Forwards SALP Mgt Summary Sys Periodic Update.Salp Info Updated to Include Repts Issued & Received at NRC Headquarters Prior to 860626
ML20204G662
Person / Time
Issue date: 07/18/1986
From: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Grace J, James Keppler, Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8608070356
Download: ML20204G662 (109)


Text

r July 18, 1986 MEMORANDUM FOR:

Those on Attached List FROM:

James M. Taylor, Director Office of Inspection and Enforcement

SUBJECT:

SALP MANAGEMENT

SUMMARY

SYSTEM PERIODIC UPDATE The SALP Management Summary System has been developed to aid in the management of the SALP program and facilitate dissemination of SALP rating information.

Since the SALP information contained in this system is of general interest, the most recent SALP Sumary Report for each region and the SALP History Report for each facility are enclosed. The SALP information has been updated to include SALP reports issued and received at NRC Headquarters prior to June 26, 1986.

SALP rating information for both Construction and Operating Reactors are included in this report. Should you have any questions or comments, please contact M. Johnson of my staff at 492-4808.

Oriainca signed by James M. Taylor, Director Office of Inspection and Enforcement

Enclosures:

1.

Introduction 2.

SALP Summary Report (Operating and Construction Reactors) 3.

SALP History Report (Operating Reactors) 4.

Construction SALP Report (Construction Reactors)

Distribution:

lis** F ORPB reading DI reading f4RC PDR M. Johnson, IE L. L. Wheeler, IE P. F. McKee, IE R. L. Spessard, IE J. G. Partlow, IE B. K. Grimes, IE E. L. Jordan, IE J. E. Konklin, IE J. Axelrad, IE J. M. Taylor, IE ED0 Reading File 4

8608070356 860718 O

PDR I&E g

MISC PDR 4

i o

0FC : E:DI:0RPB :IE: I:0RPB :IE:0}:D B

IE:D -
IE:DI:

7

.J._

NAME :MRJo son LLk ler

PF{

M$e

RL ssard :JGPartl a) lor

_____:____________:____________:. 4.________:____________:____________:

___7,_____:___________

05//f/86
09/d/86
01// 4/86 DATE :0$h3/86
09/S/86
07/[l/86

. o ~ ~<

o

,)

2-July 18, 1986 Multiple Addressees Thomas E. Murley, Regional Administrator Region I J. Nelson Grace, Regional Administrator Region II James G. Keppler, Regional Administrator Region III Robert D. Martin, Regional Administrator Region IV John B. Martin, Regional Administrator Region V Victor Stello, Jr., Executive Director for Operations C. J. Heltemes, Jr., Di rector Office for Analysis & Evaluation of Operational Data Harold R. Denton, Director Office of Nuclear Reactor Regulation Thomas Rehm, Assistant for Operations Office of the Executive Director for Operations e

s INTRODUCTION The SALP Management Summary System was developed by the Office of Inspection and Enforcement to aid in the management of the SALP program and to facilitate dissemination of SALP rating information. SALP rating information for both operating reactors and construction reactors are captured by the system. This report is an informal summary document only and should not be used in lieu of the individual SALP reports when seeking detailed information.

The SALP program is an integrated NRC staff effort to collect available observa-tions and data on a periodic basis and to evaluate licensee performance based on this information.

SALP is supplemental to normal regulatory processes used to ensure compliance with NRC rules and regulations.

It is used to provide a rational basis for allocating NRC resources and to provide meaningful guidance to the licensee's management to promote quality and safety of plant operations.

Licensee performance is assessed in selected functional areas.

For operating reactors these areas generally include:

Plant Operations (OPS), Radiological Controls (RACDON), Maintenance (MAINT), Surveillance (SURV), Emergency Preparedness (EP), Fire Protection (FP), Security and Safeguards (SEC),

Outage / Refueling (REFL), Quality Programs (QP), and Licensing Activities (LIC). The Training functional area is not shown in this report. Also, if the licensees are evaluated in areas other than the standard areas listed above, these ratings are not listed.

The functional areas for construction reactors are:

Soils and Foundations (SF), Containment Structure (CONT), Piping Systems and Supports (PIPE),

Safety Related Components (SRC), Support Systems (SSYS), Electrical Power Supply and Distribution (ELEC), Instrumentation (INST), Design-Engineering (DSN), Quality Assurance (QA), and Licensing Activities (LIC).

Based on the SALP Board assessment each functional area evaluated is placed into one of three performance categories.

Category I rates a high level of performance where reduced NRC attention may be appropriate. Category 2 rates a satisfactory level of performance where NRC attention should be maintained at normal levels. Category 3 rates acceptable performance where weaknesses are evident and both NRC and licensee attention should be increased. An "N" indicates that no rating was given for that category.

The first report, SALP

SUMMARY

REPORT, lists the most recent SALP ratings for both construction and operating reactors by region.

For facilities involved in startup and preoperational testing, ratings may be assigned for both construction and operations SALP categories.

The second report, SALP HISTORY REPORT, lists all the SALP reports for each operating facility. These are ordered alphabetically by region.

For multi-unit sites, the numbers represent combined ratings unless otherwise denoted by an asterisk.

The third report, CONSTRUCTION SALP REPORT, lists ratings for construction reactors ordered alphabetically by region. Past Construction SALP ratings for reactors that have recently been licensed are shown here for historical purposes.

=

,e 06/24/C6 BALP BUMMARY REPORT REGION 1

)

REACTORS IN OPERAT2ON PLANT NAME RPT OPS RADCON MAINT SURV EP FP SEC REFL QP LIC

--l 1 1 --

I --

1-1 I

l -- l --

CEAVER VALLEY 1 12/85 2

2 1

2 1

1 1

3 N

1 CALVERT CLIFFS 1/2 01/95 1

1 2

2 1

1 1

1 N

1 FITZPATRICK 03/86 2 2

2 2

1 1

1 2

2 2

DINNA 1 02/85 2

2 1

1 2

1 1

1 3

i HADDAM NECK 05/86 1

2 2

2 2

N 1

2 2

2 HOPE CREEK 1 04/B6 N

2 2

N 2

N 1

N 1

2 INDIAN POINT 2 12/B5 2 3

2 1

1 2

1 2

N 2

INDIAN PDINT 3 03/86 2

1 1

1 1

N 1

1 2

2 LIMERICK 1 06/86 1

2 2

2 1

N 3

N 1

1 MAINE YANKEE 01/86 2

2 2

1 1

1 1

2 N

2 MILLSTONE 1/2 05/85 1

2 1

1 1

1 1

1 1

1 MILLSTONE 3 03/86 N

2 2

3 2

1 1

N N

2 NINE MILE POINT 1

- 08/85 1

1 2

1 1

1 1

N N

1 DYSTER CREEK 1 10/85 2

1 3

2 1

2 2

2 N

2 PEACH BOTTOM 2/3 06/B6 2

2 2

2 2

2 3

1 3

2 PILGRIM 01/86 3

3 2

2 3

N 2

1 N

1 SALEM 1/2 12/B5 2

1 2

2 2

2 1

2 N

2 SHOREHAM 05/85 1

1 1

1 N

2 1

N N

2 SUSQUEHANNA 1/2 07/85 2 1

1 2

1 2

1 1

1 1

THREE MILE ISLAND 1 03/86 2 1

2 1

N N

N N

1 N

VERMONT, YANKEE 12/95 1

2 1

1 2

N 2

1 2

1 YANKEE ROWE 04/85 1

2 1

1 1

1 2

1 2

1 REACTORS UNDER CONSTRUCTION PLANT NAME RPT BF CONT PIPE BRC BiiYS ELEC INST DSN QA LIC

,3 -

-t 3

-g

- :- g -

.g _ g-

- g --

BEAVER VALLEY 2 06/85 N

1 2

1 1

2 2

2 2

2 HOPE CREEK 1 04/86 N

1 N

N N

2 N

N 1

2 NINE MILE PT 2 05/86 N

1 N

N N

N N

N 2

2 CEABROOK 1/2 06/B6 N

N N

N N

N N

N 1

1 l

i 1

ENCLOSURE 2

SALP BUMMARY REPORT REGZON 2

REACTORB IN OPERATZON PLANT NAME RPT OPS RADCON MAINT SURV EP FP SEC REFL QP LIC l-I I

l-1 I

I l-- I l,

BROWNS FERRY 1/2/3 09/B,5 3

2 3

3 2

3 3

N 3

3 BRUNSWICK 1/2 01/86 2 2

2 2

2 2

1' 2

2 2

CRYSTAL RIVER 3 02/B5 2 2

1 3

2 N

3 N

2 2

(?ARLEY 1/2 03/85 1

1 1

2 1

1 2

1 2

1 SRAND CULF 1 07/35 2 2

2 2

3 2

1 N

3 3

HATCH 1/2 10/85 2

1 3

2 2

2 2

2 2

2 MCSUIRE 1/2 12/94 3

2 2

2 1

N 2

1 2

1

' ORTH ANNA 1/2 05/85 2 1

2 2

2 2

1 1

2 2

N

!OCONEE 1/2/3 12/84 1

2 1

1 1

N 1

1 2

2 ROBINCON 01/86 2 2

2 2

1 2

1 1

2 2

[3T.LUCIE1/2

.'EQUOYAH 1/2 09/85 2

2 3

2 2

2 2

2 3

2 02/85 1

1 1

1 1

2 1

1 2

1

[CUMMER 03/86 3

1 1

2 1

3 1

2 2

2 OURRY 1/2 05/B5 2

1 2

3 2

N 1

1 2

1 TURKEY POINT 3/4 02/95 3

2 3

2 2

2 2

2 3

1 s

REACTORS UNDER CONSTRUCTION PLANT NAME RPT SF CONT PIPE SRC SSYS ELEC INST DSN GA LIC I

I I

I I

l --

1 I

I l-l-

BELLEFONTE 1/2 06/84 N

2 2

2 2

2 1

N 2

N CATAW!A 2 07/84 N

2 2

N 2

2 2

N

' 1 2

M AND CULF 2 09/83 N

N N

N N

N N

N N

N SHEARON HARRIS 1 01/86 1

1 1

2 2

3 2

N 2

2 VOGTLE 1/2 11/B5 1

2 2

1 2

2 N

N 1

2 fTTSBAR1/2 03/85 N

N N

N N'

N N

N 2

3 9

e 2

B A L.P SBUMMARY REFSORT REGION 3

REACTORS IN OPERATION PLANT NAME RPT OPS RADCON MAINT SURV EP FP SEC REFL QP LIC l-

--I i

1:

I

-l-l-l I

l BIG ROCK POINT 01/85 1

2 2

1 1

2 1

1 2

2 CYRON 1 01/86 3

3 2

3 1

2 3

N 2

2 CALLAWAY 1 08/B5 2

2 2

2 2

1 2

N 2

1 D.C. COOK 1/2 01/86 2

2 2

3 2

2 3

2 3

1 DAVIS CESSE 12/B4 2

1 3

2 3

3 2

1 3

2 DRESDEN 1/2/3 01/86 2

2 2

2 1

2 2

1 2

1 DUANE ARNOLD 05/86 1

2 2

2 1

1 2

2 2

i FERMI 2 09/.85 2

2 2

2 1

3 2

N 2

2 KEWAUNEE 03/86 1

1 1

2 1

1 2

1 2

1 LACROSSE 03/85 2

2 2

1 2

1 2

N 2

1 LA"lALLE 1/2 02/B6 3

2 3

3 2

1 2

N 3

2 MONTICELLO O2/95 1

2 1

2 1

2 1

1 2

1 PALISADES O2/B6 2

2 3

3 2

2 2

N 3

2 POINT BEACH F/2 12/B4 1

2 2

1 2

2 1

2 2

1 PRAIRIE ISLAND 1/2 02/85 2

1 1

2 1

1 1

1 2

1 QUAD CITIES 1/2 01/B6 2

2 2

2 1

2 1

1 2

1 ZION 1/2 12/B5 2

2 2

2 2

2 1

1 2

1 REACTORS UNDER CONSTRUCTION -

' PLANT NAME,

RPT SF CONT PIPE BRC 85YS ELEC INST DSN GA LIC g.

g l - - __ _ - - g g

l_g g

g

-g_._

BRAIDWOOD 1/2 02/B6 N

2 2

2 2

2 2

N 2

2 CYRON 1/2 01/B6 N

2 2

2 N

2 2

N 2

2 CLINTON 1 11/B5 2

1 1

2 2

2 2

N 2

1 PERRY 1/2 09/B5 N

1 2

1 2

2 1

N 2

2 3

y s

S A L P'

SUMMARY

R EP'O RT REGION 4

REACTORS IN OPERATION PLANT NAME RPT,, OPS RADCON MAINT SURV EP FP SEC REFL QP LIC

- -I

--I l --

I l-I-I I

I l -

ARKANSAS 1/2 09/li5 2

1 2

2 2

2 2

1 2

1

, COOPER 04/85 2

2 2

2 2

1 2

1 2

1

' FORT CALHOUN 05/85 1

1 1

1 2

1 3

1 2

1 FORT ST. VRAIN 05/85 3

1 3

2 2

2 2

1 3

3

RIVER BEND 04/86 2

2 2

2 2

1 2

N 2

2 WATERFORD 3 03/86 3

2 3

2 2

2 1

N 2

2 WOLFCREEK 04/86 2

2 1

1 2

2 2

N 1

1 REACTORS UNDER CONSTRUCTION o

PLC.NT NAME RPT SF CONT PIPE BRC BSYS ELEC INST DSN GA LIC I

"l I-I l-l-l l --

- l-

'l -

COMMANCHE PEAK 1/2 06/84 N

2 2

2 3

2 1

2 2

2 0; TEXAS PROJ. 1/2 09/85 2

2 2

2 2

2 2

1 2 ~'2 WOLFCREEK O2/85 N

N 2

2 1

2 1

N 2

1 r

i j

j 4

.6.=-

e__,_-

.,nw--,,,. - - - - -, -. -, - - -

,-,,n-,

p SAL P BUMMARY REPORT REGION 5

REACTORS IN OPERATION PLANT NAME RPT;' OPS RADCON MAINT SURV EP FP BEC REFL QP LIC i-i-i

-r i

i-i i

i - i---

i -

,DIABLO CANYON 1/2 10/85 2

2 1

2 1

1 1

N 1

1 PALO VERDE 1/2/3 12/85 2

2 2

2 2

1 2

1 2

2 RANCHO SECO 11/85 2

3 2

2 2

2 1

1 2

2 SAN DNOFRE 1 11/84 1

2 1

2 1

1 2

N N

2 SAN ONOFRE 2/3 11/84 3

3 2

2 1

2 2

2 N

2 TROJAN 01/86 2

1 2

2 1

2 2

1 2

2 4dASHINGTON NUCLEAR 2 05/85 2

2 2

1 2

2 2

N 2

2 REACTORS UNDER CONSTRUCTION f

PLANT NAME RPT' SF CONT PIPE BRC SSYS ELEC INST DSN GA LIC

-1

--I I

l I-i-i i

i 1--l-PALO VERDE 2/3 12/85 N

2 2

2 2

2 1

N N,2 I

5

l...,
  • J.**
  • ?m --. ;

/

S A L_P HISTORY REPORT PLANT NAME: BEAVER VALLEY 1 REGION: 1 RPT ASSMT. PERIDD DPS RADCON MAINT SURV EP FP BEC REFL QP LIC

--t-t l __ g t __

-j -

3

-1 02/31 09/01/79 - 0B/31/80 3

2 3

3 2

3 3

2 3

N t

.............t.

t......t.....t

..t

.===3===t....t...

