ML20204B296

From kanterella
Jump to navigation Jump to search
Provides Monthly Update Rept on Progress of Installation of Seismic Upgrade Mods to Buildings C-331 & C-335,IAW Commitments Made in USEC
ML20204B296
Person / Time
Site: Paducah Gaseous Diffusion Plant
Issue date: 03/15/1999
From: Toelle S
UNITED STATES ENRICHMENT CORP. (USEC)
To: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
GDP-99-0051, GDP-99-51, NUDOCS 9903220054
Download: ML20204B296 (5)


Text

.

i YESEC

/-

A Global Energy Company March 15,1999 GDP 99-0051 1

4 Mr. Robert C. Pierson Chief, Special Projects ' Branch Division of Fuel Cycle Safety and Safeguards, NMSS U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Paducah Gaseous Diffusion Plant (PGDP)

Docket No. 70-7001 Monthly Update on Progress of Scismic Upgrades to Buildings C-331 and C-335 1

Dear Mr. Pierson:

In accordance with USEC's commitments in our April 15,1998 letter (Reference 1), the purpose of this letter is to provide the monthly update on the progress of the installation of the seismic upgrade modifications to Buildings C-331 and C-335.

Issue 36 of DOE /OR-2026," Plan for Achieving Compliance With NRC Regulations at the Paducah Gaseous Diffusion Plant" (the Compliance Plan) requires that the modifications to increase the seismic capacity of Buildings C-331 and C-335 be completed by June 30,1999. However, as identified in our previous monthly status reports (References 2,3,4, and 5), USEC has determined that an additional 12 months will be required to complete the seismic upgrades to account for unanticipated construction difficulties and reduced worker productivity due to high temperatures.

A Certificate Amendment Request was submitted on January 12,1999 (Reference 6) to request NRC review and approval of a change in the schedule for completing these upgrades to June 30,2000.

USEC is continuing to implement productivity improvements. The rate oflocation completion has steadily risen to average 25 completions (cumulative rate for both buildings) per month. During February,32 locations were completed. The projected schedule for March shows 42 completions, which is very near the target completion rate of 47 needed by May to meet the proposed June 30, 2000 completion date. The enclosure to this letter provides the progress ofinstallation of the dg modifications through March 8,1999.

\\

9903220054 990313

~

PDR ADOCK 07007001' C

ppe 6903 Rockledge Drive, Bethesda, MD 20817-1818 Telephone 301-564-3200 Fax 301-564-3201 http:hwww.usec.com Offices in Livermore, CA Paducah, KY Portsmouth, OH Washington. DC

~

?

Mr. Robert C. Pierson March 15,1999 GDP 99-0051 Page 2 Should you have any questions related to this subject, please contact me at (301) 564-3250 or Steve Routh at (301) 564-3251. There are no new commitments contained in this submittal.

Sincerely,-

S. A.

I I

Steven A.Toelle Nuclear Regulatory Assurance and Policy Manager

References:

1. Letter from Steven A. Toelle (USEC) to Robert C. Pierson (NRC), " Schedule for Seismic Upgrades to Buildings C-331 and C-335," Letter No. GDP 98-0082, April 15,1998.
2. Letter from Steven A. Toelle (USEC) to Mr. Robert C. Pierson (NRC), "Paducah Gaseous Diffusion Plant, Docket No. 70-7001, Monthly Update on Progress of Seismic Upgrades to Buildings C-331 and C-335," Letter No. GDP 98-0217, dated November 16,1998.
3. Letter from Steven A. Toelle (USEC) to Mr. Robert C. Pierson (NRC), "Paducah Gaseous DifTusion Plant, Docket No. 70 7001, Monthly Update on Progress of Seismic Upgrades to Buildings C-331 and C-335," Letter No. GDP 98-0269, dated December 15,1998.
4. Letter from Steven A. Toelle (USEC) to Mr. Robert C. Pierson (NRC), "Paducah Gaseous Diffusion Plant, Docket No. 70-7001, Monthly Update on Progress of Seismic Upgrades a Buildings C-331 and C-335," Letter No. GDP 99-0019, dated January 15,1999.
5. Letter from Steven A. Todle (USEC) to Mr. Robert C. Pierson (NRC), "Paducah Gaseous Diffusion Plant, Docket No. 70-7001, Monthly Update on Progress of Seismic Upgrades to Buildings C-331 and C-335," Letter No. GDP 99-0037, dated i

February 16,1999.

