Deficiency Rept Re Questionable Qualification of Certain Lk Comstock QC Personnel.Initially Reported on 830311. Certification Files Updated to Reflect Prior Work Experience.Const Not Adversely Affected
ML20204F424
Person / Time
Site: Fermi 
Issue date: 04/20/1983
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-62623, NUDOCS 8305020085
Download: ML20204F424 (2)


Text

.

Donald A. Wells rtyw oua;ay Assa:rce 1313, 237 ? '.:7 2000 Second Avenue 31 3-April 20, 1983 EF2-62623 Mr. James G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Cminission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Report of Potential 10CFR50.55(e) Item on Questionable Qualifica-tion of Certain L.K. Comstock OC Personnel (#88)

Dear Mr. Keppler:

4 On March 11, 1983, Detroit Edison's Mr. T.A. Alessi, Director - Project Qual-ity Assurance, telephoned Mr. J. Konklin of NRC Region III to report on a potential problem with the qualifications of certain L.K. Comstock OC person-nel at the Fermi 2 site. A recent change in the certifications of twenty-three (23) inspection personnel has resulted in these individuals being declared unqualified for the work they had been performing.

Detroit Edison's Project Quality Assurance (POA) Department conducted a review of the certification files to determine if there was evidence to sub-stantiate the initial levels of certification. Four (4), of the twenty-three j

(23), were in training and had not performed any inspections. Of the remain-ing nineteen (19), the POA review identified four (4) inspectors whose abil-ity to. meet ANSI N45.2.6 Level I qualification requirements was questionable per the available documentation.

L.K. Ccustock then conducted a 25% reinspec-tion of hardware originally inspected by the nineteen (19) individuals. Their results revealed that all sampled inspections were properly conducted and.

documented. Corrective action was to rewrite resumes as necessary to provide greater detail in the area of prior work experience.

Based on the actions taken, there is no evidence that this preblem either resulted in any deficiency in construction, or, if left uncorrected, could have adversely affected the safe operation of this plant.

If you have any questions concerning this matter, please contact Mr. G.M.

Trahey, Assistant Director - Project Quality Assurance.

Very truly yours, W

fh.$$

DAW /WD1/pn

$0?

83 hcx osoo03y 085 G30420 PD s

APR 2 51983

Mr. James G. Keppler, Regional Administrator April 11, 1983 Page ho EF2-62623 cc: Mr. Richard DeYoung, Director

~ Office of Inspection and Enforcanent U.S. Nuclear Regulatory Comnission Washington, D.C.

20555 Mr. Bruce Little, Senior Resident Inspector U.S. Nuclear Regulatory Comnission 6450 North Dixie Highway Newport, Michigan ~ 48166