C,PU Nuclear Corporation Nuclear
- emear8o o
Middletown, Pennsy!vanta 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
July 25, 1986 5211-86-2074 Office of Nuclear Reactor Regulation Attn:
J. F. Stolz, Director PWR Projects Directorate No. 6 U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Stolz:
Three Mile Island Nuclear Station Unit 1 (THI-l)
Operating License Ho. DPR-50 Docket No. 50-289 EFW Long Term Mods System Description On April 29, 1985, GPUN submitted a system design description entitled "EFW System Upgrade to Safety Grade Design." We have identified an error in our submittal.
On page 22, Section 5.1, the in-seWice testing and inspection programs are discussed.
The submittal incorrectly states, "In-service testing and inspection shall comply with the requirements of ASME Section XI - 1980 Edition with Addenda through Winter 1980 and TMI-l Technical Specification, Section 4.2.2 and 4.9."
This should read:
"In-service testing shall comply with the requirements of Articles IWP and IWV of ASME Section XI - 1980 Edition with Addenda through Winter 1980 and THI-l Technical Specification 4.2.2 and 4.9.
In-seWice inspection shall comply with the requirements of ASME Section XI - 1974 Edition with Addenda through Summer 1975, as amended by Met Ed letter of July 6,1981, and TMI-l Technical Specification 4.2.1."
Sincerely, 8609o10208 % $ e9 PDR ADOCK PDR
. D. I ki 1 p
Vice President & Director, TMI-1 HDH/SM0/spb:603A h.n0\\