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):

NONE MRIL 1986

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-368

MMMMMMMMMMMMMMNMMMMMMMMMMMMMMMMMMMMMM SUSQUEHANNA 1 Repict Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence No. Date 4 ZZ ZZZZZZ MANUAL SCRAM TO COMMENCE SECOND REFUELING 3 02/15/86 S 534.2 C AND INSPECTION OUTAGE. 9 ZZ ZZZZZZ GENERATOR REMOVED FROM GRID DUE TO MAIN TURBINE 4 04/23/86 S 0.5 5 OVERSPEED TRIP. A 2 IF MECFUN MANUAL SCRAM FROM 19% POWER TO ALLON CONTAINMENT 5 04/24/86 F 44.4 ENTRY FOR TIP INDEXER REPAIR. i KIMMMMMMMMM SUSQUEHANNA 1 EXPERIENCED 3 SHUTDOWNS IN APRIL AS DISCUSSED ABOVE. m

SUMMARY

M NKNMMkMMMMM Tvoe Reason Method System & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination       9-Other         (LER) File (NUREG-0161)

PAGE 2-369

n=u=unn=u==u====nunu=u=u=n===u==uw=u n SUSQUEHANNA 1 M nu=u==uum=uuuxxxu==muun=nu=n===nu==u FACILITY DATA R:prrt Perled APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... PENNSYLVANIA LICENSEE................. PENNSYLVANIA POWER 8 LIGHT COUNTY...................LUZERNE CORPORATE ADDRESS. . . . . . . 2 NORTH NINTH STREET ALLENTOHN, PENNSYLVANIA 18101 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 7 MI NE OF CONTRACTOR BERHICK, PA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... SEPTEMBER 10, 1982 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... NOVEMBER 16, 1982 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JUNE 8, 1983 REGULATORY INFORMATION CONDENSER COOLING METHOD...CC,HNDCT IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....SUSQUEHANNA RIVER IE RESIDENT INSPECTOR......R. JACOBS ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....M. CAMPAGNONE COUNCIL..................MID-ATLANTIC DOCKET NUMBER........... 50-387 AREA COUNCIL LICENSE & DATE ISSUANCE....NPF-ti, NOVEMBER 12, 1982 PUBLIC DOCUMENT R00M...... 0STERHOUT FREE LIBRARY 71 SOUTH FRANKLIN STREET HILKES-BARRE, PENNSYLVANIA 18701 INSPECTION $TATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENTS: I NO INPUT PROVIDED. f FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. PAGE 2-370 f

NNNMMNNNNNNNNNNNMMMMMMMMMMMNNNNNNNNN N N SUSQUEHANNA 1 IN5PECTION STATU$ - (CONTINUED) NMMNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period APR 1986 l OTHER ITEMS t MANAGERIAL ITEMS: f NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICEN3EE 4 sea s ss s s s s ssss sss ssss ssssssss ssss ss ss s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s NUMBER DATE OF DATE CF SUBJECT EVENT REPORT NO INPUT PROVIDED. i i sessssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss i 1 l PAGE 2-371

1. Dockst 50-388 0PERATING STATUS ruunnMurnusuuruxutur:Inunnn:xnnurnt n M SUSQUEHANNA 2 M
2. R2perting Perigd: 04/01/86 Outagm + On-lins Hrs 719.0 MHK:Muunununuxxxunnnunurununnnnuunnu
3. Utility

Contact:

J. A. HIRT (717) 542-3917 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3293 SUSOUE29M4NA 2
5. Nameplate Rating (Gross MHe): 1152
6. Design Electrical Rating (Not MHe): 1065
7. Maximum Dependable Capacity (Gross MHe): 1068 MMO
8. Maximum Dependable Capacity (Not MHe): 1032  : DESIGN ELEO. RRTING = 1085
9. If Changes Occur Above Since Last Report, Give Reasons: . . FWIX. DEPDC. Cfr. - 1032 (100%)
10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any: MDC OM EE DDERIED Leent crT2ssa, omettIme NONE
                                                                               - -        <=.. .. -..--        __ c-10mD-
                                                                                                                         ..    -100 MONTH       YEAR      CUMULATIVE
12. Report Period Mrs 719.0 2,879.0 10,631.0
13. Hours Reactor Critical 719.0 2.745.4 9,866.6
14. Rx Reserve Shtdwn Hrs .0 133.6 693.9 l
15. Hrs Generator On-Line 719.0 2.720.6 9.715.7 gl
16. Unit Reserve Shtdwn Hrs .0 .0 .0
                                                                                                                              - 80
17. Gross Therm Ener (MHH) 2.316,885 8,659,589 30.690.387 800 -
18. Gross Elec Ener (MHH) 760,438 2,858.704 10.071.504
19. Het Elec Ener (MHH) _ 733,624 2,757.843 9,712,153 ~ *O
20. Unit Service Factor 100.0 94.5 91.4
21. Unit Avail Factor 100.0 94.5 91.4
22. Unit Cap Factor (MDC Net) 98.9 92.8 88.5 - 20
23. Unit Cap Factor (DER Net) 95._8 89.9 85.8

{ 24. Unit Forced Outage Rate .0 5.5 8.6 0 ,.

25. Forced Outage Hours 0 5 10
                                                                                                     ,      ,.        ,.        0 158.4                                               15     20        25
                                        .0                    915.3                                                         30 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELING OUTAGE: AUGUST 2. 1986; 84 DAYS. PPRIL 1986

27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-372

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M SUSQUEHANNA 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No . Date IEdi Hours Neason LER Number 8vstem Component Cause & Corrective Action to Prevent Recurrence NCNE unzMMMMMMMM SUSQUEHANNA 2 HAD NO OUTAGES OR SIGNIFICANT POWER REDUCTIONS IN APRIL.

     ,,u 

SUMMARY

M EUMMMMMMMMM Tvoo Reason Method System 8 Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                      & License Examination       9-Other          (LER) File (NUREG-0161)

PAGE 2-373

cun==u==ux= manum =unstran= nun:runnuus n SUSQUEHANNA 2 n un==uzunw:zuzuzmxx=unu=u:xsmsunux:MM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... PENNSYLVANIA LICENSEE................. PENNSYLVANIA PONER & LIGHT COUNTY...................LUZERNE CORPORATE ADDRESS....... 2 NORTH NINTH STREET ALLENTOHN, PENNSYLVANIA 18101 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 7 MI NE OF CONTRACTOR BERHICK, PA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITI AL CRITICALITY. . .MAY 8,1984 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... JULY 3, 1984 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... FEBRUARY 12, 1985 REGULATORY INFORMATION CONDENSER COOLING METHOD...CC,HNDCT IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....SUSQUEHANNA RIVER IE RESIDENT INSPECTOR......L. PLISCO ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....M. CAMPAGNONE COUNCIL..................MID-ATLANTIC DOCKET NUMBER........... 50-388 AREA COUNCIL LICENSE A DATE ISSUANCE. . . .NPF-22, JUNE 27,1984 PUBLIC DOCUMENT R00M....... WILKES-BARRE, PENNSYLVANIA 18701 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDEU. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. PAGE 2-374

MMMMMMMMMMMMMMMMMMMMMMMMMNNNMMNNNNMM Report Period APR 1986 INSPECTION STATUS - (CONTINUED) u SUSQUEHANNA 2 M MMNNMMMMMMMMMMMMMNNMMMMMMMMMMMNNMMMM OTHER ITEMS MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

 =====================================================================================4============================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT NO INPUT PROVIDED.

 ==================================================================================================================================

s i PAGE 2-375

1. Docket: 50-289 0PERATING STATUS MMMMuu=MuuuMuMu=uxMMMMMunuMuumuzmMMu M THREE MILE ISLAND 1 M
2. Reporting Period: 04/01/86 Cutage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

C. H. SMYTH (717) 948-8551 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2535 THREE MILE ISLRND 1
5. Nameplate Rating (Gross MHe): 968 X 0.9 = 871
6. Design Electrical Rating (Net MHe): 819 840 1803
7. Maximum Dependable Capacity (Gross MWe):

DC310N ELEC. RSTING = 819

8. Maximum Dependable Capacity (Net MWe): 776
                                                                                                   . MAX. DCPDC. CMP. - 776 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1033-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 102.216.0 ,
13. Hours Reactor Critical 181.7 1.864.0 35.680.6 h
                                                                                                                                     # =c-100
14. Rx Reserve Shtdwn Hrs 537.2 980.4 1.864.6 ************************************7
15. Hrs Generator On-Line 148.5 1.814.5 34.848.4 ll - 80 Q-
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 343.138 4 2181,475 83.831,871 500-
                                                                                                                                            - 80
18. Gross Elec Ener (MHH) 110.111 1.494.635 27.886.788
19. Not Elec Ener (MHH) 93.619 1.393.101 26.044.814 63.0 34.1 - 40
20. Unit Service Factor 20.7
21. Unit Avail Factor 20.7 63.0 34.1 17.1 62.4 32.6M - 20
 ,,22. Unit Cap Factor (MDC Net)
23. Unit Cap Factor (DER Net) 16.2 59.1 31.1 22.0 7.8 62.9 0 -

0

24. Unit Forced Outage Rate 0 5 10 15 30 35 30
25. Forced Outage Hours 42.0 154.4 58.922.9 DAYS
 ,,26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
  • ITftIL 1986 NONE
27. If Currently Shutdown Estimated Startup Date: N/A M Item calculated with a Heighted Average PAGE 2-376 l

MMMMMMMMMMMMMAMMMMMMMMMMMMMMMMMMMMMM-Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M THREE MILE ISLANC 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMhMMM No. Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 1 03/21/86 S 528.5 B 1 CC HTEXCH EDDY CURRENT GUTAGE. 2 04/23/86 F 6.0 G 3 86010 CH FAILURE TO MAINTAIN FEEDHATER REQUIREMENTS. 3 04/23/86 F 14.0 A 9 HA TURBIN RESTRICTED TO 57% P0HER DUE TO TURBINE BEARING VIBRATION. 4 04/24/86 F 22.0 A 3 HA PIPE A STEAM DRAIN LINE BREAK. l umuMMMMMMMM THREE MILE ISLAND 1 INCURRED 4 SHUTDOHNS IN APRIL AS DESCRIBED ABOVE. _M

SUMMARY

M MMMMMMMMMMM Typ= Reason Method System 8 Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scrais Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

               & License Examination        9-Other         (LER) File (NUREG-0161)

PAGE 2-377

t. -
                     ---- %. _ _ _. u::::::a a cu D              THREE MILE ISLAND 1                                  O c: muuuuuuuuuuuuuuuuuuuuuuuuuuuunuux                                             FACILITY         DATA                                                          Report ?orled APR 1986 FACILITY DESCRIPTION                                                                      UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                             UTILITY ST AT E . . . . . . . . . . . . . . . . . . . .P ENHSYLV ANI A                                                                       J EAR CORP.

LICENSEE. . . . . . . . . . . . . . . . .GPU N' CL COUNTY................... DAUPHIN CORPORATE ADDRESS........P.O. BCX 480 MIDDLETOWN, PENNSYLVANIA 17057 DIST AND DIRECTION FROM NEAREST POPULATION CTR. .10 MI SE OF CONTRACTOR HARRISBURG, PA ARCHITECT / ENGINEER....... GILBERT ASSOCIATES TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... BABCOCK & HILCOX DATE INITIAL CRITICALITY... JUNE 5, 1974 CONSTRUCTOR.............. UNITED ENG. 8 CONSTRUCTORS DATE ELEC ENER 1ST GENER... JUNE 19, 1974 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... SEPTEMBER 2, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWERS IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....SUSQUEHANNA RIVER IE RESIDENT INSPECTOR......R. CONTE l ELECTRIC RELIABILITY COUNCIL..................MID-ATLANTIC LICENSING PROJ MANAGER.....J. THOMA AREA COUNCIL DOCKET NUMBER........... 50-289 LICENSE & DATE ISSUANCE. . . .DPR-50, APRIL 19,1974 PUBLIC DOCUMENT ROOM....... GOVERNMENT PUBLICATIONS SECTION S'l ATE LIBRARY OF PENNSYLVANI A FORUM BUILDING COMMONHEALTH AND WALNUT STREET ) INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE

   ""0THER ITEMS SYSTEMS AND CCMPONENTS:

NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): PAGF, 2-578

NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN THREE MILE ISLAND 1 M Report Period APR 1986 IN$PECTION $TATUS - (CONTINUED) N MNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN DTHER ITEMS i NO INPUT PROVIDED. MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATES NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

           =============sassass==============================================================================sasassus==ssssssssssssssssammass NUMBER      DATE OF                    DATE OF          SUBJECT EVENT                    REPORT
           ---.. __    _               - - - - . . . . . . . . . . . . - - . -   .                  _.....------.....==______.....-----                 __...--.........--..--...............

NO INPUT PROVIDED. ass ===ssassassasss================sssssssssssssssssssssssssssssssss==ssusss==ssssssssssssssssssssssssssssssssssssssssssssssssssses

 =

PAGE 2-379

1. Docket 50-344 0PERATICG STATUS CCGI;rnantw-u
                                                                                                          'm'maamw20ZMnntx CC 13
2. RepIrting Pericds 04/01/86 Outtge + On-lin2 Hrn TROJAN M 719.0 tar"""~MM:Mnut :cuu Munuwaccnnzurnsa
3. Utility

Contact:

F. J. UNMER (503) 556-3713 X495 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3411 ygg,ggg
5. Nameplate Rating (Gross MHe): 1280 X 0.95 = 1216
6. Design Electrical Rating (Net MWe): 1130 .
7. Maximum Dependable Capacity (Gross MHe): 1*?2 1503 -
8. Maximum Dependable Capacity (Net MHe): 1050 _ DESIGN ELEO. RATINS - 1130
9. If Changes Occur Above Since Last Report, Give Reasons: --

MRX. DEPDe. crr. - 1050 (100%) NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE

                                                                                  * ~ ~ ~ ~ ~ * * * * ~ ~ ~ ~ * " * " * " " " " * * " " * ~I" MONTH                                 100D-
12. Report Period Hrs YEAR CUMULATIVE 719.0 2.879.0 84,695.0
13. Hours Reactor Critica! 360.5 2.506.9 53,057.3
                                                                                                                                             - 80
14. Rx Reserve Shtdwn Hrs .0 .0 3.875.4 hf L
15. Hrs Generator On-Line 360.3 2,504.9 51.559.2 b g
16. Unit Reserve Shtown Hrs .0 .0 3,237.0
                                                                                                                                            - to
17. Gross Therm Ener (MHH) 938,323 8,047,937 144,578,520
18. Gross Elec Ener (MHH) 500 -

297.229 2,572,458 53,390.774

19. Het Elec Ener (MHH) 278,342 2,446,012 50,507,356 - e3
20. Unit Service Factor 50.1 ,Q 60.9
21. Unit Avail Factor 50.1 87.0 64.7
 ,_22. Unit Cap Factor (MDC Net)        36.9                                                                                                - 20 80.9            56.8
23. Unit Cap Factor (DER Net) 34.5 75.2 52.8
24. Unit Forced Outage Rate 0 .6 14.9 0
25. Forced Outage Hours 0 5 to
                                                                                                            ,       ,-                 ,-     0
                                          .0       15.4      . 9,021.1                                     15      20            25       30 DAYS
25. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE RPRIL 1986

27. If Currently Shutdown Estimated Startup Date: 06/10/86

\ PAGE 2-380

i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M Report Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M TROJAN MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Type Mours Reason Method LER Number $vstem Component Cause & Corrective Action to Prevent Recurrence 5 0.0 H 5 REDUCED PDHER TO 73% DUE TO ABUNDANT HYDROELECTRIC 85-04 04/02/86 PDHER AVAILABLE ON THE NORTHNEST POWER GRID. S 358.7 C 1 PLANT SHUTDOWN FOR ANNUAL (1986) REFUELING OUTAGE. 85-05 04/16/86 nuuMMMMMMMM TROJAN BEGAN A REFUELING OUTAGE ON APRIL 16.

 ,,u 

SUMMARY

M EMMMMMMMMMM Method System 8 Component Type Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram . Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced toad Licensee Event Report

                                           & License Examination         9-Other         CLER) File CNUREG-0161)                                            PAGE 2-381

t :::::=aaaasassas=================u u TROJAN H c::::::::::::::::c=======n=========u FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE................... 0REGON LICENSEE................. PORTLAND GENERAL ELECTRIC COUNTY...................C0LUMBIA CDRPORATE ADDRESS....... 121 S.H. SALMON STREET PORTLAND, OREGON 97204 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 32 MI N OF CONTRACTOR PORTLAND, ORE ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR NDC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... DECEMBER 15, 1975 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... DECEMBER 23, 1975 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE....MAY 20, 1976 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING T0HERS IE REGION RESPONSIBLE......V CONDENSER COOLING HATER.... COOLING T0HER IE RESIDENT INSPECTOR......S. RICHARDS ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....K. JOHNSTON l COUNCIL..................HESTERN SYSTEMS DOCKET NUMBER........... 50-344 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....NPF-1, NOVEMBER 21, 1975 PUBLIC DOCUMENT ROOM.......MULTNOMAH COUNTY LIBRARY SOCIAL SCIENCES & SCIENCE DEPARTMENT 801 SH 10TH AVENUE PORTLAND, OREGON 97205 INSPECTION STATUS It:SPECTION

SUMMARY

     + INSPECTION ON MARCH 24-28, 1986 (REPORT NO.       50-344/86-05) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF PROCEDURES, AND FOLLCHUP DN INFORMATION BULLETINS, NOTICES AND OPEN ITEMS. DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

     + INSPECTION ON MARCH 17-21, 1986 (REPORT NO.       50-344/86-09) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS; SOLID HASTE; PREPARATION FOR REFUELING OUTAGE; FACILITY TOUR; STEAM GENERATOR TUBE LEAKAGE; AND FOLLOHUF ON IE INFORMATION NOTICES. DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

RESULTS: OF THE AREAS INSPECTED, ONE VIOLATION HAS IDENTIFIED IN ONE AREA: FAILURE TO REPORT THE CAUSE OF AN INOPERABLE RADIDACTIVE EFFLUENT MONITORING INSTRUMENT CHANNEL IN THE SEMIANNUAL RADIOLOGICAL ENVIRONhENTAL REPORT.

