Supplemental Application for Amend to License NPF-57, Reflecting Revised Commitment for Containment Vent/Purge Valve Operation
ML20204F946
Person / Time
Site: Hope Creek 
Issue date: 03/19/1987
From: Corbin McNeil
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20204F953 List:
References
NLR-N87039, NUDOCS 8703260307
Download: ML20204F946 (2)


Text

..

7 0--

d.

Y

i. '

l 7

i Public Service Electric and Gas

" Company

C!rbin A. McNeill, Jr.

Public Service Electric and Gas Cornpany P.O. Box 236, Hancocks Bridge, NJ 08038 609339-4800

' %ce Pres. dent e Nuclear -

WW 19 gy NLR-N87039 United States. Nuclear Regulatory Commission Document Control. Desk Washington, DC 20555 t

Gentlemen:

4 SUPPLEMENTAL INFORMATION CONTAINMENT VENT / PURGE VALVE OPERATION HOPE CREEK GENERATING STATION

. DOCKET.NO. 50-354-Public Service Electric and Gas Company (PSE&G).hereby transmits supplemental information in support of the containment vent / purge valve operation Technical Specification change request for Hope

. Creek Generating Station (HCGS), Facility Operating License NPF-57.

This transmittal supercedes a previous submittal dated February 20, 1987 and addresses a variety of concerns expressed by members of the NRC staff regarding a detinitive schedule for installation of blowout panels in the Containment Prepurge Cleanup System (CPCS).

In a letter from Mr. C. A. McNeill, Jr.

(PSE&G)-to Ms. E. Adensam (NRC) dated November 21, 1986, PSE&G stated that the CPCS ductwork would be installed within 120 days cd approval of'the Containment Vent / Purge Valve Operation i

Technical Specification change.

After further consideration, PSE&G withdraws this schedular request and instead commits to install all required station modifications, including CPCS

-ductwork changes, prior to implementation of the Technical

-Specification revisions for Containment Vent / Purge Valve 4

Operation.

Therefore, the Inserts for Enclosure 1 and all of of the referenced submittal have been appropriately revised and attached to this transmittal.

This transmittal supplements previous submittals from Mr. C. A.

- McNeill, ihr. to Ms. E. Adensam dated June 4, 1986, October 6, 1986, November 21, 1986 and December 18, 1986 and supercedes a

(

similar submittal dated February 20, 1987.

This transmittal does

[

-not affect the determination that the requested purge / vent changes do not involve a significant hazards consideration (Ref:

November 21, 1986 submittal) as the attached changes are schedular in nature.

B703260307 B70319 h

.PDR.ADOCK 05000354 r

,y

g.

..i....

I L,

^/

l NM 19 597 Document Control Desk 2

PSE&G requests the NRC to condition the License Amendment for Containment Vent / Purge Valve Operation to reflect the revised commitment specified above.

Should you have any questions or comments on this transmittal, please do not hestitate to contact us.

Sincerely, Attachment C

Mr. D. H. Wagner Licensing Project Manager Mr. R. W.

Borchardt Senior Resident Inspector