ML20204C990

From kanterella
Jump to navigation Jump to search
Notification of 990401 Meeting with BWROG in Rockville,Md to Discuss Encl Topics Re Feedwater Nozzle Insp,Year 2000 Activities,Appendix R - Circuit Analysis.Agenda Encl
ML20204C990
Person / Time
Issue date: 03/18/1999
From: Marlone Davis
NRC (Affiliation Not Assigned)
To: Frank Akstulewicz
NRC (Affiliation Not Assigned)
References
PROJECT-689, PROJECT-691 NUDOCS 9903240053
Download: ML20204C990 (5)


Text

r ef**%

p 4*k UNITED STATES

}

NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 2055&0001 44 *****

March 18, 1999 MEMORANDUM TO: Frank M. Akstulewicz, Acting Chief Generic Issues and Environmental Projects Bianch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation FROM:

Michael J. Davis, Project Manager ptj' Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH BWR OWNERS GROUP (BWROG)

DATE AND TIME:

April 1,1999 9:00 AM - 12:00 AM LOCATION:

U.S. Nuclear Regulatory Commission Two White Flint North i

11545 Rockville Pike Rockvi!!e, Maryland 20852 Room T-07A1 PURPOSE:

BWROG/NRC Management Meeting Agenda : See Anached Sheet PARTICIPANTS:

NRC BWROG B. Sheron K. Wichman G. Warren B. Penny B. Hermann R. Wessmen J. Kenny S. Hat;er K. Manoly G. Holahan G. Jones L. Sumner S. West C. Berlinger D. Fetters D. Townsc od, et al.

J. Werrniel T. Collins J. Mauck M. Davis, et al.

Project Nos. 689 and 691 t

Attachment:

As stated cc w/att: See next page Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to the " Commission Policy Statement on Staff Meetings Open to the Pub!ic," 59 Federal Reoister 48344,9/20/94. Members of the public who wish to attend should contact Mike Davis (NRC) at (301)415-1016.

4903240053 990318

[DR TOPRP ENVGENE" PDR 1

MEMORANDUM TO: Fr:nk M. AkstulIwicz, Acting Chl f March 18,1999 G:nsric issu:s cnd Environm:ntal Prcjects Branch Division of R:gul: tory improv:m:nt Programs Offics of Nucl: r R::ctor R:gulation FROM:

Michael '. Davis, Project Manager triginal Signed By:

Generic Issues and Environmental Projects Branch Division of Reactor Program Managemen' Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH BWR OWNERS GROUP (BWROG)

DATE AND TIME:

April 1,1999 9:00 AM - 12:00 AM LOCATION:

U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Rockville, Maryland 20852 Room T-07A1 PURPOSE:

BWROG/NRC Management Meeting Agenda : See Attached Shaet PART!CIPANTS:

NRC BWROG B. Sheron K. Wichman G. Warren B. Penny B. Hermann R. Wessman J. Kenny S. Haller K. Manoly G. Holahan G. Jones L. Sumner S. West C. Berlinger D. Fetters D. Townsend, et al.

J. Werrriel T. Collins J.Ma d M. Davis, et al.

Project No. 691

Attachment:

As stated I

cc w/att. See next page Meetings between NRC technical staff and applicants or licensees are open for interested j

members of the public, petitioners, intervenors, or other parties to attend as observera pursuant to the " Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal Reaiste 48344,9/20/94. Members of the public who wish to attend should contact Mike Davis

- (NRC) at (301)415-1016.

Document Name: G:\\MJD1\\MTGNO499.WPD OFC

RGE3, SC:RGEB,, /

NAME MDavis:ayw RArchitzef DATE 03/lf/99 03/l8/99

/

[.2 f

OFFICIAL RECORD COPY V#

- mS.

$DI Y gfgTgCOM gos W

'.O L

l NRC/BWR OWNERS' GROUP MANAGEMENT MEETING - APRIL 1,1999 DISCUSSION TOPICS PRESENTER Introduction Glenn Warren (SNC)

Feedwater Nozzlo inspection Jim Kenny (PP&L)

Year 2000 Activities Steve Haller (Alliant)

Appendix R - Circuit Analysis Glenn Warren (SNC)

Vendor Oversight - GE LOCA Methods Audits Results Glenn Warren (SNC)

Weld Overlay inspection / VIP NUREG 0313 Bob Penny (NYPA)

STATUS ITEMS PRESENTER MSIV Leakage SER Jim Kenny (PP&L)

Response Time Testing SER Jim Kenny (PP&L)

JOG AOV Glenn Warren (SNC)

Action item Status Review Glenn Warren (SNC)

r.

Project No. 691 Boiling Water Reactor Owners Group cc: ' W. Glenn Warren, Chairman

' Jim Kenny, Vice Chairman Boiling Water Reactor Owners' Group Boiling Water Reactor Owners' Group Southern Nuclear / Georgia Power Pennsylvania Power & Light Company E.I. Hatch Plant 2 North Ninth Street M/C A6-1 i

P.O. Box 1295 M/C B052 Allentown, PA 18101 Birmingham, AL 35201 Carl D. Terry Dennis B.Townsend Vice President, Nuclear Engineering GE Nuclear Energy Niagara Mehawk Power Corporation M/C 182 Nine Mile Point-2 175 Curtner Avenue PO Box 63 San Jose, CA 95125 Lycoming, NY 13093 Drew B. Fetters Thomas A. Green PECO Energy GE Nuclear Energy Nuclear Group Headquarters Mail Code 182 MC 62C-3 175 Curtner Avenue 965 Chesterbrook Blvd.

San Jose, CA 95125 Wayne, PA 19087 George T. Jones Pennsylvania Power & Light MC A6-1 Two North Ninth Street Allentown,' PA 18101

- Lewis H. Sumner Southern Nuclear / Georgia Power E.1. Hatch Nuclear Power Plant 40 Inverness Parkway PO Box 1295 Birmingham,GA 35201 John Kelly New York Power Authority 14th Floor Mail Stop 14K Centroplex Building 123 Main Street White Plains, NY 10601 4

1 g.

f

w DISTRIBUTION: Mtg. Notice BWR Owners Group Dated March 18,1999 Hard Coov Project File;

. PUBLIC PGEB r/f OGC ACRS MDavis OWFN Receiptionist TWFN Receiptionist 8EMeil SCollins RZimmerman BBoger BSheron GHolahan DMatthews CCarpenter SWest LMarsh WBateman KManaoly RWessman CBerlinger GHubbard JLyons TCollins JWermiel JMauck EMarinos RArchitze.'

- GTracy OPA PMNS t-