Informs of Mod to Unit 1 Emergency Preparedness Plan to Include Unit 2.Units Will Have One Emergency Plan & Separate Sets of Implementing Procedures
ML20204G320
Person / Time
Site: Beaver Valley
Issue date: 04/28/1983
From: Woolever E
DUQUESNE LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
2NRC-3-021, 2NRC-3-21, NUDOCS 8305020426
Download: ML20204G320 (4)


Text

.

7 2NRC-3-02I (412)787 - 5141 (412)923 -1960 Telecopy (412) 787-2629 April 28,1983 Nuclear Construction Division Robinson Plaza, Building 2, Suite 210 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission i

Washington, DC 20555 ATTENTION:

Mr. Harold R. Denton Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Emergency Preparedness Plan Gentlemen:

Beaver Valley Power Station Unit No. 1 (BVPS-1) is an operating Unit and as such has a Nuclear Regulatory Commission (NRC) approved Emergency Preparedness Plan (EPP). Duquesne Light Company (DLC) intends to modify BVPS-1 EPP to include Beaver Valley Power Station Unit No.

2 (BVPS-2).

BVPS-1 and BVPS-2 will then have one EPP with separate sets of implementing procedures.

This plan consists of two (2) volumes:

the Plan which is Volume I and the Implementing Procedures which comprise Volume II.

Volume I of the EPP contains:

Section 1 - Definitions Section 2 - Scope & Applicability Section 3 - Summary of the Emergency Preparedness Plan Section 4 - Emergency Conditions Section 5 - Emergency Organization Section 6 - Euergency Measure J

Section 7 - Emergency Facilities & Equipment J

Section 8 - Maintaining Emergency Preparedness Section 9 - Reentry and Recovery Section 10 - Appendices Volume II, Implementing Procedures, contains the following instruction and procedure series:

Instructions l

EPP/I 1.

Recognition and Classification of Emergency Conditions O

kE@PoMS PDR

?

United States Nuclear Regulatory Commission Mr. Harold R. Denton page 2 2.

Unusual Event 3.

Alert 4.

' Site Area Emergency 5.

General Emergency Implementing Procedures 4

i EPP/IP 1 Series - Activation 2 Series - Assessment 3 Series - Onsite Protective Actions 4 Series - Offsite Protective Actions 5 Series - Aid to Personnel 6 Series - Reentry / Recovery 7 Series - Maintaining Emergency Preparedness 8 Series - Fire Fighting 9 Series - Corporate Response Annexes The Implementing Procedures for BVPS-2 are in the planning stage and are not due until approximately May of 1985.

DLC has ident ified the L

necessary modifications to the Plan (Vol. 1) in order to make it applicable to both Units. The following is a summary according to section.

SECTION 4 1.

Table 4.1, " Action Level Criteria for Classification of Emer-gency Conditions," would need revision for possible tech.

spec. changes for BVPS-2 and possible deletion of Accident at SAPS under initiating condition.

t-2.

Section 4.2,

" Spectrum of Postulated Accidents," would need revision due to the major differences between BVPS-1 and BVPS-2 l

FSAR assumptions and parameters, f

3.

Table 4.2,

" Radiation Doses Resulting from Postulated Acci-l dents," would need revision due to Item 2 above.

[

SECTION 5 1.

Figure 5.2,

" Nuclear Division Organization,"

would need L

revtston.

l 2.

Figure 5.6,

" Emergency Organization Interfaces," would need revision.

l l

l I

r United States Nuclear Regulatory Commission Mr. Harold R. Denton page 3 3.

The Emergency Organization should specify which personnel are from BVPS-1, BVPS-2, or both.

SECTION 6 a.

1.

Section 6.7.1, "Onsite Protective Actions," would need revision to specify BVPS-1 or BVPS-2 and to allow for possible modifica-tions in the protected area fence.

2.

Table 6.2, " Notification Matrix," should be revised to delete BVPS-2 Construction.

SECTION 7 1.

Section 7.4.3.2, " Seismic Equipment," would need revision due to possible changes in locating the instruments in BVPS-2.

2.

Sections 7.5.2.1, 7.5.2.2, and 7.5.2.3,

" Station Assemb ly Areas," would need revision.

These sections address the Primary Assembly Area for BVPS-1, BVPS-1 Trailer Complex, and BVPS-2 Jobsite which should be changed or be deleted.

3.

Descriptions of communication systems need to be revised.

SECTION 8 1.

Table 8.1,

" Initial Training and Periodic Retraining," for contractor / construction personnel needs revision.

SECTION 10 1.

Appendix D, Enclosures 8, 9, and 10, " Process Ef fluent Radia-tion Monitoring System," would need to be revised.

BVPS-2 may l

have different channels of releases, different instruments to monitor the releases, and dif ferent monitor numbers than BVPS-1.

t The following modifications pertain to items that do not fall into l

any specific section in the Plan.

l 1.

All DLC/BVPS-2 "Jobsite" and " Construction" terms would be removed from the final BVPS Plan.

l 2.

Operating and/or Implementing Procedures referenced in the Plan

(

should specify BVPS-1 or BVPS-2 procedures, l.

3.

Specific chapters or sections from referenced materials (oper-ating manuals, appendices, etc.) should be correlated with the l

appropriate manual, etc., for BVPS-2.

i l

l l

I l

e*

'Jnited States Nuclear Regulatory Commission Mr. Harold R. Denton page 4 4.

The use of the ERF must be incorporated.

5.

The new Emergency News Center needs to be incorporated.

6.

The population distributions require updating to reflect the 1980 census population data contained in the BVPS-2 FSAR.

7.

Site specific portions of the EPP need revised to state EPP BVPS-1 or EPP BVPS-2.

8.

All. figures which state that the Emergency Recovery Facility, or BVPS-2 1s "under construction (UC)" need to be revised.

DUQUESNE LIGHT COMPANY By N <

E. F. Woolever Vice President TJZ/wjs COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF ALLEGHENY

)

On this ((

day of j //pd

[

, before me, a Notary Public in and for sYid Commonwealth and County, personally appeared E. J.

Woolever, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to exe-cute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge.

/

<d d r'l _Mb b

/

' NOTARY PUBLIC l

ELVA G. LESONDAK, NOTARY PUBLIC ROBINS 0t1 TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXPlRES OCTOBER 20,1986 i

-