ML20204F734
| ML20204F734 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/20/1987 |
| From: | Bailey G GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GN-1356, NUDOCS 8703260253 | |
| Download: ML20204F734 (1) | |
Text
~
{-
- Georgia Power Company Routs 2, Box 299A W:ynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114 Southern Company Services. Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 Vogtle Proj.ect March 20, 1987 U. S. Nuclear Regulatory Commission File: X7BC35 Atta: Document Control Desk Log:
GN-1356 Washington, D.C.
20555 NRC DOCKET NUMBER 50-425 CONSTRUCTION PERMIT NUMBER CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNIT 2 REVISED COMPLETION SCHEDULE Gentlemen:
The fuel load date for the VEGP Unit 2 has been changed from March 1988 to February 1989. - Subsection 1.1.5 of the VEGP FSAR presently reflects the March 1988 date. This will be revised in the next amendment to reflect the February 1989 date.
Should you staff require information concerning this schedular change, please do not hesitate to contact me.
Sincerely, J. A. Bailey Project Licensing Manager JAB /KWK/cas xc:
J. P. O'Reilly R. E. Conway L. T. Gucwa R. A. Thomas J. E. Joiner, Esquire B. W. Churchill, Esquire M. A. Miller (2)
G. Bockhold, Jr.
NRC Regional Administrator NRC Resident Inspector B. Jones, Esquire D. Feig R. W. McManus Vogtle Project File
- l0 8703260253 870320 109OV PDR ADOCK 05000425 A
g PDR t