ML20204B409
| ML20204B409 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/06/1978 |
| From: | David Williams ARKANSAS POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20204B415 | List:
|
| References | |
| 1-108-1, NUDOCS 7810170143 | |
| Download: ML20204B409 (1) | |
Text
e e
ARKANSAS POWER S LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501)371-4000 October 6, 1978 5
1-108-1 Mr. K. V. Sey f ri t, Director Office of Inspection & Enforcement U. S. Nuclear Regula tory Commission Region IV 611 Rycn Plaza Drive, Suite 1000 Arlington, Texas 76011
Subject:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Reportable Occurrence Report No. 50-313/78-23 and 50-313/78-24 5 (File:
0520)
Gentlemen:
In accordance with Arkansas Nuclear One - Unit 1 Technical Specification 6.12.3.1, we have attached the subject reports concerning the failure to test a breaker in the Reactivity Control System within the time limits as prescribed by Technical Specification 3.5.1.6.(78-23) and the failure of a CRD "A" breaker to trip as required upon a reactor trip (78-24).
Very truly yours,
&&i Daniel H. Williams Manager, Licensing DilW:REI:mh Attachments 7Tt017 bly3 f
)N'7 MEMF4E R MIDDLE SOUTH UTILITIES GYSTEM