DETROIT EDISON COMPANY WOLVERINE POWER SUPPLY COOPERATIVE, INCORPORATED DOCKET NO. 50-341 l
FERMI-2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 3 License No. NPF-43 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Detroit Edison Company (the licensee), dated October 9,1985, as supplemented on November 13, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Consnission; C.
There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical tio the coninon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Corsnission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the enclosure to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-43 is hereby amended to read as follows:
(2) TeEhMcal Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through-Amendment No. 3, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. Deco shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
8600070290 860731 PDR ADOCK 05000341 P
. 1 3.
This amendment is effective as date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Elinor G. Adensam, Director BWR Project Directorate No. 3 Division of BWR Licensing
Enclosure:
Changes to the Technical Specifications Date of Issuance:
July 30,1986 O
f -
6
,. ~ -
ENCLOSURE TO LICEriSE AMENDMENT NO. 3 FACILITY OPERATING LICENSE NO. NPF-43 DOCKET NO. 50-341 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain a vertical line indicating the area of change. The corresponding over-leaf page is also provided to *sintain document completeness.
REMOVE INSERT 3/4 10-5 3/4 10-5 3/4 10-6 3/4 10-6 (overleaf)
O tm t
o
SPECIAL TEST EXCEPTIONE 3/4.10.5 OXYGEN CONCENTR,TTION LIMITING CONDITION FOR OPERATION 3.10.5 The provisions of Specification 3.6.6.2 and the OPERABILITY requirements of the Drywell Oxygen Concentration instrument of Specification 3.3.7.5 may be suspended during the performance of the Startup Test Program until either the required 100% of RATED THERMAL POWER trip tests have been completed or the reactor has operated for 120 Effective Full Power Days.
APPLICABILITY: OPERATIONAL CONDITIONS I and 2.
ACTION With the requirements of the above specification not satisfied, be in at least STARTUP within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.10.5 The Effective Full Power Days of Operation shall be verified to be less than 120, by calculation, at least once per 7 days during the Startup Test Program.
FERMI - UNIT 2 3/4 10-5 Amendment No. 3 I
i o
SPECIAL TEST EXCEPTIONS i
3/4.10.6 TRAINING STARTUPS LIMITING CONDITION FOR OPERATION 3.10.6 The provisions of Specification 3.5.1 may be suspended to permit one RHR subsystem to be aligned in the shutdown cooling mode during training startups provided that the reactor vessel is not pressurized, THERMAL POWER is less than or equal to 1% of RATED THERMAL POWER and reactor coolant temperature is less than 200'F.
APPLICABILITY: OPERATIONAL CONDITION 2, during training startups.
ACTION:
With the requirements of the above specification not satisfied, immediately place the reactor mode switch in the Shutdown position.
SURVEILLANCE REQUIREMENTS 4.10.6 The reactor vessel shall be verified to be unpressurized and the THERMAL POWER and reactor coolant temperature shall be verified to be within thc limits at least once per hour during training startups.
i O
e.-
i I
4 l
FERMI - UNIT 2 3/4 10-6 l
4 l