ML20204C409

From kanterella
Jump to navigation Jump to search
Informs That ACRS Has No Objections to Proposed Amend to 10CFR50,App J, Primary Containment Leakage Testing for Water-Cooled Power Reactors, Per ACRS 342nd Meetings on 881006-07
ML20204C409
Person / Time
Issue date: 10/11/1988
From: Fraley R
Advisory Committee on Reactor Safeguards
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20204C413 List:
References
ACRS-R-1323, NUDOCS 8810200466
Download: ML20204C409 (1)


Text

gitsWms

%g UNITED STATES f!'

g NUCLEAR REGULATORY COMMISSION g

l ADVISORY COMMITTEE ON REACTOR SAFEGUARDS h

WASHING TON, O. C. 20$$$

b.'.... *#,e October 11, 1988 L

1 MEMORANDUM FOR:

Victor Stello, Jr.

E cutive Director for Operations FROM:

nd F. Fraley, Director Advisory Committee on Reactor Safeguards SUPJECT:

ACRS ACTI0ff ON THE PROPOSED AMENCMENT OF 10 CFR 50 APPENDIX J. "PRIMARY CONTAlf#ENT LEAKAGE TESTING FOR WATER COOLED POWER REACTORS" During its 342nd meeting, October 6-7, 1988, the Advisory Comittee on Reactor Sefeguards was informed of the nature of thr, pro,70 sed Amendment of 10 CFR 50, Appendix J that explicitly permits th9 use of the Mass Point statistical data analysis method for calculath.; containment leakage rates. The ACRS has no objection to the issuance of this amendment.

Reference Memorandum from Eric S. Beckjord, Director, RES, to Edward L. Jordan, i

Chairman, CRGR, transmitting (to CRGR and ACRS) the proposed Amendment i

of 10 CFR 50, Appendix J to permit Mass Point anslysis, dated September 15, 1983.

j cc:

S. J. Chilk, $ECY J. Hoyle, EDO E. Beckjord, RES C. Bartlett, RES G. Arndt, RES D. Persinko, NRR r

P E

I 0910200466 881011 I

i PDR ACRS l

R 1323 PDC i

_ _ -