ML20203N521
| ML20203N521 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 09/29/1986 |
| From: | Carey J DUQUESNE LIGHT CO. |
| To: | Bagchi G, Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| 2NRC-6-103, NUDOCS 8610090220 | |
| Download: ML20203N521 (2) | |
Text
O 4
h m
M 2NRC-6-103 Beaver Valley No. 2 Unit Project organization Telecopy ( 2) 12 Ext.160
$. so*x"$2$"'
Sept. 29, 1986 Shippingport, PA 15077 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. G. Bagchi Engineering Branch Office of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 BVPS-2 Seismic and Dynamic Qualification Progran
REFERENCES:
A) 2NRC-6-057, dated June 4, 1986 B) 2NRC-6-076, dated August 4, 1986 Gentlemen:
Please find attached (Attachment 1) the Acknowledgement of Receipt for Beaver Valley Power Station - Unit 2 Seismic ana Dymanic Qualification Progran of Safety Related Equipment Manual submitted under the above references.
Please affix the Control Label (Attachment 2) to your Copy No. 4 and return Receipt Acknowledgement letter to T. Buckman, Duquesne Light Company, P.
O. Box 328, Shippingport, PA 15077.
Should you have any questions, please contact Mr. T. J. Zog1mann at (412) 643-5200, extension 232.
DUQUESNE HT COMPANY BY J. iJ. /Gerey
/
Sr. Vtte Presid6nt TJZ/ijr NR/BAGCHI Attachments AR/NAR cc:
C. O. Richardson, Jr., SWEC (5) (3)
NCD File It i
8610090220 860929 PDR ADOCK 05000412 A
3 Acknowltdgement of Receipt for' Beaver Valley Power Station - Unit 2 Seismic and Dynamic Qualification Program for Safety-Related Equipment l
Dated June 1986 1
i I acknowledge receipt of the BVPS-2 Seismic and Dynamic Qualification Program for Safety-Related Equipment i
Dated June 1986
'.h 5;
., }
4
[ }E A Nf BE AVER V ALLEY POWER ST ATION - UNIT 2 i.
M g-k k-I i'
SEISMIC IND DYN #41C QUILIFICMION PROGR AM FOR S/FETY RELMED EQUIPMENT fi lj
4(a CONTROL COPY 4
a l
control copy No. 4 Assigned to:
G. Bagchi, Engineering Branch, NRC Received by:
Date Please return this form to l
Stone & Webster Engineering Corporation P.O. Box 2325 Boston, MA 02107 Attn A. Alexander 245/8 t
g -
_. _,..