05/82 09/01/80 - 08/31/81 2

1 3

2 2

2 3

2 N

2

.t

.t......t.....t...

3

.t

.t...t....t..

3....

01/83 12/01/91 - 11/30/82 2

1 2

2 2

2 1

2 N

1 t................'.t...t===

==...t

.t 3

t

.t.

.t===l....

C5/84 12/01/82 - 03/31/84 2

1 2

2 1

2 1

2 N

1

..t

..........t...t......t===.t

..t===t===l===l==..t...t....

12/85 04/01/B4 - 09/30/85 2

2 1

2 1

1 1

3 N

1 3......m====.......t...t......

.t....

.t

..t===t....

O f e o

I l

i l

1 l

t eBALP H Z EBTOMY REPORT PLANT NAMES CALVERT CLIFFS 1/2 4tESION: 1 M

ASSMT. PERIOD 6PS RADCON MAINT SURV EP FP SEC REFL OP LIC 1

--l - l i

I l-1 I

l-l-

l-22/30 10/01/79 - 09/30/50 3 2

3 2

2 2

3 2

3 N

g.

.t.

t

==

..t t

3 g

.l

....g....

C2/83 10/01/01 - 09/30/32 2

1 2

1 1

1 2

1 N

2 g

.t

.t t

.t g...l

.t===g..

.g....

C2/54 10/01/82 - 09/30/83 2 2

3 3

2 1

1 2

N 2

.g...................t==.I

..t.

..t

.===1

.g g

..g

.g j

S1/95 10/01/83 - 09/30/84 1

1 2

2 1

1 1

1 N

1 l

=...................i

.i

.i..

i i

.i...

..i...i....

6 No ratings were assigned for the 10/1/80 - 9/30/81 assessaant period.

)

k

?

.-,, +. -,, -

. ~ - - -. -,. - -. -

t SAL P H I SiiB T O R Y REPORT s

PLANT NAME: FITZPATRICK REDIONs 1 DPS MADCON MAINT SURV EP FP BEC REFL QP LIC RPT ABSMT. PERIDD

~ l I

l-I-t-i I

I i

8-I I-C2/01 12/01/79 - 11/30/B0 2 3

2 2

3 3

3 2

3 N

rr.g g

. 3 -==g..

g g

3

.g- -

===g....

C9/C2 03/01/B1 - 02/28/B2 3 3

2 2

2 2

1 2

N 2

3 -

g - - - -==... g==== g g --

g g... g.

07/C3 01/01/82 - 12/31/82 2

2 2

2 1

2 1

N N

2

--t===================I===l======1=====1====1 - I===I - I====I===I====1 12/94 01/01/93 - 06/30/B4 2

2 2

2 1

1 1

1 N

2

.g..................

===l g

..g g

3...g 3...g C3/B6 07/01/B4 - 10/30/85 2 2

2 2

1 1

1 2

2 2

.g 4=v...........g..-

g===

g====g===g g...g

.g 3..--:

~

I l

t l

1 i

- ~ ~ ~

W " ~~. ~.'.' ~~ ~

SALP HZBTORY R E P'O RT PLANT NAME: SINNA 1 REGIONS 1 W

f.8SMT. PERIOD OPS MADCON MAINT SURV EP FP SEC REFL GP LIC t

i=-

_ i_ :

b7/80 01/01/79 - 05/02/B0 2

2 2

2 2

2 2

2 2

N

~

...:...................i...i...................i...:...:............

D3/82 07/01/80 - 06/30/81 1

2 1

2 2

2 2

1 2

N

=i===================1===i======i=====i====i===,===I===I====,===i

D3/83 07/01/81 - 06/30/82 1

2 1

2 1

2 1

1 N

1 m..

i..................i...i

...i.

...i......i....i...i....

D9/83 C&/01/82 - 05/31/83 2

2 2

2 2

1 1

1 N

1 c.'......................i...i......i

...i.......i...

.i....

D2/85 07/01/93 - 12/31/84 2

2 1

1 2

1 1

1 1

3

.i.......;..................................................

r O

e I

e O

e O

1

v S AL_P HISTORY REPORT PLANT NAME: HADDAM NECK REDIDN 1

RPT ASSMT. PERIDD DPS RADCON MAINT SURV EP FP SEC REFL QP LIC 1-

-- I l-

-1

-l I

l I l -- l -

-l

' 10/20 06/01/79 - 06/01/B0* 2 2

2 2

2 2

2 2

2 N

.t...............--==t===3====--

=====3====3===g===g===1====1 3....:

i C7/02 07/01/B0 - 06/30/01 1

1 1

2 2

1 1

1 1

N i

m ml.....M35mmmmmmmmme.lW.ml==WWWWlMM.BWl333.lIBMSlW.SlSS.l=m==l=m3l=m

.l

01/83 09/01/B1 - 08/31/82 1

1 1

1 1

1 1

1 N

1 i

=====I===================l===I======1=====1====1===I===I===I====I===1====1 05/C5 09/01/83 - 02/28/B5 1

2 1

2 2

2 1

1 2

1

....-=================l-3===..t-...==-t---g===g.

.g==.g....:

C5/86 03/01/95 - 02/2B/.86 1

2 2

2 2

N 1

2 2

2

~

...t===

..-,..--=======g===3.-====l=====l====3===t===1===l====3===3====

O N

r 4

6 I

l

.e 1

---,-n

SAL P HISTORY REPORT PLANT NAME: HOPE CREEK 1 REGION: 1 CPT ASSMf. PRRIOD OPS RADCON MAINT SURV EP' FP SEC REFL QP LIC

-g - g

__g____g___

__g__

g___g__g____g

  • 04/C6 11/01/84 - 10/31/05 N

2 2

N 2

N 1

N 1

2

=

g===================gp========g-====g===

g======g==.g...-g......:

<Preoperational testing phase.

Ratings also assigned under Construction SALP.

_-(

~~

4 1

I S AL_P HZBTORY REPORT PLANT NAMES INDIAN PDINT 2 l

REGION: 1 ftPT ASSMT. PERIDD OPS RADCON MAINT SURV EP FP SEC REFL GP LIC t I

-- I

-l 1-1 I

1 04/81 01/01/80 - 12/31/B0 3 2

3 2

2 2

3 2

3 N

=1===================1===I======1=====l====I===t===I===1====1===I

09/92 03/01/01 - 02/28/52 2

2 2

3 2

2 1

2 N

2

.g......

.t t

t=====I====t===t===l.

t

.t...t....

08/83 02/01/82 - 01/31/83 2

2 2

2 N

2 3

1 3

1

.t.......

....t...t...

.t=====t===

t

.t...t===l.

.t===l....

C2/85 02/01/83 - 07/31/B4 2

3 1

1 1

3 2

2 2

2

..t.......

..........t...t===..t==

.t===.t==

t.

t...t====I===t....

12/95 08/01/84 - 07/31/85 2

3 2

1 1

2 1

2 N

2 M.

J G

9 4

i S A L.P' HISTORY REPORT PLANT NAME: INDIAN POINT 3 REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC 1

l l

l----l---I I

l i

I l

1 C4/81 02/01/B0 - 01/31/B1 2

3 13 2

2 2

3 2

2 N

=l

....-========t===l.....=3==--=====g

--t..=l=======l--=g==..

03/82 04/01/B1 - 03/31/82 2

1 1

1 2

1 2

N N

2 g--.....

=

===l===========g.. =g..

t==

l===)...

g===:....:

09/83 01/01/82 - 12/31/82 1

1 1

1 1

1 1

1 N

3

...g===================t==ul====..t====.t===

t===

==

===-t===g 12/84 01/01/83 - 06/30/84 1

1 1

1 1

1 1

1 2

2

.....:...................:... ---... -----i....==-i.

---i....:...:....:

03/86 07/01/84 - 10/30/85 2

1 1

1 1

N 1

1 2

2 l

====l==...........-=====g-.

======t....

g.--

g...g--.g...l.---g-..g....:

e e

l l

l 1

l l

e P

i 1

SIB A L P HISTORY REPORT PLANT NAME: LIMERICK 1 REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP 'SEC REFL QP LIC

-l-1 I

I I

--l-l-l i

I I

l 02/85 12/01/03 - 11/30/94 2

2 N

N 2

1 3

N N

1

..g

....g g===-

t

.--t

..g===l...g -

====g...g....:

06/86 04/01/B5 - 01/01/86 1

2 2

2 1

N 3

N 1

1

..... g

-===.

..==. 3 o r --

.g....g g...g...g.

.g...g....g J

l l

  • I l

1

8 SAL P HIBTORY REPORT PLANT NAME NAINE YANKEE REGION: 1 RPT ASSMT. PER!bD OPS RADCON MAINT SURV EP FP SEC REFL GP LIC t-

-l - -

= l-1 l-l I

l-g 1

21/C0 09/01/79 - 08/31/B0 2

2 2

2 2

2 2

3 3

N g..................t...t l.....g

..t===l...g...

==

3...t....

04/82 07/01/B0 - 06/30/81 2

2 2

1 1

1 3

1 2

N

==.t

....:===l g

.t

..g...g 01/83 08/01/B1 - 07/31/82 3

2 2

2 2

1 2

N 3

2

...:...................i...i......g.._.i

-i - : - i...g.

.i...

10/83 07/01/82 - 06/30/B3 3

2 2

2 2

1 2

1 2

2 t...................t

.t......g.....t.

.t

...l...g.

3...g....

C9/B4 07/01/B3 - 06/30/B4 3

2 2

2 1

2 1

1 N

2 t = =...

............ t... t = = =.. l

... g.... l

.==. g g.... t... : = = =.

01/B6 07/01/B4 - 10/31/B5 2

2 2

1 1

1 1

2 N

2

.g.

.g====..g

...t

.g...g.

g

.t....g..

3....

i O

e 9

0 e

3

I SAL P HISTORY R E P O R*T" EANT NAME: MILLSTONE 1/2 ESION: 1 I

PT CSSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC t --

l - l- - -- - -- l - t - - l

  • - 1 I

l-

@/C0 07/01/79 - 07/01/80 2

2 2

2 2

2 3

2 2

N i

...t

....g

...g.......g...t...g...

3...

i F/22 07/01/80 - 06/30/81 1

2 1

1 1

1 2

1 1

N

- t.==============g===I===I======1=====I====I===I===I===l====1===1====

)1/C3 09/01/81 - 08/31/92 1

1 1

1 1

1 1

1 N

1 t...................t...t......t.....g...

3...g...g...t...

3...

8/84 C9/01/82 - 08/31/83 2

1 1

1 1

2 1

1 N

1 9

...................'.~i...:......:.....:....:.

U/C5 09/01/B3.- 02/28/B5 1

2 1

1 1

1 1

1 1

1

-==1~===================t===I======t=====I====t===lm.=t===t=..=1...t====

O e

e 9

O

S A L_ P HZSTORY REPORT PLANT NAME: MILLSTONE 3

- REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC i-

- i_

i

_ i __ i

_ i _ _i___i____

  • b3/86 09/01/84 - 08/31/95 N

2 2

3 2

1 1

N N

2

.....i...................:.............i.......i..........i.......

cTransitional period to operating phase.

e 4

e

(

=

D 9

a 1

i S A L F*

HISTORY RE F*DRT PLANT NAME: NINE MILE POINT 1 REGION: 1 RPT ASSMT. PERIOD DPS RADCON MAINT SURV EP FP SEC REFL QP LIC

-3

-- l 3

- -- t _

g l

g-g -

05/81 02/01/80 - 01/31/81 2

3 2

2 3

2 2

2 2

N

...g.

...t=====l....g...g...g...l

.t===g....

09/82 05/01/01 - 04/30/92 2 3

2 2

2 2

1 1

N 1

., _ x x:...

..g...g

.t -==g==

g

.t===l===g.

...t 08/83 05/01/82 - 04/30/83 2 2

2 N

N 1

1 1

N 1

........................................l...g.

g...g C9/94 05/01/83 - 04/30/94 3

2 2

2 1

1 1

1 N

1

.....g..was..............

t==...g.....l l...gn==l...g

...l...:....

CB/85 05/01/94 - 05/31/85 1

1 2

1 1

1 1

N N

1

...................i..............i.....

i..........g...

E O

e

]

/

1

6Q o '.o ~ O o oo

- ~ " ' '

~ ' ' ' ~

-s S AL P' HZBTORY R EP' ORT i

PLANT NAME: OYSTER CREEK 1 REGION: 1 RPT ABSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL GP LIC D

1-1 I

-I l-l i

I l-1 I --

10/C0 08/01/79 - 07/31/80 2 3

2 3

2 2

2 2

3 N

_r......

..==...

..t

.t

..I___---I

..g t.

t===t t...g....

06/32 11/01/80 - 10/31/B1 2

2 3

3 2

2 2

2 N

2

.i...............

..i...i

..i

.i

.i

.i.

i _.i...i....

06/53 02/01/82 - 01/31/83 2

2 2

2 2

2 1

2 N

2

.. l.......= =.......... t.

==.... t

... t.

t... l.

t... l

. t

. t....

10/94 02/01/p3 - 04/31/94 1

1 2

1 2

2 2

2 N

2

.:......e............:...t......i.....:....i...:.

10/85 05/01/84 - 06/30/85 2

1 3

2 1

2 2

2 N

2 l

- zz t===============.===l..=t.===.=l==...l===.I

=l...t...l....t...t....

P G

I Y

S AL_P HISTORY REPORT PLANT NAME: PEACH BOTTOM 2/3 REGIDN: 1 RPT ASSMT. PERIOD OPS RADCDN MAINT SURV EP FP BEC REFL QP LIC 1

I-1 I

I l-1 I

I I

I I

07/B0 05/01/79 - 05/01/B0 2

N 3

2 2

2 3

2 3

N

.=t..........

