ML20204D832

From kanterella
Jump to navigation Jump to search
Notification of 870407 CRGR Meeting 112 Re CRGR Review of Rev to Branch Technical Position MEB-1 on Requirements Relating to Postulated Arbitrary Intermediate Pipe Ruptures in Class 1,2 & 3 Piping.W/O Encl
ML20204D832
Person / Time
Issue date: 03/18/1987
From: Zerbe J
Committee To Review Generic Requirements
To: Bernero R, Cunningham R, Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), Office of Nuclear Reactor Regulation
References
NUDOCS 8703250571
Download: ML20204D832 (2)


Text

kY

'o,,

UNITED STATES

)

NUCLEAR REGULATORY COMMISSION n

h WASHINGTON, D. C. 20555

%*****/

MAR 101987 MEMORANDUM FOR:

Robert M. Bernero, NRR Richard W. Starostecki, R-I Richard E. Cunningham, NMSS Denwood F. Ross, RES Clemens J. Heltemes, Jr., AE0D Joseph Scinto, 0GC FROM:

John E. Zerbe, Acting Chairman Committee to Review Generic Requirements

SUBJECT:

CRGR MEETING N0. 112 The Coninittee to Review Generic Requirements (CRGR) will meet on Tuesday, April 7, 1987, 1-5 p.m. in Room 6110 MNBB.

1-2 p.m.

G. Arlotto (RES) will present for CRGR review the enclosed roposed revision to Branch Technical Position MEB-1 p(SRP Section 3.6.2) concerning requirements relating to postulated arbitrary intermediate pipe ruptures in Class 1, 2 and 3 piping.

(Category 2 item.)

2-3 p.m.

W. Russell (NRR) will present for CRGR review the enclosed proposed Generic Letter concerning short-term technical specification improvements.

(Category 2 item.)

3-5 p.m.

J. Funches (NRR) will present for CRGR review the enclosed proposed policy statement concerning integrated schedules.

(Category 2 item.)

If a CRGR member cannot attend the meeting, it is his responsibility to assure that an alternate, who is approved by the CRGR Chairman, attends the meeting.

Persons making presentations to the CRGR are responsible for (1) assuring that

.the information required for CRGR review is provided to the Committee (CRGR Charter - IV.B), (2) coordinating and presenting views of other offices, (3) as appropriate, assuring that other offices are represented during the presenta-tion, and (4) assuring that agenda modifications are coordinated with the CRGR contact (Walt Schwink, x28639) and others involved with the presentation.

I Division Directors or higher management should attend meetings addressing

/

agenda items under their purview.

y h

8703250571 870318 i d

PbR Rguse ruggeggg MEETING 112, g

f MAR 18 887 i

In accordance with the ED0's March 29, 1984 memorandum to the Commission con-cerning '.' Forwarding of CRGR Documents to the Public Document Room (PDR)," the enclosures, which contain predecisional information, will not be released to the PDR until the NRC has considered (in a public forum) or decided the matter addressed by the information.

,/-

,.s John E. Zerbe, Acting Chairman Committee to Review Generic Requirements

Enclosure:

As stated cc: SECY Commission (5)

V. Stello, Jr.

Office Directors Regional Administrators W. Parler G. Arlotto W. Russell J. Funches Distribution:

JZerbe TRehm JRoe DEDR0GR cf RFraley BZalcman GZwetzig FHebdon MLesar RErickson WLittle PDR(NRG/CRGR)

R0GR Staff Central Files JClifford WMcDonald PRabideau STreby

'0FC

ROGR
Act/DEDygGR:

____.:.._...____:__-w,..7..:__________.:-_-________-:_.________:-_________-:.________-.

NAME :WSchwink

JZerbe "

_____:____________:___.L______:___________-:....____---:._____--._:_-_________-:._________

DATE :3/18/87

3/ft/87 rdPalERntrytrawruerwm