    + INSPECTION ON MARCH 18 - APRIL 28, 1986 (REPORT NO.         50-344/86-10) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
    + ENFORCEMENT CONFERENCE ON MARCH 27, 1986 (REPORT NO.          50-344/86-11) 

SUMMARY

1. DESCRIPTION OF THE VIOLATIONS ASSOCIATED HITH THE JANUARY 14 - MARCH 4, 1986 INSPECTION AND DOCUMENTED IN INSPECTION REPORT NUMBER 50-344/86-03 (IE-V-729), DATED MARCH 20, 1986; 2. NRC CONCERNS; 3. LICENSEE CORRECTIVE ACTIONS PLANNED AND IMPLEMENTED.

PAGE 2-382

MMMMMMMMMMMMMMMMMMMMMMMMMMMFMMMMMMMM STATUS - (CONTINUED) M TROJAN M R:ptrt Period APR 1986 INSPECTION MMMMMMMMMMMMMMMMMMMMMMMMMMMEMMMMMMMM INSPECTION

SUMMARY

   + INSPECTION ON APRIL 7-24, 1986 (REPORT NO.      50-344/86-12) AREAS INSPECTED: ROUTINE MATERIAL CONTROL AND ACCOUNTING - REACTORS INSPECTION. DURING THIS INSPECTION, ONE INSPECTION PROCEDURE WAS UTILIZED.

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

   + ENFORCEMENT CONFERENCE ON MARCH 27, 1986 (REPORT NO.        50-344/86-13) 

SUMMARY

AN ENFORCEMENT CONFERENCE WAS HELD ON MARCH 27, l 1986. THE FOLLONING TOPICS HERE DISCUSSED: (1) VIOLATIONS IDENTIFIED DURING INSPECTIONS OF THE TROJAN NUCLEAR PLANT EMERGENCY I' VENTILATION SYSTEM (INSPECTION REPORT NO. 50-344/86-06); (2) MATTERS OF CONCERN TO NRC.
   + INSPECTION ON APRIL 14-18, 1986 (REPORT NO. 50-344/86-14) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF THE LICENSED                    I OPERATOR TRAINING PROGRAM, DESIGN, DESIGN CHANGES, AND MODIFICATIONS PROGRAM, AND OPEN ITEMS CLOSE OUT. DURING THIS INSPECTION,                 i VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

I RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

   + INSPECTION ON APRIL 28 - MAY 2, 1986 (REPORT NO.       50-344/86-15) REPORT CANCELLED.
   + INSPECTION ON APRIL 28 - MAY 2, 1986 (REPORT NO.       50-344/86-16) REPORT BEING PREPARED; TO BF REPORTED NEXT MONTH.
   + INSPECTION ON MAY 5-9, 1986 (REPORT NO. 50-344/86-17) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
   + INSPECTION ON MAY 4-9,   1986 (REPORT NO. 50-344/86-18) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
   + INSPECTION ON APRIL 29 - JUNE 9, 1986 (REPORT NO. 50-344/86-19) INSPECTICN CONTINUING; TO BE COMPLETED IN JUNE,1586.
   + EXAMINATION ON APRIL 14-17, 1986 (REPORT NO. 50-344/0L-86-02) 

SUMMARY

DURING THIS REQUALIFICATION CYCLE, FIVE REACTOR OPERATORS AND FIVE SENIOR REACTOR OPERATORS HERE EXAMINED. THE NRC PREPARED A COMPLETE HRITTEN EXAMINATION IN ACCORDANCE WITH NUREG-1021, ES-601 AND ADMINISTERED IT TO THE OPERATORS ON APRIL 14, 1986. ORAL EXAMINATIONS HERE ADMINISTERED TO TFE OPERATORS ON APRIL 15-17, 1986. ALL OF THE OPERATORS PASSED THE HRITTEN AND ORAL EXAMINATIONS. THE EXAMINERS ALSO REVIEHED FACILITY RECORDS TO VERIFY COMPLIANCE HITH THE PRESENT REQUALIFICATION PROGRAM. BASED ON THE REVIEH OF FACILITY RECORDS AND IN ACCORDANCE HITH NUREG-1021 CRITERIA, THE REQUALIFICATION PROGRAM AT TROJAN NUCLEAR PLANT IS EVALUATED AS SATISFACTORY.

ENFORCEMENT

SUMMARY

  "PGE NUCLEAR QUALITY ASSURANCE PROCEDURE NQAP 114 ... REQUIRES PGE PERSONNEL TO INTERVIEW SIGNERS OF CERTIFICATES OF CONFORMANCE FOR ONLY A SAMPLE OF THE VENDORS FROM HHICH SAFETY-RELATED EQUIPMENT IS ACCEPTED BASED SOLELY ON CERTIFICATES OF CONFCRMANCE.

THIS FAILS TO MEET (NRC) REQUIREMENTS IN THAT ONLY A SAMPLE RATHER THAN ALL VENDORS ARE INTERVIEHED, AND THE INTERVIEWS ARE INADEQUATE TO VERIFY THE EFFECTIVENESS OF THE CERTIFICATION SYSTEM IN AREAS SUCH AS MATERI AL CONTROLS, NONCONFORMANCE CONTROLS, INSPECTION, AND TESTS. AS A RESULT, PGE HAS INSTALLED, AND IS RELYING ON THE OPERATION OF, SAFETY-RELATED COMPONENTS HHICH HAVE BEEN IMPROPERLY PROCURED." "PGE NUCLEAR DIVISION PROCEDURE NDP 700-4 ... DOES NOT SATISFY THE REQUIREMENTS OF 10 CFR 50 APPENDIX B OR 10 CFR 21 IN THAT SECTION 5.1D STATES THAT ' DEFECTS OR NONCOMPLIANCES FOUND ... PRIOR TO FINAL ACCEPTANCE OF A STRUCTURE,

  • SYSTEM OR COMPONENT FOR OPERATION SHALL NOT BE SUBJECT TO REPORTING UNDER 10 CFR 21,' HHEREAS, DEFECTS FOUND BEFORE FINAL ACCEPTANCE FOR OPERATION ARE REQUIRED TO BE REPORTED BY 10 CFR 21."

(8503 4) TECHNICAL SPECIFICATION 3.3.3.11, "RADI0 ACTIVE GASEOUS PROCESS AND EFFLUENT MONITORING INSTRUMENTATION," REQUIRES IN SECTION B. THAT: "HITH THE INOPERABLE INSTRUMENT CHANNELS IDENTIFIED IN TABLE 3.5-13 ITEMS 1, 2, 3C, 4 AND 5 NOT RETURNED TO OPERABLE STATUS HITHIN 30 DAYS, IDENTIFY THE CAUSE OF THE INOPERABLE CHANNELS IN THE SEMIANNUAL RADIOLOGICAL ENVIRONMENTAL RtPORT IN LIEU OF ANY OTHER REPOPT." CONTRARY TO THE REQUIREMENT, THE LICENSEE FAILED TO REPORT THE STATUS AND IDENTIFY THE CAUSE OF AN INOFERABLE PAGE 2-383;

n = u=Im ur a xu n un ru zr : H u n a ..-c n e sm n :Em Repart Perisd APR 1985 INSPECTION STATUS - (CONTINUED) u TROJAN D munz n:Mrnunrununnnn:MnMzi:Em Zurra ENFORCEMENT

SUMMARY

RADI0 ACTIVE GASEOUS EFFLUENT MONITORING CHANNEL (FR-3100) IN THE SEMIANNUAL RADIOLOGICAL EFFLUENT REPORTING PERIOD OF JULY 1, 1985. THROUGH DECEMBER 31, 1985, DATED FEBRUARY 28, 1986. SPECIFICALLY, THE MOISTURE REMOVAL SYSTEM FOR PRM-6 BECAME OPERATIONAL DURING JULY 1933 AND CHANNEL FR-3100 HAS NOT MADE OPERABLE AS OF MARCH 17, 1986.AN ANNUAL INDEPENDENT FIRE PROTECTION AND LOSS PREVENTI0re AUDIT BY QUALIFIED LICENSEE PERSONNEL OR AN OUTSIDE FIRE PPOTECTION FIRM HAS NOT BEEN PERFORMED SINCE JULY 1984 AS REQUIRED BY TECHNICAL SPECIFICATION SECTION 6.5.2.8.H. DURING 1985 REGULAR FIRE BRIGADE DRILLS HERE CONDUCTED AT TURKEY POINT BUT THE FREQUENCY BETHEEN 8 0F 19 DRILLS EXCEEDED THE SPECIFIED 3 MONTH MAXIMUf1 TIME INTERVAL STIPULATED BY 10 CFR 50, APPENDIX R, SECTION III.I AND LICENSEE'S PROCEDURE AP15500 AS REQUIRED TO BE IMPLEMENTED BY TECHNICAL SPECIFICATION SECTION 6.4.2 AND 6.8.1 RESPECTIVELY. THE FIRE HOSE STATIONS IN THE VICINITY OF SAFETY RELATtD EQUIPMENT HERE NOT DEMOIiSTRATED OPERABLE BY A VISUAL l INSPECTION OF HOSE STATION EQUIPMENT DURING THE 42 DAYS BETHELN AUGUST 27 AND OCTOBER 8, 1985. THIS EQUIPMENT IS REQUIRED TO BE ' INSPECiED MONTHLY BY TECHNICAL SPECICICATION SECTICN 4.15.3.A.1. I AN ANNUAL INDEPENDENT FIRE PROTECTION AND LOSS PREVENTION AUDIT BY QUALIFIED LICENSEE PERSONNEL OR AN OUTSIDE FIRF PROTECTION FIRM HAS NOT BEEN PERFORMED SINCE JULY 1984 AS REQUIRED BY TECHNICAL SPECIFICATION SECTION 6.5.2.8.H, NAS NOT CONDUCTED IN 1985. DURING 1985 REGUL AR FIRE BRIGAEE DRILLS HERE CONDUCTED AT TURKEY POINT BUT THE FREQUENCY BETHEEN 8 0F 19 DRILLS EXCEEEED THE SPECIFIED 3 MONTH MAXIMUM TIME INTERVAL STIPULATED BY 10 CFR 50, APPENDIX R, SECTION III.I AND LICENSEE'S PROCEDURE AP155CD AS REQUIRED TO BE IMPLEMENTED BY TECHNICAL SPECIFICATION SECTION 6.4.2 AND 6.8.1 RESPECTIVELY. THE FIRE HOSE STATIONS IN THE VICINITY OF SAFETY RELATEC EQUIPMENT HERE NOT DEMONSTRATED OPERABLE BY A VISUAL INSPECTION OF HOSE STATION EQUIPMENT DURING THE 42 DAYS BETHEEN AUGUST 27 AND OCTOBER 5, 1985. THIS EQUIPMENT IS REQUIRED TO BE INSPECTED MONTHLY BY TECHNICAL SPECIFICATIDH SECTION 4.15.3.A.1. (8600 5) . OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:

   + 1.      STEAM GENERATOR SNUBBERS FAILED TO OPERATE PROPERLY. 2. CONTROL ROOM VENTILATION SYSTEM DOES NOT FUNCTION PROPERLY.

FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: _ + MODE 5: EDDY CURRENT TESTING IN PROGRESS. LAST IE SITE INSPECTION DATE: 04/29-06/09/86+ INSPECTION REPORT NO: 50-344/86-19+ PAGE 2-384

Repert Period APR 1986 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM REP 0RTS FR0M LICENSEE M TROJAN M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-01-LO 02-08-86 03-07-86 CIRCULATING MATER PUMP TRIP RESULTING IN HIGH NEGATIVE FLUX RATE REACTOR TRIP 86-02-L0 02-24-86 03-18-86 CONTROL ROOM EMERGENCY' VENTILATION SYSTEM DEGRADATION DUE TO EQUIPMENT FAILURE AND DESIGN DEFICIENCY

   ========================================================= 3 :================================= ::::::::::::::::::::::::::::::::
                                                                                                                                              --g T                                                                                                          #

_~ PAGE 2-345

l. Docket 50-250 0PERATING STATUS EM MMM MM:nnnn:CKXMO M-~~ ~ M:0~a:M
2. R:psrting Pcelsde 04/01/86 M TURKEY POINT 3 n Outage + On-line Hrs: J1,1d MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts _fL W. GRANT (305) 552-3675 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MWt): 2200 TURKEY POINT 3
5. Nameplate Rating (Gross MWe): 894 X 0.85 = 760
6. Design Electrical Rating (Not MWe) 693 ,,,,,
7. Maximum Dependable Capacity (Gross MWe): 700 _

1800

8. Maximum Dependable Capacity (Not MWe): 666 DESIGN M. WING = 003
9. If Changes Occur Above Since Last Repor't, Give Reasons: .... ffDC. DEPDC. OFr. - 800 (100%)

NONE

10. Power Level To Which Restricted, If Any (Not MWe):
11. Reasons for Restrictions, If Anyt

_ _NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Mrs 719.0 2.879.0 117.488.6
13. Hours Reactor Critical 531.9 1.784.3 82.581.2
14. Rx Reserve Shtdwn Hrs .0 .0 844.3 l
15. Hrs Generator On-Line 508.0 1.740.5 80.147.5 g _ , , , , , , , , , , , , , , , , _ _ , , , , , , ,
16. Unit Reserve Shtdwn Hrs .0 .0 121.8
17. Gross Thern Ener (MHH) 1.108.434 3.737.640 165.943.161 300 - -80
18. Gross Elec Ener (MWH) 364.320 1.227.970 53.099.515
19. Not Elec Ener (MWH) 243.551 1.156.850 50.266.431 - 80
20. Unit Service Factor 70.7 60.5 68.2
21. Unit Avall Factor 70.7 60.5 68.3 ""
22. Unit Cap Factor (MDC Net) 71.7 60.3 65.8M
23. Unit Cap Factor (DER Net) 68.9 58.0 61.7
                                                                                                                                                                                                                                              -20
24. Unit Forced Outage Rate 29.3 39.5 7.7 0 ,.

0

                                                                                                                                                                                                        ,.       .-        ,-        .-          0
25. Forced Outage Hours 211.0 1.138.5 6.173.3 5 to 15 30 3 30 g)gyg
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE fyR11. 1333

27. If Currently Shutdown Estimated Startup Dates N/A M Item calculated with a Heighted Average PAGE 2-386'

mummmmmmmmmmmunummmmmmmmmmmu m r z um m TURKEY POINT 3 R ptrt Period APR 1986 UNIT SHUTD0WN$ / REDUCTION $ munusununuunumusunnummmmmmmmmmmmuuan LER N"-her System Componenk Cause B Correctlwa Actlan to Prevent Warueranca No. _ Data IEEI BIEEE Reason Method 250-86-009 NG ZZZZZZ CONTINUED THE INVESTIGATION AND EVALUATION OF F 211.0 A 4 POTENTIAL CONCERNS MITH DIESEL OENERATOR LOADING. 4 03/27/86 zu MMMMMMMu TURKEY POINT 3 EXPERIENCED 1 OUTAGE IN APRIL AS DISCUSSED ABOVE. .M

SUMMARY

M mMMMMMMMMMM Reaman Method Svetem A commonant Tvon F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & N 3-Sched B-Maint or Test G-Oper Error 2-Manual ScramPreparation Instructionsoffor C-Refueling H-Other 3-Auto Scram 4-Continued Data Entry Sheet D-Regulatory Restriction 5-Peduced Load Licensee Event Report E-Operator Training a License Examination 9-Other (LER) File (NUREG-0161) PAGE 2-387

                                                                           ..m .

