Forwards Revised Figure 3.1-3 Re Allowable Time to Realign Control Element Assembly Vs Initial Total Integrated Radial Peaking Factor,Per SA Mcneil 861001 Request.Figure Applicable to Both Units
ML20204C570
Person / Time
Site: Calvert Cliffs  
Issue date: 03/19/1987
From: Williams J
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8703250325
Download: ML20204C570 (2)


Text

_

BALTIMORE GAS AND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 March 19, 1987 Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

Subject:

Calvert Cliffs Nuclear Power Plant Units 1 & 2; Docket Nos. 50-317 & 50-318 CEA Misalignment Amendment Request - Revised Figure 3.1-3

Reference:

Letter, J. A. Tiernan (BG&E) to A.

C~. Thadani (NRC),

Request for Amendment, October 1, 1986 Gentlemen:

Mr. S. A. McNeil requested revision of Figure 3.1-3 from the reference letter to clarify the time allowed to realign a Control Element Assembly when the measured premisalignment total integrated radial peaking factor is greater than 1.63.

The revised figure is enclosed. This figure is applicable to both Calvert Cliffs units.

?

.ew

/J. F. Williams Analytical Support Unit Nuclear Engineering Services Dept.

Calvert Cliffs Nuclear Power Plant JFW/sjb cc:

D. A. Brune, Esquire J. E. Silberg, Esquire A. C. Thadani, NRC I

S. A. McNeil, NRC T. E. Murley, NRC db T. Foley/D. A. Trimble g

T. Magette, DNR L. S. Larragoite 8703250325 870319 DR ADOCK 050 7

FIGURE 3.1-3 ALLOWABLE TIME TO REALIGN CEA VERSUS INITIAL TOTAL INTEGRATED RADIAL PEAKING FACTOR 70 5

60

=

4 2

50

~_

a E

7 W

=

978 - 600 FR a

2.

=

40 E

E o

30 z

5 ALLOWED REGION

=

E 5

20 5-R m

zp 10

__==

3 (1.63,0) 0 3._

=

2 I

I l

l I

l l

l l

l l

l l

l 1.50 1.51 1.52 1.53 1.54 1.55 1.56 1.57 1.58 1.59 1.60 1.61 1.62 1.63 1.64 1.65 MEASURED PRE-MISALIGNED TOTAL INTEGRATED RADIAL PEAKING FACTOR i