ML20203Q220

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to ISI-P-002, Preservice Insp Program. Thirty-eight Relief Requests Identified & Included in Program.Augmented Insp of Piping Welds in ESF Sys (SER Confirmatory Item 23) Completed
ML20203Q220
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/07/1986
From: Bailey J
GEORGIA POWER CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20203Q221 List:
References
GN-875, NUDOCS 8605090129
Download: ML20203Q220 (2)


Text

Georgts Power Company Routa 2. Box 299A Waynesboro. Georgia 30830 Telephone 404 554-9961 -

404 724 4114 Southem Company Services. Inc.

Post Office Box 2625 B4rmirgham. Alabama 35202 Telephone 205 870-6011 Vogtle Project May 7, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention:

Mr. B. J. Youngblood Log:

GN-875 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.

20555 REF:

FOSTER TO DENTON, GN-349, DATED 5/1/84 NRC DOCKET NUMBER 50-424 CONSTRUCTION PERMIT NUMBERS CPPR-108 V0GTLE ELECTRIC GENERATING PLANI - UNIT 1 SER OPEN ITEM 2: PSI PROGRAM SER CONFIRMATORY ITEM 23: VOLUMETRIC EXAMINATION OF ESF SYSTEMS

Dear Mr. Denton:

Enclosed for your staff's review are ten (10) copies of the VEGP Unit 1 Preservice Inspection Program, ISI-P-002.

Please note that 38 relief requests have been identified and are included as part of the program. The relief requests identified represent the substantial majority in that the PSI program has been completed except for the steam generator examinations, which are approximately half completed, and the examination of the piping supports which is scheduled for July in conjunction with the hot functional testing. The

' inspections completed to date included the augmented inspection of piping welds in the engineered safety systems. The augmented inspection was performed as committed to by the Project and identified as SER Confirmatory Item 23. Records of this augmented examination program are available at the site for your audit.

The enclosed program supercedes the program submitted to your staff by the referenced letter. If your staff requires any additional information, please do not hesitate to contact me.

S

erely, J. A. Bailey Project Licensing Manager JAB /sm Enclosure 8605090129 860507 PDR ADOCK 05000424
10 Q

PDR

t Director of Nuclear Reactor Regulation Files X7BC35 l

May 7,'1986 Log:

GN-875 Page 2 Ic:

R. E. Conway-l-

R. A. Thomas J. E. Joiner, Esquire B. W. Churchill, Esquire M. A. Miller B. Jones (Esquire) l

~ G. Bockhold, Jr.

NRC Resident Inspector l

D. C. Teper.

l W. C. Ramsey L. T. Gucwa Vogtle Project File 0443V r

I-

{'

i l

i I

3 l

I i

._