ML20204F809

From kanterella
Jump to navigation Jump to search
Informs That Wiring Mods Identified in Westinghouse Re Potentially Undetectable Failure of on-line Test Circuitry for Master & Slave Relays Completed on 870130.SER & Draft Tech Specs Should Be Modified as Listed
ML20204F809
Person / Time
Site: Vogtle 
Issue date: 03/16/1987
From: Bailey J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GN-1355, NUDOCS 8703260274
Download: ML20204F809 (2)


Text

4 Georgia Power Company Rout 3 2. Box 299A Waynesboro, Georgd 30830 J

Telephone 404 554-9961 404 724-8114 Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Tetephone 205 8704011 Vogtle Proj.ect March 16, 1987 U. S. Nuclear Regulatory Commission File: X7BC35 Attn: Document Control Desk Log:

GN-1355 Washington, D.C.

20555 NRC DOCKET NUMBER 50-425 CONSTRUCTION PERMIT NUMBER CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNIT 2 SLAVE RELAY TESTING Gentlemen:

Supplement 4 of the VEGP Safety Evaluation Report (7.3.3.3.) identified that the Vogtle Unit 2 Technical Specifications will contain test requirements which reflect the status of the circuit modifications to the Unit 2 slave relays similar to the modifications which were completed for Unit 1.

The potentially undetectable failure in the on-line test circuitry for the master and slave relays in the engineered safeguards system was originally identified to you on August 6, 1982 (NS-EPR-2638) by Westinghouse.

Subsequently, on January 17, 1984 Westinghouse transmitted letter NS-EPR-2877 describing the minor wiring modifications required to assure that circuit l

failure was easily detectable.

[

The wiring modifications identified in Attachment 2 of NS-EPR-2877 were incorporated into the VEGP Unit 2 design via FECO-N-132-BF which reflected Westinghouse Field Change Notice GBEM-10554. The physical change was completed on January 30, 1987.

l In accordance with the above discussion, please reflect quarterly testing of tne slave relays in the NRC draf t of the Vogtle Unit 2 Technical Specification and revise the Vogtle SER as appropriate.

Should your staff require any additional information, please do not hesitate l

to contact me.

(

Sincerely,,

s J. A. Bailey Project Licensing Manager lh 8

8703260274 870316

{DR ADOCK 05000425 PDR

a

~

.0ffice of Nuclear Reactor Regulation Files X7BC35 March 16, 1987 Iog:

GN-1355' Page 2 xc J. P. O'Reilly R. E. Conway.

j L. T. Gucwa l

R. A. Thomas

'l

-J.

E. Joiner, Esquire

)

B. W. Churchill, Esquire I

M. A. Miller'(2) l

'G.

Bockhold, Jr.

NRC Regional-Administrator NRC Resident Inspector B. Jones, Esquire D. Feig R. W. McManus Vogtle Project File 1085V I

l-I I

l-1 a

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _