Advises That Util Does Not Intend to Pursue Molded Case Circuit Breaker Testing Further,Per 861229 Commitment.Util Decided to Test All Breakers Provided W/Separate Overcurrent & Instantaneous Trip Features to Verify Operability
ML20204H125
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/18/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810240326
Download: ML20204H125 (2)


Text

I

^

TENNECSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ol SN 157B Lookout Place OST 181988 U.S. Nuclear Regulatory Comunission ATTN Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - MOLDED-CASE CIRCUII BREAKERS - TECHNICAL SPECIFICATION INTERPRETATION

Reference:

TVA letter to NRC dated December 29, 1986, "Sequoyah Nuclear Plant - Molded Case Circuit Breakers - Technical Specification Interpretation" In the referenced letter, TVA discussed a proposed technical specification interpretation regarding molded-case circuit breaker testing. The calculation prepared to support the interpretation identified a smaller number of molded-case circuit breakers, for which testing in the overcurrent trip range could be avoided, than originally thought could be demonstrated by analyses.

To minimize administrative details associated with segregating such a small number of breakers f rom the test program, TVA lecided to test all breakers provided with separate overcurrent and instantaneous trip features to verify operability of bsth features.

In the referenced letter TVA committed to advise NRC within six months after l

restart of SQN unit 2 of any intent to further pursue this issue. TVA does not intend to pursue this issue further.

t Please direct questions concerning this issue to M. J. Burzynski at (615) 870-6172.

Very truly yours, f

IENNESSEE Y AUTHORITY r

c R. Crldiey, Ma ager Nuclear Licensing and Regulatory Affairs JO l

cc: See page 2 fI f

i' l

0 8810240326 881018 PDR ADOCK 050005>/

P Pt4' An Equal Opportunity Errptoyer

~ _. -.

s o U.S. Nuclear Regulatory Commission (fll) 1h lhhh cc:

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 i

Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division l

U.S. Nuclear Regulatory Commission l

Region II l

101 Marietta Street, NW, Suite 2900 l

Atlanta, Georgia 30323 l

l Sequoyah Resident Inspector l

Sequoyah Nuclear Plant l

2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 l

l l

l l

l 1

l l

t