ML20204G541
| ML20204G541 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 10/13/1988 |
| From: | Mihalcik J BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NEU-88-308, NUDOCS 8810240146 | |
| Download: ML20204G541 (2) | |
Text
_ _ _ _ _ _ - _ _
BALTIMORE OAS AND ELECTRIC L
CHARLES CENTER P.O. BOX 1475 BALTIMORE. MARYLAND 21203 NUCLEAR ENGINEERING SERVICES DEPARTMENT cALvtat cons NucttAn Powtm Ptawi LUsSY, WAmVLANO 904$7
[
October 13, 1988 NEU 88 308 i
U. S. Nucleat Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk i
SUBJ ECT:
Calvert Cliffs Nucler.r Power Plant Unit No. 1; Docket No. 50 317 Correction to Reoort of Ctartun Testine for Unit 1 Cvele 10 L
REFERENCES:
(a)
Letter, J. A. Tierna7 (BC6E) to Document Control Desk l
(NRC), dated Septerloer 9, 1988, "Calvert Cliffs Nuclear l
2 Power Plant Unit
.a.
1 Docket No. 50 317, Report of Startup Testing for Unit 1 Cycle 10" i
t i
j Centlemen:
l i
Reference (a) contains a data reversal and a typographical error in Table 1 l
l Critical Boron Heasurements. The predicted and measured values for CEA Croups 1 l
through 5 Inserted Zero Power, are reversed. Also the predicted value for Full Power should have been reported as 1302, not 1303. All analytical work and j
review / acceptance criteria were performed using the correct values. Attached is the corrected page.
l Very truly yours, O
G L.
p J.'A.'Mihaleik Principal Engineer-Nuclear Engireering 2
9 JAM / Int
(
i l
Attachment r
cc:
D. A. Brune, Esquire p
[
J. E. Silberg, Esquire
(
- (.A*
g, R. A. Capra, NRC
%4 4td (/[d I
l S. A. McNeil, NRC V. T. Russell, NRC i
i D. C. Trimble/V. L. Pritchett, NRC M
t T. Magette, DNR r
J 8810240146 881013 i
i PDR ADOCK 05000317 f
P PDC i
_- ~ __._,.._ _.__._.. _.,.-_.. _...,.. _.,._. _ -
F" "o J 1ABLE 1 iv, CRITICAL BORON MEASUREIGNTS Review Measured Predicted Criteria Zero Power All Rods out, 532 F' 1750 ppm 1780 ppm 150 ppm r
Zero Power CEA Groups 1 through 5 Inserted, 532 F 1411 ppm 1403. ppm 150 ppm l
t i
Full Power CIA Croup 5 105" Withdrawn 1303 ppm 1302 ppm 150 ppm l
l TABLE 2 f
ISOTHERMAL TEMPFRATURE COEFFICIENTS AND POWER COEFFICIENTS IIG Review Measured Predicted Criteria i
Zero. Power, CEA Croup 40.265x10 4 40.222x10~4 10.3x10 4 5 at 100.5 Withdrawn delta rho / F delta rho / F delta rho / F
@ 1750 ppm Full Power, CEA Croup 0.446x10 4 0.402x10'0 10.3x10'4 I
5 at 105" Withdrawn delta rho /*F delta rho / F delta rho / F
@ 1303 ppm POWER COEFFICIENT t
100% Power. CEA Croup 0.904x10'4 0.88x10*4 10.3x10 4 5 at 105" Withdrawn delta rho / F delta rho / F delta rho /*F i
f l
t i
f
[
I