6. Letter from Steven A. Toelle (USEC) to Dr. Carl J. Paperiello (NRC), " Certificate Amendment Request - Buildings C-331 and C-335 Seismic Upgrades," Letter No.

GDP 99-0012, dated January 12,1999.

Enclosure:

Schedule for Seismic Upgrades to Buildings C-331 and C-335 cc: NRC Region III Office NRC Resident Inspector-PGDP NRC Resident Inspector - PORTS Mr. Randall M. DeVault (DOE)

Enclosure to GDP 99-0051 Milestone Schedule for Seismic Upgrades to Buildings C-331 and C-335 Progress Through March 8,1999 i

I l

1

)

i 1

~

Activity J

,. Activity ~

Early

. EarlyJ ES Orig

-. -h g g g h: h g g gypg g h 4 h h d2.i a. ^

DescripHon!L i Start 1 Finish (

Dur ma SEISMIC UPGRADES C-331/C-335.

I INTERMEDj5fE lillEESTON5

~

~

~

E2R555]Illdg C-331 StaEdliloor Relocations

{14MAY98A ilM 0

+

IUR603i Bliig C-535 Start CeII Floor RelAc~aWnU 34MAI5A iM 0

+

1 6

K2R'D006 CMctorreaktoNork(Steelinstaliation)~

i8MAY98A INI i

+

- K5RD027 illdg C-331 Start Ground Floor Steel Installation

li5UG98A,

~

0 iM t

_ _ _ __L I

K2RD029 :Bidg C-335 Start Ground Floor SteelInstallation 17AUGS8A iM 0

+

l l K2RD033 iBldg C-331 Start Ground Floor Relocations 17AUG38A IM 0

l--_. b

K2RD037 ' Bldg C-335 Start Ground Floor Refocations 17AUG98A IM 0

l l

l l K2RD021 j Bldg C-331 Start Cell Floor Steel Installation 15DEC98A' IM 0

+

i i

I l

[

! K2RD025 ! Bldg C-335 Start Cell Floor Steel Installation 15DEC96A IM 0

l l

LPROJECT MANAGEMENT.

K2RD001 iTeam assemble (Mgmt & Support Personnel)

01APR98A'20APR98A MG i 20f i

. I K'2RD04bNTP to JS droTndElo'o'riteel FaEliaion ~ M51ilAY91i ~

7MG C

I

____.o..________.__-.

_ ___.i._._...i.._.._

1.__

l j K2RD013 :PORC presentations (CAAS, Steelinstallation) l12JUN98A 18JUN98A;MG 5

s

..__. d'__.. _. __ _

_____L...___J_...__L_..

i

+

K2RD016 : Schd addt'l resources (Title lit, Escorts, etc.)

iO8DEC98A12 MAR 99 [MG l. _ _ _ _

I 5

l i __ _ __.i I

' K2RD014 lDecument & met all regulatory commitments 08 MAR 99 {19 MAR 99 ;MG ;... _