3===g.

.l=====g.

3=.-l 3===g t===g 09/B1 07/01/80 - 06/30/81 2

2 2

1 2

3 2

1 2

N

..-g

.t----==

=

-g

.g - t---3 t====t...g 10/82 07/01/01 - 06/30/82 2

3 2

.2 2

3 2

2 N

1 3.

.g...

=l===.

3====l.

3 l===g....g 3

C9/B3 03/01/82 - 02/28/83 2

3 2

3 1

3 1

2 N

2 t

=====l-.

t...l-..g 3---

i 6

05/84 03/01/83 - 12/31/83 2 2

2 2

2 2

1 2

N 1

l

...i====......

i.

. _.:.....i....i...i....

i---i...i....

i 66/85 01/01/84 - 03/31/B5 2

3 1

2 2

2 3

1 N

1

..-==g=====-----

-=....t===:======t===--t====g

-3===t=======g===l C&/86 04/01/85 - 01/31/86 2

2 2

2 2

2

,3 1

3 2

3======

........-===.3===g==

..t=====g...

3==

i==.g===t====t==.g...=3 l

t 1

s.-.-....-.._

B AL_P HZBTORY REPORT PLANT NAME: PILGRIM REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC

-g______

g 3 -- - - g -- -

g_l g-g -

__g__g____

04/B1 01/01/80'- 12/31/80 2

3 2

2 3

2 2

3 3

N

.l...t====..l.........l...

....g...g....

10/81 09/01/80 - 08/31/81 3

2 3

2 1

2 2

2 3

N g...............

3...

3....

3....

3...===g....g...:....

11/82 09/01/S1 - 06/30/82 3

2 2

2 1

3 2

2 N

2

...................t...l......t.....g....g...

...t.......t===

01/84 07/01/82 - 06/30/83 2

2 2

1 1

1 2

N N

1

...................t.........l.....t..

...g==.g...g===.g...g....

12/B4 07/01/B3 - 09/30/84 2

3 1

1 3

2 2

1 N

1

...................i.........i............i...i..............

01/86 10/01/84 - 10/31/85 3

3 2

2 3

N 2

1 N

1 i...................i...i...........i.......i......i...........

G l

W I

O i

l 2

SAL P HZSTORY REPORT PLANT NAME: SALEM 1/2 RESION: 1 RPT ASSMT. PER!dD OPS RADCON MAINT SURV EP FP SEC REFL GP LIC l

l -- - -

-- l - l

-- I I

- l-1 1-1-1 1

j l10/81 07/01/80 - 06/30/81 1

2 1

1 2

2 3

1 1

N l

lC1/83 09/01/81 - 08/31/82 2

1 1

1 2

2 3

1 N

2 t

.t..

..t g

.g

.g 3

.t...g....

01/84 10/01/82 - 09/30/83 3

2 2

2 1

2 2

1 N

~2 g...............

..l t.

...l.....t....g...g

.t===g

..t...

11/B4 10/01/83 - 08/31/84 3

2 2

2 2

3 1

2 N

2 g...................t...t...........t....t...===l..

3 l...

12/55 09/01/8.4 - 09/30/85 2

1 2

2 2

2 1

2 N

2

-43...................:...:......:

)

o 9

O O

e

i SALP HZBTORY REPORT PLANT NAME: SHOREHAM MGION: 1 RPT ABSMT. PERIOD DPS RADCON MAINT SURV EP FP BEC REFL QP LIC

-g-g__

g g __ g __ g __ g __ l -

g___g____

05/81 03/01/80 - 02/26/D1 2

N 2

2 N

N N

N 2

N

............:...:......:.....:....:...g......:....:...:....

07/82 03/01/83 - 02/2E/82 N

2 2

N N

2 2

2 N

2

...........................:......g.....g....g...:...g.......g...:....

09/83 02/01/82 - 01/31/B3 2

2 2

N 2

2 2

N N

2

...................g...g......g.....g.......

...g...g....g...:....

05/64 02/01/B3 - 02/29/84 1

1 1

1 2

2 1

N N

2 y

........................:..............i....:......:...:....:...:....

0G/85 03/01/B4 - 02/28/B5 1

1 1

1 N

2 1

N N

2 O

O k

e e

l 9

I e

1 1

SALP 'AISTORY REPORT M ANT NAMES SUSQUEHANNA 1/2 REGIONS 1 7tPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL GP LIC i=

I

- -- l -

a l

1 - : - --

l- -

  • 04/01 01/01/00 - 42/31/30 2

2 3

3 2

2 2

N 3

N

.t........

3.......:....

    • 10/82 03/01/31 - 02/28/82 2

N 2

N 2

N 1

N 2

2

    • 02/03 02/01/82 - 01/31/83 2 2

2 1

1 1

1 N

N 1

g...................g

..g

.....:.....==..is..i g...==..g...i 04/84 02/01/83 - 01/31/34 2

2 1

2 1

1 1

N N

1

..:...................g...

07/95 02/01/04 - 04/30/05 2

1 1

2 1

,2 1

1 1

1

.....w.........

......:.....t.......s.

g...g.

....g....

e

'o Combined Construction ratings also assigned.

o* Ratings are for Unit 1 only. Unit 2 rated under Construction.

Q ne

  • j e

i e

i l

l 1

!I.

S A L P' HISTORY R EP'O R T PLANT NAME: THREE MILE ISLAND 1 REGION: 1 RPT A88MT. PERIOD DPS RADCON MAINT SURV EP FP BEC REFL QP LIC t

l __ t.

g g-

- t __ l

_t

--l__-__

06/81 04/01/80 - 03/31/81 2

2 2

2 N

2 2

N 2

N

=t======================t======t=========t===t======t

=

====t, 01/83 10/01/81 - 09/30/82 1

2 2

1 1

1 1

N 1

1 l

=

===================t===t===========t====t===t===t===t====t=======t j

07/84 10/01/82 - 01/31/84 2

1 1

1 1

1 1

N 1

2 l

=

================t

==

=====t====t======t===t====t=======l 04/85 02/01/84 - 01/31/85 1

1 1

1 1

1 1

N N

2

=====l===================l===l======l=====l====l===l===l===l====l===t====l 03/96 09/16/85 - 01/10/96 2

1 2

1 N

N N

N 1

N t====,-========= '====t===t======t=====t====t======t===

=

====t r

1

s 5

EB AL_P H I ESTORY REPORT i

PLANT NAME: VERMONT YANKEE REGION: 1 RPT.

ABSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC

-g-_

l-g:

-g

-g-

-3 3-t-g g-63/83 07/01/81 - 06/30/82 1

1 1

1 2

1 1.

1 N

1 i

.. 3...................t...t......t.....t....t...t===t

..t.

3

.t....

11/83 05/01/82 - 04/30/83 2

1 1

1 N

1 1

2 N

1

.....[...................l...[.

...l.....[.

.[...t.

[...j....l..

3....

12/04 05/01/83 - 10/31/84 1

2 2

1 1

2 1

1 2

1 3........

.. t==. l.

... t

... t..

... t== = t t.

t

. t....

12/55 11/01/84 - 10/19/85 1

2 1

1 2

N 2

1 2

1

..t......................t.....

3.....t...

3...t.

g

.g g...g....

O e

e k

D e

?

O i

I l

1

\\

s S AL.P HZSTORY REP > ORT

. ANT NAMES YANKEE ROWE EGIDN 1

OPS RADCON MAINT SURV EP FP SEC REFL GP LIC PT CSSMT. PERIOD -

-l w l-

-g__

-- l-g-g-g- g -

3-l n

F/C3 05/01/79 - 05/01/80 2

2 2

2 2

2 2

2 2

N

-g--

e t

..t===I

....t t

..t.

t.

t...t.

t...t 3/92 07/01/80 - 06/30/81 1

2 1

1 1

1 2

1 2

N t...........

......t

.t

..t.....t

..t

.t

.t

.t.

.t===t....

I

.1/93 07/01/01 - 06/30/82 1

1 1

1 1

1 1

1 N

1 t

........t...t

...t

...t t...t

.t.

t====I..

3....

2/94 C5/01/82 - 08/31/93 1

2 1

1 1

1 2

1 2

1 i...............

..t.........t

.i.......i.

i

.i....i...i 8

4/85 09/01/83 - 01/31/95-1 2

1 1

1 1

2 1

2 1

-.t...................t==.t.

...t.....t =..t.

t.

t.==t....t...l...=

O e

9 6

e O

e F

1

s SAL P HISTORY REPORT I

PLANT NAME: BROWNS FERRY 1/2/3 REGION: 2 OPS RADCON MAINT SURV EP FP SEC REFL QP LIC RPT ASSMT. PERIOD

--l-t---t_

t_t_t-t-t t_i__

01/01 04/01/79 - 03/31/B0 2

3 2

2 2

2 2

2 3

N 2

--l--

====t===================l===l======l=====l====t===l===l===l====l===l

11/82 07/01/80 - 06/30/81 3

3 2

2 N

3 2

2 3

N t===t======t=====t====t===t===t=======t===

==

=

===================2 C6/B3 07/01/81 - 12/31/8 3

3 3

2 2

2 3

1 3

2

t===t======t=========t===t===t===t====t===t===

06/B4 01/01/83 - 02/29/

3 3

3 2

2 N

3 3

3 2

=====t==================84

l===t======l=====t====t===t===t============

09/B5 03/01/94 - 05/31 3

2 3

3 2

3 3

N 3

3

=====t=================/85

==3===================l===1======t=====l====t===t===t===1

O 9

em a

e e

O e

e 4

e O

P e

N I

1 l

}

v EiB A L_ P HIGTORY REPORT PLANT NAME: BRUNSWICK 1/2 REGION: 2 MPT ASSMT. PERIOD

_ g __ ___ _

______g - : - ___l g _ _l___g__g - l-

-_l___g _ _

01/81 04/01/79 - 03/31/80 2

3 2

2 2

2 2

2 2

N t====......

-- -====

===l......g=====l...=l===t===l==-3....l

.=3====

09/82 07/01/80 - 12/31/B1 3

3 3

2 2

3

!i N

3 N

t=====....

====t===t===...t=====t..--l

=

l...=l

==

06/83 01/01/82 - 01/31/83 3

2 3

3 1

3 1

3 3

3 g-=====================l....--=====;========== =.-l====g..=g....

08/84 02/01/83 - 04/30/84 2

1 2

2 1

2 1

1 2

2

===================1.--t======l.....t-===l===3======3====l===3====

01/86 05/01/84 - 10/31/85 2

2 2

2 2

2 1

2 2

2

... = =.........-===========

======t.....

==

t...t

=

D e

a 4

O e

e o

e 9

e o

e

SAL P HISTORY REF* ORT PLENT NAME: CRYSTAL RIVER 3 REGION: 2 RPT C.SSMT. PERIOD DPS RADCON MAINT SURV EP FP SEC REFL QP LIC l_____--

- g - : --- g -- -

=g-

-t-1

- 1 l - --

31/31 C5/01/79 - 04/30/80 2

2 2

2 3

2 2

2 2

N m

..t...................

3...

=====l....g...g...t...t....

...t....

01/33 C5/01/80 - 06/30/82 2

2 3

1 2

2 2

2 N

3

....................t.

t......g.....t....t...g

.g.......t...l....

12/83 07/01/82 - 06/30/83 2

1 2

2 2

2 2

1 2

2

..t.............e====.t...l......t.....t....t...===1

.g 3...g....

02/85 07/01/B3 - 10/31/84 2

2 1

3 2

N 3

N 2

2 4..................

.....i...........t....i.........i.......:....

O e

e i

O t

4 l

I 1

1

l t

1 4

l

I S AL_P H Z S*T'O RY REPORT PLANT NAMES FARLEY 1/2 RESION: 2 IPT CSSMT. PERIOD EqPS RADCON MAINT SURV EP FP BEC REFL GP LIC

- g

- - g.

3

-g - g.

g l

l-l_

2/82 G7/01/90 - 04/30/91 1

1 1

2 2

2 2

2 1

N n====1===================1===l======1---

t====1===1===!===I====I===t====

33/83 07/01/91 - 07/31/92 1

1 1

1 1

2 1

1 N

2

=====1===================I===1==-

1=1=====1====1===!===I===1====1===I====

>4/34 CS/01/82 - 07/31/83,1 1

1 1

2 N

1 1

1 2

3...............

..t

.t

...g.....t

...g t

.t.

.g

.l 33/85 C8/01/B3 - 12/31/94 1

1 1

2 1

1 2

1 2

1 M.*

g........

...i.

i...g

.g...:....

O e

O k

/

O e

9

)

i l

\\

l

--4

'-u, vv,,

,,-ww_--

1 S AL_P HISTORY REPORT PLCNT NAME: GRAND GULF 1 REGION: 2 RPT ABBMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC g _ _ __ : - __

i - - -

, g __ l -

-l

-g - g _ g. - g-g --

g. _ g____

11/82 07/01/80 - 06/30/81 2

N 2

3 N

N N

N 1

N i

..t...........--======l...

==.

...-=t....g===t...t==.t==.

3--.l.--.

04/83 07/01/81 - 08/30/82 3

2 N

3 2

N 2

N 2

2 i

...:......--.....--...-i..............i...=i......i...... i...:....

01/C4 09/01/82 - 09/30/83 3

2 3

3 1

2 2

N 3

3

.....t====.............=t...t=====

t.....t====l======l===t====l...g====

07/85 10/01/83 - 04/30/85 2

2 2

2 3

2 1

N 3

3

.---.......-=====.

t===t......t=========t===g...g===g g==.g....

G 5

e O

e e

0 e

f 9

O l

1

SAL P HISTORY REPORT I

M. ANT NAME: HATCH 1/2 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC l __

.l - l-

-- l l - l - l - l - l :-

l-l__

01/01 04/01/79 - 03/31/80 2 2

2 2

2 2

2 2

2 N

8

.mmemlmmmmmmmmmmmmmmmmmmmlmemlmmnsmalmenemlmemelmemlmeml3.mlmmmagenslmmen 20/92 07/01/B0 - 06/30/81 2

2 2

2 N

2 1

2 2

N i

_lmesoamm mmmmmmmmmeslmemlmesmemlmmnemlmm mlmemlmeslm.mlmem lmesl3 33 C3/93 07/01/81 - 10/31/B2 2 2

2 2

2 2

2 N

2 2

.mmemlmmmmmmmmmmmmm.am...l mmlmememmtemamelmemelmm gammlemelmemelm.agemme C3/84 11/01/82 - 10/31/83 3

2 3

2 1

N 1

N 3

2 l

emeestammmmmmmmmmmmm..mmelmemlmeses.[emmeslagentemelmeml mas lmesmlmeslmmum 10/85 11/01/83 - 06/30/85 2

1 3

2 2

2 2

2 2

2 me mammem4mmmmmmmmmmmml malmemuselmm.aml mama lWaslmeslWWWl3333lmaml333.

