Text
=~
j a<are f,,
UNITED STATES 4
g NUCLEAR REGULATORY COMMISSION n
- j WASHINGTON,0. C. 20555
/
COMMONWEAL.TH EDISON COMPANY DOCKET NO. STN 50-455 BYRON STATION, UNIT NO. 2 AMENDMENT TO CONSTRUCTION PERMIT Amendment No. 1 Construction Permit No. CPPR-131 1.
The Nuclear Reculatory Comission (the Comission) has found that:
A.
The application for amendment filed by Commonwealth Edison Company (the licensee), dated September ?5, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules ano regulations set forth in 10 CFR Chapter I; 8.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and C.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Construction Permit No. CPPR-131 is amended as follows:
A.
Change Paragraph 3.C to read:
C.
This construction permit authorizes the applicant to con-struct the facility described in the application and in the hearing record, in accordance with the principal architectural and engineering criteria (except to the extent modifications of such criteria have been authorized by the exemption issued on October 28, 19851 and environmental protection comitments set forth therein.
3.
This amendment is effective as of the date of issuance.
F0 THE EARREGUI.ATORYCOMMISSIOy
,D
\\
pg50 45 e60429 ?
,b k -
A CM 05000465 l
PDp T omas M. N
, A ' ting Director Division of 1.i ensing-A Office of Nuclear Reactor Regulation Date of Issuance:
APR 2 31986
buT1
=
et-
_2-3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGUI.ATORY COMMISSION O
f Th mas M. NoVak, Acting Director Division of PhR I.icensing-A Office of Nuclear Reactor Regulation Date of Issuance: IEE f
- See next page for previous concurrences Yh5'f/ /d
/
OELD SHL 0Q.D' DIR:PD#
k:els*3p'gSPD#5 PD#5 L01shan*
Stewis*J J Sc'into VSNoopan MRush 11/1 B 11/7/85 11/13/85
</ /86
/
/86 W.-A' ya.' f I
o
-p.
3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Hugh L\\ Thompson, Director Division,of Licensing Offi e..of}uclear Reactor Regulation Date of Issuance.
N
\\
\\
\\
LB!1:DLf '[ OELD I M I OELD LBf1:DL LS 1 DL' MRu(shbhok:kab.
' L01shan Ik Stewis JScinto BJYoungblood 11/{/85 11/ 7 /85 11//y/85 11/ /85 11/
/85 AD:L:DL D:DL TNovak HThompson 11/
/85 11/
/85
C UNITED STATES g
j.f g
NUCLEAR REGULATORY COMMISSION
- l WASHINGTON, D. C. 20655
\\...*/
COMMONWEAL.TH EDIS0N COMPANY DOCKET N0. STN 50-456 BRAIDWOOD STATION, UNIT NO. 1 AMENDMENT TO CONSTRUCTION PERMIT Amendment No. 1 Ccnstruction Permit No. CPPR-132 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment filed by Comonwealth Edison Company (the licenseel, dated September 25, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; 8.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and C.
The issuanc of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Construction Permit No. CPPR-132 is amended as follows:
A.
Change Paragraph 3.C to read:
C.
This construction permit authorizes the applicant to construct the facility described in the application and in the hearing record, in accordance with the principal architectural and engineering criteria (except to the extent modifications of such criteria have been authorized by the exemption issued on October 28, 1985) and environmental protection commitments set forth therein.
3.
This amendment is effective as of the date of issuance.
FOR THE EAR REGUI. TORY COMMISSION T
m'
..I ov Ac< ng Director Division of R ico sing-A Office of Nuc R'
ctor Regulation Date of Issuance pp, S D 1985
v.
COMMONWEALTP EDISON COMPANY DOCKET NO. STN 50-4!,6 BRAIDWOOD STATION, UNIT N0. 1 AMENDMENT TO CONSTRUCTION PERMIT Amendment No. I Construction Permit No. CPPR-132 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment filed by Comonwealth Edison Company (the licensee), dated September 25, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and C.
