Director Office of Nuclear Reactor Regulation U.S.-Nuclear Regulatory Commission Washington, D.C.
20555 Docket No. 50-182
Dear Sir:
This letter is submitted in compliance with the requirement in 10CFR.50-64. Since funding has been approved, the following schedule is proposed for the conversion from HEU to LEU.
May 1, 1987'- Obtain date and programs, set up models, validate methods, and refine models for calculating reactor performance with new fuels.
November I, 1987 - Start metal-water study, critical size, temp-erature coefficients, and determine physics-acceptable core with new fuels.
March I, 1988 - Start thermal hydraulics on acceptable cores of the final design for new core.
May 1, 1988 - Start core and reflector physics and thermal hydraulics on final design.
July 1, 1988 - Start final Safety Analysis Report.
August 31, -1988 - Complete safety report for new core and sub-mit to NRC.
8703250024 8'70317 PDR ADOCK 05000182 P
PDR alo+o NUCLEAR ENGINEERING BUILDING
- WEST LAFAYETTE. IN 479o7
- 13171494 5739
4 t
,C1
~...
,a Q
Summer 1989 - Install new reactor cdre, providing NRC approval ~
and ftiel fabrication schedules have been rade.
If we can be of any further help,! please feel free to contact us.
Sincerely, j
F. M <^ Clikeman Professot/ and Acting Head FMC:csw
(