G J

l 9

4 0

I e

h 1

e SALP HISTORY REPORT i

PLANT NAME: MCGUIRE 1/2 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC 1

. - _ ____g.

=-

____g__g - g g ___ g __ g ___

10/80 05/01/79 - 04/30/B0, 2

2 2

2 2

2 2

2 2

N I

...................t===l......t....

t=======t===

=

==.=:===g....

12/B2 05/01/B0 - 05/30/82 2

1 1

1 1

2 2

1 N

2 l

me..

gn=========.m=======ta==l======t..===l====l===le==l===l====te.mte...

20/B3 06/01/82 - 04/30/83 1

1 1

2 1

2 1

1 2

1 1

.35.WlW533355533333-W.53ElM3ElW5.EE.lWWWEElB.W.l5..lWSSlWWWlWWWElBEMl....

12/84 05/01/B3 - 08/31/94 3

2 2

2 1

N 2

1 2

1

\\

.....:...................:...:......:............:...:.......i...:....

1 S

6 O

f

)

1 i

1 I

O 1

)

1

SAL P HISTORY REPORT I

FLANT NAME: NOPTH ANNA 1/2 REGION: 2 CPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC

-.-.__g=---=-t - _g _ : 3 - _i___g____

l 12/B0 05/01/79 - 04/30/80 2

2 2

2 2

2 2

2 2

N

...................t.........t.....g....

...t...t...g....g...:....

12/92 07/01/80 - 06/30/81 2

1 2

2 2

2 2

2 0

N

.....t......................t......:.....t....g...t...:...

....g...

04/83 07/01/81 - 09/30/82 2

1 2

2 2

2 1

1 2

2

..t...t......t.....:.......g......t....g...

02/94 10/01/82 - 0B/31/B3 1

1 2

2 1

N 1

1 2

1

-.....g...................t...g......g.....g....:...

...:...g....g...g....

05/C5 09/01/B3 - 02/,2B/85 2

1 2

2 2

2 1

1 2

2

.....t....)..............t...t......g.....g.......g...t...g.......g....

e 9

er e

e e

1 9

e 1

4

-m- - -

+--r---------_w, yg----a,,-,.,.---.,,---y.,,,y-p--,,--,--,

y__-,-yc,,

-r,w.---3-- - - -, -, - - - - -. - - - -

S AL_P HISTORY REPORT PLANT NAMES DCDNEE 1/2/3 RESIDNs 2 RPT CSSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL GP LIC

-=g-l-l

.g-:-g-t-g g _ g __

- g__

- -- = - -

20/80 C5/01/79 - 04f30/80 *2 2

2 2

2 2

2 2

2 N

m

.g...................t===g.....

3

...g...

3...g..

3...g.

.g...

10/82 C9/01/SO - 05/30/92 2 2

1 2

1 2

1 1

N 2

.................... 3.

3...

3...

.g...g....g...g....

10/83 C6/01/s2 - 04/30/B3 2

2 1

3 2

N 1

1 2

2

...................t...g

....g.....

===l g...

12/04 05/01/93 - 08/31/84 1

2 1

1 1

N 1

1 2

2

...i.....i....i...i...i..............

O e

l

)

i l

i l

F e

-l I

i i,

1 f

1 1

SALP NISTORY REPORT j

PLC.NT NAME: ROBINSON REGION: 2

-RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC a

-g--

--gw -g_-

_g-g_ g_ g_ g_g -

-g.

g 01/81 04/01/79 - 03/31/80 2

2 2

2 2

2 2

2 2

N s

...t...................t...l======t.....g

...t...:=======3===3....

I 09/92 07/01/B0 - 12/31/B1

.2 3

2 2

2 2

2 2

2 N

3...............

..t==

g.

...t=====

--t

.t

.===t====l

..g....

08/94 02/01/83 - 04/30/84 2

2 2

1 1

1 2

1 2

2 j

i I

m..majam.m.mem.

m.mm..m.l=am{m am..l...mela...{.am{

..{...l==m lmesl=m..

C1/86 05/01/84 - 10/31/B5 2

2 2

2 1

2 1

1 2

2

(

g..................===t...........t==.t...t===g===g...........

e O

d 4

/

I I

O 9

e I

i*

~ ' '

S A L.P' HZSTORY REP' ORT PLANT NAME: SEQUOYAH 1/2

,. ftEGION: 2 VtPT ASSMT. PERIOD Of5 RADCON MAINT SURV EP FP SEC REPL GP LIC

-g__

-t t

-- t --

l - g-

-g t-t 0 01/01 08/01/79 - 03/29/80 2

2 2

2 2

3 2

2 2

N t

.................g...:===...t==.

t...

3...t......t.

...t 0 11/C2 07/01/80 - 06/30/81 3

-2 2

2 2

2 2

N 3

N t==1===..

..t

.t g

t t

.g===t

.g.

.g...g 06/83 07/01/81 - 12/31/82 2

2 2

1 2

N 3

2 3

2 t

t

. t -- -

--=g t====g t

t - g

.g 06/84 01/01/S3 - 02/29/84 2

1 1

1 3

1 2

1 3

  • 2 t....

............t..

1

...t

..g.

.t===g g..

3.

g 09/C5 03/01/84 - 05/31/85 2

2 3

2 2

2 2

2 3

2 s

. t

.. t.

l.

... t

. f g

. t t

. g g

. g

\\

CBatings are for Unit 1 only. Unit 2 rated under Construction.

9 O

M e

4 e

P G

Y' e

  • . e C" F e

e e

1

t SALP HZBTORY REF*QRT M. ANT NAME: ST. LUCIE 1/2 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC

= _ - - _ -_ :

-t-

'01/31 05/01/79 - 04/30/50 2 2

2 2

2 2

2 2

2 N

..c:.........
  • 01/83 05/01/30 - 06/30/82 1

1 2

1 2-2 2

1 N

2 22/03 07/01/82 - 06/30/83 1

1 1

1 1

2 2

1 2

2

.:....:...i....

02/85 07/01/03 - 10/31/34 1

1 1

1 1

2 1

1 2

1

.............:...g......:.....:.......:...:

.g

.:...g....

OConstruction ratings also assigned for Unit 2.

9 e

0 e

l SALP HISTORY REPORT PLANT NAME: SUMMER REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC


l=-

l

-l-

--l-l l

l l

--- l -

l 01/81 09/01/79 - 08/31/80 2

2 2

2 2

2 2

2 2

N

-..g===================t===l======l===

==

===t===l=======l===:==.=g 11/82 09/01/80 - 03/31/82 2 N

2 2

1 N

2 2

2 N

-l===================l===l==

=

=l===l

=

l===:

05/83 04/01/82 - 02/28/83 2

1 1

2 1

3 2

N N

2

====3l==WW=======B=m=====l===l======l=m===l===-l==ml===l===l====l===l====l 10/84 03/01/83 - 06/30/84 2

1 1

2 1

2 1

N 2

2

==l===================t===t======t=========t

=

:===-g---l=

03/86 07/01/84 - 12/31/85 3

1 1

2 1

3 1

2 2

.2

=============,===============l=========l======l===t=======:====:

=

O l

O I

1

BALP HISTORY REPORT i

PLANT NAME: SURRY 1/2 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL CP LIC g -- -

--t__

_.g._t-

- t __

z-12/B0 05/01/79 - 04/30/Bb 3

2 2

2 2

2 2

2 2

N

...................t===t...............

...t...

11/82 07/01/B0 - 06/30/81 3

2 2~

2 N

2 2

2 O

N

.....t

.................t...

....t...

...l.

...t....

04/S3 07/01/91 - 09/30/B2 1

2 2

1 2

2 1

2 2

0

.....t...................t...t===...t.....t....t...t...t===t...........

02/84 10/01/82 - 08/31/B3 2

3 2

1 1

2 1

1 2

1 p

.....:...................t===1...........t===.t...t......t==..t===t....

05/B5 09/01/B3 - 02/28/85 2

1 2

3 2

N 1

1 2

1

.....t==..T...............t...t......t.....l....l...t===t..

3....t...t....

O

?

S 9

7 O

1

1 r

smLp HzsTORY REPORT PLANT NAME: TURKEY POINT 3/4 REGION: 2 i

RPT CSEMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC l

- g

- -- l - : --

- - g-g- g

- g-g -

-g-g 01/91 C5/01/79 - 04/30/B0 2

2 2

2 2

2 2

2 2

N m====3==s..m.m..........(===lmes.m.l...m.lm...{

el..el==={===={..alm.m.

01/83 09/01/80 - 06/30/82 2

1 2

2 2

2 2

1 N

2 3........

........-t===l=====.t.

..g

.g

...t....g...

22/83 07/01/82 - 06/30/93 3

1 2

2 2

N 2

2 1

2

--____._...................t...t======t...--t

.t===3===t..

3

..t===l....

02/85 07/01/83 - 10/31/84 3

2 3

2 2

2 2

2 3

1

=====t======.............t...t......g

.,.g....g...g...g...g....g..,,,,,,

O e

=

e e

l

\\

l Y

1

SAL P HZSTORY REPORT PLANT NAME: BIG ROCK POINT REGION: 3 RPT CSSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL GP LIC 1

t-t -

l-

_t--

I t-l-

l-

-t _

D2/91 09/01/79 - 09/30/80 2

3 1

2 2

2 2

2 2

N t===================t===t===========t====

=

t===t

27/C2 07/01/80 - 06/30/81 1

2 2

2 2

2 1

1 2

2

..t======================t==================

t

==

t=

L2/B2 07/01/B1 - 06/30/B2 1

3 1

2 2

2 2

1 N

2

==

================t.

==

t====t===t===t=========

1 LO/83 07/01/B2 - 06/30/83 1

2 1

1 1

2 1

N 2

2 W

=

================!

==

=t=======t===t===t

=

31/95 07/01/B3 - 10/30/B4 1

2 2

1 1

2 1

1 2

2 n====

=======

=t======t=========g===gn=====gn===gn

==

i l

h 1

l t

SALP HISTORY REPORT PLANT NAME: BYRON 1 l

REGION: 3 a

RPT ABBMT. PERIOD OPS RADCON MAINT SURV EP FP BEC REFL QP LIC l---

'I I

I

.I l-1 1

I l *07/e4 01/01/83 - 04/30/84 N

2 N

N 2

3 2

N 2

2 t===l......t.....g

..t......g...g....g...g 0 01/86 05/01/84 - 10/31/85 3

3 2

3 1

2 3

N 2

2 u.s i...:...:.

....i...:....
  • Construction ratings also a'ssigned.

i O*

4

/

r 9

O e

9 I

k I

S A L.P HZBTORY REPORT PLANT NAMES CALLAWAY 1 StE3 ION: 3 ftPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL GP LIC

-g__

---l l-

-l

_g l

l-g l-l-l -

)

'04/84 10/01/92 - 11/30/83, N 1

N N

N 2

2 N

2 1

1

.................i...i......:..

....:...g...i...i.

.i...g....

08/85 12/01/83 - 05/31/85 2

2 2

2 2

1 2

N 2

1

-- _- g

..............t...g

....t..

.t.

.t...l...l...t.

.t 1....

o Antings also assigned under Construction.

G e

e E

e Oe 1

o e

I

. S A L_ P' HISTORY R EP'O RT PLANT NAME: D.C. COOK 1/2 REGION: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC

-1 I

l-

---l l

I

-l I-l-

I l -- g 02/81 10/01/79 - 09/30/80 2

2 2

,2 3

3 2*

2 2

N

.....---...........t== t======l=====l=======l===l..=l----l===

==

10/82 10/01/80 - 04/01/82 2

2 2

3 3

3 2

2 3

3

.....g==...-------=======l===

==


l====g===:===l===

=

====l 08/83 04/01/82 - 03/31/83 2

2 3

2 2

3 2

2 3

2

=====l..-======u--

_-========l======l=====l......=l===g..=l

.=l=--l----l 06/84 04/01/83 - 03/31/84 2

2 2

2 2

2 2

1 3

2

.....l...........--------t===l.---==g---==

==

===g===l===l====l..=l..--l 01/86 04/01/84 - 09/30/85 2

2 2

3 2

2 3

2 3

1

=l-===============...l--

t.---=======l====t======l

=l====l===l====l m

I e

e p

e e

A-

SALP HISTORY REP' ORT PLANT. NAMES DAVIS BESSE REGIDN 3

RPT ASSMT. PERIOD DPS RADCON MAINT SURV EP FP SEC REFL QP LIC

_ ___l_g-g

_g-g-

g _ g- -

g__g____

12/80 11/01/79 - 10/31/80 2 2

2 2

3 2

3 2

2 N

I...g......g.....g....g

===1....===l....

..................=

C9/82 11/01/80 - 03/31/82 2 1

3 2

1 2

2 1

3 2

3............................

=====l....g...

===g...

...g....

10/83 04/01/82 - 03/31/83 2

1 3

2 2

2 2

2 N

2

...................g===g==...

3

.g...g...g...g....g..

3....

p 12/84 04/01/83 - 08/31/84 2

1 3

2 3

3 2

1 3

2 m...g......................g......g.....g....g...g...g...g....g...g....

G O

e e

9 0

1

SAL P HZBTORY RENORT PLANT NAME: DRESDEN 1/2/3 REDION: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC

!=--

t I

-- l-I-1-1

  • I l 21/80 07/01/79 - 06/30/80 2

3 2

2 3

2 2r.

.2 2

N

.t..

............t...t......l.... 3....t===I...t...t.

.l...t....

12/82 07/01/80 - 12/31/81. 3 3

2 2

1 3

1 1

3 1

.t.....

..t...t

....t

...t....l..

3.

...t

.t...g....

G7/83 01/01/82 - 12/31/82 2

2 3

2 2

2 1

1 2

1 t...t

....t.....t....

===3==.3....l...

09/54 01/01/83 - 05/31/84 2

3 3

1 1

2 2

1 2

2 I===================I===1======I=====I====I===I===I===1====1===1====

=

01/86 06/01/84 - 09/30/85 2

2 2

2 1

2 2

1 2

1

..t.....

...t...........t....t...t...t..

3....t...