The issuance of this anendment is in accordance with 10 CFR Part 51 4
of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Construction Permit No. CPPR-132 is amended as follows:
A.
Change Paragraph 3.C to read:
C.
This construction permit authorizes the applicant to construct the facility described in the application and in the hearing record, in accordance with the principal architectural and engineering criteria (except to the extent modifications of such criteria have been authorized by the exemption issued on October 28, 1985) and environmental protection comitments set forth therein.
3.
This amendment is effective as of the date of issuance.
FOR THE NUCl. EAR REGULATORY COMMISSION W
Thomas M. NovaY, Acting Director Division of PWR licensing-A Office of Nuclear Reactor Regulation Date of Issuance geg3 ext page for previous concurrences
/
3(h PD#5 OEl.D OELD DIR:PD#5 PDf5 MRushbegoJuels*
JStevens*
- ECharrl, JScinto VSNoona 11/1/8 11/8/85 q/j{/86
,/- /86 g
/86 W -A' f HTh(ompson dip R-A on i
/86 g /86'
COMMONWEALTH EDIS0N COMPANY DOCKET NO. STN 50-456 j
BRAIDWOOD STATION, UNIT NO. 1 AMENDMENT TO CONSTRUCTION PERMIT i
Amendment No. 1 Construction Permit No. CPPR-132 1.
The Nuclear Regulatory Comission (
Comission) has found that:
A.
The application for amendment filedsby Commonwealth Edison Company (the licensee), dated September 25, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; y
\\
l B.
The issuance of this amendrnent will not be inimical to the comon defense and security or to the health and safbty of the public; and y
The issuance of this amendmentis in accordance'With 10 CFR Part %h C.
of the Comission's regulations and all applicabl requirements have been satisfied.
\\
2.
Accordingly, Construction Permit No. CPPR-132 is amended cs follows:
\\
A.
Chani Paragraph 3.C'to read:
\\
C.
This construction permit authorizes the applicant to construct the s
facility described in the application and in the hearing record, L
in accordance with the principal architectural and engineering criteria (except to-the extent modifications of such criteria have,been authorized by the exemption issued on October 28, 1985)-
l and environmental protection comitments set forth therein.
l 3.
This ameridment is effective as of the date of issuance.
i FOR THE NUCl. EAR REGUI.ATORY COMMISSION l
Thomas M. Novak, Acting Director pi Division of PWR I.icensing-A Office of Nuclear Reactor RegulatioH Date of Issuance
- See next page for previous concurrences DIR:PD#f[
PD#5 PD#5 OEl.D agg OEI.D MRus'hpook:els*
JStevens*
EChad JScinto SNo e-
/ )p/86 11/l785 11/8/85 8///6 /86
/ /86 7
i AD:PWR-A D:FSR-A
(
TNovak FThompson
/ /86
/ /86' o
COMMONWEALTH EDISON COMPANY DOCKET NO. STN 50-456 BRAIDWOOD STATION, UNIT NO. 1 AMENDMENT TO CONSTRUCTION PERMIT Amendment No. 1 Construction Permit No. CPPR-132 TheNuclearRegulatory\\ommission(theCommission)hasfoundthat:
1.
C Theapplicationfor\\
A.
amendment filed by Commonwealth Edison Company (the licensee), dated September 25, 1985, complies with the standards g
and requirements of the Atomic Energy Act of 1954, as amended (the Act),andtheCommissioysrulesandregulations~setforthin10CFR Chapter I;
/
B.
Theissuanceofthisamendr?tentwillnot'b inimical to the common defense and security or to t'he health and safety of the public; and The issuance of this amendment >is in accordance with 10 CFR Part W h C.
of the Commission's regulations sod all applicable requirements have been satisfied.
,/
\\s
/
\\
2.
Accordingly, Construction' Permit No. CPPR-132 is amended as follows:
/
\\
A.
Change Paragraph 3.C to read:
'\\,.