MMMENEMHMHDZMMMAM%%MH%MEMMMZMH%M%CM2 M TURKEY POINT 3 H M sMuMuusuxxxxxuMMuuuuu MMM:ManMZMZu FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... FLORIDA LICENSEE................. FLORIDA POWER & LIGHT COUNTY...................DADE CORPORATE ADDRESS....... 9250 HEST FLAGLER STREET P.O. BOX 011100 MIAMI, FLORIDA 33174 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 25 MI S OF CONTRACTOR MIAMI, FLA ARCHITECT / ENGINEER.......BECFTEL TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY.. 0CTOBER 20, 1972 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER...HOVEMBER 2, 1972 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 14, 1972 REGULATORY INFORMATION CONDENSER COOLING METHOD... CLOSED CANAL IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... CLOSED CYCLE CANAL IE RESIDENT INSPECTOR......T. PEEBLES ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. MCDONALD COUNCIL. ................ SOUTHEASTERN ELECTRIC DOCKET NUMBER.......... .50-250 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-31, JULY 19, 1972 PUBLIC DOCUMENT ROOM....... ENVIRONMENTAL AND URBAN AFFAIRS LIBRARY FLORIDA INTERNATIONAL UNIVERSITY MIAMI, FLORIDA 33199 INSPECTION

SUMMARY

iNSPECTIO?l STATUS

 + INSPECTION FEBRUARY 3-7 (86-03): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 20 INSPECTOR-HOURS AT THE SITE DURING NORMAL DUTY HOURS, IN THE AREA 0F PLANT CHEMISTRY. NO VIOLATIONS OR DEVIATIONS HERF. IDENTIFIED.

INSPECTION JANUARY 15-16 (86-04): THIS SPECIAL, UNANNOUNCED INSPECTION ENTAILED 11 dXTERNAL EXPOSURE AND MANAGEMENT CONTROLS DURING HORK PERFORMED ON THE UNIT 3 FLUX THQ MAPPING VIOLATIONS HERE SYSTEM. IDENTIFIEDINSPEC

  - FAILURE TO CONDUCT OPERATIONS IN ACCORDANCE HITH EITHER APPROVED OR ADEQUATE PROCEDURES, AND FAILURE TO ADEQUATELY TRAIN AN INDIVIDUAL IN THE USE OF A RADIATION DETECTION INSTRUMENT. AN ENFORCEMENT CONFERENCE HAS HELD JANUARY 31, 1986.

INSPECTION FEBRUARY 3-7 (86-06): LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS (92701 AND 927028).THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 20 INSP HOUSEKEEPING (54834B), MATERIAL IDENTIFICATION AND CONTROL (42902B), MATERIAL LICENSEE EVENT REPORT CONTROL (42940B), FOLLONUP (9270 GULFALLOY SUPPLIED MATERIALS (92705B), GENERIC LETTER 85-02, PROPOSED LICENSE AMENDMENT, ACCEPTANCE CRITERIA FOR INSERVICE TE.0B), AND INSERVICE INSPECTION. ONE VIOLATION HAS IDENTIFIED STING PROCEDURE". " FAILURE TO PROVIDE APPROPRIATE INSPECTION FEBRUARY 24-28 (86-09): PROTECTION / PREVENTION AND FOLLONUP DN PREVIOUSLY IDENTIFIED INSPECTICH ITEMS.THIS ROUTINE, ANNOUNCED INSPECTION ENTA THREE VIOLATIONS HERE IDENTIFIED - EXCESSIVE TIME PROTECTION AND LOSS PREVENTION INSPECTION AND AUDIT FOR 1985; AND EXCESSIVE TIME BETHE PAGE 2-388

MWNMMMhMMMMMMMMMMMMMMMMMMMMMMMMMMMMM TURKEY POINT 3 M R:pgrt Period APR 1986 INSPECTION STATUS - (CONTINUED) M MhMMMMMMMMMMMMMMMMMMMMMMMMMMMMMDMMMM INSPECTION

SUMMARY

THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 110 DIRECT INSPECTION HOURS AT THE SITE, INSPECTION FEBRUARY 10 - MARCH 10 (86-10): INCLUDING 18 HOURS OF BACKSHIFT INSPECTION, IN THE AREAS OF LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, ANNUAL AND MONTHLY SURVEILLANCE, MAINTENANCE OBSERVATIONS AND REVIENS, OPERATIONAL SAFETY, ENGINEERED SAFETY FEATURES HALKDOWN, INDEPENDENT THREE INSPECTION, AND PLANT EVENTS. VIOLATION - FAILURE TO MEET THE REQUIREMENTS OF TECHNICAL SPECIFICATION (TS) 6.8.1., EXAMPLES. INSPECTION MARCH 3-7 (86-14): THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 16 INSPECTOR-HOURS AT FP&L CORPORATE OFFICES IN JUNO i BEACH AND THE ST. LUCIE PLANT IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS, OFFSITE SUPPORT STAFF, OFFSITE l REVIEN COMMITTEE, AND TESTS AND EXPERIMENTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION MARCH 3-7 (86-15): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 19 INSPECTOR-HOURS ON SITE IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCENENT MATTERS (92701B) (92702B), HOUSEKEEPING (54834B), MATERIAL IDENTIFICATION AND CONTROL (429028), MATERIAL CONTROL (42940B), INSPECTION DEMONSTRATION AND INSERVICE TESTING OF PUMPS AND VALVES (61700B). NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. THIS ROUTINE, UNANNDUNCED INSPECTION ENTAILED 113 DIRECT INSPECTION HOURS AT THE SITE, INSPECTION MARCH 10 - APRIL 14 (66-17): INCLUDING 16 HOURS OF BACKSHIFT INSPECTION, IN THE AREAS OF LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, ANNUAL AND MONTHLY J l SURVEILLANCE OBSERVATIONS, MAINTENANCE OBSERVATIONS AND REVIENS, OPERATIONAL SAFETY VERIFICATION, ENGINEERED SAFETY FEATURES i HALKDOHN, INDEPENDENT INSPECTION, PLANT EVENTS AND AN INFORMATION MEETING HITH LOCAL OFFICIALS. VIOLATION - FAILURE TO MEET THE l REQUIREMENTS OF TECHNICAL SPECIFICATION (TS) 6.8.1. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: SELECT SAFETY SYSTEM OPERABILITY REVIEW IN PROGRESS. FACILITY ITEMS (PLANS AND PROCEDURES): PROCEDURE UPGRADE PROGRAM (PUP) IN PROGRESS. MANAGERIAL ITEMS: PEP IN PROGRESS. PLANT STATUS: NORMAL OPERATION. LAST IE SITE INSPECTION DATE: MARCH 10 - APRIL 14, 1986 + INSPECTION REPORT NO: 50-250/86-17 + PAGE 2-389

l Mr%2%n2%EMuuu=E32n%23 n:MMZMMuunn 2 Rapsrt Paried APR 1986 REPORTS FR0M LICENSEE u TURKEY POINT 3 u MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l

                                     ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT l EVENT REPORT \ ----- _ .------- ___ __--- =-

                                                                                                                                                     =_                     _

86-004 01/25/86 02/24/86 SHUTDONN OF UNIT 3 DUE TO POTENTIAL OF DEBRIS TO EXIST IN ECCSs UNIT 4 ECCS HAD DEBRIS IN 4A/B ECC; DEBRIS LEFT IN STEAM GENERATOR DURING REFAIR OUTAGES FOR EACH UNIT. 86-006 02/11/86 03/13/86 ESF ACTUATION - SAFETY INJECTION AND REACTOR TRIPS CAUSE - CONSTRUCTION ACTIVITIES ON UNIT 4 RESULTED IN OPENING 4D01-39 INITIATING 1 CHANNEL OF CONTAINMENT HIGH PRESSURE PROTECTION. 86-007 02/12/86 03/14/86 TECHNICAL SPECIFICATION - SAFETY INJECTION PUMPS CAUSE - REVEALED AN OVERSIGHT IN REVIEN OF UNIT 4 CLEARANCES ALLOHED THE 4B HHSI TO BE DECLARED IN SERVICE HITH ITS DISCHARGE VALVES CLOSED. i 86-008 02/14/86 03/17/86 SHUTDOHN COMMENCED DUE TO A POTENTIAL CONCERN ON THE ABILITY OF THE ICH SYSTEM TO MEET FLON REQUIREMENTS FOR A DESIGN BASIS ACCIDENT. i 86-009 02/24/86 03/26/86 POTENTIAL EXCHANGERS.CONCERN EXISTED ASSOCIATED HITH THE CCH FLOW THROUGH THE RESIDUAL HEAT REMOVAL HEAT 86-010 02/21/86 03/31/86 A DAILY CHECK PERSONNEL OF AN " ARMS" CHANNEL HAD NOT BEEN COMPLETED DURING THE PAST 7 DAYSs DUE TO CVERSIGHT. 86-011 02/28/86 03/31/86 INTERVAL BETHEEN MONTHLY INSPECTIONS REQUIRED BY TECHNICAL SPECIFICATION OF FIRE PROTECTION EQUIPMENT HAS EXCEEDED: CAUSE - TRIGGERED BY A FAULTY COMPUTER GENERATED PROJECTION OF MAINTENANCE AND INSPECTION ACTIVITIES. 86-012 03/05/86 04/04/86 RPS SYSTEM ACTUATION - SUBCRITICAL REACTOR TRIPS CAUSE - LON RESISTANCE AT THE DETECTOR AND DIODE CR9A 0F THE FIRST STAGE OF THE PREAMPLIFIER HAS SHORTED.

                                     ==========================================================================================,,===,,,,,,,=,,,,,,,,,,,,,,=,,,,,,,,,,,,

i PAGE 2-390.

M l N W O 4 L i w Z 4 l

                           '                         \

m

                           >=

LA. W

                           .J
                           >=

n J 4 Z C M H Z tiJ

                           >=

Z M L4J O 4 L to M Z

                           >=
1. Dscket: 50-251 0PERATING STATUS MMMMMMxxuMMumMMMMMMMxMMMuummKzzKMuun M TURKEY POINT 4 u
2. Raperting Pariod: 04/01/86 Outags + On-lins Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMXXMMM
3. Utility

Contact:

N. H. GRANT (305) 552-3675 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2200 TURKEY POINT 4
5. Nameplate Rating (Gross MHe): 894 X 0.85 = 760
6. Design Electrical Rating (Not MHe): 693
7. Maximum Dependable Capacity (Gross MHe): 700 1800
8. Maximum Dependable Capacity (Not MHe): 666 - DCSION ELCC. RATING = 693
                                                                                                     ...... fMX. DCPDO. CfF. - 666 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any:

NONE MONTH YEAR CUMULATIVE o

12. Report Period Hrs 719.0 2,879.0 111.216.0  %
13. Hours Reactor Critical .0 225.4 77,860.8 hf
14. Rx Reserve Shtown Hrs .0 .0 166.6 NO NET POWER OUTPUT THIS MONTH l
15. Hrs Generator On-Line .0 225.1 75.327.5 hf ....,,,,,,,,,,,,,,,,,,,,,,,,,,,, _

ff

16. Unit Reserve Shtdwn Hrs .0 .0 31.2 Q-
17. Gross Therm Ener (MHH) 0 440,167 159,486,896 - 80 500 -
18. Gross Elec Ener (MHH) 0 139,235 50,781,867
19. Net Elec Ener (MHH) -1.013 127,539 48,091.796 - 80
20. Unit Service Factor .0 7.8 67.7
                                                                                                                                                     - 63
21. Unit Avail Factor .0 7.8 67.8
22. Unit Cap Factor (MDC Net) .0 6.7 66.5M
                                                                                                                                                     - 20
23. Unit Cap Factor (DER Net) .0 6.4 62.4
24. Unit Forced Outage Rate .0 .0 6.5 0 -
                                                                                                            ,      .         ,     _..   ,.             O O           5     10        15      20  25         30
25. Forced Outage Hours .0 .0 4,824.7 DAYS I
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration)

NONE I I"

27. If Currently Shutdown Estimated Startup Date: 07/04/86 M Item calculated with a Heighted Average PAGE 2-392

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Repsrt Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M TURKEY POINT 4 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date T~pe Hou?s keason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 02 01/10/86 S 719.0 C 4 RC FUELXX UNIT 84 REMAINED SHUTDOHN FOR REFUELING AND SCHEDULED MAINTENANCE. 1 EMMMMMMMMMM TURKEY POINT 4 REMAINS SHUT DOWN FOR REFUELING. ,,M

SUMMARY

M HMMMMMMMMMM Tvoe Reason Method System & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                       & License Examination        9-Other         (LER) File (NUREG-0161)

PAGE 2-393

E2m%uC%%um%u%u%uu%um%%%%%u%u%%%%u%u3 n TURKEY POINT 4 x Report Period APR 1986 FACILITY DATA cumuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum UTILITY A CDNTRACTOR INFORMATION FACILITY DESCRIPTION UTILITY LOCATIDH LICENSEE................. FLORIDA POWER & LIGHT STATE.................... FLORIDA CORPORATE ADDRESS....... 9250 HESTFLORIDA FLAGLER33174 STREET P.O. BOX 013100 COUNTY...................DADE MIAMI, DIST AND DIRECTION FROM CONTRACTOR HEAREST POPULATION CTR..MIAMI, 25 MI SFLA OF ARCHITECT / ENGINEER . . . . . . .BECHTEL HUC STEAM SYS SUPPLIER...HESTINGHOUSE TYPE OF R7 ACTOR............PHR DATE INITIAL CRITICALITY... JUNE 11, 1973 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... JUNE 21, 1973 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... SEPTEMBER 7, 1973 REGULATORY INFORMATION IE REGION RESPONSIBLE......II CONDENSER COOLING METHOD... CLOSED CANAL IE RESIDENT INSPECTOR......T. PEEBLES CONDENSER COOLING HATER.... CLOSED CYCLE CANAL LICENSING PROJ MANAGER.....D. MCDONALD ELECTRIC RELIABILITY DOCKET NUMBER........... 50-251 COUNCIL.................. SOUTHEASTERN ELECTRIC RELIABILITY COUNCIL LICENSE & DATE ISSUANCE. . . .DPR-41, APRIL 10,1973 PUBLIC DOCUMENT ROOM....... ENVIRONMENTAL AND URBAN AFFAIRS LIBRARY FLORIDA INTERNATIONAL UNIVERSITY MIAMI, FLORIDA 33199 INSPECTION STATUS INSPECTION

SUMMARY

THIS ROUTIME, UNANNOUNCED INSPECTION ENTAILED 20 INSPECTOR-HOURS AT THE SITE DURING NORMAL

     + INSPECTION FEBRUARY 3-7 (86-03):

DUTY HOURS, IN THE AREA 0F PLANT CHEMISTRY. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. THIS SPECIAL, UNANNOUNCED INSPECTION ENTAILED 12 INSPECTOR-HOURS AT THE SITE IN THE AREA 0F INSPECTION JANUARY 15-16 (86-04): TH0 VIOLATIONS HERE IDENTIFIED

     -EXTERNAL FAILURE TO  EXPOSURE CONDUCT AND           MANAGEMENT OPERATIONS             CONTROLS HITH IN ACCORDANCE     DURING         HORK EITHER       PERFORMED APPROVED                  ON THE UNIT DR ADEQUATE                   3 FLUX AND PROCEDURES,       MAPPING FAILURE  SYSTEM.

TO ADEQUATELY INDIVIDUAL IN THE USE OF A RADIATION DETECTION INSTRUMENT. AN ENFORCEMENT CONFERENCE HAS HELD JANUARY 31, 1986. THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 19 INSPECTOR-HOURS ON SITE IN THE AREAS OF INSPECTION FEBRUARY 3-7 (86-06): AND 92702B), HOUSEKEEPING (548348), MATERIAL IDENTIFICATION AND CONTROL GENERIC LETTER 85-02, PROPOSED LICENSE AMENDMENT, LICENSEE ACTION (42902B), MATERIAL ON PREVIOUS CONTROL (42940B), ENFORCEMENT MATTERS (92701GULFALLOY SUPPLIED MATERIALS

                                                                                                                                    " FAILURE TO PROVIDE(927055),DNE APPROPRIATE          VIOLATION LICENSEE EVENT REPORT FOLLOHUP (92700B), AND INSERVICE INSPECTION.