G O

e 9

e e

e e

O P

O 1

B A L_P HISTORY REPORT PLANT NAME: DUANE ARNOLD

- REGION: 3 RPT ASSMT. PERIOD DPS RADCON MAINT SURV EP FP BEC REFL QP LIC

-g=-

g 3

-g_

g

-t-l ___ l 12/CO 09/01/79 - 08/31/80 2

3 2

2 3

2 2

3 2

N

...g...........-=-

=g...:======l=====l==--g===l...g...g----t...g====1 07/03 04/01/G2 - 03/31/B3 2

2 1

2 2

2 2

2 2

2

......-==..----....-

...g

..--t...-

g...-g..-===g===g===.g...g---.

11/DS 04/01/83 - 08/31/84 1

2 1

3 2

1 3

N N

1 g===.-===========..g=========g.....g===.g==-g..

g...g....g...g...-g

.C5/C6 09/01/B4 - 02/28/86 1

2 2

2 1

1 2

2 2

1

..=======---=====--

-g===g..--==g----=l-

...g..

3...g--..

...g....;

v e

1

s SAL P HZSTORY REPORT PLANT NAME: FERMI 2 REGION: 3 RPT ASSMT. PERI 6D OPS RADCON MAINT SURV EP FP BEC REFL OP LIC g--

-- g -_-_g-

-g g-t-t-g

_g-g_

09/85 10/01/84 - 06/30/85 2

2 2

2 1

3 2

N 2

2

=====l===................g...g......g

...g....g...g g...g..

g...g....

ORatings also assigned under Construction.

l l

l O

9 e

T b

t SALP HISTORY REPORT PLANT NAME: KEWAUNEE REGION: 3 RPT A8SMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC

- i ___ v - -

-n-

-, _ i ___ i --

12/80 11/01/79 - 10/31/80 2

2 2

2 3

2 2

2 2

N

==

..t===================

=

======l====-t=======t======g====t---t==--t 07/B2 11/01/B0 - 03/31/82 1

1 1

2 2

2 2

1 N

2

==============t=========l

==

t===t

==

===;---=1 11/93 04/01/82 - 03/31/B3 2

2 1

2 2

1 2

1 N

2 s

=

===================t===t======t=====l===-t===l===t===t====t..=====l 09/84 04/01/83 - 06/30/84 1

1 1

1 2

1 2

1 N

2

=====t===================t===t======g=====g====t t===t===g..--g===g

...g 03/86 07/01/84 - 12/31/95 1

1 1

2 1

1 2

1 2

1

============ e=====t===g======:

t==.g===g===g....t...:

e O

4 e

t 9

1 e

O we

S A L 5:'

H I S*T O RY R Ef'O R*T PLANT NAME: LACROSSE REGION: 3 RPT ASSMT. PERIOD, OPS RADCON MAINT SURV EP FP SEC REFL QP LIC

_g______=----

g___i

_g--

___i___

g-g___

01/81 0G/01/79 - 07/31/B0 2

3 2

2 3

2 3

2 2

N

....................g...

3.....g....g...g...g..

3....g...g....

0$/82 07/01/80 - 06/30/81 3

2 2

2 3

2 2

2 2

N

.....:......................:......g.....:....g...:...g...g....g...

01/B3 07/01/B1 - 06/30/E2 3

2 1

2 3

2 2

2 N

2

......g..................

g...g......g.....g....g...g...g...g....g...g....

11/83 07/01/82 - 06/30/83 2

2 2

2 2

1 2

N N

O

.....g...................g...

.....g....

...g....g...g....

03/B5 07/01/83 - 12/31/84 2

2 2

1 2

1 2

N 2

1

.....g...................:...:......g.....:....:......g...g....g...g....

9 4

9 I

1

SALP HZSTORY R EiC P O R T PLENT NAME: LASALLE 1/2 RESIDN: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL GP LIC g _ --

g

---l - g-l g-l-

g_g-0 11/82 07/01/80 - 12/31/81 N

2 2

3 2

2 3

N 2

N 3

.................g

==...g.....====l...g...

===l====g

..g....

c07/83 01/01/82 - 12/31/82 2

2 1

3 2

2 3

1 3

2

.....t...................===g======g.....

===g===l...

====3..

3....

ee08/84 01/01/83 - 04/30/84 3

2 2

2 2

2 2

1 2

2

................. in e :

. = = = =.. = = =. 3.... : = = = l== = 3=== g=== = l...

)

    • C2/86 05/0DB4 - 09/30/85 3

2 3

3 2

1 2

N 3

2 e==en me.....m.m.mm.esame : mes a.mm.m : m.ma mem= l... g ma... I a.m. g.am

.mm.

CIntings are 'for Unit 1 only. Unit 1 also rated under Construction.

    • Ratings are for Units 1 and 2 combined. For 8/84 recor't, Category 2 SURV is fcr Unit 1 only and results for LIC and REFL are for Unit 2 only.

O C

k r

o l

1 l

=

e 0

P e

l e

i O $

t y

9 4

]

5 I

SALP HISTORY REPORT PLANT NAME: MONTICELLO REGION: 3 RPT ASSMT. PERIOD OPS RADCDN MAINT SURV EP FP SEC REFL QP LIC g

-_t-

- 3. _

- :- g

-g l _ i_

-=-

01/81 10/01/79 - 07/30/80 2

3 2

2 3

2 2

2 2

N

.g...................,3.........g.........g...g---...g...

3...g....

C5/B2 07/01/B0 - 06/30/81 1

2 1

1 2

2 2

1 1

N

..:...................g....

...g...--3....

...g==

g...g...........

12/02 07/01/81 - 06/30/82 1

2 2

1 1

2 1

1 N

1

.g..

.........======g...g.

...:====.3...

3...:===g..

3....===l....

10/93 07/01/82 - 06/30/B3 2 2

2 1

1 2

1 1

N 2

.....g...................g==

g......g====.g

...g==.g...g....g===g....

02/85 07/01/83 - 11/30/84 1

2 1

2 1

2 1

1 2

1 g...................

......g.....g....g...g...g...g.......g....

e e

I E

e I

e 1

SALP HISTORY REPORT PLANT NAME: PALISADES -

REGION: 3 RPT ASSMT. PERIOD dPSRADCONMAINTSURVEP FP BEC REFL QP LIC i-

- i n

--i--

i_

- i ___ i -

i i

- i ___ i _

02/81 09/01/79 - 09/01/80 3

3 2

3 2

2 2

2 2

N

.mmem l mmmmmmmmmmmmmmmme,m l mem l memamm i nemme l meme l mem l mem l mem l meme l mem l mmes 07/82 07/01/80 - 06/30/81 2

2 2

3 2

1 2

2 3

3 1

i

.amme l maammmmmmmmmmmmmmme j man l ansamme l mamme j same l maa j asem l mas l meme l mem l mamm 01/83 07/01/01 - 06/30/82 2

3 2

1 2

2 2

2 2

2

.amme l enamunememmmmmmmmme l emm l mmnsme l mmnem l memm i nem l mem i nem l mesm l m== l m===

10/83 07/01/82 - 06/30/83 1

2 2

1 1

2 2

N 1

2

.mmmmlmmmmmmmmmmmmmmmmmmmlmmejemamamlmmneminemelmmnissagemelmemelmemlme==

01/95 07/01/83 - 10/31/84 2

2 2

2 2

2' 2

1 2

2

.amamlmmmmmmmmmmmmmmmmmmelmmagamommejemammlmmnagemagemelmemlmemelmem3mmes 02/86 11/01/84 - 10/31/95 2

2 3

3 2

2 2

N 3

2 wommelmmmmmmmmmmmmmmmmmmmlmemlmemesmlmmmmmlmemmlmemlmem3memlmemejemm3meme i

O 9

8 M

4 1

,_,._-.,m-

. m

SAL P HISTORY REPORT PLANT NAME: POINT BEACH 1/2 REGION: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC

= - -

_ _ _ g __ g -

_ -_ g g

g g

g g

g-g __

g -- - -

G9/B2 11/01/80 - 07/31/82 2

1 2

2 2

3 2

2 N

2

...g...................g...g......g.....g.......g...:..,g....:...g....

6B/83 04/01/82 - 03/31/83 1

2 1

1 3

3 2

2 N

2

..g......................g......g.....g....g...g...g...g....g...g....

12/84 03/01/B3 - 09/30/84

'1 2

2 1

2 2

1 2

2 1

...:...................:...g......g.....g....g...g...g.. g...

g...g.,,,

.J*

e G

e e

k S

)

I 1

l

SAL P HISTORY REPORT PLANT NAME: PRAIRIE ICLAND 1/2 REGION: 3 RPT CSSMT. PERIOD DPS RADCON MAINT SURV EP FP SEC REFL GP LIC l_g_ -g l __ g -

g_g-01/01 09/01/79 - 05/31/80 2

2 2

2 3

2 2

2 3

N

...................I...g....

==......g...l...t...t....

05/02 07/01/80 - 06/30/81

.1 1

1 1

2 1

2 1

1 N

.g......................t......:....

l...

g==.g==.g...:....

82/82 07/01/81 - 06/30/82 1

1 1

1 2

1 1

1 2

1

...................t...:......:

...:....:...s...:...:....g...:....

10/83 07/01/82 - 06/30/83 2

1 1

1

'1 1

1 1

N 1

t.

02/85 07/01/B3 - 11/30/B4 2

1 1

2 1

1 1

1 2

1

...t......l.....l....l......g...

...g....

O e

6 3

h t

9 1

SALP HISTORY REPORT PLANT NAME: QUAD CITIES 1/2 REGION: 3 RPT ASSMT. PERIDD OP8 RADCON MAINT SURV EP FP SEC REFL GP LIC

- 3.--

g l

g-

__g_l-

-l

  • l l-

-l-11/80 07/01/79 - 96/30/80 2

3 2

2 3

3 1.

.2 2

N

.....g..................

...:..................i...:...:....g...

11/82 07/01/80 - 12/31/B1 1

2 2

2 2

2 2

1 N

1

.....g...................t...t===

.:.....t....l......t...

07/B3 01/01/82 - 12/31/82 2

2 2

1 2

1 1

1 N

1

...:......................t

..g.......g...l...

C8/84 01/01/83 - 04/31/84 3

2 2

1 1

2 1

1 2

1

...................g..

l...

.g

...t....g...

..ag

..g.

...l....

01/86 06/01/84 - 09/30/85 2

2 2

2 1

2 1

1 2

1

...t......t==

...g...

....:...g....

O e

9 4

O e

i I

I 1

l

~

PLANT NAME: ZIDN 1/2' REGION: 3 RPT AS8MT. PERIOD OPS RADCON MAINT SURV EP FP SEC,REFL QP LIC l-I l-1 I

l-1-1 I

l-l-

21/80 07/01/79 - 06/30/80 2

3 2

2 3

2 2.

.2 2

N

__ zr

..........=f........t===t======t

====l===l===t..

t====l===3====

11/82 07/01/80 - 12/31/81 2

.3 2

2 2

N 2

1 N

2 t.........--========t===g.... =l==...l==..l===t.

t.-=t....

t....

03/C3 01/01/82 - 12/31/82 2

2 2

2 2

2 2

1 N

2 i

.t...................t===t======t=====t==.t===t===t...t===

g...

09/84 01/01/83 - 04/30/84 2

2 1

2 2

2 3

1 2

1

..t....

.............t===l======l.....l===.t===l. -t===I===.t===I====

12/C5 05/01/84 - 10/30/85 2

2 2

2 2

2 1

1 2

1

.t

.........===...==t===1..====I=====l====t===I===I===I====1===1====

e 0

e e

i e

9 1

SALP HISTORY R'EPORT PLANT NAMES ARKANSAS 1/2 REGION: 4 RPT ASSMT. PER!pD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC I

l-l I

l-I-l i

I l-l 09/80 01/01/79 - 08/19/80 2

2 2

2 2

2 3

2 2

N

. 3

.....l...t

.g

...t..

.l

==.l...t....t--.g....

09/82 07/01/80 - 06/30/81 2

2 2

3 1

2 2

2 1

N

......--=====...

...g====.g...

l...g...

...g...-g...g....

03/83 07/01/81 - 06/30/82 3

2 3

3 3

2 2

2 3

2

..g..................

3...===== t

...t..

3..

3.

3...g....g...g....

11/83 07/01/82 - 06/30/83 2

2 3

2 2

3 1

2 2

2

...g...................g...t===..

3.....l..

l===3...g...l==..l...g....

09/84 07/01/83 - 06/30/84 2

2 3

3 2

2 1

1 2

1

.....i...................i...i......i

...i....i..=i...i..............

09/85 07/01/96 - 06/30/85 2

1 2

2 2

2 2

1 2

1

...t.................--t...g......

.....g....g 3.

g...g....g...g....

P E

O l

0 1

S AL.P HZBTORY R EP'O RT PLANT NAME: CDDPER REGIDN 4

RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL GP LIC g

-g _ g-

==--g-

- -- g -

g -_

3-g _. g __

OS/C0 01/01/79 - 08/06/80 2

2 2

1 2

2 2

1 2

N 3...................I...g.....

3.....g....g..

3...g...g

.g

.g....

06/82 07/01/80 - 06/30/81 1

2 2

1 3'

2 2

1 1

N

...g

....g.....g...

3...t===l..

3.

....g....

11/82 07/01/01 - 06/30/B2 1

1 1

1 3

1 1

1 2

1

...g...................g.

g......g

...g..

g...g

.===g....g...g....

12/83 07/01/82 - 06/30/83 2

2 1

1 2

1 2

1 2

1 f

................g...g.

...g...;.g......

...i....g...

04/85 07/01/83 - 01/31/85 2

2 2

2 2

1 2

1 2

1

..g.

..........g...g

====l...g...g...

..g...g....

e 0

m E

e I

1

,... - - - - ~ - - - -. - - -, - - - - - - ~ - - -

S A L.P HZSTORY REPORT PLC.NT NAME: FORT CALHOUN REGION: 4 RPT CSSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC 3 --

g l

g_g_:-l l

g-g_

08/80 01/01/79 - 06'/30/80 2

2 2

2 2

2 2

2 2

N

...g............................:....

g====g g==.g...u SS/82 07/01/80 - 06/30/81 2

2 2

2 2

2 2

N 2

N

=

...............g...g.....-t.....

....g...g...g..

3....g..

3....

12/92 07/01/81 - 08/31/82 1

2 2

1 2

2 2

2 3

1

..g...................

...g......g.....g...

g===g

..g

..g...-g...

02/84 09/01/82 - 08/31/83 1

2 2

1 2

2 2

1 3

2 f.......................~g.........g.....g....g..

3...g...g....g...

05/85 09/91/83 - 02/28/85 1

1 1

1 2

1 3

1 2

1

...g==....

g==

g..........:....