Thiscons[ructionpermitauthorizestheapplicanttoconstructthe C.
facility described in the application and in the hearing rec'ord, in ac'cordance with the principal architectural and engineering criteria (except to the extent modifications of such criteria
- have been authorized by the exemption issued on October 28, 1985)
./ and environmental protection conrnitments set forth therein.
3.
This amendment is effective as of the dated o,f issuance.
FOR THE NUCLEAR REGULATORY COMMISSICs Thomas M. Novak, Acting Director Division of PWR I.fcensing-A Office of Nuclear Reactor Regulation Date of Issuance
- See next page for previous concurrences MRus]m
/
PD#5 OELD 0 ELD DIR:PD#5 PD#5 F
iM:els*
JStevens*
EChan JScinto VSNoonan 11/1/85 11/8/85
/ /86
/ /86
/ /86 AD:PWR-A Q:PWR-A TNovak P ompson
/ /86
/86 e
.. 3.
This amendment is effective as of the date of issuance.
\\
FOR T NUCLEAR REGULATORY COMMISSION
\\
Hugh L. Thompson, Director Division of Licensing Office of Nucle r Reactor Regulation Date of Issuance:
\\
'tB bL LB#1:DL h OELD OELD LB#1:DL map hbrook:kab JStevenh EChang JScinto BJYoungblood 11/,/85 11/4/85 11/ /85 11/ /85 11/
/85 AD:L:DL D:DL TNovak HThompson 11/
/85 11/
/85 l
L req 8
.k UNITED STATES
[
p, NUCLEAR REGULATORY COMMISSION j
W ASHINGTON, D. C. 20555 O
c
\\...+/
COMMONWEAI.TH EDISON C0ftPANY DOCKET NO. STN 50-457 BRAIDWOOD STATION, UNIT NO. 2 AMENDMENT TO CONSTRUCTION PERMIT Amendment No. 1 Construction Permit No. CPPR-133 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment filed by Comonwealth Edison Company (the licensee), dated September 25, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and C.
The issuanc6 of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Construction Permit No. CPPR-133 is amended as follows:
B.
Change Paragraph 3.C to read:
C.
This construction permit authorizes the applicant to con-struct the facility described in the application and in the hearing record, in accordance with the principal architectural and engineering criteria (except to the extent modifcations of such criteria have been authorized by the exenption on October 28, 1985) and environmental protection commitments set forth therein.
3.
This amendment is effective as of the date of issuance.
FOR THE NUCl. EAR REQUI.ATORY COMMISSION l
homas ov k, cting Director Division o PW l.icensing-A Office of N r Reactor Regulation Date of Issuance:
APR 291986
COMMONWEALTH EDIS0N COMPANY DOCKET NO. STN 50-457 BRAIDWOOD STATION, UNIT NO. 2 AMENDMENT TO CONSTRUCTION PERMIT Amendment No. 1 Construction Permit No. CPPR-133 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment filed by Comonwealth Edison Company (the licensee), dated September 25, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The issuance of this ameadment will not be inimical to the comon defense and security or to the health and safety of the public; and C.
The issuance of this amendment is in accordance with 10 CFR P'.rt 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Construction Permit No. CPPR-133 is amended as follows:
A.
Change Paragraph 3.C to read:
C.
This construction permit authorizes the applicant to con-struct the facility described in the application and in the hearing record, in accordance with the principal architectural and engineering criteria (except to the extent modifcations of such criteria have been authorized by the exemption on October 28, 1985) and environmental protection commitments set forth therein.
3.
This amendment is effective as of the date of issuance.
FOR TPE NUCl. EAR REGULATORY COMMISSION h
as M. NovakV, Acting Director Division of PWR I.icensing-A f
Office of Nuclear Reactor Regulatio,
Date of Issuance: APR 20186
- See next page for previous concurrences PD PD#5 OELD OEtD DJR:PD#5 MRush ook:els*
JStevens*
EChangd J$cinto VSNynan 11/10 11/8/85
/ /86
/, -186
/p'f86 s
A R-A D
,J: PWR-A t
FThompson
/86 y /86
~
COMMONWEALTH EDIS0N COMPANY DOCKET N0. STN 50-457 BRAIDWOOD STATION, UNIT NO. 2 AMENDMENT TO CONSTRUCTION PERMIT Amendment No. 1 Construction Permit No. CPPR-133 N
1.