ACCEPTANCE CRITERIA FOR INSERVICE TESTING PROCEDURE". THIS ROUTINE, ANNOUNCED INSPECTION ENTAILED 19 INSPECTOR-HOURS ON SITE IN THE AREAS OF FIRE INSPECTION FEBRUARY 24-28 (86-09): THREE VIOLATIONS HERE IDENTIFIED - EXCESSIVE TIME l PROTECTION / PREVENTION AND FOLLOHUP DN PREVIOUSLY IDENTIFIED INSPECTION ITEMS. FAILURE TO CONDUCT AN INDEPENDENT FIRE BETHEEN PROTECTION REQUIRED AND LOSSTECHNICAL PREVENTION SPECIFICATION INSPECTION AND SURVEILLANCE AUDIT FOR 198S; TESTS ON THE FIRE AND EXCESSIVE PROTECTION TIME BETHEEN SHIFTSYSTEMS: FIRE BRIGADE DRILLS. PAGE 2-394

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Rspert Period APR 1986 INSPECTION STATUS - (CONTINUED) M TURKEY POINT 4 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

INSPECTION FEBRUARY 10 - MARCH 10 (86-10): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 111 DIRECT INSPECTION HOURS AT THE SITE, INCLUDING 18 HOURS OF BACKSHIFT INSPECTION, IN THE AREAS OF LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, ANNUAL AND MONTHLY SURVEILLANCE, MAINTENANCE DBSERVATIONS AND REVIENS, OPERATIONAL SAFETY, ENGINEERED SAFETY FEATURES HALKDONN, INDEPENDENT INSPECTION, AND PLANT EVENTS. VIOLATION - FAILURE TO MEET THE REQUIREMENTS OF TECHNICAL SPECIFICATION (TS) 6.8.1., THREE EXAMPLES. INSPECTION MARCH 3-7 (86-14): THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 16 INSPECTOR-HOURS AT FP&L CORPORATE OFFICES IN JUNO BEACH AND THE ST. LUCIE PLANT IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS, DFFSITE SUPPORT STAFF, OFFSITE REVIEH COMMITTEE, AND TESTS AND EXPERIMENTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION MARCH 3-7 (86-15): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 19 INSPECTOR-HOURS ON SITE IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS (927015) (927025), HOUSEKEEPING (548348), MATERIAL IDENTIFICATION AND CONTROL (429028), MATERIAL CONTROL (429408), INSERVICE INSPECTION (ISI), INSPECTION DEMONSTRATION AND INSERVICE TESTING OF PUMPS AND VALVES (617005). NO VIOLATIONS OR DEVIATIDMS HERE IDENTIFIED. l INSPECTION MARCH 10 - APRIL 14 (86-17): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 113 DIRECT INSPECTION HOURS AT THE SITE, INCLUDING 16 HOURS OF BACKSHIFT INSPECTION, IN THE AREAS OF LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, ANNUAL AND MONTHLY SURVEILLANCE OBSERVATIONS, MAINTENANCE OBSERVATIONS AND REVIENS, OPERATIONAL SAFETY VERIFICATION, ENGINEERED SAFETY FEATURES HALKDONN, INDEPENDENT INSPECTION, PLANT EVENTS AND AN INFORMATION MEETING HITH LOCAL OFFICIALS. VIOLATION - FAILURE TO MEET THE REQUIREMENTS OF TECHNICAL SPECIFICATION (TS) 6.8.1. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: SELECT SAFETY SYSTEM OPERABILITY REVIEN IN PROGRESS. FACILITY ITEMS (PLANS AND PROCEDURES): PROCEDURE UPGRADE PROGRAM (PUP) IN PROGRESS. MANAGERIAL ITEMS: PEP IN PROGRESS. PLANT STATUS:

           + REFUELING OUTAGE. PLANT IN COLD SHUTDOWN.

LAST IE SITE INSPECTION DATE: MARCH 10 - APRIL 14, 1986 + j INSPECTION REPORT NO: 50-251/86-17 + PAGE 2-395 )

MZHUME M M M ZZZCHi!ZUM MMMCM*J. 2nMI:CZM*iCCil FR0M LICENSEE u TURKEY POINT 4 n Repirt Perled APR 1986 REPORTS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM; MUM s==s=====z=============z==s=====s===============s====s======z=s===s========ss=======z=====ss=======s==ss===s=ss=====sss===z=a==s== ! NUMBER DATE OF DATE OF SUBJECT EVENT REPORT -- 86-005 02/06/86 03/08/86 ESF ACTUATION - PHASE "A" CONTAINMENT ISOLATION; CAUSE - INADVERTENT PHYSICAL DISTURBANCE OF A SAFEGUARDS RELAY BY CONSTRUCTION PERSONNEL DURING A VOLTAGE CHECK.

   ===s====s============================sas===ss======ss=ss======================us======s=ss=z======ss====s==== sass ==s====us====s===

PAGE 2-396

1lll ll l! l i 4 llllI1ll 7 9 3 2 E G A P K N A L B T F E L Y L L A N O I T N E T N I E G A P S I H T l l i

1. Dscket: 50-271 0PERATING STATUS MMEMMMMMMMMMMMMMMMMMMMuunMMMunMunMus M VERMONT YANKEE 1 M
2. Reporting Period 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

F. J. BURGER (802) 257-7711 X136 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 1593 VERMONT YRNKEE 1
5. Nameplate Rating (Gross MWe): 626 X 0.9 = 563
6. Design Electrical Rating (Het MWe): 514 535 1833
7. Maximum Dependable Capacity (Gross MWe):

DESIGN ELEO. RRTING = 514

8. Maximum Dependable Capacity (Net MWe): 504
                                                                                   ......tmX.           DEPDO. Cfr. = 504 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MWe):
11. Reasons for Restrictions, If Any:

NONE 10m3-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.0 119,281.8
13. Hours Reactor Critical .0 .0 93.110.9 hh
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line .0 .0 90.718.2 hf
16. Unit Reserve Shtown Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 0 0 132.109.618 500- --------------------------------------- -100
18. Gross Elec Ener (MHH) 0 0 43,955,902
                                                                                                                                      - 80
19. Net Elec Ener (MHH) 0 0 41,700,250
                                        .0          .0            76.1                                                                - so
20. Unit Service Factor
21. Unit Avail Factor .0 .0 76.1 , , ,
22. Unit Cap Factor (MDC Net) .0 .0 69.4
                                                                                                                                      - 20
23. Unit Cap Factor (DER Net) .0 .0 68.0 6.9 0 -

0

24. Unit Forced Outage Rate .0 .0 0 5 to 15 20 25 30
25. Forced Outage Hours .0 .0 5,466.6 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

= frRIL 1988 NONE

27. If Currently Shutdown Estimated Startup Date: 06/26/86 PAGE 2-398,

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M i ) Repert Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M VERMONT YANKEE 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l ) Type Hours Reason Method LFR Number $vstem Component Cause & Corrective Action to Prevent Recurrence No. Date l 85-14 09/21/85 S 719.0 C i 1985 REFUELING / MAINTENANCE /RECIRC PIPE REPLACEMENT GUTAGE IN PROGRESS. I ( l l i i DMDMMMMMMMM VERMONT YANKEE REMAINS SHUT DOHN FOR REFUELING, MAINTENANCE, AND RECIRCULATING PIPING REPLACEMENT.

 .M 

SUMMARY

M QUDMMMMMMMM Type Reason Mgibed System a Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling N-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                   & License Examination       9-Other         (LER) File (NUREG-0161)                                                      PAGE 2-399

acucacaocaccawauw0000000000000000000 0 VERMONT YANKEE 1 0 xD000*000DDOM00D00DGOD000MDDMGDOMD00 FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... VERMONT LICENSEE................. VERMONT YANKEE NUCLEAR PDHER COUNTY...................HINDHAM CORPORATE ADDRESS....... 1671 HORCESTER ROAD FRAMINGHAM, MASSACHUSETTS 01701 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI S OF CONTRACTOR BRATTLEBORD, VT ARCHITECT / ENGINEER.......EBASCO TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... MARCH 24, 1972 CONSTRUCTOR..............EBASCO DATE ELEC ENER 1ST GENER... SEPTEMBER 20, 1972 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... NOVEMBER-30, 1972 REGULATORY IFFORMATION CONDENSER COOLING METHOD... COOLING T0HER IE REGION RESPONSIBLE......I CONDENSER COOLING HATER.... CONNECTICUT RIVER IE RESIDENT INSPECTOR......H. RAYMOND ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....V. ROONEY COUNCIL.................. NORTHEAST POWER DOCKET NUMBER........... 50-271 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-28, FEBRUARY 28, 1975 PUBLIC DOCUMENT ROOM....... BROOKS MEMORIAL LIBRARY 224 MAIN STREET BRATTLEBORD, VERMONT 05301 INSPECTION

SUMMARY

INSPECTION STATUS NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

! NONE OTHER ITEMS l l 3YSTEMS AND COMPONENTS: NO INPUT PROVIDED. l FACILITY ITEMS (PLANS AND PROCEDURES): l HO INPUT PROVIDED. PAGE 2-400 I l 1

NNNNNNNNNNMMMNNMMMNNNNNNNNNNNNNNNNNN VERMONT YANKEE 1 N Repret Period APR 1986 INSPECTION STATUS - (CONTINUED) N NNNNNNNNNNNNNNNNNNNNNNNNENNNNNNNNNNN 1 l OTHER ITEMS l i MANAGERIAL ITEMS 8 NO INPUT PROVIDED.

.            PLANT STATUS:

NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. f INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

             ==============================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _ _ - .

                                                                                                                                                     -== -                        -

NO INPUT PROVIDED. i ==================================================================t2============================================================== 5 l l i PAGE 2-401

                                        - - _ _ - - - -                                        e                                                           +                    ,                                         - -

STATUS unsungruunnurMan NrnsangunnarMnMntrx

1. Dockot 50-397. OPERATING U HASHINGTON NUCLEAR 2 2 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMu%MnMcM:suMMusta
2. Reporting Period
3. Utility

Contact:

LEONARD HUTCHISON (509) 377-2501 X2486 AVERAGE DAILY P0HER LEVEL (MHe) PLOT 3323 NASHINGTON NUCLEAR 2

4. Licensed Thermal Power (MHt):
5. Nameplate Rating (Gross MHe): 1201
6. Design Electrical Rating (Not [1He): 1100 Hmc
7. Maximum Dependable Capacity (Gross MWo): 1140 DESIGN ELEO. RHTING - 1100
8. Maximum Dependable Capacity (Net MHe): 1095 ......MRX. DEPDC. CRP. - 1006 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:
10. Power Level To Hhich Restricted, If Any (Net MHe): NO NET POWER OUTPUT THIS MONTH
11. Reasons for Restrictions, If Any ------- ------- -- - ----- -
                                                                                                                                                - 100 NONE                                                                    1000-MONTH         YEAR      CUMULATIVE
12. Report Period Hrs 719.0 2,879.0 12.079.2
                                                                                                                                                - 80
13. Hours Reactor Critical .0 1.779.4 9,095.6 h
14. Rx Reserve Shtdwn Hrs .0 340.4 340.4
15. Hrs Generator On-Line .0 1,738.1 8,764.6 hf _,,
16. Unit Reserve Shtdwn Hrs .0 381.7 381.7 j
17. Gross Therm Ener (MHH) 0 3,877.530 21.441.810 800 -
18. Gross Elec Ener (MHH) 0 1,275,780 7,099.030 - go l
19. Het Elec Ener (MHH) 0 1,223,978 6.810.751 l
20. Unit Service Factor .0 60.4 72.6
21. Unit Avail Factor .0 73.6 75.7 - 30
22. Unit Cap Factor (MDC Net) .0 38.8 51.5
23. Unit Cap Factor (DER Net) ,. 0 38.6 51.3 0
24. Unit Forced Outage Rate 100.0 29.7 14.8 0' s
                                                                                                           ~

gis g'c ti3 g'E 30

25. Forced Outage Hours 719.0 735.2 1.520.2 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE

27. If Currently Shutdown Estimated Startup Date: 05/30/86 PAGE 2-402

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M l ! Repgrt Period APR 1986 UNIT SHUTD0HNS / REDUCTIONS M HASHINGTON NUCLEAR 2 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence No. 4 RC FUELXX REFUELING / MAINTENANCE OUTAGE CONTINUES. l 81-03 03/31/86 F 719.0 C l l l l l l l umMMMMMMMMM HNP-2 REMAINS SHUTDOWN FOR REFUELING.

 ,, M 

SUMMARY

M MEMMMMMMMMM Method Svstem & Component Tvne Reason F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual ScramPreparation Instructionsoffor C-Refueling H-Other 3-Auto Scram j Data Entry Sheet D-Regulatory Restriction 4-Continued ' E-Cperator Training 5-Reduced Load Licensee Event Report

                            & License Examination           9-Other         (LER) File (NUREG-0161)                                              PAGE 2-403 l

1

u==un==nusraurununun==u==nnuunnnruun n NASHINGTON NUCLEAR 2 M un cumnu==nnnEnuunnuzzuunnuzunMMussu FACILITY DATA Report Perigd APR 1976 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.......... .........HASHINGTON LICENSEE. . . . . . . . . . . . . . . . .HASHINGTON PUBLIC P0HER SUPPLY SYSTEM COUNTY...................BENTON CORPORATE ADDRESS........P.O. BOX 968 RICHLAND, HASHINGTON 99352 DIST AND DIRECTION FROM NEAREST POPULATION CTR... 2 MI H CD R C OR ( TYPE OF REACTOR... ........BHR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... JANUARY 19, 1984 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER...MAY 27, 1984 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCI AL OPERATE. . . . DECEMBER 13, 1984 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWERS IE REGION RESPONSIBLE......V CONDENSER COOLING WATER.... MECHANICAL T0HERS IE RESIDENT INSPECTOR......R. D0DDS ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....J. BRADFUTE COUNCIL. ........ ..... .HESTERN SYSTEMS DOCKET NUMBER........... 50-397 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....NPF-21, APRIL 13, 1984 PUBLIC DOCUMENT ROOM.......RICHLAND PUBLIC LIBRARY SHIFT AND h0RTHGATE STREETS RICHLAND, HA 99352 INSPECTION STATUS INSPECTION

SUMMARY

   + INSPECTION ON MARCH 12-26, 1986 (REPORT NO.           50-397/86-J3) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
   + INSPECTION ON MARCH 10-28, 1986 (REPORT NO.           50-397/86-08) AREAS INSPECTED: ROUTINE, UNANNOUNCED EMERGENCY PREPAREDNESS INSPECTION IN THE AREAS OF CHANGES TO THE EMERGENCY PREPAREDNESS PROGRAM, PUBLIC INFORMATION, SHIFT STAFFING AND AUGMENTATION, NOTIFICATIONS AND COMMUNICATIONS, LICENSEE AUDITS, EMERGENCY DETECTION AND CLASSIFICATION, PROTECTIVE ACTION DECISION MAKING, KNONLEDGE AND PERFORMANCE OF DUTIES (TRAINING), FOLLONUP DN 13 OPEN ITEMS IDENTIFIED DURING PREVIOUS INSPECTIONS AND ONE ITEM 0F INTEREST TO THE INSPECTOR. DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. EIGHT OF THE PREVIOUSLY IDENTIFIED OPEN ITEMS HERE CLOSED. ONE OPEN ITEM HAS IDENTIFIED DURING THIS INSPECTION.

   + INSPECTION ON MARCH 17 - APRIL 25, 1986 (REPORT NO.            50-397/86-09) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
   + INSPECTION ON MARCH 24-28, 1986 (REPORT NO.           50-397/86-10) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION BY REGIONALLY BASED INSPECTORS OF RADIATION PROTECTION ACTIVITIES DURING REFUELING OUTAGE CONDITIONS; LICENSEE ACTIONS TAKEN ON IE INFORMATION NOTICES (INS); TOURS OF THE LICENSEE'S FACILITY; AND AN IN-OFFICE REVIEH OF THE LICENSEE'S JULY 1 - DECEMBER 30, 1985, SEMIANNUAL EFFLUENT REPORT. DURING THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE UTILIZED.

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. PAGE 2-404

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION STATUS - (CONTINUED) x HASHINGTON NUCLEAR 2 M R:psrt Period APR 1986 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

   + INSPECTION ON JUNE 16-27, 1986 (REPORT NO. 50-397/86-11) INSPECTION TO BE COMPLETED IN JUNE,1986.
   + INSPECTION ON APRIL 28 - MAY 2, 1986 (REPORT NO. 50-397/86-12) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
   + INSPECTION ON APRIL 7 - MAY 2, 1986 (REPORT NO. 50-397/86-13) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
   + INSPECTION ON APRIL 29 - MAY 15, 1986 (REPORT NO. 50-397/86-14) INSPECTION CONTINUING; TO BE COMPLETED IN MAY,1986.
   + INSPECTION ON APRIL 7-10, 1986 (REPORT NO. 50-397/86-15) REPORT CANCELLED.
   + INSPECTION ON APRIL 15, 1986 (REPORT NO. 50-397/86-16) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.

INSPECTION ON APRIL 28 - MAY 9, 1986 (REPORT NO. 50-397/86-17) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.

   + INSPECTION ON APRIL 27 - MAY 31, 1986 (REPORT NO. 50-397/86-18) INSPECTION CONTINUING; TO BE COMPLETED IN MAY, 1986.
   + EXAMINATIONS ON FEBRUARY 4-6, 1986 (REPORT NO. 50-397/0L-86-01) 

SUMMARY

HRITTEN AND OPERATING (ORAL AND SIMULATOR)

EXAMINATIONS HERE ADMINISTERED TO FOUR SENIOR REACTOR OPERATOR AND SEVEN REACTOR OPERATOR CANDIDATES. ALL REACTOR OPERATOR AND SENIOR REACTOR OPERATOR CANDIDATES PASSED THE EXAMINATIONS. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:

   + NONE FACILITY ITEMS (PLANS AND PROCEDURES):

NONE MANAGERIAL ITEMS: NONE PLANT STATUS:

   + THE PLANT BEGAN ITS FIRST REFUELING OUTAGE ON APRIL 1, 1986, AFTER APPROXIMATELY TWO HEEKS OF RESERVE SHUTDOWN PROMPTED BY AVAILABILITY OF HYDR 0 ELECTRICITY. THE REFUELING OUTAGE WILL INCLUDE REPAIR OF THE 'B' RECIRCULATION PUMP VIBRATION PROBLEM. THE PLAN IS SCHEDULED TO RESUME OPERATION IN LATE MAY, 1986.