O e

e S

e D

r I

9 1

)

m

,--m-

SALP HISTORY REPORT PLENT NAME: FORT ST. VRAIN REGION: 4 RPT CSSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL OP LIC 3-

-1 3-30/80 10/01/79 - 10/01/B0 2

2 2

2 2

2 3

2 2

N

...:...................:6..:......:.....:..........:...:....:...:....

36/82 07/01/B0 - 06/30/81 3

2 2

2 2

2 2

2 2

N 91/83 09/01/81 - 08/31/82 3

2 1

2 2

1 2

N 2

1 36/04 09/01/B2 - 09/30/83 3

2 2

2 1

N 2

2 2

3 n.......................i...:......:.....:....:...:......:.......:....

s5/B5 10/01/B3 - 02/28/85 3

1 3

2 2

2 2

1 3

3 l

~.

l l

e 1

SAL P HISTORY REPORT PLANT NAME: RIVER BEND REGION: 4 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC l

l

-l l - l -.

l-l-

l -- l ---

. l --

no2/C5 08/01/83 - 12/31/84.2 2

N N

2 N

2 N

2 2

...:.......:...l...:.......:....

04/26 01/01/B5 - 01/31/B6 2

2 2

2 2

1 2

N 2

2

..g...................:...:...........g....:...i...

  • Construction ratings also ass.igned.

4 9

e 6

D 1

e O

9 0

9 i

i l

1 l

i l

1

.: " "." L '.. '-. "

SAL P H I S T O R-Y REPORT PLANT NAME: WATERFORD 3 REGION: 4 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC I -l--

-l I

l-1-1 I

l -- l -

07/82 07/01/80 - 06/30/81 3

N N

2 N

N 2

N 3

3

=====:======================g======:=====g====g======g===g====g===g====g 12/82 07/01/81 - 06/30/82 2

3 N

3 N

2 1

2 3

2 l---............ ---t===l======g=====g====g===3===g===g====l===g....:

01/84 07/01/82 - 06/30/83 2

2 3

N 3

1 2*

N 1

2

===================g===g======g=====g====g===g===g===g====g===g====g 03/86 12/18/84 - 12/31/95 3

2 3

2 2

2 1

N 2

2

=

================g===g--==--g=====g g===g

=

====g===g====g O

e e

e O

F 1

e 4.

.__._.,____.m.,-

SAL P HISTORY REPORT PLANT NAME: WOLFCREEK REGION: 4 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC l

1-1 1

I I

i-I

- --l-l-

1

-1

  • C2/85 08/01/83 - 09/30/84 N

2 2

N 3

1 2

N 2

1

...i.......................i......i.....i.

.i......i.......i.......i 04/86 10/02/84 - 01/31/86 2

2 1

1 2

2 2

N 1

1

................i....i.....

.i

  • Construction ratings also assigned e

e S

e e

O e

e

,7 e

O m

m_

w w e e

e 4

l S A L.P HISTORY REPORT PLANT NAME: DIABLO CANYON 1/2 REGION: 5 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC g

- -._ ;- - ___ __ l l

_g-g __ l l

g - : ___ i ___

'003/B3 07/01/B1 - 12/31/82 2

2 2

2 1

2 1

N 2

2

.....:..........=========:==============:.......

===g==-3

..=g...:....

11/B4 01/01/B3 - 06/30/84 2

2 2

2 2

2 1

N 2

2

.....g...................t===

=l

==

===gn==:=.

t====t===l....

10/85 07/01/B4 - 07/31/95 2

2 1

2 1

1 1

N 1

1 i

=====l===================t===l===========t====l. mg.

.l===g

.. g

..g....

cAlso rated under Construction this assessment period.

O e

O

.Y 1

S A L.P' HZSTORY MEP'O RT M MAME: PALo VERDE 1/2/3

% ION: 5 W

assnT. PEnIon ops nAncoN MAINT SURV EP FP SEC REFL GP LIC t__

1

- g-

-I

--_l-I-t t

l t-t-

)/53 07/01/31 - 02/2s/s3 2

1 2

N N

N N

N N

1 1...................!

.t

..t.....l.

1...[

.l...t.

l

.l

/34 C3/01/33 - 03/31/34 2

2 2

N 1

N 2

N N

2

....................t...t--- -_.t

. 1

..l

.t===1...t

..t.

t....

/85 C4/01/34 - 09/30/85 2

2 2

2 2

1 2

1 2

2

===t===================1===1--

1I=====I====I===I===I===I====1===l====

Wistruction ratings also assigned these assessment periods.

G 9

=e e

b G

i e

Q O

e e

e 1

---.-p


r-,

S A t_P HISTORY REPORT PLANT NAME: RANCHO SECD REGION: 5 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL QP LIC l--

I l-1-

l 1 -

-I - I l -~ l CS/B0 04/15/79 - 04/15/B0, 2 2

2 1

2 2

2 2

3 N

...tm..................t=========t.===t.==.t===t===t===l====t===t====

04/C2 06/06/80 - 06/30/81 2

2 2

2 2

1 2

1~

2 N

..t.........==========t===l======1....

1...=l===3===t...====l===t====

C3/83 07/01/81 - 09/30/92 2

2 2

2 2

2 1

1 N

1

===t..........-===.

..====

====.=t

.--t====t..=t.-=t...gm

l==

==

05/84 10/01/82 - 11/30/83 3

2 2

3 2

2 1

1 N

3

.-t

...............==1===l=.-===le.===1====1===l===t===l====l===t====

11/B5 12/01/83 - 05/21/B5 2

3 2

2 2

2 1

1 2

2

..i.....=.m..==....;..

i...i...........i==..i=..i...i...i....i..= =.-=

4 k

e 9

9 0

1


..,s-

S A L.P HISTORY REPORT PLANT NAME: SAN ONOFRE 1 REGIDNs 5 RPT ASSMT. PERIOD

  • DPS RADCON MAINT SURV EP FP SEC REFL QP LIC l-1 I

l I l I I

l-C9/81 05/16/80 - 06/30/81 2

3 3

1 2

2 3

1 2

N 3.....

............t===3======3=====l====3===1..=l===l====g...

01/83 07/01/81 - 06/30/82 3

3 3

2 1

2 3

N 2

2

====.t.....--============3===t====.t=====1

..t===3===l===t====l===1-...

11/84 06/01/83 - 09/30/84 1

2 1

2 1

1 2

N N

2

.----l...................t=======..l====.3-...gm..

g===l==..

...:.=..

O e

e

'O h

9 G

e

.Y e/

p e

,-w,

,-----------w-e e

SAL P HZSTORY REPORT i

PLANT NAME: SAN ONOFRE 2/3 1

RESIDN: 5 a

RPT CBBMT. PERIOD OPS RADCON MAINT SURV EP FP SEC REFL GP LIC l

-t-

-g g-g_

g _ _-

- 3,-

g 09/91 06/01/B0 - 06/30/81 2

3 3

1 1

2 3

1 2

N 3...............

..g.

g 3.....g

. 3.

g

===g

.g...g..'..

12/82 07/01/91 - 06/30/82 2

2 2

2 1

2 2

1 2

2 g.

3...g

..g

..g

.g

.g...g.

g

.g...g....

11/34 06/01/B3 - 09/30/94 3

3 2

2 1

2 2

2 N

22

...................t 3

.t

..t

.t..

3...g....g...

2 S

9 0

e e

b 4

r.

9 O

4

SALP HISTORY REPORT PLANT NAME: TROJAN REGION: 5 RPT ASSMT. PERIOD DPS RADCON MAINT SURV EP FP SEC REFL QP LIC l---l-l l-l 3

g l___:_-

10/80 09/01/79 - 08/31/B0, 2 2

2 2

2 2

2 2

2 N

...t

...t==.

......t=======l===l...t===.t...t==

04/82 06/01/80 - 06/01/81 1

2 2

2 1

1 2

1 2

N g

.................t==.t==....t.

..t

..g...g.

t...l..

l==

g....

12/82 07/01/B1 - 08/31/82 2

1 1

2 1

2 1

1 2

1 g................

.l...

. l

....g...l...t...l....

...==.

C4/84 09/01/82 - 08/31/83 2

2 2

1 1

2 1

1 3

1

.....t...................t...l==...

l.....t

..=l===g

.t...=l==.g....

01/85 09/01/83 - 10/31/B4 3

1 2

1 1

2 1

1 3

2

.....t==.................

.t==.........l

...t...l...t....t...

01/96 11/01/84 - 10/31/85 2

1 2

2 1

2 2

1 2

2

.....:.................................:....l...

.....i....

a*

o e

9

.4.n 4

Bd4LP HZSTORY REPORT PLANT NAME: NASHINGTON NUCLEAR 2 ftESION: 5 ItPT ASSMT. PERI 6D DPS RADCON MAINT SURV EP FP BEC REFL GP LIC I

I I

I I

-l 1-1-1 1 - : --

>11/01 05/01/80 - 06/30/81 2

N 1

1 N

N N

N 2

N

_-g...

g.

l-------_r.g u

..g

.g.

===l....g...g....

312/02 07/01/81 - 07/31/92 2 2

N N

N N

N N

2 1

g.............

...g...g

..g g

..g...g.

===g

.g

.g....

)12/83 08/01/82 - 07/31/83 2 2

N N

2 N

2 N

N 2

g...

..g...g

...g

..g

.g

.===3 g.

.g

.g 05/85 08/01/83 - 01/31/85 2

2 2

1 2

2 2

N 2

2

..g

.................g

.g

...g

..g g

.g.

g

.g g...g....

O Construction ratings also assigned.

l l

S k

i J.

a-

.~

~

t 1

l t

CONSTRUCTZO'N

,sALP REPORT R ANT NAMES CEAVER VALLEY 2

\\

REGIONS 1 RPT ASSMT. PERIDD SF CONT PIP SRC SSYS ELEC INST DSN GA LIC - I-l-t-i-l-I-04/31 03/01/80-02/28/81 l-I-t -i-2 2

2 2

2 2

2 N 2 N

03/C2 09/01/80-08/31/82. g......

...t t

t...g.

g....l 3....g 3.g 1

2 2

N N 2

N N N N

05/84 12/01/82-03/31/94. g

.......s.. l

. t t.

g

. 3.... g... g..===.

N 1

3 1

1 3..-

2 3

N 2

M7..l....M....

.M..l lM..l...lM l m.l 06/s5 04/01/e4-03/31/95 N

1 2

1 1

2 2

2 2

2 M.. l.

. l M. l M l==.

s.

s..s

..s...s.

g.

.s

..s

..s...g..n...

O e

e e

b e

I E

)

P l

l 2.*

a 1

}

l l

y

CONSTRUCTION S AI._P REPORT PLANT NAME: HOPE CREEK 1 REGION: 1 ftPT ASSMT. PERIOD BF CONT PIP SRC 88YS ELEC INST D8N GA LIC l-

- g-g g_

g _ g _ _g-g g-g__

C1/81 11/01/79-10/31/80 2

2 3

2 N

2 N

N N

2 t......

.t==l....

.t...====3====l====g===g..g...

03/82 07/01/80-06/30/81 N

2

'1 1

1 1

N 1

2 N

...t===...........

.t..t....t

..t==.t....gn==.l===

g.

g..g...

11/82 09/01/81-08/31/82 1

2 1

2 2

N N

N N

N

.....t.................t..t====t===t.

t....t====g....g

.g==g...

08/83 09/01/82-07/31/83 1

2 2

1 2

N 2

N N

2

.....t.......

t l====t...g...

..t.

.t

..g...t==g===

04/85 08/01/83-10/31/84 N

1 2

1 1

2 2

N 1

2..

...t..=m.............t==3

..t

..t.

....t===.t....:===g==t==.

~

02,/86 11/01/84-10/31/85 N

N N

N N

2 2

N 1

2

..i.................i..t....:...i...i........i

..g...g..t...

44/86 11/01/84-10/31/85 N

1 N

N N

2 N

N 1-2

.=1.....===

...t t....t...t...t.

.g....g....

.g..g...

  • Plant.is in. preoperational testing phase.

Ratings also assigned under Operations sal.P.

e e

0 9

I 1

l y - - - _ - __

_,-,,y

,y-.

CONSTRLJCT I ON S A L_P REPORT PLANT NAME: LIMERICK 1/2 REGION: 1 RPT ASSMT. PERIOD GF CONT PIP SRC BSYS ELEC INST DBN GA LIC i

- - i.__ i i _ i___i

-i-o i

i __ i -

12/00 10/01/79-09/30/80 2 2

2 2

2 2

2 N

3 N

.t.--...

.....g..g 3...g..

3...

3....

..g

.g g...

08/C1 07/01/80-06/30/81 N

2 1

2 2 2

2 2

2 N

-:=============----:....--g......t====l

..t...

g

.g..g...

04/B3 01/01/82-12/31/82 1

1 1

N 2 2

2 2

N 2

..g===

==g....

g...t

..g

....t a.

01/C4 12/01/82-11/30/83' 1

1 1

1 1

1 2

2 N

1

.. g -- l....... g... g.... g

.. g

--.. 3 3

e' 1

CONSTRUCTION BALP REPORT PLANT NAME: MILLSTONE 3 REGIONS 1 RPT ASSMT. PERIOD SF CONT PIP SRC SSYS ELEC INST DSN GA L 04/81 03/01/50~02/28/91-_3 _g - t - g - 1 - g - l--g IC 2

2 2

2 N

2 N

N 3

N 10/81 07/01/00-06/30/81..i....

..i

i. - - i.

-.i....: -.

1 1

1 1 -- N 1'

1 3

2 N

.....t.................t..t....l

...c....g

. 3.

g

.t==3 10/82 09/01/01-08/31/82 1

1 1

2 1

1 1

N 2 1

...t.

..............t..l

..t..

3...g F1/93 09/01/82-08/31/83 N

1 1

2 1

1 N

N 1

2 3

.g..g.ps

..................g..t==..t...t

.g.

.g.

3 3...g g.

10/94OJ/01/83-08/31/84 N

1 2

1 1

1 1

1 N

2

...:...............:..:....:...:...i....:....:....:.

E l

l 1

e-

)

f, ';

l 6

l 1

s. e

-,-.,e

.--w- -....

. - -,, _ - _ _...,.,., ~...,..

--....-.--,-.~w.-

C'ONSTRUCTION SALP REPORT PLANT NAME: NINE MILE PT 2 REGION: 1 i

RPT ASSMT. PERIOD SF CONT PIP SR6 SSYS ELEC INST DSN GA LIC

--l-I-l 1 - 3 1-1 1 -l - l 04/81 02/01/80-01/31/01 2

2 2

2 2

2 2

N 2

N i

...t==--..........---==3

..t...g...g...

3---.t

..t...g.

