ML20203P879
| ML20203P879 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 02/28/1986 |
| From: | Mike Williams KANSAS GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20203P830 | List: |
| References | |
| NUDOCS 8605080293 | |
| Download: ML20203P879 (1) | |
Text
-
S OPERATING DATA REPORP DOCK W NO.
STN 50-482 NOLP CREEK GENERATING STATION KANSAS GAS AND ELECTRIC COMPANY DATE 03-01-86 COMPIEEED BY M. Williams TELEPHONE 316-364-8831_
OPERATING STATUS
.1.
Reporting Period:
February, 1986 Gross Hours in Reportirx3 Period: 6.72.0
- 2. Currently Authorized Power Invel(MNt): 3411 Max. Depend. Capacity (MWe-Net) : 1128 Design Electrical Rating (MWe-Net): 1170 3.
Power Level to Which Restricted (If Any)(Mwe-Net):
N/A 4.
Ibasons for restriction (If Any):
N/A W is Month Yr to Date Cunulative 5.
Nanber of Hours Reactor was Critical 611.8 1362.8 4153.1 6.
Reactor Reserve Shutdown Hours 41.4 41.4 120.2 7.
Hours Generator on Line 614.7 1358.7 4130.3 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross Wennal Energy Generated (MNH) 2,005,668 4,486,147 13,361,080
- 10. Gross Electrical Energy Generated (MWH) 709,461 1,582,755 4,653,845 ll.' Net Electrical Energy Generated (MWH) 679,535 1,519,835 4,461,935
- 12. Reactor Service Factor 92.1 96.2 96.7
-13.
Reactor Availability Factor 98.2 99.2 99.5
- 14. Unit Service Factor 91.5 96.0 96.1
- 15. Unit Availability Factor 91.5,
96.0 96.1
- 16. Unit Capacity Factor (Using MDC) 89.6 95.2_
92.1
- 17. Unit Capacity Factor. (Usirg Design MWe) 86.4 91.7 88.8
- 18. Unit Forced Outage Rate
_8.5 4.0 3.8
~19.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each) : None
- 20. If Shut Down at End of Report Period, Estimated Date of Startup:
N/A
- 21. Units in test Status (Prior to Connercial Operation): Forecast Achieved Initial Criticality 5-22-85 5-22-85 l
Initial Electricity 6-13-85 6-12-85 Cmmercial Operation 9-09-85 9-03-85 8605080293 860422 "
PDR,ADOCK 05000482-Page 8 of 11 R
PDR l