3 10 3.. _ _

I I

I I

i ENGINEERING IK2'RD012 Complete break reorn e'ngIneering design

03APR98A'140CT98A.EN 10 i

~

K2RD002 Review JS Albericl'Ua Plan & Procedures 3APR98A 1FIUN98 E 20

~

~

1

! K2RD015$EstaElisTQAl~Qdself assessment plan 54MAY98N19JUN98 IEN 10

~

! 52'R51 JSAUd MTE program to existing QA Plan 02JUN98AhEN98A EN

~ ~~

19 m

[

l I

r i K2RD019]G7 steel shop drawings approval

,03AUG58d14AUG98A EN 10 I

I

_.__l l

m iM2 W

Project Start 27 MAR 96

~ " mm Early Bar O

%pM os Prosect Finish 23JUN00 Progress Bar LOCKHEED MARTIN UTILITY SERVICES F-

-[-

y f

Data Date 08 MAR 99 m3mme Crttical Activity SEISMIC UPGRADE PROJECT An Date 12 MAR 99 Intermediate Milestor.es 2-

@ Primevers Systems, hu.

i

hActivity

, Description !

{ Startginish f Dur C M W SIO E D M F U W H JjJJAIB M NID 3!F'MiA CiJiJJAlSTO X D LActivity 5

-i Early] Early1! ES ' Orig

-1998 A-1999~

2000

~ ~ ^

Lt "ND 5 K2RD022 Resolve DOE rnsterial rit: rage trea

.04JAN99A 19APR99 :EN 30 c

{

~!

l U K2RD003 ;Eng'r raview of constructability$iEilAs' ris~~uits II8JAN99 12 MAR 99 ;EN )

s 5

l l

]

~

~

I~

55IWIAji95 EU U

K2PD9929 Complete Design /C5C'~~ ~

d lrL...___

u__

PROCIFAB/ DELIVERY -

K2RD009. Procurement to contrt.ct ground floor relocations 04MAY98A 19JUN98A PR 15 i

i K2iOO17 Cdll floor st' el delivery (JS Albirici) 505MAI98 2CSEP98'A'PR~

e 15 i

IK2RDU45 'Grotind'Fioor Fa'brication (JS Alberici) '

25M 98 140CT95AMR

'45

' KUPF 939' Com pie'te' Proc'u'remertt

^

05M R99 5 0

~

d' l

l

! K7etD047 ; Ground Floor Steel Delivery (JS Alberici) j l210CT98A,PR 0

[K2iED005 ; Contractor re-mobilization (office, tools,mpwr) 120APR98A.15MAY98A CN 10

~

l I

l h.ii2ED008 Training (Contractor)Initiai~ Crew l04MAY98A 08MAY98A CN l 5

8 i

I i

q n K2RD010 Cell floor rtility relocations (Eict, Mech,1&C)

14MAY98A08SEP99 ;CN I6I) d i

~

dK2RD007lSA and U US work pckis prip (firstI1)~~~

22MAY98A19JUN98A'CN E 15 l

IK2RD023 "CFC sieelinstiliation drawings

~~

'04JUN98 '01iWi R99hC5 8

~

i K2Rdd24 'ShelIn'sU!IaUon C'-331, CeIfFlooi

~

~~ '08JUU98A DiJ N00 U5~ ~ 5 2*

~

ii2iiD026 Steellnstallation C-555,' Cell Floor 30JUN95 06J5N00 ;CN 489*

~~

_. _ l.._ _.,!

j K2RD020 Grd floor util:ty relocations (Elect, Mech, I&C) l17AUG98A09DEC99,CN j. _ _ _.

181 i _.. _... _. _ _. _. _. _. _ _ _. _ _ _ _

4.._.-._. _ L

_ u__ _ j. _ _..

jlC2?R ' Steel Installation C-331, Ground Floor

!15DEC98A 15JUN00 ;CN 379*

1

~

~

K2R'Dd30 S'teeiIistaiiatioTC-335,'Gr5uniFlooi 15DEd98 I23 JUNO <Cfi[385 lK2RD039 Contractor Mobilization (Engr Title Ill) f66JY59 CN' UO I

K2R6041 Trainin[5ngr Tide ~lh(~GET3D$EoikouiTag)' ~

!133 A99A'CN 5

s I

K5C9969 Complete Construction / Installation 23JUNUO CN O

L.K2PK9989. Complete Project l

l23JUN00 ;CN i 0

I I

N sn iz.a