3 12/C3 10/01/82-09/30/83 1

2 3

2 N

2 2

N 3

2

..t........

....--l..l t.--l...t...-:...-t....g..

3--g...

C3/B5 10/01/B3-01/31/B5 N

2 2

1 1

3 2

3 2

2

...t....----.--=====

t..l

..l..-l===t.-==t........g==.g..

65/C6 02/01/85-01/31/86 N

1 N

N N

N N

N 2

2

..t.......... --====3==l.

.l===3..

3--

l

-=3....t...g.

3...

r l

.Y i

1 o

~.

CONSTRLJCT I ON B A L_ P REPORT PLANT NAME: SEABROOK 1/2 REDIDN 1

RPT ASSMT. PERIOD BF CONT PIP BRC SSYS ELEC INST DSN GA LIC l-

'l-1 1-1 l --- l -- l -

-l-l 'C2/01 01/01/B0-12/31/80 2

3 1

2 2

2 2

N 1

N g..

.........--=g 3----t===t..

3--..g--..g..

-g==.g..t...

09/B1 07/01/B0-06/30/81 1

2 2

2 N

2 N

3 2

N t====-----.----..

t==t====l..=l

.g.--.g.---:---

g.--==t...

09/02 08/01/B1-07/31/82 1

2 3

2 1

2 1

N N

2

-t=====.-----..--.

3.-t====l...l...g.

.l.

....l...g..g..-

09/83 07/01/82-06/30/83 1

1' 3

2 1

2 1

N 2

2

..t........--......=l==

==.

3==.t. -t==......g--..g===l==

=

C2/B5 07/01/83-12/31/B4 N

1 2

2 1

3 2

N 1

2

......--.............i...

.........--i........i...i==i...

Oi/86 01/01/B'5-03/31/86 N

N N

N N

N N

N 1

1 l

l

=====g============.....

3=

g...t...t....

....t--.t.....g...

f k

O f

I i

9 1

1

  • ' - ~. ~ ~. ~.. ~.. *.. ~ ~ ~ ~. ~ ~. : :.~. ~.

- - ~.

i CONSBTRUCT Z ON S AL F*

REP

  • ORT PLCNT NAME: SUSQUEHANNA 1/2 REGION: 1 ftPT ASSPIT. PERIOD SF CONT PIP SRC SSYS ELEC INST DSN GA LIC

-l-I-I

-1

-l 1

-l-

--l - l I-l

~

w /81 01/01/30-12/31/91 4

N 2

2 N

3 3

N 3

N

==1=================I==l====1===I===I====i====1====I===I==1

    • 10/32 03/01/31-02/28/32 N

N N

N N

2 2

N 2

2

..g.................l......t

.t..

l....l....g....

...g==g...

    • 08/83 02/01/82-01/31/93 N

N 2

1 N

2 N

N N

N

...................:..i

..t...i...:.

.t.

.g

.....:..i

' N /04 02/01/03-01/31/84 N

1 1

1 N

1 1

N N

1 3.............--.-t.

l

..t...g...g

..l g....g...(

.g...

~

  • Combined Operation ratings also assigned.
    • Ratings are for Unit 2 only. For 4/84 report Operation ratings also assigned.

e 9

0 e

0 1

CONSTRUCTZON BAL P REPORT PLANT NAMES BELLEFDNTE 1/2 RESIDN 2

RPT ASSMT. PERIOD SF* CONT PIP SRC SSYS ELEC INST DSN GA LIC

-- g_.

g_l g_:

l-l l

- :- t-g 10/90 04/01/79-08/31/80 2

2 2

2 2

2 2

N 2 N

==g..

t===l

.:====3====g.

.le==l==

=

12/92 07/01/81-12/31/82* N 2

3 2 44 2

2 N

2 2

...g.......

g

..g...g..

3.p.

. 3

.t

.t 06/84 01/01/83-02/29/04 N

2 2

2 2

2 1

N 2

N

.g l..g

.l

.g...l

.g

..'(.

.I===g 3

Cf/s5 03/01/84-05/31/85 N

2 1

N 2

2 2

N 2 /N g.

..t==1.

.t

...t

.l l

...g==l e e 9

8 i

O 1

O 1(-V.e W *.

g.

+

ge

. a :. ' *..

i l

1 i

)

....--.y--------------------------------------_-----

i l

l l

t

CONSTRUCTZON SALP REPORT PLANT NAME: CATAWBA 2 REGION: 2 RPT ASSMT. PERIOD BF CONT PIP SRC SSYS ELEC INST DSN GA LIC I

l-1 I

1

- l --

1 I

I l '

C3/81 09/01/70-02/28/81, 2 2

2 2

N 2

2 N

3 N

..l......

l.t l

..l...g....g....g....l...l g

12/02 09/01/80-05/30/92 N

1 2

2 N

2 N

N N

2

.g...........

....t==1

.t...l.

3.

.g

..t====l==.t==l 10/83 06/01/82-04/30/93 N

2 1

N N

2..,

2 N

1 2

...t..........

==t

..l

.===l

.t

.g.

.g 3

g 07/84 05/01/83-02/29/84 N

2 2

N 2 2

2 N

1 2

i

.i...i....: _.i.

.i O

e O

e 9

h 0

I 9

Y.

.e O.

1 i

e e.

-+--w w

w-

--..-w.v-w,.._

wr

.ww.-

1-... - - - - - - - -, - - - - - - - - - - -,, - -, - - - - -

CONSTRUCT 1DN EiB AL_P' REP

  • ORT

's 4T NAME: GRAND GULF 2 ION: 2 SF CONT PIP SRC 55YS ELEC INST DSN GA LIC T

ASSMT. PERIOD l - I ---- l - I - t -- l - I - t - t - i -

i

-t-C1 09/01/79-09/30/B0 2

2 2

2 2

2 2

N 2

N t

1==I====1===I===l====1====1====I===1==I===

==

==t===============/91 31 07/01/50-06/30 N

N 2

2 N

1 1

N 2

N t.................t

.t....

.t===l== -I....t....t...t==t...

32 07/01/B0-06/30/81 N

N 2

2 N 1

1 2

2 N

- t = = = = = = = = === = = = = = = I = = I== = = 1=== 1=== 1=== = 1 = = = = l = === 1

'83 07/01/81-08/30/82 N

N 2

N 2 2

2 N

2 2

t

...............t==t....t===l===3==.

3....t

...t...t..g...

'C0 C9/01/82-09/30/83 N,, N N

N N

N N

N N

N m-=1........=.......t..g......

3.......g....g....g...g..g...

~

S S e

r t

o P

l e

I l

1

_y,.-.._--

CONSTRUCTZON BAL.P REPDFtT M.CNT NAME: MCSUIRE 2 RESIDN: 2 RPT AESMT. PERIOD SF CONT PIP SRC SSYS ELEC INST DSN GA LIC I

l-1 1 1 I

I I

l-I-10/50 05/01/79-04/30/30- 2 2

2 2

2 2

2 N 2 N

.g.

g==g.

.g g...gsi...g...

g g...

',12/52 09/01/80-05/30/92 N

N 1

N 2 1

1 N N 2

.==l

..............g..g

.g g.

g.

g

..g....g

.g g

l e

go e

0 i

t e

O f

1

CONEBTRUCT Z ON B A L_P REPORT PLC.NT NAMES SEQUOYAH 2 REGION: 2 MPT ASSMT. PERIOD SF CONT PIP SRC SSYS ELEC INST DSN GA LIC 1--

I-l I-l -- I

-1 l-l 1 01/31 08/01/79-03/29/80

.2 2

2 2

2 2

2 2

2 N

==I=================I==I====I===I===1====I====1====I===I==I

21/82 07/01/80-06/30/81 N

2 2

2 2

2 N

N 2

N

..:=================t======g===1===t====3====t====l===l==g===

e e

e o

e e

s E

O e

e 9

e O

0 1

SALP REPORT CONSTRUCTION in PLC,NT NAME: SHEARON HARRIS 1 REGION: 2 SF CONT PIP SRC SSYS ELEC INST DSN GA LIC RPT ASSMT. PERIOD

- g -t-g- t-l-t-i-t-i

- l __

  • 2 2

2 2

N 2

2 N

N N

- 10/80 04/01/79-08/31/B0 0..

..i

..i

.:-i...

p i.

.i...i 2

2 2

2, 2 2

N 2

2 N

65/82 07/01/80-12/31/81 t

t t.

t..

..l t...t l....t====t N

1 2

2 1

2*

N N

2 3

65/83 01/01/82-01/31/83 s"

[

l

.[....j...{

{===

e.

[.......

.j l

l

.l.

1 1

2 2

1 2

N N

2 2

CS/84 02/01/83-04/30/94 g

t =t t.....

.==t===.t...t...t====l....

=== = ~

2 5

1 1

1 2'2 3

2 N

2 01/86 05/01/94-10/31/.8 t

l..

.g..

E.

.........g..g

...t...t==..g

..t==..g

.==.

E 1

9 l

0" e

.l 1

i e....

k


,7_-,-

_,__,..n..

_y.__

CONSTRUCTION S A L_P REPORT PLANT NAME: ST. LUCIE 2 REGION 2 2 RPT ASSMT. PERIOD SF CONT PIP SRC SSYS ELEC INST DEN GA LIC i__ _ i___

i ___ -

i _ i__:

- =--

01/B1 09/01/79-08/31/80

.N 2

2 2

2 2

2 2

2 N

m...l....mm..mm.m....

l..l m.mt...g...l...

g....l....g...l..l.

01/S3 09/01/80-06/30/82 N

N 2

2 2

2 2

N N

2 l...m........m......g====l...:...

....g....g...g..g...

e e

6 e

9 e

p l

l l

l

..-,nn---

i CONSTMLJCT 2 QN SAL.P REP

  • ORT

~-

PLANT NAME: BUMMER RESIDN 2

RPT ASSMT. PERIOD SF CONT PIP SRC 38YS ELEC INST DSN GA LIC I

l-l I-1 I

I

- l I

l-I-o 01/s1 09/01/79-08/31/80, 2 2

2 2

2 2

2

. N 2 N

.l...

t..l...

3...g...g

.g...

3.

....g..g o 11/82 09/01/80-03/31/82 N

N 2

N 1

1 1

N 1

N

~

g g

.g g

  • 0perations ratings also assigned these assessment periods.

y' e

Q e

l D

E r

O e

9 8

e 6

P e

9-a e

6 1

--w--=---

e --- ww c w e nwe---

=

wa-e--=-ee -sewe---

e-- - - -

e--me'-ev+---

-ww--=-----

w--.-ee-n-e-=i-----

vwm

---e--

i CONSTRUCTION SALP REPORT PLCNT NAME: VOGTLE 1/2 RESIDNs 2 RPT ASSMT. PERIOD SF CONT PIP SRC 58YS ELEC INST DSN GA LIC

- - l - --

f. - l 1-1 l-1 I

l-1-1 09/e1 07/01/80-06/30/81 N

2 2

2 N

N N

N N

N t..====l...t...l=ww.t.

t....

1 g

10/82 07/01/01-10/31/82 2'

1 2

2 N

N N

N 2

1

...............i i..i...i...i.'...i i

.i i

C5/54 11/01/82-10/31/83 2 2

2 1

N 2,,. N N

1 2

' t l

[... t... t.

. t

. g 3

g.4,.#

11/95 11/01/83-06/30/85 1

2 2

1 2

2 N

N 1

2 as

.g..

.............t..l....l......l.

.l

... 3

.l..g...

O k

O S

i l

e e

e 6

e e

I

,e.

.,e a

e e

1 e

ee a 4

.-....-r-

l CONSTRUCTION BALP REPORT PLANT NAME: WATTS BAR 1/2 1

REGION: 2 l

RPT ABSMT. PERIOD SP" CONT PIP SRC SSYS ELEC INST DSN GA LIC 1-I-l i

I I

- l l-I l-1 09/80 04/01/79-08/31/80 N

N-N N

N N

N N

N N

. 3.

.t==l

.g...g...

3

..t....t...g..

10/81 07/01/80-G /30/81 N

2 3

3 2

2 2

2 N

N

.....g.........

......t..

...t...:====l

..t====l...g==l 04/53 07/01/81-12/31/82 N

N 2

2 2

2 2

N 3

2

~

...:..: - i...:...

..i.i:.

.i...

i.p.'

006/84 01/01/03-02/29/84 1

2 2

N N

2 N

N 2

2 l

.....g.................t..g.

t...t...t

..g

.l...==l...

C003/84 01/01/83-02/29/84 1

2 2

N. N 2

N.

N 2

3

.......t..t

..l...

t.

.l

..t..

l...t

.==.

003/05 03/01/84-12/31/84 N

N N

N N

N.

N N

2 3

.....g.................l==t....t...t...... 3

. 3

... 3..t

    • 03/85 03/01/64-05/31/85 N

N 2

N N

2 N

N 2

3 1

m....l....

..l..l....l...l...l

..l

..l....l...l l

O Ratings are for Unit 1 only.

Construction Activities given an overall

'2' for the 3/35 report. Refer to 50-390/85-05 report.

co natings are for Unit 2 only.

e

  • .P0*

3 0

e, 1

e 4

,,m__-,_-,.___

.,,m--

9 s

CONSTRUCTION B A L_P R EP O RT*

PLANT NAME: BRAIDW'OOD 1/2

-~' '

~

~ ~ " ~ ~ ~ ~

'~^

~

~

~

REGION: 3-RPT A8SMT. PERIOD SF CONT PIP SRC SSYS ELEC INST DSN GA LIC e

-1 1 l

l l-1-1-1 1-1 06/B0 07/01/79-06/30/80

.,.N N

N N

N N

N N

N N

3..............

=t..

.g..

3.

====l 3..t===

@4/82 07/01/90-12/31/81 N

2 2

2 2

2 2

N N

2

.i...i...i....i

..i.......:

i 85/83 01/01/82-12/31/82 N

2 2

3 2'

2 N

N 3 1

.g.................

t

..g...g...g.

.l

..g....l...t..

11/94 01/01/83-06/30/84 N

2 3

3 2

2 2

N 3

2 l..

===t

..t..

3....g..

3 02/86 07/01/84-11/30/85 N

2 2

2 2

2 2

N 2

2

..... t...

.. g.. t = =..

. t... g.... g.

3.

. :... l.. g.. ~

  • g.

I

~

-6 l

E i

e 0

e*

e O

g me I

i i

1 l

1 i

---.--.--,r--

,-m,m.-

r-.m.. _ - -, _.,. - - -..

e CONSTRUCTZON BA L_P REPORT PLANT NAMES BYRON 1/2 REGION: 3 RPT ASSMT. PERIOD SF CONT PIP SRC SSYS ELEC INST DSN GA LIC

-- - - = l ----------- l 1 - l -

l-1 I

l-l C2/82 07/01/B0-12/31/01 N

1 2

2 N

3 2

N 2

2

.g.....