LAST IE SITE INSPECTION DATE: 06/16-27/86+ PAGE 2-405

Report Period APR 1986 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION STATUS - (CONTINUED) M HASHINGTON NUCLEAR 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION REPORT NO: 50-397/86-11+ REPORTS FR0M LICENSEE NUMBER DATE OF DATE OF SUBJECT EVENT REPORT NONE

   =============================::=========================================.===========,====================,,,,=====,,,,,,,,=,,,,,,,

l l PAGE 2-406

o t i N W O 4 A W Z at a M

                             >=

La. W 4 Y

                             .a
                             .J aC 2

O M

                             >=

Z W

                             >=

Z M W O aC A 4/5 M Z

                             >=

t

1. Dockst 50-382 0PERATING STATUS EM%%n%%EuMuruul'Muu 22nunuCCMM22 EMr3 u HATERFORD 5 M
2. R:ptrting Parlsd 04/01/86 Outtg3 + On-lino Mrs: 719.0 MEMMZMKMMMZMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

GEORGE MILLER (504) 467-8211 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3390 HRTFRFORD 3
5. Nameplate Rating (Gross MHe): 1153
6. Design Electrical Rating (Not MHe): 1104
7. Maximum Dependable Capacity (Gross MHe): 1104 1800
8. Maximum Dependable Capacity (Not MWe): 110e DESIGN E2EC. ItMTING = 1104
9. If Changes Occur Above Since Last Report, Give Reasons: . ... rvot. DEPDE). CMP. - 1104 (100%)
10. Power Level To Which Restricted, If Any (Net MWe):

Moo cree at mwnrn tammt crness. omemous

11. Reasons for Restrictions, If Any -
                                                                                                                                    ^
                                                                                                                                       -100 NONE 1000 -

MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.0 5.256.0
13. Hours Reactor Critical 719.0 2.303.8 4.172.5
14. Rx Reserve Shtdwn Hrs .0 .0 h
                                                               .0
15. Hrs Generator On-Line 719.0 2.272.4 4,074.2
                                                                                                                                       -80
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 2,380,512 7,480,970 13,123,4 C 9 500-
18. Gross Elec Ener (MHH) _ 810.060 2,526.220 4.424.070
                                                                                                                                      . go
19. Het Elec Ener (MHH) 777.345 2.405.504 .4,210.657
20. Unit Service Factor 100.0 78.9 77.5
21. Unit Avail Factor 100.0 78.9 77.5
                                                                                                                                      - 30
22. Unit Cap Factor (MDC Net) 97.9 75.7 72.6
23. Unit Cap Factor (DER Net) 97.4 75.7 72.6
24. Unit Forced Outage Rate .0 2.2 13.1 O g-
25. Forced Outage Hours .0 g gg - g g g 0 50.1 614.9 DAYS
25. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE ITftIL 1988

27. If Currently Shutdown Estimated Startup Date: _ N/A PAGE 2-408

7-

                                                                                                                                            /

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M HATERFORD 3 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. _ Date Tsii Hours keason Method LER Number System domponent Cause & Corrective Action to Prevent Recurrence 86-05 04/29/86 S 0.0 5 5 ZZZZZZ UNIT POWER REDUCTION HAS INITIATED TO PERFORM CONTROL ELEMENT ASSEMBLY EXERCISING AND TURBINE VALVE TESTING REQUIRED BY TECHNICAL SPECIFICATIONS. i l DDOMMMMMMMM HATERFORM 3 CPERATED ROUTINELY IN APRIL. O

SUMMARY

M DDOMMMMMMMM Tvpe Reason Method Svstem a Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                & License Examination        9-Other         (LER) File (NUREG-0161)

PAGE 2-409

                 ' M23%2E EMUEM M M %%%%%M%MECMHM33%MZN MMMH M              HATERFORD 3                  E cM:n=urust:MurussannuuMMartMxt25%Mua                    FACILITY           DATA                                                               Report Pericd APR 1986 FACILITY DESCRIPTION                                               UTILITY & CONTRACTOR INFORMATION LOCATION                                                        UTILITY STATE....................L0UISIANA                              LICENSEE................. LOUISIANA PONER & LIGHT COUNTY...................ST CHARLES                             CORPORATE ADDRESS. . . . . . . 142 DEL ARONDE STREET NEH ORLEANS, LOUISIANA 70174 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 20 MI H OF                          CONTRACTOR NEW ORLEANS, LA                     ARCHITECT / ENGINEER.......EBASCO l                         TYPE OF REACTOR............PHR                                     NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY... MARCH 4, 1985                          CONSTRUCTOR..............EBASCO DATE ELEC ENER IST GENER... MARCH 18, 1985                         TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE. .. SEPTEMBER 24, 1985                REGULATORY INFORMATION l

CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBL E. . . . . .IV CONDENSER COOLING HATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......J. LUEHMAN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....J. HILSON COUNCIL..................SOUTHHEST POWER POOL DOCKET NUMBER........... 50-382 LICENSE & DATE ISSUANCE....NPF-38, MARCH 16, 1985 PUBLIC DOCUMENT ROOM....... HEAD LIBRARIAN LOUISIANA COLLECTION EARL K. LONG LIBRARY UNIVERSITY OF NEW ORLEANS LAKEFRONT DRIVE INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION CONDUCTED FEB.10-14, 1986 (86-04) ROUTINE, UNAN*l0VNCED EMERGENCY PREPAREDNESS INSPECTION IN THE AREAS OF EMERGENCY DETECTION AND CLASSIFICATION, PROTECTIVE ACTION DECISION-MAKING, DOSE CALCULATION AND ASSESSMENT, AND AUDITS. HITHIN THE EMERGENCY RESPONSE AREAS INSPECTED, ONE VIOLATION HAS IDENTIFIED. INSPECTION CONDUCTED FEB.1-28, 1986 (86-05) ROUTINE, UNANNOUNCED INSPECTION OF LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS; PLANT STATUS; LICENSEE EVENT REPORT (LER) FOLLOHUPs FOLLOHUP ON PREVIOUSLY IDENTIFIED ITEMSs MONTHLY MAINTENANCE, MONTHLY SURVEILLANCE; ROUTINE 1NSPECTION; INSPECTION & ENFORCEMENT (IE) CIRCULARS AND BULLETINS; AND ALLEGATIN FOLLOHUP. THE INSPECTION INVOLVED 93 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR. HITHIN THE AREAS INSPECTED, ONE VIOL ATION HAS IDENTIFIED. ENFORCEMENT

SUMMARY

NONE t

)

PAGE 2-410 q t

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM i Rspart Period APR 1986 INSPECTION STATUS - (CONTINUED) M HATERFORD 3 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: l NONE FACILITY ITEMS (PLANS AND PROCEDURES): - 1 MANAGERIAL ITEMS: l i NONE l PLANT STATUS: l l LAST IE SITE INSPECTION DATE: FEB.1-28, 1986 INSPECTION REP 0RT NO: 50-382/86-05 REP 0RTS FR0M LICENSEE

     ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT - 86-004 3/14/86 4/14/86 PERSONNEL ERROR RESULTED IN IMPROPER TAG-0UT CAUSING THE LOH PRESSURE SAFETY INJECTION PUMP LER BEING INOPERABLE DUE TO THE DISCHARGE VALVE BEING CLOSED. 86-006 3/22/86 4/21/86 INSUFFICIENT TRACKING OF SURVEILLANCE RESULTED IN MODE CHANGE HITHOUT PERFORMING SURVEILLANCE ON LER THE BORIC ACID MAKEUP TANK.

     ==========================================================================================================================

PAGE 2-411

s , w

1. Dockst 50-482 0PERATING STATUS cnMKMurunuxurenM:nnMMnunuzMn:MMMcMuu u HOLF CREEK 1 'n
2. Rcpsrting Paried: .04/01/86 Outtgs + Dn-lins Hen: 719.0 EURACMtMMMMunn% MMMM3EMKMHMZMXCHan%M
3. Utility Conta te. M. HILLIAMS (316) 364-8831 AVERAGE DAILY P0HER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MRt): 3411 t,KRJE CREEX 1
5. Nameplate Rating (Gross MWe): 1250
6. Design Electrical Rating (Net MHe): 1170 i
7. Maximum Depondable Capacity (Gross MHa): 1170 18G3
8. Maximum Dependable Capacity (Not MWe): 1123 DESIGN 2220. RATING - 1170
                                                                                                ...... rfm. DEPDc. ORP. - 1128 (1000
9. If Changes Occur Above Since Last Report, Give Reauens:

MDo tsee SE - tammt erf2rWE. Dem171eus

10. Power Level To Which Restricted, If Any (het NHair. r EI-*-d---**------------------------ yde -100
11. Reasons fcr Restrictions, If Any NONE 10G3- c M0riTH YEAR CUMULATIVE
12. Report Period Hrs 719.0 2.879.0 5,758.7 - 80
15. Hours Reactor Critical 332.4 2,439.2 5,229.5
14. Rx Reserve Shtdwo Hrs .0 41.4 120.1
15. Hrs Generator On-Line 320.0 2.422.7 5,194.3 gl - 80
16. Unit Reserve Shtdwn Hrs .0 .0 19.0
17. Gross Therm Ener (MHH) 933.250 7.932,622 16,807.555 500-
18. Gross Elec Ener (MHH) 323,585 2.793.388 5.864.478 - to
19. Net Elec Ener (MHH) 297.904 2,671.373 5,613.473
20. Unit Service Factor 44.5 84.2 90.2
21. Unit Avail Factor 44.5 84.2 90.5 - 30
22. Unit Cap Factor (MDC Net) 36.7 82.3 55.8M
23. Unit Cap Factor (DER Net) 35.4 79.3 83.3
24. Unit Forced Outage Rate .0 2.3 3.1 0
25. Forced Outage Hours i io iE' $0 $5 33
                                        .0      57.3          165.4                                                [WTYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELING - 10/9/86 - 55 DAYS. MRII. 1986

27. If Currently Shutdown Estimated Startup Date: _ N/ A M Item calculated with a Heighted Average PAGE 2-412 4

i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Rcpurt Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M HOLF CREEK 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Type Hours Reason Method LER Number $vstem Component Cause & Corrective Action to Prevent Recurr ence 2 04/06/86 F 0.0 B 5 REPAIR "B" MFP RECIRC VALVE. 3 04/08/86 S 399.0 G 3 SHITCHYARD RELAY TECHS INADVERTENTLY TRIPPED MAIN GENERATOR BREAKER. THE OUTAGES HAS EXTENDED TO INCLUDE A SCHEDULED MAINTENANCE OUTAGE AT 0800 ON APRIL 9. MMMMMMMMMMM HOLF CREEK HAD 1 OUTAGE IN APRIL AS DISCUSSED ABOVE.

         . u 

SUMMARY

M MMMMMMMMMMM Tvoe Reason Method Svstem & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                    & License Examination               9-Other         (LER) File (NUREG-0161)

PAGE 2-413l l

                                                                          - - ~

i

cuc3 Usnuunn2=nnnurunn=2nE2nnunnu=um M HOLF CREEK 1 M t=u:MunnuwxxuuummunununuxuMMMMMMMMMM FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... KANSAS LICENSEE................. KANSAS GAS & ELECTRIC COUNTY...................C0FFEY CORPORATE ADDRESS........P.O. BOX 208 HICHITA, KANSAS 67201 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 3.5 MI NE OF CONTRACTOR BURLINGTON, KAN ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY...MAY 22, 1985 CONSTRUCTOR.............. DANIEL INTERNATIONAL DATE ELEC ENER 1ST GENER... JUNE 12, 1985 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... SEPTEMBER 3, 1985 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING LAKE IE REGION RESPONSIBLE......IV CONDENSER COOLING HATER.... COOLING LAKE IE RESIDENT INSPECTOR......J. CUMMINS ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....P. OCONNOR COUNCIL............. ....SOUTHHEST POWER POOL DOCKET NUMBER........... 50-482 LICENSE & DATE ISSUANCE....NPF-42, JUNE 4, 1985 PUBLIC DOCUMENT R00M.......HILLIAM ALLAN HHITE LIBRARY GOVERNMENT DOCUMENTS DIVISION EMPORIA STATE UNIVERSITY 1200 COMMERCIAL STREET EMPORIA, KANSAS 66801 INSPECTION

SUMMARY

INSPECTION STATUS INFO. NOT SUPPLIED BY REGION ENFORCEMENT

SUMMARY

NONE l __0THER ITEMS i SYSTEMS AND COMPONENT PROBLEMS: INFO. NOT SUPPLIED BY REGIDH FACILITY ITEMS (PLANS AND PROCEDURES):

 . INFO. NOT SUPPLIED BY REGIDH l    MANAGERIAL ITEMS:

i PAGE 2-414 i l

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM HOLF CREEK 1 M R4 pert Period APR 1986 IN$PECTION STATUS - (CONTINUED) M MMMMMMMMMMMMMMMMMMMMMIMMMMMMMMMMMMMM INFO. NOT SUPPLIED BY REGION PLANT STATUS: INFO. NOT SUPPLIED BY REGION LAST IE SITE INSPECTION DATE: INFO. N3T SUPPLIED BY REGION i INSPECTION REPCRT NO: INFO. NOT SUPPLIED BY REGION REP 0RTS FR0M LICENSEE

===============================2===========.  :================================================.====================:====

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT --=. .___--- _ ------_ __ INFO. NOT SUPPLIED BY REGION ===============================================================================================,==========================,===,=,=, PAGE 2-415

1. Docket: 50-029 0PERATING STATUS M:MHMMM ZCZEMZMMMMMMZM3CM M MMMMMMru u YANKEE-ROHE 1 M
2. Reporting Period 04/01/86 Outage + On-line Hrs 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts S. HHIPPLE (617) 872-8100 AVERAGE DAILY P0HER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 600 YANKEE-ROHE 1
5. Nameplate Rating (Gross MHe): 185 X 1.0 = 185
6. Design Electrical Rating (Not MHe): 175
7. Maximum Dependable Capacity (Gross MWe): 180 1500
8. Maximum Dependable Capacity (Not MHe): 167 DES!0N E220. RRTING - 175
                                                                                                                   . ..tmX. DEPDE). Cfr. -     167 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Not MHe):
11. Peasons for Restrictions, If Any _

NONE 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2,879.0 223,124.0
13. Hours Reactor Critical 719.0 2.879.0 178,400.2
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line 719.0 2.879.0 173.537.4
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 430,480 1,704.599 94.385.216 500-
18. Gross Elec Ener (MHH) 131.175 523,113 28.605,786
19. Not Elec Ener (MHH) 125,039 490,359 26,766,576
20. Unit Service Factor 100.0 100.0 77.8
21. Unit Avail Factor 100.0 100.0 77.8

_22. Unit Cap Factor (MDC Net) 190 (Mut K """" '- ErfDEL "'TItus 102.5 102.0 73.7M - 100

23. Unit Cap Factor (DER Net) 97.8 97.3 70.3w - 50
24. tinit Forced Outage Rate .0 .G 5.2 0 . . . .- 0 0 5 to 15 30 25 33
25. Forced Outage Hours .0 .0 8.326.1 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE fFftIL 1986

27. If Currently Shutdown Estimated Startup Dates N/A M Item calculated with a Heighted Average PAGE 2-416

1 l MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Ripert Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M YANKEE-ROWE 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. _ Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence NONE f l I 1 l i ruxxxMMMMMM YANKEE ROHE OPERATED ROUTINELY IN APRIL HITH NO OUTAGES OR SIGNIFICANT P0ilER _M

SUMMARY

M REDUCTIONS REPORTED. NMMMMMMMMMM Tvp+ Reason Method Svstem & Component F-Fe'rced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 5-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination       9-Other         (LER) File (NUREG-0161)

PAGE 2-417

                                                                                                                                                                     ~

i ux=unuuuumunzuxmmnusunutuu=m wxungun -! 4 M YANKEE-ROHE 1 M murxxxumannuununummununux=uunxxurxxu FACILITY DATA Report Period AFR 1986 i FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION l LOCATION UTILITY STATE.................... MASSACHUSETTS LICENSEE................. YANKEE ATOMIC ELECTRIC COUNTY................... FRANKLIN CORPORATE ADDRESS. . . . . . . 1671 HORCESTER RD. DIST AND DIRECTION FROM FRAMINGHAM, MASSACHUSETTS 01701 NEAREST POPULATION CTR.. 25 MI NE OF CONT 3 ACTOR , PITTSFIELD, NASS ARCHITECT / ENGINEER....... STONE & HEBSTER f TYPE OF REACTOR.... .......PHR HUC STEAM SYS SUPPLIER...HESTINGHOUSE ! DATE INITIAL CRITICALITY. . . AUG'JST 19, 1960 1 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER IST GENER. . . NOVEMBER 10, 1960 TURBINE SUPPLIER.........HESTINGHOUSE , DATE COMMERCIAL OPERATE.... JULY 1, 1961 I REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I , CONDENSER COOLING HATER., .DEERFIELD RIVER IE RESIDENT INSPECTOR......H. EICHENHOLZ ELECTRIC RELIABI'ITi l COUNCIL........_ ......... NORTHEAST POWER LICENSING PROJ MANAGER.....J. CLIFFORD

DOCKET NUMBER........... 50-029

, COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-3, DECEMBER 24, 1963 3 PUBLIC DOCUMENT ROOM.......GREENFIELD COMMUNITY COLLEGE

1 COLLEGE DRIVE i

INSPECTION GREENFIELD, MASSACHUSETTS 01301 j INSPECTION

SUMMARY

STATUS NO INSPECTION INPUT PROVIDED. I ENFORCEMENT

SUMMARY

NONE OTHER ITEMS I J SYSTEMS AND COMPONENTS: j NO INPUT PROVIDED. j FACILITY ITEMS (PLANS AND PROCEDURES): 4 NO INPUT PROVIDED. 1 4 !' PAGE 2-418 I i

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Rapset Period APR 1986 INSPECTION STATUS - (CONTINUED) M YANKEE-ROHE 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. 1 1 l INSPECTION REPORT ND: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

                      ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT - - _ _ _ . -

                                                                   =____                                 _   _

NO INPUT PROVIDED.

