Forwards Insp Rept 50-445/99-05 & 50-446/99-05 on 990222-26. One non-cited Violation Noted
ML20204E984
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/19/1999
From: Good G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20204E989 List:
References
50-445-99-05, 50-445-99-5, 50-446-99-05, 50-446-99-5, NUDOCS 9903250195
Download: ML20204E984 (4)


See also: IR 05000445/1999005

Text

,

.

'

g*"%g\\

UNITED STATES

-

y

NUCLEAR REGULATORY COMMISSION

$

f

REGloN IV

g

  • ,[

611 RYAN PLAZA DRIVE, su!TE 400

,***,

ARLINGTON, TEXAS 76011-8064

WAR 191999

Mr. C. L. Terry,

TU Electric

Senior, Vice President & Principal Nuclear Officer

ATTN: Regulatory Affairs Department

P.O. Box 1002

Glen Rose, Texas 76043

.

SUBJECT: NRC INSPECTION REPORT NO. 50-445/99-05; 50-446/99-05

Dear Mr. Terry:

This refers to the inspection conducted on February 22-26,1999, at the Comanche Peak

Steam Electric Station. Units 1 and 2 facilities. The inspection focused on your solid radioactive

waste and radioactive materials transportation programs. The enclosed report presents the

results of this inspection.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred. This violation is being treated as a Non-Cited Violation (NCV),

consistent with Appendix C of the Enforcement Policy. The NCV is described in the subject

inspection report. If you contest the violation or severity level of the NCV, you should provide a

response within 30 days of the date of this inspection report, with the basis for your denial, to

the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC

20555-0001, with copies to the Regional Administrator, Region IV, and the Director, Office of

Enforcement United States Nuclear Regulatory Commission, Washington, DC 20555-0001,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

htth(

I

@_0

\\

Gail Good, Chief

(

Plant Support Branch

\\

Division of Reactor Safety

9903250195 990319

I

PDR

ADOCK 050004 5

G

_

-

\\

-

.

TU Electric

-2-

i

Docket Nos.: 50 445

1

50-446

License Nos.: NPF-87

NPF-89

Enclosure:

NRC Inspection Report No.

50-445/99-05;50-446/99-05

cc w/ enclosure:

Mr. Roger D. Walker

TU Electric

1

Regulatory Affairs Manager

P.O. Box 1002

Glen Rose, Texas 76043

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

George L. Edgar, Esq.

Morgan, Lewis & Bockius

1800 M. Street, NW

Washington, D.C. 20036

G. R. Bynog, Program Manager /

Chief Inspector

Texas Department of Licensing & Regulation

Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

County Judge

P.O. Box 851

Glen Rose, Texas ~76043

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 7E756

'

John Howard, Director

Environmental and Natural Resources Policy

Office of the Governor

P.O. Box 12428

Austin, Texas 78711

.

TU Electric

-3-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE06)

bec distrib. by RIV:

Regional Administrator

Resident inspector (2)

DRP Director

DRS-PSB

DRS Director

MIS System

Branch Chief (DRP/A)

RIV File

Project Engineer (DRP/A)

Branch Chief (DRP/TSS)

DOCUMENT NAME: R:\\_CPSES\\CP905RP.MCH

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

Peer Review

RIV:PSB

E

C:DRS\\PSB

C:DRP\\A_, ,z

$0s

/

JBNicholas*

MCHay*

GGood*

JTapia #fV

GFSaribero

03/ /99

03/ /99

034%99

03/999

QV/09

N

  • Previously concurred.

OFFICIAL RECORD COPY

_

_

,..

.

.

4,

.

TU Electric

-3-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE06)

bec distrib. by RIV:

Regional Administrator

Resident inspector (2)

DRP Director

DRS-PSB

,

'

DRS Director

MIS System

Branch Chief (DRP/A)

RIV File

Project Engineer (DRP/A)

Branch Chief (DRP/TSS)

l

l

l

l

l

l

!

DOCUMENT NAME: R:\\__CPSES\\CP905RP.MCH

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

$O..

/

Peer Review

RIV:PSB

E

C:DRS\\PSB

C:DRP\\A _, ,A

,

l

JBNicholas*

MCHay*

GGood*

JTapia #4V

GFSanb6fn

03/ /99

03/ /99

039/99

03/999

03F/99

N

'

  • Previously concurred.

OFFICIAL RECORD COPY

l

250005

-