......t..l...

3===l.

g.

.g.

.t...

3

=4m.3 C6/83 01/01/82-12/31/82 N'

2 2

3 3

3 N

N 3

1

.i.................i. 1.

.i

.i

.i.

i.......:

o 07/84 01/01/03-04/30/84

,N 2

2 2

2 2

,2 N 2 2

'..t.............

..t l...

3...t.

l...

3...~g.

...g g

o 01/86 05/01/04-10/31/05 N

2 2

2 N

2 2

N 2 2

...........i.............

  • Unit I also rated under. Operations these assessment periods.

e o

i I

.e i

e e

o O

9 t'..**

, y*

a e

1 e 4 w,.rw-----

,--,y,,, -

nr------,r----

CONSTRUCTION SAL P REPORT PLANT NAME: CALLAWAY 1 REGION: 3 1

RPT ASSMT. PERIOD SF CONT PIP SRC BSYS ELEC INST DEN GA LIC

-- -l - g 3.__ g._ g _ g.

- g - - g-07/82 07/01/80-09/30/81. 2 2

2 2

N 3

N N

N 1

.....g.................t.

3....g...l...g.

3....g....g...

==3...

63/03 10/01/81-09/30/82 N

2 2

1 N

2 2

N 1

1

........i !.......i.......

i...

0 04/84 10/01/82-11/30/83 N

1 2

1 1

2,. 1 N

2 1

.. l................. t.. t.... l... t... t.... t.... g....== = 3.. t eir

  • Ratings also assigned under Operations these assessment periods.

O e

9 r,g l

l e

l I

y e,.

}

4 e

--,,,_-n-.

,. - - _. ~.,,,.,,,. _.,.,,,,

i CONSTRUCTZON D A L.P*

REF* ORT PLANT NAME: CLINTON 1 REGIONS 3 RPT ASSMT. PERIOD SF. CONT PIP SRC SBYS ELEC INST DEN GA LIC I

l-1 1

I l-1 I

I l 10/s0 07/01/79-06/30/50 N

N N

N N

N N

N N

N

...g

.........o..

==l

..l...t...i.'...g====l....t

.l==l C4/32 07/01/80-09/30/81 2

2 3

2 2

N

,2 N

3 2

J i...........----.i..l

..i..i 1

. l n.t.

is l

i. d '

01/33 10/01/81-09/30/82, 2 2

2 2

N 14 2

N 3

2

..i.

.....l..l==..is.

3 3.

l 3....t...g i

07/84 10/01/82-02/29/84. N 2

2 2-2 2

2 N

2 2

.i.................r..i....i...

.i..

i....

.i..

11/85 03/01/84-08/31/B5 2

1 1

2 2

2 2

N 2 1

i..............

.i......i...i..i....i

..i....

.i E

O e

G 4

G8 e

e

  • e Y

.Y a

0

. +

  • CONSTRUCTION WALP REPORT PLANT NAME: FERMI 2 REGION: 3 f

RPT ASSMT. PERIOD SF" CONT PIP SRC SSYS ELEC INST DSN GA LIC i

i-o i

i i

i-i i-i- r-07/83 10/01/81-09/30/02 N

2 2

2 2

3 N

N 2 1

i

...t.....

t..g t.

g g....

.t..

g g..g j

C2/84 10/01/82-09/30/83 N

2 2

2 _N N

N N

3 2

l

.g g

t g...g.

t.

.g

..g.

.t

==3 12/84 10/01/83-09/30/84 N

N 2

N-N 3

3 N

2 2

...t.....

g g

g.

t.

g..

g t

g g

t

  • 09/85 10/01/04-06/30/85 N

N 2

N N

2 2

N 2,,2'

.t t==g 3.

g.

g g

g g

g 3

/

  • Ratings also assigned under Operations D

f r

.: a

.y.

y..

.:.. :& :l s;

.4 :, r. -

. 9 9s f,

1 7---

~wge--.-

ww

+-

m-w u

-v v

,w-w.-m--

c>........

CONSTRUCTZON SALP RENORT

Pt. ANT NAME: LASALLE 1/2

' #tESION: 3 ftPT ASSMT. PERIOD SF CONT PIP SRC 3845 ELEC INST DSN GA LIC

-I l-1 1 I I

l-1 10/80 07/01/79-06/30/50 2

2 2

2 2 2

2 N 2 N

g.

I==l t

t g..

l

.t g

t g

>11/.82 07/01/80-12/31/31 N

2 2

2 N

2

.*'2 2 2 2


z!=================1==I====1===I===I====1====I====1.==1==!===

f07/23 01/01/82-12/31/82

.N N

2 N

N N

N N

N 2

~

l

.i

.l

'05/54 01/01/3'3-04/30/84 N

2 2

N N

2 N

N 2 2

. t=================I==i====I===I - I====1====I====i===i==i===

, o Results are for Units 1 and 2 combined. Unit I also rated under Operations.

    • Results are for Unit 2 only.

e l

l I

Im O

.e

.e 0

e-o-u tra59u=nr e_s carra ev--- tra_5m o

a PLCNT NAMES PERRY 1/2 REGION: 3 RPT ASSMT. PERIOD SF CONT P2P SRC SSYS ELEC INST DSN GA LIC

= = g --

- l l-l I l-1-:-

07/80 07/01/79-06/30/B0 N

N N

N N

N N

N N

N g.........

..Ioui

...g..

3...g 3....t...

3 03/82 07/01/80-09/30/81 N

2 2

2 2

3 2

1 N

1

.....g========

l..g...

3...g.

Y.

g....l....t 3.

3...

01/53 10/01/31-09/30/82 N

1 2

2 2 N

N 2

N 1

.....g.................g==g....g...t..

3.

.g

..g 3

3..g...

03/84 10/01/82-12/30/53 N

1 2

2 2 2-2 N 2 2

p*'

e

..... g............

. l g....... g.

g.

3

.. l..

l

. g..,g 09/85 01/01/W4-06/30/85 N

1 2

1 2

2 1

N 2 2

==...g...................g...

3

.g

.g

..g....g

.g g..g...

e e

e e

e O

f, e

e e

9 e

  1. 9 t

1 e

e I

WONSTRUCTZDN BAL P REPORT N4MCs COM%NCHE pgAg g,g gg g y 4

RPT ASSMT. PERIOD SF CONT PIP SRC 10/80 08/01/79-07/31/80_ l-t-g_l--gSEYS ELEC INST DSN GA LIC

=-

3 3-t_l N

N N

N N

N N

N N

N

.................t.....

1......:....t.......

g..

g..g...

09/S: 10/01/81-09/30/C2 N

2 2

.1 N

1 1

N N

1 46/S4 10/01/82-10/31/83..... t................. g. g... t... g... g....t.... t....g..

N 2

2 '2 3

2 1

2 2

2

...:.................:..i....:...t...i...

1..'..i....:... :..p..

/

e E

e S

e =

5 O

9 9

= f f

4 e

p

'e 9

I 9

e +*

.N 1

g e

]-

4 CONSTRUCT 2DN SALP REPORT PLANT NAME: RIVER BEND REGION: 4 RPT ASSMT. PERIOD SF CONT PIP SRC BSYS ELEC INST DSN GA LIC

==l=-

I - t-I-

I l-1-1 1-1 09/80 09/01/79-06/31/80 N

N N

N N

N N

N N

N

.t.................t t

t===l t....t

..g.

.t t==I...

10/81 07/01/80-06/30/81 1

2 2

N N

2 N

N N

1

.....t................".g..t

..t...t.......:==.t..

l

.g..l...

10/52 09/01/31-08/31/82 N

2 2

2 N

2 N

2 N

2 t.

..............t==1

..t...

3...

3

.g...g 09/53 09/01/82-07/31/83 N

2 2

2 2

.2 2

1 2 -)

..........t==l t

.t.

l l

..g....g

. =,=l...

0 02/B5 08/01/83-12/31/84 N

1 2

2 2

2 2

2 2

2

..........i..i

..i......i

  • 0peration, ratings also assigned.

6

\\

r l

l t

.?

1

j CONSTRUCT 2DN B A L.P REPOR r-a, PLANT NAME: S.TEXAB PROJ. 1/2 REGION: 4 RPT ASSMT. PERIOD e

SF CONT PIP SRC SSYS ELEC INST DSN GA LIC

_g----

06/92 07/01/80-06/30/81--_g- _ _g - g _g _.g.__g l_.: _

N 2

N N

2 N

N N

3 1

...............................g...g....g....g....g...g.,g.,,.

06/84 12/01/82-11/ Cr/33 3

2 1

2 N

  • 1 N

2 2

1

.... 3................. g.. g

.. t... g... g.... g.... g.... g... g. g....

09/85 12/01/B3-06/30/85 2

2 2 '2 2

2 2

1 2

2 3.

..............g..g....g.. 3...g....g 4"..g....g...g.,)g,,

e

/

e.

O e

e D

g s

ff 0

I e

i F

Y,.

' J.

..W'..

w 1

e 4

E

g s.

CONEiBTRUC"F" 2 DN EiB AL P REPORT LANT NAME: WATERFORD 3 3BIDNa 4 RPT CSSMT. FERIOD SF CONT PIP SRC SSYS ELEC INST DSN GA LIC l-l 1 t I

-l-1 -

B/80 CS/01/79-07/31/50 1

1 2

2 N

2 2

N 2

N

.................==....:.

i.......:....:

P/82 07/01/80-06/30/81 N

1 2

2 N

2 2

N N

3 S/52 07/01/51-06/30/82 N.

2 3

3 N

2 3

N N

2

- i.................:..:....:...:...:....:....:....:...:..:...

B/54 07/01/82-06/30/83 N

N N

N N

N N

2 2

2

.:.................i......:...i...g....:

e O

O f

e e

G G

r.

e 0

e 6

1

r 4

s.

CONSTRUCTION SALP, REPORT PLANT NAME: WOLFCREEK,

REGION: 4 RPT ASSMT. PERIOD OF CONT PIP SRC SSYS ELEC INST DSN GA LIC i

i-i i-i-i -

i i

i-i-i-11/80 08/01/79-07/31/80 1

1 2

2 N

2 2

N N N

rg n.....

l..g

====l t

3 g

04/82 07/01/80-06/30/81 N

1 2

2 ~2 2.

N N

N 1

___=rri t

l l

l.

(

l

.g l

g 2

N 1

1 l

11/82 08/01/01-07/31/82 N 1

3 2

2 2. -

.m. t.---.

r re t l

l t

l 3

g l

12/83 08/01/82-07/31/83 N N

3 3

2 1

N N 2'2

.. l.

1tlltttl 0 02/05 08/01/83-09/30/84 N

N 2

2 1

2 1.

N 2 1

2-rrg.

l l

t.

coperationhratingsalsoassigned.

e CD S

0 E

e 9

l

.Y

.e

,.... c...,..

$y?*f.'.';

.;g l-

. ~,

C **

1

. =.. :... :.;

... - - - - - - - - ~ ~ ~ ~ - - - - -..... - - - _...

y o'

+-

CONESTRLJCT Z ON WAL P REPORT PLCNT NAME: DIABLO CANYON 1/2 REGION: 5 RPT ASSMT. PERIOD SF CONT PIP BRC S8YS ELEC INST DSN GA LIC g-g g _ g _ g-

- g-g

- :- g- -

003/B3 07/01/81-12/31/82.N 1

2 1

1 2

2 2

2 N

g.................==l 3...g 3.

3....g...

3....:==g...

  • 0perations ratings also assigrted.

,Y

~

e e

e w

G e

A i.

e

/

e-

?

r' e

r O

1 e

e

CONSTRUCTZON S A L.P REPORT PLANT NAME: PALO VERDE 1/2/3 REGION: 5 RPT ASSMT. PERIOD 8F CONT PIP 8RC 88Y8 ELEC INST D8N GA LIC t-- 1 1-1 I l-l

- l 65/80 05/01/79-05/30/80 N

N-N N

N N

N N

N N

...g.................I..l

...g...g.

===.g 4..

09/81 06/01/80-06/30/81 N

N N

N N

N N

N N

N

.....:.................i. 1....i i...i.'...i

.i....:...i i

006/83 07/01/81-02/25/83

,1 2

2 1

2 2

2 N

N 1

.. l.. ;..

g l.

l.... l.... g.

. g... =. g. ' '

006/84 03/01/83-03/31/84 1

2 2

2 3

2 1

N N

2

.....t.................[..g....l...t...g.

.....g....g...l..

  • 12/85 04/01/84-09/30/85 N

2 2

2'2 2

1 N N 2

.t.................t......t...t...t....t........t g==t...

  • Also rated uhder Operations.

e e

o i.

I P

l t

e e

1

^% *

~

CONSTRUCTZON SALP REPORT PLANT NAME: SAN ONOFRE 2/3 ftEGION: 5 ptPT ASSMT. PERIOD SF CONT PIP SRC 35YS ELEC INST DSN GA LIC l-l I

t-1

-1 I

l-- l 1--

09/80 06/01/79-06/30/80

'1 1

3 2

2 2

2 N 2 N

.i..

.. - 3..:

D09/91 06/01/80-06/30/81 k

N 2

2 'N 2

1 N

1 N

1 S.

..t i

..t...t...l.

.l g

3===3 g

i 2/82 07/01/81-06/30/82 N

1 2

1 1

2.. 2 2 2 N

(

l s

-- rr zr_z_.

i t

g.

.g

.i

  • 0peratioiratings also assigned.

e e

e e

D q

e e

d e

e F

y

., e.-

e O

1

i CONSTRUCTZDN ESAL P REPORT ANT NAME: WASHINGTON NUCLEAR 2

SIDN: 5 tPT CSSMT. PERIOD SF CONT PIP SRC SSYS ELEC INST DSN GA LIC --

- :- t - : - t - - t -- g -- g - - t -

/81 05/01/80-06/30/81 N

2 3

2 2

2 2

3 2

N i

.t............

..t....t

.t...t....t....t====1...t==t...

!/52 07/01/81-07/31/B2 2

2 2

2 2 3

2 2

2 1

..t.................t..t....t...t...t....t.

.t.

.t t..t

'/C3 CB/01/82-07/31/83 N

2 2

N N 2

2 N

2 2

== t ===== = = = = = === === = 1 = = I== = = 1 = = = 1 = = = I== = = 1=== = 1 = === !=== 1== I==

e e

e O

e e

O-9 i

e 9

e e

e I

e o

f l

4

.