ML20204E968
| ML20204E968 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 07/22/1986 |
| From: | Butler W Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20204E975 | List: |
| References | |
| TAC-60372, NUDOCS 8608010382 | |
| Download: ML20204E968 (2) | |
Text
'o #
c UNITED STATES db NUCLEAR REGULATORY COMMISSION y
j WASHINGTON, D. C. 20555 w
e MISSISSIPPI POWER & LIGHT COMPANY MIDDLE SOUTH ENERGY, INC.
SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 13 License No. NPF-29 1.
The Nuclear Regulatory Commission (the Commission) has found that A.
The applicaticn for amendment by Mississippi Power & Light Company, et al. (the licensee) dated December 27, 1985, as supplemented January 31, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Com-mission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the' Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, paragraph 2.C.(33)(d)(2) of Facility Operating License No.
NPF-29 is hereby amended to read as follows:
(2)
(a) MP&L shall complete its research program on hydrogen control to show that the hydrogen control system will perform its intended function in a manner that provides adequate safety margins. This research program shall be completed on a schedule which reflects the requirements of 10 CFR 50.44.
(b)
If it is determined that plant modifications are required to obtain NRC approval that an adequate hydrogen control system for Grand Gulf is installed, then these modifications shall be completed on a schedule which is approved by the NRC.
86080103e2 e60722 PDR ADOCK 0500 c.
P L._
. s-3.
This license amendment is effective as of its date'of ~ issuance.-
FOR THE NUCLEAR REGULATORY; COMMISSION-IS,'
l.L.k',Mner g( Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing.
Date of Issuance:
July 22, 1986 A(
as r-, D 1',
MQ1E Al WButler Q n
LKintner:lb 1/ptug /8 / / /86
-7/ /86
-f / [/86
., _ _ - ~ - - - - - -. - - - - - - - - - - - -, -. -
-