ML20204H079

From kanterella
Jump to navigation Jump to search
Annual Rept for License R-53 for Jul 1983 - June 1984
ML20204H079
Person / Time
Site: 05000112
Issue date: 07/30/1984
From: Terrell C
OKLAHOMA, UNIV. OF, NORMAN, OK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8411120147
Download: ML20204H079 (4)


Text

y -

1$

l' [

  • SCHOOL OF AEROSPACE, MECHANICAL AND '

NUCLEAR ENG'.NEERING 865 Asp Avenue, Room 212 The University of Oklehoma Norman, oklahoma 73019 I i

Terrell 1

{ i l

l  !

$ 0Nb 1 l om)) V' ,

1 NJG 2 01984

[ ih. j July 30, 1984 L --- j U.S. Nuclear Regulatory Commission (

Region IV 611 Ryan ' Plaza Drive, Suite 1000 Arlington, TX 76012 Re: Annual Report for the period 1 July 1983 to 30 June 1984 for license R-53 in accordance with 10CFR50.59(b).

(

The following information is submitted in accordance with the Federal Regulation requirement that an annual report on the University's reactor facility be submitted to the Nuclear Regulatory Commission.

s

1. There have been no changes in our facility design. The Nuclear Regulatory Commission approved the 20 year license renewal for the reactor in December,.1983. Part of the libense renewal was the approval to increase the power level from 15 watts thermal to 100 watts. Included in the license renewal were a number of operating procedural changes to reflect the increase in maximum power level and the deletion of certain monitoring and limiting conditions of operation. Certain operating procedures and surveillance procedures were deleted or modified to reflect the changes in the new license.

All surveillance tests and inspections were within their normal ranges of approved values or conditions.

2. The reactor was operated 56 times for a total of 1003 watt-hours.
3. There were 19, inadvertent scrams for the reporting period.

There were no emergency shutdowns. Tne inadvertent scrams were the result of operator errors, electronic noise, accidental trips or noise transients.

4 There were no major maintenance operations performed during the reporting period.

5. Th'e re were a number of major changes to the facility procedures and survefilance tests for the reportir}g period as described in part 1.

8411120147 840730 PDR ADOCK 05000112 R PDR I (4"

) k o

7; page 2

6. No radioactive effluents were released or discharged to the environs beyond our effective control.
7. No environmental surveys were performed outside our -facility.
8. Were were no unusually high radiation exposures to the facility personnel or laboratory visitors. All the radiation and contamination surveys performed by the Radiation Safety Office were within normal ranges of acceptable values.

V 9. There were a few changes in our facility personnel.

a) Dr. Emin Yilmas resigned August 10, 1983, from the University and the Reactor Safety Committee.

b)- Dr. Steward Ryan (Physics Department) was appointed to replace Dr. Y11 mas.

c) Mr. Johnny James, the Reactor Supervisor, resigned from the University effective June 30, 1984.

Sincere 6W/

C. W. Terrell Acting Reactor Director CWT /pn a

cca NRC, Document Control Section '

NRC, Director of Inspection

-and Enforcement 4 I

i s

l

h g' L :o '. -

3

- .page 3

' SCRAMS: 1 July'1983 to 30 June 1984 9 >

1). 8-5-83' High Level Linear Channel - Operator Error

2) 8-25-84 Water Monitor - Operator Error
3) 8-25-84 Water Monitor -- . Electronic problem
4) .9-29-84 High Level Linear Channel - Operator Error
5) 10-27-84 Water Monitor Trip -- Spurious Counts (Nosie) 16),10-27-84 . Water Monitor Trip - Spurious Counts (Noise)
7) 10a28-84 Water' Monitor Trip - Spurious Counts (Noise)-

8)-12-9 Low Water Level Interlock - Low water level

9) 12-9-83 Linear Channel Scram - Operator Error 10)-12-13-84 Low Level Log Channel - Transient 111) 12-13-84 ' Period Scram - Power Line Transient
12) 12-13-84 Low Level Log Channel - Transient
13) '2-9-84 Period Scram - Voltage Transient

'14) 2-9-84 Period Scram - Voltage Transient

15) 2-9-84 Period Scram - Voltage Transient
16) 3-9-84 Linear Power Scram - . Operator Error 17)- 4-23-84 Safety Rod Drop - Accidental Drop

.18) 4-23-84 High Level Linear Channel - Due to moving chamber

19) 5-8-84 Linear Scram - Noise or Operator Error
b.

F 4

g _ _.

r-f.'

.1 g-

,Page 4

-C . WATT HOURS: 1 July 1983 to 30 June 1984

'1) 10.53 50) 2.5

2) 5.90 51) 3.8
3) 5.90 .
52) 0.066
4) 15.00
53) 35.012 L _ ,.- 5) .12.902, 54) 10.515
6) '22.500 55) 2.5

'7) '5.55 56) 6.517 8)- -5.00 a 9). 22.257-11 0 ) . 0.16 TOTAL 1002.788

11) -0.051.

12)- 0.05

'13) 17.7

14) 60.0-

'15) 3.17

16) .4.2 17)~ 0.13
18) 0.244

'19) 17.25

20) 60.75' '

21)- 5.0

'22) 15.0

23) .0.87
24) 0.45
25) 0.33
26) 3.45
27) 0.27
28) 0.745

'29) 0.029

30) 0.13 31)- 0.289
32) 0.117
33) 70.93

'34)- 87.65 35),198.85 36)- 0.062 37)~ 0.652

38) 217.17

.- 39 ) 0.0

40) 0.05
41) 1.72
42) 0.137
43) 0.13

-44) 1.727

45) 0.122-
46) ~3.364
47) 16.78

'48) 14.518

49) 5.362