ML20204C578

From kanterella
Jump to navigation Jump to search
Correction to Amend 204.TS Page 3.5-4 Was Inadvertently Issued with Amend 211 & Did Not Reflect Changes Made by Amend 204,which Changed Location of SR 3.5.1.5 to TS Page 3.5-3.TS Page 3.5-4 Should Have Been Changed to Amend 211
ML20204C578
Person / Time
Site: Hatch 
Issue date: 03/18/1999
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20204C582 List:
References
NUDOCS 9903230155
Download: ML20204C578 (1)


Text

-. _ _ _ _ _. _. _ _ _ _

t 4

8 ECCS - Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.1.6


NOTE--------------------

Only required to be performed prior to entering MODE 2 from MODE 3 or 4, when in MODE 4 > 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Verify each recirculation pump discharge 31 days valve cycles through one complete cycle of full travel or is de-energized in the closed position.

3 1

i SR 3.5.1.7 Verify the following ECCS pumps develop the In accordance specified flow rate against a system head with the corresponding to the s'pecified reactor Inservice pressure.

Testing Program SYSTEM HEAD NO.

CORRESPONDING 0F TO A REACTOR ly.iIEM FLOW RATE EW21PJ PRESSURE OF CS k 4250 gpm I

k 113 psig i

LPCI k 17,000 gpm 2

m 20 psig i

SR 3.5.1.8


NOTE--------------------

Not required to be perfomed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure s 1058 psig g2 days and a 920 psig, the HPCI pump can develop a flow rate k 4250 gpa against a system head corresponding to reactor pressure.

(continued) 9903230155 990318 PDR ADOCK 05000321 P

PDR HATCH UNIT 1 3.5-4 Amendment No.204 l

--