                      ==================================================================================================================================

PAGE 2-419

i 0PERATING STATUS DucaMRRODOORDuaMMMaanMUDuniaaasnMGMD

1. Docket _50-295_ D ZION 1 0 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
2. Reporting Period 2
3. Utility

Contact:

GERRI AUSTIN (312) 746-2084 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3250 ZION 1
5. Nameplate Rating (Gross MHe): 1220 X 0.9 = 1098
6. Design Electrical Rating (Net MWe): 1040 1085 1823
7. Maximum Dependable Capacity (Gross MWe):

_ DESIGN CLCC. RRTING = 1040 G. Maximum Dependable Capacity (Net MHe): 1040 .. FWlX. DEPDC. Cfr. - 1040 (100Z3 l 9. If Changes Occur Above Since Last Report, Give Reasons: NONE

10. Power Level To Hhich Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any:

_ - 100

                                                                                                   -~       ^

NONE 1000 -

                                                                                 /

f [ MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 108.095.0
13. Hours Reactor Critical 719.0 2,755.3 76,472.4 . go l 0 .0 2,621.8
14. Rx Reserve Shtdwn Hrs 2,732.8 74,338.9
15. Hrs Generator On-Line 719.0 hf
                                                                                                                                 - 80
                                                                    .0
16. Unit Reserve Shtdwn Hrs .0 .0
17. Gross Therm Ener (MHH) 2,304,621 8,735,971 215.370,274 , _

757,406 2,875.392 68,594,190

18. Gross Elec Ener (MWH) - e3
19. Het Elec Ener (MHH) 729,134 2,757,189 65,166,533
20. Unit Service Factor 100.0 94.9 68.8
21. Unit Avail Factor 100.0 94.9 68.8 - 20
22. Unit Cap Factor (MDC Net) 97.5 92.1 58.0
23. Unit Cap Factor (DER Net) 97.5 92.1 58.0 5.1 0 o
                                          .0                      13.9                          ,,                   .,      .
24. Unit Forced Outage Rate O 5 10 15 20 25 30
                                          .0      146.2      11.362.5                                  DAYS
25. Forced Outage Hours
 ,26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

FIPRIL 1986 NONE N/A PAGE 2-420

27. If Currently Shutdown Estimated Startup Date:

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 UNIT SHUTD0WNS / REDUCTIONS M ZION 1 M WMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date IEEi Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence NONE , I l l l l i MMuuMMMMMMM ZION 1 OPERATED ROUTINELY IN APRIL HITH NO SHUTD0HNS OR SIGNIFICANT POWER REDUCTIONS REPORTED. ,,M

SUMMARY

M MMMMMMMMMMM Tvp+ Reason Method System 8 Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-operator Training 5-Reduced Load Licensee Event Report

               & License Examination        9-Other            (LER) Flie (NUREG-0161)

PAGE 2-421

uc=u2H=%====nucun==ursu==%cuMcM=u: u M ZION 1 5 N xu==nzumnunummmuusux: xurmurx2Enuu FACILITY DATA Report Period APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE....................ILLIN0IS LICENSEE.................COMMONNEALTH EDISON COUNTY................... LAKE CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINOIS 60690 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 40 MI N OF CONTRACTOR CHICAGO, ILL ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... JUNE 19, 1973 CONSTRUCTOR..............COMMONHEALTM EDISON DATE ELEC ENER IST GENER... JUNE 28, 1973 TURBINE SUPPLIER.........NESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 31, 1973 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBL E. . . . . .III I CONDENSER COOLING HATER.... LAKE MICHIGAN IE RESIDENT INSPECTOR......M. HOLZMER s ELECTRIC RELIABILITY COUNCIL..................MID-AMERICA LICENSING PROJ MANAGER.....J. NORRIS INTERPOOL NETWORK DOCKET NUMBER........... 50-295 ' LICENSE & DATE ISSUANCE....DPR-39, OCTOBER 19, 1973 j PUBLIC DOCUMENT R00M....... ZION - BENTON PUBLIC LIBRARY

2400 GABRIEL AVENUE j ZION, ILLINDIS 60099 INSPECTION

SUMMARY

INSPECTION STATUS INSPECTION ON MARCH 24-27 (86007; 86007): PROGRAM: LICENSEE ACTIONS ON PREVIOUSLY IDENTIFIED ITEMS; ACTIVATION OF THE EMERGENCY PLAN; ROUTINE, UNANN EMERGENCY DFIECTION AND CLASSIFICATION; PROTECTIVE ACTION DECISIONMAKING; NOTIFICATIONS AND COMMUNICATIONS; CHANGES TO THE EMER SHIFT EMERGENCY STAFFING AND AUGMENTATION; KNOHLEDGE AND PERFORMANCE OF DUTIES (TRAINING); DOSE ASSESSMENT AND CAL PREPAREDNESS. NO VIOLATIONS OF NRC REQUIREMENTS HERE IDENTIFIED DURING THIS INSPECTION. INSPECTION ON APRIL 1-4, 7, 18 AND 21 (86010; 86009): ROUTINE, UNANNOUNCED INSPECTION OF (1) TECHNICIAN CHEMISTRY PERFORMANCE STAFF; (3) IN HOT AND COLD LABORATORIES, COUNTING ROOM, LICENSEE INTERNAL AUDITS; AND (4) AND SAMPLING

                                                                                                                                                           , OBSERVATIONS OF   FA (2) TRAINING AND QUALIFICATIONS OF OPEN ITEMS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED.REVIEH ON ACTIONS TAKEN REGARDING A VIOLATION AND OF PREVI I

i ENFORCEMENT

SUMMARY

NONE PAGE 2-422

NNNNNNNNNNNNNNNNNNNNNNNNMMNNNNNNNNNN Report Period APR 1986 INSPECTION STATUS - (CONTINUED) N ZION 1 N NNNNNNNNNNNNNNNNNNNNNNNNENNNNNNNNNNN OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: UNIT DUE TO ENTER A REFUELING OUTAGE IN JULY 1986 - HILL LAST TO DCTOBER 1986. LAST IE SITE INSPECTION DATE: 5/9/86 IDSPECTION REPORT NO: 86012 REPORTS rR0M LICENSEE

             ==============================================================================================================uss=================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT NONE

             =============================================================================================================================ss===
                                                                                                                                                    \

PAGE 2-423

1. Docket: 50-304 0PERATING STATUS nuurmM=uMuunnMuMMMumMunusunzuumumMuu N ZION 2 m
2. Reporting Period: 04/01/86 Outage + On-line Hrs: 719.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

CERRI AUSTIN (312) 746-2084 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3250 ZION 2
5. Nameplate Rating (Gross MHe): 1220 X 0.9 = 1098
6. Design Electrical Rating (Not MWe): 1040
7. Maximum Dependable Capacity (Gross MWe): 1085 gygg
8. Maximum Dependable Capacity (Not MHe): 1040 DESIGN ELCo. PrGING - 1040
9. If Changes Occur Above Since Last Report, Give Reasons: "--" W. m. W.- 1040 (1 m )

NONE

10. Power Level To Which Restricted, If Any (Not MWe):

l 11. Reasons for Restrietions, If Anya rec w ac r=wenm m tr73rve. ocee!T! cess NONE - _ g gg 2000-MONTH YEAR CUMULATIVE

12. Report Period Mrs 719.0 2.879.0 101.808.0
13. Hours Reactor Critical 719.0 2.240.2 73.659.6 g
                                                                                                                            - 80 g
14. Rx Reserve Shtdwn Hrs .0 0 226.1
15. Hrs Generator On-Line 719.0 1.991.2 71.599.0
16. Unit Reserve Shtdwn Hrs .0 .0 .0 _ go
17. Gross Therm Ener (MHH) 2.295,326 5.845.788 211.515.291 880 ~
18. Gross Elec Ener (MWH) 771.046 1.953.939 66.273.534
19. Net Elec Ener (MWH) 742.523 1.859.834 63.037.276 - to
20. Unit Service Factor 100.0 69.2 70.3
21. Unit Avail Factor 100.0 69.2 70.3
                                                                                                                           -0
22. Unit Cap Factor (MDC Net) 99.3 62.1 59.5
23. Unit Cap Factor (DER Net) 99.3 62.1 59.5
24. Unit Forced Outage Rate .0 1.2 15.5 0 , , , .,. ,. o 23.7 13.161.8 8 8 18 5 ao as ao
25. Forced Outage Hours .0 D
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE frRIL 1986

27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-424

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period APR 1986 UNIT SHUTD0NNS / REDUCTIONS M ZION 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date TVPe Hours Reason Method ~LER Number System Gomeonent Cause & Corrective Action to Prevent Recurrence NONE I MMMMMMMMMMM ZION 2 OPERATED ROUTINELY IN APRIL HITH NO OUTAGES AS SIGNIFICANT POWER REDUCTIONS REPORTED. M

SUMMARY

M MMMMMMMMMMM Tvoo Reason Method System & Component F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

               & License Examination        9-Other           (LER) File (NUREG-0161)

PAGE 2-425

                                                                                            ~ _ _ _ _ _         ._  _      __      _   _                                            _ _ _

CE".CC'."0 CCCU"*ETJuu2COCENHu;iZu2Ji'.K3 m ZION 2 u nannunuwwwununuuuuuuuuuuuuuuuuuummuu FACILITY DATA R* Port Period'APR 1986 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION i LOCATION UTILITY STATE....................ILLIN01S LICENSEE.................COMMONNEALTH EDISON 4 COUNTY................... LAKE CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINOIS 60690 l DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 40 MI N OF CONTRACTOR CHICAGO, ILL ARCHITECT / ENGINEER.......SARGENT & LUNDY { TYPE OF REACTOR. . . . . . . . . . . .PHR NUC STEAM SYS SUPPLIER...NESTINGHOUSE J DATE INITIAL CRITICALITY... DECEMBER 24, 1973 CONSTRUCTOR..... .......COMMONNEALTH EDISDN DATE ELEC ENER IST GENER... DECEMBER 26, 1973 TURBINE SUPPLIER. .......NESTINGHOUSE DATE COMMERCIAL OPERATE.... SEPTEMBER 17, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... LAKE MICHIGAN IE RESIDENT INSPECTOR......M. HOLZMER ELECTRIC RELIABILITY LICENSING PRO J MANAGER. . . . .J . NORRIS COUNCIL..................MID-AMERICA DOCKET NUMBER........... 50-304 INTERPOOL NETHORK LICENSE & DATE ISSUANCE....DPR-48, NOVEMBER 14, 1973 PUBLIC DOCUMENT ROOM....... ZION - BENTON PUBLIC LIBRARY 2400 GABRIEL AVENUE ZION, ILLINOIS 60099 INSPECTION

SUMMARY

INSPECTION STATUS INSPECTION ON MARCH 24-27 (86007 86007): PROGRAM: LICENSEE ACTIONS ON PREVIOUSLY IDENTIFIED ITEMS; ACTIVATION OF THE EMERGENCY PLANS EMERGENCY CLASSIFICATIONS PROTECTIVE ACTION DECISIONMAKINGs NOTIFICATIONS AND COMMUNICATIONSs CHANGES TO THE EMERGENCY PREPAREDNE SHIFT STAFFING AND AUGMENTATIONS KNOHLEDGE AND PERFORMANCE OF DUTIES (TRAINING) EMERGENCY PREPAREDNESS. NO VIOLATIONS OF NRC REQUIREMENTS HERE IDENTIFIED DURING THIS INSPECTION. DOSE ASSESSMENT AND CALCULATI INSPECTION ON APRIL 1-4, 7, 18 AND 21 (86010; 86009): ROUTINE, UNANNOUNCED INSPECTION OF (1) 1

)

TECHNICIAN PERFORMANCE IN HOT AND COLD LABORATORIES, COUNTING ROOM, AND SAMPLING FACILITIES; OBSERVATIONS OF CHEMISTRY STAFFS (3) LICENSEE INTERNAL AUDITSs AND (4) (2) TRAINING AND QUALIFICATIONS OF OPEN ITEMS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED.REVIEH ON ACTIONS TAKEN REGARDING A VIOLATION AND OF PREVIOU 1 ENFORCEMENT

SUMMARY

NONE PAGE 2-426 l

1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM STATUS - (CONTINUED) M ZION 2 N Report Period APR 1986 INSPECTION MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE l FACILITY ITEMS (PLANS AND PROCEDURES): I HONE MANAGERIAL ITEMS: NONE PLANT STATUS: THE UNIT IS OPERATING NORMALLY LAST IE SITE INSPECTION DATE: 5/9/86 INSPECTION REPORT NO: 86011 REPORTS FR0M LICENSEE

     ======================================s====================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 86-10 02/19/86 04/22/86 FAILURE OF 0 DIESEL GENERATOR NHILE 2A DIESEL GENERATOR NAS INOPERABLE 86-11 03/24/86 04/25/86 REACTOR TRIP CAUSED BY INDUCED NOISE IN NUCLEAR INSTRUMENTATION SYSTEM AND FAILURE OF AUTO BU TRANSFER

     ============================================================================================

PAGE 2-427

N T n W O

        *C A

r f i 2 4

    .a M

La. W

    .a
    >=

a me 4C 2 > Q H W 2 W W 2 m W G L (S w 2 W

2: O 2 LaJ ts w n. M n as: i

e nunc==rt:xrcru n PRESSURIZED 3 $TATU$ 0F SPENT FUEL $T0 RAGE CAPABILITY I M MATER u

u REACTORS n (a) n=cMMMMMMMMMMM CORE SIZE REMAINING CAPACITY 1 PRESENT AUTH. NO. OF IF PENDING REQUEST (NO. OF STORAGE POOL CAP. ASSEMBLIES REMAINING CAPACITY APPROVED (b)

FACILITY ASSEMBLIES) (FUEL ASSEMBLIES) STORED NEXT REFUEL MILL FILL PRESENT' MMMMMMMM MMMMMMMMMM (NO. OF ASSEMBLIES) (NO. OF ASSEMBLIES) SCHED. DATE AUTH. CAPACITY MMMMMMMMMMMMMMM MMMMMMMMMM MMMMMMMMMMMMMMMMM MMMMMMMMMMMMMMMMM MMMMMMMMMMM MMMMMMMM.MMMMMMMMM ARKANSAS 1 177 988 456 ARKANSAS 2 532 08-86 1998 177 988 168 820 BEAVER VALLEY 1 157 833 232 601 06-86 2003 BYRON 1 193 1950 0 05 86 1995 CALLAMAY 1 1050 10-86 1995 193 1340 64 1536 CALVERT CLIFFS 1 217 1830(c) 1000(c) N/S 1993 CALVERT CLIFFS 2 217 830(c)(m) 1998 10-86 1991 CATANSA 1 193 1418 0 1418 03-87 1991 i COOK 1 193 2050(c) 08-86 2008 i COOK 2 193 802(c) 1244(c) N/S 1994 { CRYSTAL RIVER 3 177 1163 328 829 03-86 1994

