Insp Rept 70-1113/86-08 on 860408.No Violations or Deviations Identified.Major Areas Inspected:Confirmatory Radiation & Contamination Surveys Performed as Closeout Insp of Storage Facility Leased by Eastern Distribution,Inc
ML20203P109
Person / Time
Site: 07001113
Issue date: 04/25/1986
From: Hosey C, Revsin B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20203P103 List:
References
70-1113-86-08, 70-1113-86-8, NUDOCS 8605060338
Download: ML20203P109 (5)


Text

.

j,4 - - - - _ _ ._

ma at! UNITED STATES

/ o NUCLEAR REGULATORY COMMISSION

[' , '

REGION ll 3- ,j 101 MARIETTA STREET.N.W.

  • 't ATLANTA, GEORGI A 30323

%, v /

      • .* APR 2 51986 Report No.: 70-1113/86-08 Licensee: General Electric Company Wilmington, NC- 28401 Docket No.:-- 70-1113 License No.: SNM-1097 Facility Name: Eastern Distribution, Inc. Warehouse E (leased to General-Electric Company)

Inspection Conducted: April 8, 1986 Inspected At: :Greenville, SC Inspector: N Flav M b h 4-T5-Ah p B. K. Revsin Date Signed Approved by: h (44 M

  • 4 M C. M. Rosey, Section Chief Date Signed

. Division of Radiation Safety and Safeguards

SUMMARY

Scope: This routine, announced inspection entailed 5 inspector-hours onsite in the areas of confinnatory radiation and contamination surveys as part of a

, closecut inspection for Eastern Distribution, Inc. Warehouse E in Greenville, SC which was leased by General Electric for the storage of unirradiated fuel assemblies in shipping containers.

Results: No violations or deviations were identified.

+

8605060338 860425 PDR ADOCK 07001113 C PDR

2 REPORT DETAILS

1. Persons Contacted Licensee Employees
  • T. P. Winslow, Manager, Licensing and Nuclear Materials Management-R. Lewis, Radiation Protection Shift Supervisor
  • Attended exit interview
2. Exit Interview The -inspection scope and -findings were - summarized telephonically on April 22, 1986, with those persons . indicated in Paragraph 1 above. The

' inspector described the areas inspected . and discussed in detail the

. inspection findings. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector ~ during this inspection.

3. Licensee Action on Previous Enforcement Matters-This subject was not addressed in the inspection.

- 4. Closecut Inspection and Survey (83890)

a. Surveys Eastern Distribution, Inc. Warehouse E, located on Perimeter Road, near Donaldson Center in Greenville, SC had been 'used by General Electric- Company to store packaged uranium under NRC License -SNM-1097, Condition 9, Part I, Paragraphs 1.8.4.2 and 1.8.4.3. The . radioactive material was stored either i Fissile Class I packages or in raetal containers of the RA-series shipping package. The Warehouse had also been used to store non-radioactive General Electric (GE) reactor components.

The inspector reviewed licensee release survey records for fixed and loose alpha and beta gamma radioactivity. It was determined that the records adequately documented the surveys performed by the licensee and that the data in the records were consistent with the survey result

, summaries presented in the licensee's letter to the NRC Office of Nuclear Material Safety and Safeguards dated March 14, 1986.

, The warehouse was comprised of two rooms, Section A*and Section B, each The licensee had divided

~

approximately 100 feet by 100 fe'et in size.

each room into rectangular grid sections such that each room contained 100 grids of approximately ten feet to a side.

4

3 Direct alpha and beta gamma surveys were performed by the inspector using NRC equipment in 18 floors grids of Section A ( Attachment 1).

Walls adjoining floor grids were surveyed to a height of approximately four feet. In Section B, floor grid surveys were not possible due to the fact that the floor had been painted and treated with a sealer prior to this inspection. The licensee explained that the original lease on the Warehouse had terminated on March 31, 1986. The licensee had made arrangements to extend the lease for an additional thirty days; however, due to a misunderstanding between the warehouse owner and the warehouse manager, the manager had released Warehouse E effective April 1, 1986. The new leasee had constructed curbing around the sides of Section B and had painted and sealed the floor. At the inspection approximately 300 55 gallon drums of chemicals were occupying part of Section B. Consequently, the inspector was only able to perform surveys on walls.

Sixteen wall grids were surveyed ( Attachment 1). Smear surveys were performed in both sections and represented 10 percent of the total 200 grids. The smears were counted at the Region II laboratory for gross alpha and beta radioactivity on a alpha-beta proportional counter (Attachment 2)

Gamma radiation surveys were performed by the inspector in both Sections A and B and outside the warehouse. Measurements were taken at floor level, three feet above floor level and six feet above floor level.

The results of fixed and loose contamination surveys showed that no radioactivity above limits specified for unconditional release by license SNM-1097 were observed. Similar results had been reported by the licensee in their final survey report. Since no loose contamination had been found, environmental surveys were not performed.

b. Conclusion The licensee survey results showed no detectable contamination above background levels in Warehouse E and representative NRC surveys confirmed these results. Although the inspector was unable to survey the floor of Section B due to paint and sealer, the licensee had performed its final survey prior to application of these materials to the floor.

. e 4

ATTACHMENT 2 Smear Survey Results of Warehouse E Results Smear No. Location Gross Alpha Beta-Gamma dpm/ smear dpm/ smear 1 Grid 143 Floor <1 <1 2 Grid 183 Floor <1 <1 3 Grid 86 Floor <1 <1 4 Grid 110 Floor <1 <1 5 Grid 110 Floor <1 <1 6 Grid 188 Floor <1 <1 7 Grid 10 Sprinkler Piping <1 <1 8 Grid 8 Girder 11 921 9 Grid 50 Weight Boxes <1 <1 10 Grid 105 Pole <1 <1 11 Grid 111 Girder <1 <1 12 Grid 111 Piping <1 <1 13 Grid 191 Girder <1 <1 14 Grid 200 Girder <1 21 15 Grid 120 Wall <1 <1 16 Grid 20 Sprinkler <1 11 17 Grid 17 Wall <1 <1 18 Grid 95 Pole <1 11 19 Grid 12 Wall <1 <1 20 Grid 31 Wall <1 <1 I

l I

L

_ _ _ _ - _ _ - . _ _ _ _ - - ~~

r l

FIGURE 1 -

WAREHOUSE E - EASTERN DISTRIBUTION GREENVILLE, S. C. fN GRID MAP I SECTION A SECTION B e 100ft -

100 ft -

182 '/

f 185 186 187 '

189 9 192 IIIN IIh4 195 ii f\ 197 198 199- p 161 162 163 sy 165 166 167 168 169 -

71 172 173 174 175 176 177 178 179 18d 142 144 145 147 148 149 150 151 152 153 154 155 156 157- 158 159 160 121 122 123 124 125 126 127 129 130 31 132 133 134 135 136 137 138 139 '140 hg

~

102 / 104 105 106 107 108 109 11 112 113 114 115 116 117 118 iT9 120 P Door 8 82 83 84 k 87 89 92 93 94' 9 96 97 98, 99 00 100 ft 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 8 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 16 57 58 59 60 21 22 23 24 25 26 27 28 29 30 h 31 32 33 34 35 36 37 38 ~ 39 4h 3 =

lilii l) a fill! 11 n v 24' Door 24' Door TTF7 2%41- d '7/31{85 M c-1 SAGA A2248 - c4 q\eles QN -14 447 -. cd 7116 66 g Yg, 3 g Gamma luR/hr) measurements ,g t 985 d g 4 g o '

. . _ -- - ___ _ _ _ - _ _