The NuclearMegulatory Commission (the Comission) has found that:
\\
A.
The application for amendment filed by Commonwealth Edison Company (thelicense'el,datedSeptember 25, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I;
\\
The issuance of this\\
amendment will not be inimical to the common B.
defense and security or'to the health and safety of the public; and
\\'
C.
The issuance of this amendmbnt is in accordance with 10 CFR Part 50 of the Commission's regulatidns and all applicable requirements have been satisfied.
'N N
2.
Accordingly, Construction.PermitNo.CPPq-133isamendedasfollows:
\\
l A.
Change Paragraph 3.C to read:
\\
C.
This construction permit authorizes the's applicant to con-struct the facility described in the application and in the hearing / record, in accordance with the\\ principal architectural and engineering criteria (except to the extent modifcations of such criteria have been authorized by the
~
exemption op October 28, 1985) and environmental protection commitments set forth therein.
3.
This amendment is effective as of the date of issuance.
i FOR THE NUCLEAR REGUI.ATORY COMMISSION Thomas M. Novak, Acting Director Division of PWR licensing-A l
Office of Nuclear Reactor Regulatio i
i i
Date of Issuance:
I
- See next page for previous concurrences PD#5 PD#5 OELD fQ g OEI.D DIR:PDE h L
i rook:els*
JStevens*
EChan.
\\JScinto VSNoona 1 1 85 11/8/85 9//3/86
/ /86 V/ /86 AD:PWR-A N:PWR-A i
TNovak HTlompson
/ /86
~ / /86
e COMMONWEALTH EDISON COMPANY DOCKET NO. STN 50-457 BRAIDWOOD STATION, UNIT NO. 2 AMENDMENT TO CONSTRUCTION PERMIT Amendment No. 1 Construction Permit No. CPPR-133 1.
The Nuclear Regulatory Comission the Comissio.pl has found that:
\\
A.
The application for amendment fil'ed by Co nwealth Edison Company (the licensee), dated September 251 1985, complies with the standards and requirements of the Atomic Enerhy' Act of 1954, as amended (the Act), and the Comission's rules and ' regulations set forth in 10 CFR f
\\
Chapter I;
\\
B.
The issuance of this amendment will not Q inimical to the comon defense and security or to the health and' safety of the public; and C.
The issuance of this amen'dment is in accord oce with 10 CFR Part SP b of the Comission's re<julations and all applicable requirements have been satisfied./
\\
\\
Accordingly,ConstrugtfonPermitNo.CPPR-133isamendedasfollows:
2.
/
/
\\
A.
Change Paragraph 3.C to read:
/
C.
This construction permit authorizes the applicant to con-struct the facility described in the application and in the' hearing record, in accordance with the principal architectural and engineering criteria (except to the extent riodifcations of such criteria have been authorized by the dexemptiononOctober 28, 1985) and environmental protection comitments set forth therein.
3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Thomas M. Novak, Acting Director Division of PWR licensing-A Office of Nuclear Reactor Regulation Date of Issuance:
- See next page for previous concurrences PDf.
PD#5 OELD OEl.D DIk PD#5 MRu k:els*
JStevens*
EChang JScinto VSNoonan 11/ /85 11/8/85
/ /86
/ /86
/ /86 AD:PWR-A sD:PWR-A TNovak JThompson
/ /86
(
/ /86'-
t
.' 3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Hugh L. Thompson, Director Division of Licensing Office of Nuclear Reactor Regulation Date of Issuance:
EQ1 bL LB#1:D 0 ELD 0 ELD LB#1:DL MRds brook:kab JSteven EChang JScinto BJYoungblood 11/g/85 11/f/85 11/ /85 11/ /85 11/
/85 i
AD:L:0L D:DL TNovak HThompson 11/
/85 11/
/85