DAVIS-BESSE 1 177 735 204 N/S 1997 DIABLO CANYON 1 531 03-87 i 193 1400 0 1400 1993 1

i DIABLO CANYON 2 08-86 1993 FARLEY 1 157 1407 273 I FARLEY 2 157 1134 N/S 1407 188 1219 1991 ! FORT CALHOUN 1 133 729 348 381 04-86 1994 CINNA 121 1816 03-87 1996 i NADDAM NECK 420 596 I 157 1168 597 571 N/S 1993 ' INDIAN POINT 1 0 288 160 07-87 1994 INDIAN POINT 2 193 128 N/S 940 460 520 INDIAN POINT 3 193 840 292 N/S 1993 KEMAUNEE 121 548 N/S 990 376 614(m) 1993 MAINE YANKEE 217 1476 721 N/S 1993 1 MCGUIRE 1 193 1463 755 N/S 1 MCGUIRE 2 152 1311(n) 1987 193 1463 78 1585 05-86 2010 MILLSTDNE 2 217 667 449 03-86 2010 MILLSTONE 3 0 214 10-86 0 0 0 1987 NORTH ANNA 1 157 1737(c) NORTH ANNA 2 157 520(c) 1217 WS 1995 OCONEE 1 177 1312(1) N/S DCONEE 2 1038 274(1)(n) 1993 177 WS 1991 OCOMEE 3 177 875 08-86 PALISADES 390 485 1991 204 798 477 02-87 1991 PALO VERDE 1 241 321 1329 0 1329 N/S 2002 POINT REACH 1 121 1502(c) 03-87 POINT BEACN 2 121 835(c) 667(c) 1993 PRAIRIE ISLAND 1 04-86 1995 121 1586(c) 741(c) N/S 1995 i PRAIRIE ISLAND 2 121 845(c)(m) 03-86 j RANCHO SECO 1 177 1993 1880 316 764 N/S 1993 i ROBINSON 2 157 541 01-87 ! SALEM 1 193 274 266(e) 2000 1170 296 379 N/S 1988(g) l SALEM 2 193 1170 874 SAN ONOFRE 1 140 1930 03-86 2001 4 157 216 94 10-86 SAN ONOFRE 2 217 122 2004 SAN ONOFRE 3 800 72 728 03-86 1988 217 Set 72 04-86 SE000YAH 1 193 1386 728 1997 348 1833 11-86 Report Period APR 1986 N/S 1994 PAGE 3-2

l l i tcc:MMMMMMMMMM ST0 RAGE CAPABILITY c PRESSURIZEDM STATUS 0F SPENT FUEL U HATER M REMAINING CAPACITY D REACTORS M Ca) IF PENDING REQUEST (b) CCZMMMMMMMMMM CORE SIZE PRESENT AUTH. NO. OF NEXT REFUEL HILL FILL PRESENT APPROVED (NO. OF STORAGE POOL CAP. ASSEMBLIES REMAINING CAPACITY AUTH. CAPACITY FACILITY ASSEMBLIES) (FUEL STORED (NO. OF ASSEMBLIES) ASSEMBLIES) MMMMMMMMMM MMMyMMMMMMMMMMMMN (No. OF ASSEMBLIES) SCHED. DATE MMMMMMMMMMMMMMM MMMMMMMMMMMMMMMMM MMMMMMMMMMM MMMMMMMMMMMMMMMMM EMMMMMMM MMMMMMMMMM N/S 1994 SEGUOYAN 2(d) 193 356 N/S 1993 ST LUCIE 1 217 728 372 N/S 1993 217 1076 152 924 2008 ST LUCIE 2 96 1180 N/S SUMMER 1 157 1276 05-86 1985 157 1044(c) 849(c) 195(c) 1985 SURIY 1 N/S l SURRY 2 157 544 12-86 1991 THREE MILE ISLAND 1 177 752 208 N/S i 442 0 442 1993 1 THREE MILE ISLAND 2 177 361 1047 04-86 TROJAN 193 1408 N/S 1993 157 1404 445 959(m) 1993 TURKEY POINT 3 482 922 N/S TURKEY POINT 4 157 1404 N/S 1993 217 1088 0 1988 HATERFORD 3 0 1540 N/S HOLF CREEK 1 193 1540 N/S 1993 76 721 325 396 1995 YANKEE-RONE 1 1104(c) 06-86 ZIOd 1 193 2112Cc) 1008Cc) 02-86 1995 ZION 2 193 IhDEPENDENT SPENT FUEL STORAGE INSTALLATIONSCh) l 750 MTU(j) 315 385 MTU(J) 1490 MTU(J) MORRIS OPERATIONS 170 MTU 80 MTU NFSti) 250 MTU Co) At each refueling outage approximately 1/3 of a PHR core and 1/4 of a BHR core is off-loaded. (b) Some of these dates have been adjusted by staff assumptions. =- =- (c) This is the total for both units. (d) Plant not in commercial operation. N/S = Not Scheduled (o) Some spent fuel stored at Brunswick. (f) Authorized a total 2772 BWR and 1232 PHRassemblies for both pools. (g) Robinson 2 assemblies being shipped to Brunswick for storage. Ch) Capacity is in metric tons of uranium; 1 MTU = 2 PHR assemblies or 5 BHR assemblies. (i) No longer accepting spent fuel. Racked for 700 MTU (J ))Reserved. (k (1) (m) This is the Installed stationistotal. capacity less than that authorized. (n) McGuire 1 authorized to accept Oconee fuel assemblies. PAGE 3-3 Report Period APR 1986

MMMMMMMMMMMMMM $T0 RAGE CAPAB1LITY M BOILING M STATUS 0F SPENT FUEL M HATER M REMAINING CAPACITY M REACTORS M Ca) IF PENDING REQUEST (b) MMMMMMMMMMMMMM CORE SIZE PRESENT AUTH. NO. OF NEXT REFUEL HILL FILL PRESENT APPROVED (NO. OF STORAGE POOL CAP. ASSEMBLIES REMAINING CAPACITY AUTH. CAPACITY FACILITY ASSEMBLIES) (FUEL ASSEMBLIES) STORED (NO. OF ASSEMBLIES) (NO. OF ASSEMBLIES) SCHED. DATE MMMMMMMMMMMMMMM MMMMMMMMMM MMMMMMMMMMMMMMMMM MMMMMMMMMMMMMMMMM MMMMMMMMMMM MMMMMMMMMMMMMMMMM MMMMMMMM MMMMMMMMMM 249 N/S 1993 DIG RCCK POINT 1 84 441 192 N/S 1995 764 3471 1288 2183 1993 BROWNS FERRY 1 2310(m) 1819 N/S BROWNS FERRY 2 764 3471 1161 1993 1004 2467(m) N/S BROWNS FERRY 3 764 3471 N/S 1992 560 (f) 160PHR+656BWR 123 BRUNSHICK 1 144PWR+564BNR 107 N/S 1993 BRUNSWICK 2 560 N/S 1996 548 2366 790 1576 1990 COOPER STATION 451 N/S 464 672 221 DRESDEN 1 724 3537Cc) 1413 (c) 2124Cc) (c) N/S 1993 DRESDEN 2 2266 N/S 1993 724 3537 1271 1998 DRESDEN 3 2050 696 1554 02-87 DUANE ARNOLD 368 N/S 1992 560 2244 1012 768 1993 FITZPATRICK 1440 N/S GRAND GULF 1 800 1440 0 N/S 1999 560 6026 1580 4446 1999 HATCH 1 1525 09-86 HATCH 2 560 236 N/S HUMBOLDT BAY 172 487 251 03-86 1992 72 440 237 203 1988 LA CROSSE 191 1971 N/S LASALLE 1 764 2162 N/S 1988 LASALLE 2 764 N/S 1995 764 2040 0 2040 1991 LIMERICK 1 2184 1546 638 05-87 MILLSTONE 1 580 05-86 1999 484 2237 701 1536 MONTICELLO 1532 1788 03-86 1996 NINE MILE POINT 1 532 2776 1244 04-86 1990 560 2600 1204 1596 OYSTER CREEK 1 PAGE 3-4 Report Period APR 1986 I

CCCMMMMMMMadMM u STATUS 0F SPENT FUEL ST0 RAGE CAPABILITY BOILING M n HATER M REMAINING CAPACITY U REACTORS N fa) IF PENDING REQUEST (b) uCcMMMMMMMMMMM CORE SIZE PRESENT AUTH. NO. OF NEXT REFUEL HILL FILL PRESENT APPROVED (NO. OF STORAGE POOL CAP. ASSEMBLIES REMAINING CAPACITY AUTH CAPACITY FACILITY ASSEMBLIES) (FUEL ASSEMBLIES) STORED (NO. OF ASSEMBLIES) (NO. OF ASSEMBLIES) SCHED. DATE MMMMMMMMMMMMMMM MMMMMMMMMM MMMMMMMMMMMMMMMMM MMMMMMMMMMMMMMMMM MMMMMMMMMMM MMMMMMMMMMMMMMMMM MMMMMMMM MMMMMMMMMM 1354 2357 01-87 1989 PEACH BOTTOM 2 764 2816 1462 N/S 1989 2816 1490 1326 2329 PEACH BOTTOM 3 764 642(m) 09-86 1990 PILGRIM 1 580 2320 1128 09-87 2003 j 724 3657 2358 1299 2003 10-86 QUAD CITIES 1 842 3055 QUAD CITIES 2 724 3897 RIVER BEND 1 2458 N/S 1997 SUSQUEHANNA 1 764 2840 382 08-86 1997 764 2840 0 2840 1992 SUSQUEHANNA 2 1296 704 N/S VERMONT YANKEE 1 368 2000 04-86 1993 2658 0 2658 HASHINGTON NUCLEARM 764 l INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS (h) 750 MTU(J) 315 385 MTU(J) 1490 MTU(J) NORRIS OPERATIONS 80 MTU NFSti) 250 MTU 170 MTU Co) At each refueling outage approximately 1/3 of a PHR core and 1/4 of a BHR core is off-loaded. (b) Some of these dates have been adjusted by staff assumptions. (c) This is the total for both units. (d) Plant not in commercial operation. N/S = Not Scheduled

                                                                                                                                                                                  =

(o) Some spent fuel stored at Brunswick. (f) Authorized a total 2772 BNR and 1232 PHRassemblies for both pools. (g) Robinson 2 assemblies being shipped to Brunswick for storage.1 MTU = 2 PHR assemblies or 5 BNR assemblies. (h) Capacity is in metric tons of uranium; ( ) No longer accepting spent fuel. ( ) Racked for 700 MTU (k) Reserved. (1) (m) This is the Installed stationistotal. capacity less than that authorized. (n) McGuire 1 authorized to accept Oconee fuel assemblies. PAGE 3-5 Report Period APR 1986

(INCLUDES BOTH IICENSED REACT 0R YEARS OF EXPERIENCE AND NON-LICENSED UNITS) IST ELEC 1ST ELEC 1ST ELEC YEARS GENERATE UNIT YEARS GENERATE UNIT YEARS GENERATE UNIT Mu NMMMMMMMMMMM ----- u LICENSED M 11.75 08/01/74 ARKANSAS 1 7.35 12/26/78 ARKANSAS 2 9.88 06/14/76 BEAVER VALLEY 1 u OPERATING M 23.39 12/08/62 BIG ROCK POINT 1 12.54 10/15/73 BROWNS FERRY 1 11.67 08/28/74 BROHNS FERRY 2 u ELECTRICAL M 9.63 09/12/76 BROWNS FERRY 3 9.40 12/04/76 BRUNSHICK 1 11.01 04/29/75 BRUNSHICK 2 u PRODUCING M 1.17 03/01/85 BYRON 1 1.52 10/24/84 CALLAHAY 1 11.32 01/03/75 CALVERT CLIFFS 1 m UNITS M 9.40 12/07/76 CALVERT CLIFFS 2 1.27 01/22/85 CATAWBA 1 11.22 02/10/75 COOK 1 Ku=MMMMMMMMMMMM 8.11 03/22/78 COOK 2 11.98 05/10/74 COOPER STATION 9.25 01/30/77 CRYSTAL RIVER 3 8.67 08/28/77 DAVIS-BESSE 1 1,47 11/11/84 DIABLO CANYON 1 .53 10/20/85 DIABLO CANYON 2 16.05 04/13/70 DRESDEN 2 14.78 07/22/71 DRESDEN 3 11.95 05/19/74 DUANE ARNOLD 8.70 08/18/77 FARLEY 1 4.95 05/25/81 FARL EY 2 11.24 02/01/75 FITZPATRICK 12.68 08/25/73 FORT CALHOUN 1 9.39 12/11/76 FORT ST VRAIN 16.41 12/02/69 GINNA 1.53 10/20/84 GRAND GULF 1 18.73 08/07/67 HADDAM NECK 11.47 11/11/74 HATCH 1 7.61 09/22/78 HATCH 2 12.85 06/26/73 INDIAN POINT 2 10.01 04/27/76 INDIAN POINT 3 12.06 04/08/74 KEHAUNEE 18.01 04/26/68 LA CROSSE 3.66 09/04/82 LASALLE 1 2.03 04/20/84 LASALLE 2 1.05 04/13/85 LIMERICK 1 13.48 11/08/72 MAINE YANKEE 4.84 06/30/81 MCGUIRE 1 2.94 05/23/83 MCGUIRE 2 15.42 11/29/70 MILLSTONE 1 10.48 11/09/75 MILLSTONE 2 .21 02/12/86 MILLSTONE 3 15.16 03/05/71 MONTICELLO 16.47 11/09/69 NINE MILE POINT 1 8.04 04/17/78 NORTH ANNA 1 5.68 08/25/80 NORTH ANNA 2 12.99 05/06/73 OCONEE 1 12.40 12/05/73 OCONEE 2 11.66 09/01/74 OCONEE 3 16.60 09/23/69 OYSTER CREEK 1 14.33 12/31/71 PALISADES .89 06/10/85 PALO VERDE 1 12.20 02/18/74 PEACH BOTTOM 2 11.66 09/01/74 PEACH BOTTOM 3 13.78 07/19/72 PILGRIM 1 15.48 11/06/70 POINT BEACH 1 13.74 08/02/72 POINT BEACH 2 12.41 12/04/73 PRAIRIE ISLAND 1 11.36 12/21/74 PRAIRIE ISLAND 2 14.05 04/12/72 QUAD CITIES 1 13.94 05/23/72 QUAD CITIES 2 11.55 10/13/74 RANCHO SECO 1 .41 12/03/85 RIVER BEND 1 15.59 09/26/70 ROBINSON 2 9.35 12/25/76 SALEM 1 4.91 06/03/81 SALEM 2 18.79 07/16/67 SAN ONOFRE 1 3.61 09/20/82 SAN ONOFRE 2 2.60 09/25/83 SAN ONOFRE 3 5.77 07/22/80 SEQUOYAH 1 4.35 12/23/81 SEQUOYAH 2 9.98 05/07/76 ST LUCIE 1 2.88 06/13/83 ST LUCIE 2 3.46 11/16/82 SUMMER 1 13.82 07/04/72 SURRY 1 13.14 03/10/73 SURRY 2 3.46 11/16/82 SUSQUEHANNA 1 1.83 07/03/84 SUSQUEHANNA 2 11.87 06/19/74 THREE MILE ISLAND 1 10.35 12/23/75 TROJAN 13.49 11/02/72 TURKEY PnINT 3 12.86 06/21/73 TURKEY POINT 4 13.61 09/20/72 VERMONT YANKEE 1 1.93 05/27/84 HASHINGTON NUCLEAR 2 1.12 03/18/85 HATERFORD 3 l

                           .88 06/12/85 HOLF CREEK 1                               25.47 11/10/60 YANKEE-ROHE 1                                    12.84 06/28/73 ZION 1 12.34 12/26/73 ZION 2 TOTAL 910.13 YRS
                          =____                                      =-                          _ -                  _ = _ - - - _ _ -       _     _ _====                     _ - =-- ____

IST ELEC SHUTDOWN IST ELEC SHUTDOHN YEARS GENERATE DATE UNIT YEARS GENERATE DATE UNIT unnuMMMMMMMMMMM ----- --- = -------- ---- u PERMANENTLY M 3.80 08/14/64 06/01/68 BONUS 3.04 12/18/63 01/01/67 CVTR u OR M 18.54 04/15/60 10/31/78 DRESDEN 1 4.44 08/24/63 02/01/68 ELK RIVER u INDEFINITELYM 6.32 08/05/66 11/29/72 FERMI 1 1.26 05/29/63 09/01/64 HALLAM u SHUTDOWN M 13.21 04/18/63 07/02/76 HUMBOLDT BAY 12.12 09/16/62 10/31/74 INDIAN POINT 1 m UNITS M 1.19 07/25/66 10/01/67 PATHFINDER 7.76 01/27/67 11/01/74 PEACH BOTTOM 1 MMMMMMMMMMMMMMM 2.16 11/04/63 01/01/66 PIQUA .93 04/21/78 03/28/79 THREE MILE ISLAND 2 TOTAL 74.77 YRS

