Discusses NMSS Guidance Consolidation Project.Draft Procedures for Process Provided as Attachment 1 to Memo
ML20204G855
Person / Time
Issue date: 03/23/1999
From: Paperiello C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Collins S, Thadani A
NRC (Affiliation Not Assigned), NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
Shared Package
ML20204G858 List:
References
NUDOCS 9903260317
Download: ML20204G855 (3)


Text

-. _ _ . -. - -- . - _ - _ _ - _ -

p*

y., & UNITED STATES s* j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20656-0001

\.m./ March 23, 1999 MEMORANDUM TO: Samuel J. Collins, Director Office of Nuclear Reactor Regulation Ashok C. Thadani, Director Office of Nuclear Regulatory Research FROM: Carl J. oaperiello, Director Off:ce of Nuclear Material Safety [pv j9 hw

/

and Safeguards

SUBJECT:

NMSS GUIDANCE CONSOLIDATION PROJECT During the Office of Nuclear Material Safety and Safeguards' (NMSS') Business Process Reengineering (SPR) effort to evaluate and improve the materials licensing process, it was determined that much of the existing licensing guidance was very old, and in some cases duplicative, or unavailable in a current or readily accessible electronic form. As a result, the Division of Industrial and Medical Nuclear Safety (IMMS) is updating and consolidating existing licensing guidance documents into a series of license-specific guidance NUREGs. IMNS has developed a process that uses a team approach to facilitate both develop and review cf the document. Draft procedures for the process are provided as Attachment 1 to this memorandum.

As part of this project, NMSS identified the need to update, consolidate, and/or develop guidance on several topics that are central to licensing. One such topic was " Issues Associated with 10 CFR Part 20 Compliance." NMSS plans to develop a NUREG that would provide applicants and licensees with information on 10 CFR Part 20 compliance. This initiative is currently scheduled to begin on June 7,1999. Since this guidance may impact both NMSS and the Office of Nuclear Reactor Regulation (NRR) programs, and existing 10 CFR Part 20 guidance was developed by the Office of Nuclear Regulatory Research (RES), we propose using a writing team made up of individuals from these Offices. The document would be reviewed by management team members from NMSS, NRR, RES, anc the Office of the General Counsel. I have provided the project schedule as Attachment 2. If the starting date for this project precludes your participation, we can mova the project by as much as 3 months.

Participation by your Office would add to the success of this project and ensure allissues applicable to all NRC licensees are adequately addressed.

CONTACT: Sally L. Merchant, NMSS/IMNS ,f(

(301) 415-7874 1 6 d h '2, 9903260317 990323 Iff1" PDR ORG NOMA PDR ,

/[~L

/ I l

7-

. 4 March 23, 1999 NMSS Guidance Consolidation Project 2

If you are interested in participating in this important project, please provide your selection for a writing team member, and a manager to serve on the review team by April 30,1999. If the starting date is a problem, please provide an alternative date. You can provide your input directly to Sally Merchant of my staff at 415 7874, or e-mail (sim2).

Attachments:

1. Draft procedures
2. Project Schedule Distribution: PDR Yes *See previous concurrence IMNS R/F LCamper, MSB CHaney,RGB Fcombs, IMNS 3)n/49c To receive a copy of th6s document, ind6cate ht the bor "C" e copy without attachment / enclosure. *B' e copy with attachment / enclosure, "N" a Ns. cop (i OFFICE: RGBMMNS RGBMMNS Editor DAMNS j g NAME: SWerchant* PKHolahan* EKraus by fax DATE: 3 /15 /99 3/15 /99 2/25/99 3/ W /99 OFFICE: DM NAME: C ello DATE: 3/ 4 # /99 th g OFFICIAL RECORD CoPYa:\NRR.wpd

7, 1

l NMSS Guidance Consolidation Project 2

If you are interested in participating in this important project, please provide your selection for a l writing team member, and a manager to serve on the review team by April 30,1999. If the

. starting date is a problem, please provide an alternative date. You can provide your input directly to Sally Merchant of my staff at 415-7874, or e-mail (sim2).

Attachments:

1. Draft procedures
2. Project Schedule l