Text

.- .-.

7 0-- d.

Y i. '

7 l

i Public Service Electric and Gas l

" Company '

C!rbin A. McNeill, Jr. Public Service Electric and Gas Cornpany P.O. Box 236, Hancocks Bridge, NJ 08038 609339-4800

' %ce Pres. dent e Nuclear -

WW 19 gy NLR-N87039 United States. Nuclear Regulatory Commission Document Control. Desk Washington, DC 20555 t Gentlemen:

4 SUPPLEMENTAL INFORMATION CONTAINMENT VENT / PURGE VALVE OPERATION HOPE CREEK GENERATING STATION

. DOCKET.NO. 50-354-

! Public Service Electric and Gas Company (PSE&G).hereby transmits supplemental information in support of the containment vent / purge ,

, valve operation Technical Specification change request for Hope

, . Creek Generating Station (HCGS), Facility Operating License NPF-57. This transmittal supercedes a previous submittal dated February 20, 1987 and addresses a variety of concerns expressed by members of the NRC staff regarding a detinitive schedule for installation of blowout panels in the Containment Prepurge Cleanup System (CPCS). In a letter from Mr. C. A. McNeill, Jr.

(PSE&G)-to Ms. E. Adensam (NRC) dated November 21, 1986, PSE&G stated that the CPCS ductwork would be installed within 120 days i cd approval of'the Containment Vent / Purge Valve Operation Technical Specification change. After further consideration, PSE&G withdraws this schedular request and instead commits to install all required station modifications, including CPCS

-ductwork changes, prior to implementation of the Technical 4 -Specification revisions for Containment Vent / Purge Valve Operation. Therefore, the Inserts for Enclosure 1 and all of Enclosure 2 of the referenced submittal have been appropriately revised and attached to this transmittal.

This transmittal supplements previous submittals from Mr. C. A.

- McNeill, ihr. to Ms. E. Adensam dated June 4, 1986, October 6, 1986, November 21, 1986 and December 18, 1986 and supercedes a

( similar submittal dated February 20, 1987. This transmittal does

[ -not affect the determination that the requested purge / vent changes do not involve a significant hazards consideration (Ref:

November 21, 1986 submittal) as the attached changes are schedular in nature.

B703260307 B70319 h

.PDR .ADOCK 05000354 r - ,y

. . . . g. ..i .. .. .. .

.- , I L, #

^/

l NM 19 597 Document Control Desk 2 PSE&G requests the NRC to condition the License Amendment for Containment Vent / Purge Valve Operation to reflect the revised commitment specified above.

Should you have any questions or comments on this transmittal, please do not hestitate to contact us.

Sincerely, Attachment C Mr. D. H. Wagner Licensing Project Manager Mr. R. W. Borchardt Senior Resident Inspector