                                                                                                                                           =-               - =-- ==--                       - - - - - - = - - -==-

Report Period APR 1986 PAGE 3-6

unsunwannavn REACT 0RS IN THE U. S. W RESEARCH u NON-POWER m REACTCRS u mununwanumww AUTHORIZED LICENSE DATE OL POWER REACTOR TYPE DOCKET NUMBER ISSUED LEVEL (KW) STATE CITY LICENSEE AGM-201 0102 50-406 R-122 08-30-74 0.0001 ALABAMA TUSKEGEE TUSKEGEE INSTITUTE TRIGA MARK I 50-113 R-52 12-05-58 100.0 ARIZONA TUCSON UNIVERSITY OF ARIZONA TRIGA MK. III 50-224 R-101 08-10-66 1000.0 BERKELEY UNIVERSITY OF CALIFORNIA, BERKELEY COLLEGE 01-05-72 0.003 CALIFORNIA L-85 50-375 R-188 CANOGA PARK ROCKWELL INTERNATIONAL CORP. TRIGA MARK F 50-187 R-90 03-04-63 1000.0 HAWTHORNE NORTHROP CORP. LABORATORIES TRIGA MARK I 50-326 R-116 11-24-69 250.0 IRVINE UNIVERSITY OF CALIFORNIA, IRVINE 50-142 R-71 10-03-60 100.0 UNIVERSITY OF CALIFORNIA, L.A. ARGONAUT LOS ANGELES TRIGA MARK F 50-163 R-67 07-01-60 1500.0 SAN DIEGO GENERAL ATOMIC COMPANY TRIGA MARK I 50-089 R-38 85-03-58 250.0 SAN DIEGO GENERAL ATOMIC COMPANY NTR 50-073 R-33 10-31-57 100.0 SAN JOSE GENERAL ELECTRIC COMPANY AGN-201 0100 50-394 R-121 05-16-73 0.0001 SAN LUIS OBISPD CALIFORNIA STATE POLYTECHNIC COLLEGE TRIGA (IMDUS) 50-228 R-98 7-02-65 250.0 AER0 TEST OPERATIONS, INC. 0(2-03-74 0.01 SAN RAMON UNIVERSITY OF CALIFORNIA, SANTA BARBARA L-77 50-433 R-124 SANTA BARBARA TRIGA MARK I 50-274 R-115 02-24-69 1000.0 COLORADO DENVER U.S. GEOLOGICAL SURVEY DEPARTMENT AGM-201 0113 50-898 R-43 07-03-58 0.0001 DELAWARE NEWARK UNIVERSITY OF DELAWARE AGM-201 0101 50-877 R-31 11-15-67 0.0001 DIST OF COLUMBIA WASHINGTON THE CATHOLIC UNIVERSITY OF AMERICA ARG0 MAUT 50-083 R-56 05-21-59 100.0 FLORIDA GAINESVILLE UNIVERSITY OF FLORIDA AGN-201 0104 50-276 R-111 04-19-68 0.0001 GEORGIA ATLANTA GEORGIA INSTITUTE OF TECHNOLOGY HEAVY WATER 50-160 R-97 12-29-64 5000.0 ATLANTA GEORGIA INSTITUTE OF TECHNOLOGY AGM-201 0103 50-284 R-110 10-11-67 0.0001 IDAHO POCATELLO IDAHO STATE UNIVERSITY LDPRA 50-356 R-117 12-27-71 10.0 ILLINDIS URBAMA UNIVERSITY OF ILLINDIS TRIGA 50-151 R-115 07-22-69 1500.0 URBANA UNIVERSITY OF ILLINOIS HTR 50-087 R-119 01-28-72 10.0 ZIDH WESTINGHOUSE ELECTRIC CORP. LOCKHEED 50-182 R-87 08-16-62 10.0 INDIANA LAFAYETTE PURDUE UNIVERSITY UTR-10 50-116 R-59 10-16-59 10.0 IOWA AMES IOWA STATE UNIVERSITY LOCKHEED 50-148 R-78 06-23-61 250.0 KANSAS LAWRENCE UNIVERSITY OF KANSAS TRIGA 50-188 R-88 10-16-62 250.0 MANHATTAN KANSAS STATE UNIVERSITY 50-170 R-84 06-26-62 1000.0 MARYLAND BETHESDA ARMED FORCES RADI0 BIOLOGY RESEARCH INSTITUTE TRIGA TRIGA 50-166 R-70 10-14-60 250.0 COLLEGE PARK UNIVERSITY OF MARYLAND l PAGE 3 7

cecrn==zc==u n RESEARCH u H0N-POWER REACT 0RS IN THE U. S. D REACTORS n ganz =mununum AUTHORIZED LICENSE DATE OL POWER STATE CITY LICENSEE REACTOR TYPE = DOCKET NUMBER ISSUED LEVEL (KW)_ MASSACHUSETTS CAMBRIDGE MASSACHUSETTS INSTITUTE OF TECHNOLOGY HWR REFLECTED 50-020 R-37 06-09-58 5000.0 LOWELL UNIVERSITY OF LOWELL GE 50-223 R-125 12-24-74 100f 0 WORCESTER WORCESTER FOLYTECHNIC INSTITUTE GE 50-134 R-61 12-16-59 1 0 MICHIGAN ANN ARBOR UNIVERSITY OF MICHIGAN POOL 50 $ 002 R-28 09-13-57 2000.0 EAST LANSING MICHIGAN STATE UNIVERSITY TRIGA MARK I 50-294 R-114 03-21-69 250.0 MIDLAND DOW CHEMICAL COMPANY TRIGA 50-264 R-108 07-03-67 100.0 MISSOURI COLUMBIA UNIVERSITY OF MISSOURI, COLUMBIA TANK 50-186 R-103 10-11-66 10000.0 ROLLA UNIVERSITY OF MISSOURI POOL 50-123 R-79 11-21-61 200.0 MEBRASKA OMAHA THE VETERANS ADMINISTRATION HOSPITAL TRIGA 50-131 R-57 06-26-59 18.0 NEW MEXICO ALBUQUERQUE UNIVERSITY OF HEW MEXICO AGH-201M 0112 50-252 R-102 09-17-66 0.005 l 1EW YORK BRONX MANHATTAN COLLEGE - PYHSICS DEPT. TANK 50-199 R-94 03-24-64 0001 i 1 BUFFALO STATE UNIVERSITY OF HEW YORK PULSTAR 50-057 R-77 03-24-61 200 .0 l ITHACA CORNELL UNIVERSITY TRIGA MARK II 50-157 R-80 01-11-62 Su>.0 ITHACA CORNELL UNIVERSITY ZPR 50-097 R-89 12-11-62 0.1 NEW YORK COLUMBIA UNIVERSITY IN THE CITY OF HEW YORK TRIGA MARK II 50-208 R-128 04-14-77 250.0 TUXED" UNIGH CARBIDE CORP POOL 50-054 R-81 09-07-61 5000.0 NORTH CAROLINA RALEIGH NORTH CAROLINA STATE UNIVERSITY AT RALEIGH PULSTAR 50-297 R-120 08-25-72 1000.0 OHIO COLUMBUS OHIO STATE UNIVERSITY POOL 50-150 R-75 02-24-61 10.0 THE UNIVERSITY OF OKLAHOMA AGH-211 0102 50-112 R-53 12-29-58 0.100 OKLAHOMA NORMAN 02EG0H CORVA*.LIS OREGON STATE UNIVERSITY TRIGA MARK II 50-243 R-106 03-07-67 1000.0 PORTLAND REED COLLEGE TRIGA MARK I 50-288 R-112 07-02-68 250.0 PENNSYLVANIA UNIVERSITY PARK PENNSYLVANIA STATE UNIVERSITY TRIGA MK. III 50-005 R-2 07-08-55 1000.0 RHODE ISLAND HARRAGAHSETT RHODE ISLAND HUCLEAR SCIENCE CENTER GE POOL 50-193 R-95 07-21-64 2000.0 TENNESSEE MEMPHIS MEMPHIS STATE UNIVERSITY AGH-201 8108 50-538 R-127 12-10-76 0.0001 TEXAS AUSTIN UNIVERSITY OF TEXAS TRIGA MARK I 50-192 R-92 08-02-63 250.0 COLLEGE STATIDH TEXAS A8M UNIVERSITY AGN-201M 8106 50-059 R-23 08-26-57 0.005 COLLEGE STATIDH TEXAS A&M UNIVERSITY TRIGA 50-128 R-83 12-07-61 1001 0 UTAH PROVO BRIGHAM YOUNG UNIVERSITY L-77 50-262 R-109 09-07-67 0.01

'                                                                                                                             PAGE 3 - 8

puumummmmmmm u RESEARCH w NON-POWER REACT 0RS IN THE U. S. M DEACTORS

  • unummmmmmmum AUTHORIZED LICENSE DATE OL POWER STATE CITY LICENSEE REACTOR TYPE DOCKET NUMBER ISSUED .LEVEt (KW)_

THE UNIVERSITY OF UTAH TRIGA MARK I 50-407 R-126 09-30-75 100.0 UTAH SALT LAKE CITY 0.005 SKLT LAKE CITY UNIVERSITY OF UTAH AGN-201M 0107 50-072 R-25 09-12-57 VIRGINIA POLYTECHNIC INSTITUTE UTR-10 50-124 R-62 12-18-59 100.0 VIRGINIA BLACKSBURG CAVALIER 50-396 R-123 09-24-74 0.1 CHARLOTTESVILLE UNIVERSITY OF VIRGINIA 06-27-60 2000.0 CHARLOTTESVILLE UNIVERSITY OF VIRGINIA POOL 50-062 R-66 BABCOCK 4 WILCOX COMPANY LPR 50-099 R-47 09-05-58 1000.0 LYNCHBURG WASHINGTON STATE UNIVERSITY TRIGA 50-027 R-76 03-06-61 1000.0 WASHINGTON PULLMAN 03-31-61 100.0 SEATTLE UNIVERSITY OF WASHINGTON ARGONAUT 50-139 R-73 UNIVERSITY OF WISCONSIN TRIGA 50-156 R-74 11-23-60 1000.0 WISCONSIN MADISON l unummum4mmmmmmmmmmmmmmmmmmmmmmmmum u EXPERIMENTAL AND TEST REACTORS u l unummmmmmmmmmmmmmmmmmmmmmmmmmmmmun GETE 50-070 TR-1 01-07-59 50,000.0 CALIFORNIA SAN JOSE GENERAL ELECTRIC COMPANY TEST 50-184 TR-5 06-30-70 10,000.0 j DIST OF COLUMBIA WASHINGTON NATIONAL BUREAU OF STANDARDS l unummmmmmmmmmmmmmmmmmmmmmmmmmmmmum u CRITICAL EXPERIMENT FACILITIES a , muummmmmmmmmmmmmmmmmmmmmmmmmmmmmum NEW YORK TROY RENSSELAER POLYTECHNIC INSTITUTE 50-225 CX-22 07-03-64 0.0 BABC0CK 8 WILCOX COMPANY 50-013 CX-10 10-22-58 0.0 VIRGINIA LYNCHBURG RICHLAND BATTELLE MEMORIAL INSTITUTE 50-360 CX-26 11-29-71 0.0 l WASHINGTON  ! I PAGE 3 - 9

          *u.5.GOVE RL%47 9414T140 0FFICE 1996.a91 621sa3307

i

  • E*Om1 Nwve t W # Ass gae8 e. UC #88 F3' NJ . #d'9 8 u 5 NUCst ad .'t GutAf od e COvviS5sO%

esac 8C eM 32 Q L36 BIBLIOGRAPHIC DATA SHEET NUREG-0020 Volume 10 Number L 1 t ,, j A RECePIENT $ AC 5580N NuwetR 3 TeYtt AND Swafeitt Licensed 0p ting Reactors / Report

  • oAn amaf Co=*tano Status Suma Mohite TEAR JpLY 1986
  • Aur oam oAn p iis5uto lisONT viAn P. A. Ross, M. R. be JULY 1986 9 PR tC1#f h5Ervv0RE UNIT NUWetR p PtuFOmueNG ORGANe2ATION psAME AND MA G ADDRESS fiasc8eese le Co8mf Division of Budget and A sis Office of Resource Marfage p eiN Nuu na U. S. Nuci ar Regulatory ission T Washington, DC 20555 48e le C8dri 12e iVPt OF REPORT Il SMN50 ming OaGAN42 ATION Naut AND MAstsNG ADOhts$

Division of Budget and Analysis Office of . Resource'Mariagement m n a Oo Cov t a t o ,,,.<~.. 8. , U. S. Nuclear Regulatory Commission Washington, DC 20555 APRIL 1986 13 SurftEMENT ARY NOTES Status Sumary Report f The OPERATING UNITS STATUS REPORT - LICENSED ERAT NG REACTORS provides data on the operation of nuclear units as timely and accur el as possible. This information is collected by the Office cf Resource Management the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's gional Offices, and from utilities. The three sections of the report arei rnonthly h ights and statistics for' commercial operating units,-and errata from previously rep 't data; a dompilation of detailed information on each unit, provided by NRC's Reg nal ffices, IE Headquarters and the utilities; and an appendix for miscellaneous i ormat such as spent fuel storage. capability, reactcr-years of experience and n -power ctors in the U.S. It is hoped the report is helpful to all agencies and ind iduals in rested in maintaining an awareness of the U.S. energy situation as a ole, i its Elv Uwom05 AND UOCUMINT ANALYSIS Its OtSCRsPIOm3

                                                                                                                                                                      ,,                                                 .. Nuo.l. O. , AGE, 5, Ai t ot N,
    .. .. Asi A..t..                                                                                                                                                     S.,C,u.. . . ,C t a ... .C A , SON linlimited                                                                                                                                                       UnEIIssified I, SE CURIT Y Ct allef sC A T ION                  #0 PM'Cl Inc%ssified                                         s
                                . . . , _ . _ . . . . . . . . . . . x m DISTRIBUTION LIST - NRC INTERNAL DISTRIBUTION                                                                  EXTERNAL DISTRIBUTION.

Office of the Commissioners 5 Atomic Safety and Licensing Appeal Panel 3 SPECIAL REQUESTS Advisory Committee on Reactor Safeguards 6 Office of Inspector and Auditor 1 Air Force 1 Office of Policy Evaluation 1 Congress 10 Office of the Genocal Counsel 1 Department of Energy '32 Office of Public Affairs 21 Government Accounting Office 1 Office of Congressional Affairs 3 Environmental Protection Agency 1 Office of the Executivo Director for Operations 7 Electric Power Research Institute 1 Office of Administration 2 Argonne National Laboratory. i 3 Offico of the Executive Legal Director 2 Bureau of Mines- 1 Office of Analysis and Evaluation of Operational Data 2 Department of Acriculture l' Office of International Programs 3 Department of the Commerce -l' Offico of State Procrams 1 Department of the. Interior 1 Office of Resource Mangpnent .. 19

                                                                                                                                                    . 53 Office    of Nuclear Material Safety and Safeguards.                            2
      -  Division of Fuel Cycle and Material Safety                            3
      -  Division of Safeguards                                                2 Office    of Nuclear Reactor Regulation                                       138
      -  Division of Engineering
      -  Division of Safoty Technology                                                OTHER
      -  Division of Licensing
     -   Division of Systems Integration                                             -GPO Depository          - -                  ,

440

     -   Division of Human Factors Safety                                            .GPO Stores                  -

75-Office of Nuclear Regulatory Research 4 National Technical Information Service 257 Office of Inspection and Enforcement 7 Subscriptions-(HTIS) . 250:

     -  Region I                                                              11      Colleges and Librarios (including Public Document Rooms)'     128
     -  Region II                                                             10      Utilities and Other Requests-                             ' _111_ :.
     -  Region III                                                            10                                                                  1145                    .
     -  Region IV                                                             10                                                                                        -
     -  Region V                                                               7'                                   ,.

4 281 3_ , I

                                                                                                    .g.....
                                                                                                                                                                                                                                                                                    .                      y y. -
                                                              , :    p,
                                                                     + .                              . 2 , ,               4

[ N! - 3 4, . -

                                   #                                 - 2                                        <                                               -                                  -                 ,

s <

                                                                                                                                                                                                                                                                                                    ..gxn.-     ,y 7
            -.t.-.                                                                                                                                                               -,                                                                                                                  -

t

                                                                                                                                                                                                                                                                             ,                                 m3:a  .
                                                                                                            -                                                         4 ,                                           :. us'                                                                                a
                                                                                        't l.3

_.. p m, -f ,!

                                                                                                                                                                                                                                                                                                     -T ;f ^g 77 pry-'                                      . .                                            .
                                                                                                                        ~e:

pj yF ' a~ sinsi-ctass unit '

                                                       .% ! UNITED STAfES :, .. ;                                                  1.                                                                                           ,
                . _y NUCLEAR REGULATORY COMMisslON;'                                                                                      0742 '                                                     ,
                                                                                                                                                                                                                                  ,.                    ; posta3gsfc[sme

_ ' wasn o. t - . ,

                '(f%  N:-
                                                    '!.WASHI   '

g .y. T,0N.- D.C. 20666 l " c j ? '. c c,; y { [ / F '

                                                                                                                                                                       , 77             1 1AE;st                                                            navir as AAL /                    ,

l $USINESS , AEU-; IV cr b

                                                              . or                                                   ,
                                           <, PfNALTY FOR PRIVATE USE,4300.3                                                             L;LICy                     ,   y    _7 ^, yb r
                                                                                                                                         ,r
                                                                                                                                                                          '-        '  T -,, _

r,;a q;pgg 7 1 , c1

                   .q.                  ,,_
                                                                                  't                          off . e                    .L        ~INGTU,                                             , ,  .,
                                                                                                                                                                                                                                                             .m     .
                                                                                                                                                                                                      ~    '

h_[ . jO , f?j > 3f? y

                                                                                                                       ; ;. y 3 -

t , s

                                                                                                                                                                                                                                                                               -       s
                'h$[ $"T(;.
                                 *.           z-9

(

                                                                                                                                                                                                                                                                                      ;yn
a. .A s

h x' ,y~ , M

                                                                                                                                                            *                                                                                                   #                                s
                                        - *                                                                                       .,;. 7
                                                                                                                                  \'   -
  • r
             ,..,u.

[ 1 ,,1 h

           . y_                                                                                                                                                                                                                                        <

r. 3 .; k '.; '

 >=

t .Wg -1 . 7

                                                                                                                                                                                                                                         - J.                     ,
                '         4                                                                                                                 ,
                                                                                                                                                                                                                                                 .ev. .
                                                                                           '_ f                                                                                                                                                                         s
                                                                                                  "                                                     \s
                                                                                            '/
                                                                               . 2                                       s                                                                                                                                                 -                                             -
                                             .\                             . it,.i.                                                                                                                                                                                                                   ,
 ?                                                          ,~

e ikk u.

  • ri I ' =

lu C m - y (. %

                                                                                                    ?                                                                                                                                                                                                                  ,'-

l L:- j E-

                          .'.e!c' t.
 =                                                                                                                                                                                                                                                                                                                 ,    c.

L l:

        ;                                           , ,                                                                                                                                                                                                                                                         q
    .                                              . 7 k_                                                               /s g                                                                -

l: N n j k y 7, l'k'

                                                                                                                                                                                                                                                                                                        +               l' k}}