JUL 3 01986 Mr. John Pullen 5531 Yolanda Lane Dallas, Texas 75229
Dear Mr. Pullen:
[ 'Y This is in reply to your letter regarding Comanche Peak and your concerns about its construction and final inspections.
~
l The design adequacy and quality of construction of this plant are matters which are before the Neclear Regulatory Commission's Atomic Safety and Licensing Board.
This Board has been and will be conducting public hearings
-in which the utility (Texas Utilities Electric Company) will have to demonstrate that the plant has been designed and constructed properly.
Texas Utilities is currently conducting a very extensive re-inspection of the plant in an effort to either show that it is adequate or correct any deficiencies it may find.
In fact, the utility recently announced further j
delays in the opening of the plant because additional problems have recently
)
been discovered in the design area which will take more time to correct.
This I
program is being closely monitored by the NRC staff.
l Comanche Peak will not receive a license to operate until it can be shown that requirements for licensing have been satisfied.
Because your letter relates to matters which are before this licensing board, we are forwarding a copy of l
your letter to them, together with this response, for their information.
Sincerely, Original aignea by:
Thomas M. Novak Thomas M. Novak, Acting Director Division of PWR Licensing-A Office of Nuclear Reactor Regulation Distribution:
NRC PDR w/cy %
Docket File Pfartin of incomiiTtf SECY (1)
Local PDR w/cy of incoming V. Stello MBridgers,EDO #1963 DMossburg(EDO#-1963) w/cy of incoming EDO Reading P. Baker (2)
H. Denton/R. Vollmer C. Trammell w/cy of incoming T. Novak M. Rushbrook PD# 5 Reading (w cy of incoming)
V. Noonan PD#5 Green Ticket File
- See previous concurrences PD#5 DIR:PD#5
-A
- CTrammell:es *VNoonan T ovak 7/24/86 7/28/86 7/
86 8600070062 860730 PDR ADOCK 05000445 H
PDR..
l
6 Mr. John Pullen 5531 Yolanda 1.ane Dallas, Texas 75229
Dear Mr,
Pullen:
/
/
This is-in reply to your letter regarding Comanche Peak and your concerns f
about its construction and final inspections, p
The design adequacy and quality of construction of this plant'are matters which are before the Nuclear Regulatory Comission's Atomic' Safety and I.icensing Board. This Board has been and will be conducting public hearings in which the utility (Texas Utilities Electric Company),will have to demonstrate that the plant has been desianed and constructed properly.
Texas Utilities is currently conducting a very exten(ive re-inspection of the plant in an effort to either show that it is adequate or correct any deficiencies it may find.
In fact, the utilitypecently announced further delays in the opening of the plant because additional problems have recently been discovered in the design area which wil.l'take more time to correct. This program is being closely monitored by the NRC staff.
ComanchePeakwillnotreceivealicense'kooperateuntilitcanbeshownthat requirements for licensing have been satisfied. Because your letter relates to matters which are before this licensing board, we are forwarding a copy of your letter to them, together with,this response, for their information.
Sidcerely,
/
/
i/-
Parold R. Denten, Director
,/
Office of Nuclear Reactor Regulation Distribution:
Docket Eile OEl.D NRC'PDR w/cy of incoming SECY (1) 1.ocal/ PDR w/cy ~of incoming V. Stello ED0f# 1963 PPAS (ED0# -1963) w/cy of incoming EDO Reading P. Baker (2)
H. Denton/R. Vollmer C. Trammell w/cy of incoming eT. Novak M. Rushbrook
/ PD# 5 Reading (w(w cy of inconiing)
V. Noonan
/
Service list cy of incoming)
PD#5 Green Ticket File
/
F l1 l
PD#5h (P. $
DIR:
AD:PWR-A DD:NRR DIR:NRR I.C ammell:es VNoongo t
TNovak RVollmer PDenton g/86
/ /86
/ /86
/ /86
/0 86
- f UNITED STATES B,PI gh 7
NUCLEAR REGULATORY COMMISSION
'8 g
WASHINGTON, D. C. 20555 EDO PRINCIPAL CORRESPONDENCE CONTROL DUE: 08/06/86 EDO CONTROL: 001963 FROM:
DOC DT: UNDATED FINAL REPLY:
JOHN PULLEN EBBY HALLIDAY REALTORS TO NRC GREEN SECY NO: 86-743 FOR SIONATURE OF:
4dENWM s ROUTING:
DESC:
RMARTIN CONCERNS RE COMANCHE PEAK NUCLEAR PLANT DATE: 07/18/86 ASSIGNED TO: NRR CONTACT: DENTON SPECIAL INSTRUCTIONS OR REMARKS:
NRR RECEIVED: 07/21] 86 ACTION:
(DPLA;;- NOVAK ~
NRR ROUTING:
DENTON/VOLLMER SBURG/ TOMS 4 4 p
tC
(/u/
c.v p
4 i
C 7 LP
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:
CRC-86-0743 LOGGING DATE: Jul 17 86 ACTION OFFICE:
EDO AUTHOR:
J. Pullen AFFILIATION:
TX (TEXAS)
LETTER DATE:
FILE CODE: ID&R-5 Comanche Peak
SUBJECT:
Concerned with the construction of the Comanche Peak plant ACTION:
Direct Reply DISTRIBUTION:
SPECIAL HANDLING: None NOTES:
DATE DUE:
Aug 1 86 SIGNATURE:
DATE SIGNED:
AFFILIATION:
Rec'd Off. ED0 Date 7-/9~V[o Time -
b '. Cro a g
EDO 001963
,..-