Text
..
7 0--
d.
Y
- i. '
l 7
i Public Service Electric and Gas
" Company
- C!rbin A. McNeill, Jr.
Public Service Electric and Gas Cornpany P.O. Box 236, Hancocks Bridge, NJ 08038 609339-4800
' %ce Pres. dent e Nuclear -
WW 19 gy NLR-N87039 United States. Nuclear Regulatory Commission Document Control. Desk Washington, DC 20555 t
Gentlemen:
4 SUPPLEMENTAL INFORMATION CONTAINMENT VENT / PURGE VALVE OPERATION HOPE CREEK GENERATING STATION
. DOCKET.NO. 50-354-Public Service Electric and Gas Company (PSE&G).hereby transmits supplemental information in support of the containment vent / purge valve operation Technical Specification change request for Hope
. Creek Generating Station (HCGS), Facility Operating License NPF-57.
This transmittal supercedes a previous submittal dated February 20, 1987 and addresses a variety of concerns expressed by members of the NRC staff regarding a detinitive schedule for installation of blowout panels in the Containment Prepurge Cleanup System (CPCS).
In a letter from Mr. C. A. McNeill, Jr.
(PSE&G)-to Ms. E. Adensam (NRC) dated November 21, 1986, PSE&G stated that the CPCS ductwork would be installed within 120 days cd approval of'the Containment Vent / Purge Valve Operation i
Technical Specification change.
After further consideration, PSE&G withdraws this schedular request and instead commits to install all required station modifications, including CPCS
-ductwork changes, prior to implementation of the Technical
-Specification revisions for Containment Vent / Purge Valve 4
Operation.
Therefore, the Inserts for Enclosure 1 and all of of the referenced submittal have been appropriately revised and attached to this transmittal.
This transmittal supplements previous submittals from Mr. C. A.
- McNeill, ihr. to Ms. E. Adensam dated June 4, 1986, October 6, 1986, November 21, 1986 and December 18, 1986 and supercedes a
(
similar submittal dated February 20, 1987.
This transmittal does
[
-not affect the determination that the requested purge / vent changes do not involve a significant hazards consideration (Ref:
November 21, 1986 submittal) as the attached changes are schedular in nature.
B703260307 B70319 h
.PDR.ADOCK 05000354 r
,y
g.
..i....
I L,
^/
l NM 19 597 Document Control Desk 2
PSE&G requests the NRC to condition the License Amendment for Containment Vent / Purge Valve Operation to reflect the revised commitment specified above.
Should you have any questions or comments on this transmittal, please do not hestitate to contact us.
Sincerely, Attachment C
Mr. D. H. Wagner Licensing Project Manager Mr. R. W.
Borchardt Senior Resident Inspector
_____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _