e' y
/
CONWRonwealth Esilson One First National Plaza, Chica00. lilinois
., 2 Address Reply tg Post Omco Box 767 Chicago, Illinois 60690 0767 August 13, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 4
1
Subject:
LaSalle County Station Units 1 and 2 Supplemental Information to Proposed Amendment to Technical Specification for Facility Operating License NPF-ll and NPF-18 Management Organizational Changes NRC Docket Nos. 50-373 and 50-374 References (a):
C. M. Allen letter to H. R. Denton dated December 20, 1985.
(b):
C. M. Allen letter to H. R. Denton dated April 29, 1986.
Dear Mr. Denton:
Pursuant to 10 CFR 50.90, commonwealth Edison proposed to amend Appendix A, Technical Specification, to Facility Operating License NPF-ll and l
NPF-18 in reference (a). This original submittal was amended by supplemental response dated April 29, 1986.
This supplemental response is in reply to questions by your reviewer in an August 4, 1986 telecon. These are addressed in Attachment A.
4 Since these changes are administrative in nature, there is no change to the Significant Hazards Considerations submitted with reference (a).
i Commonwealth Edison is notifying the State of Illinois of our request for this amendment by transmittal of a copy of this letter and its attachments to the designated State Official.
I i
1 i
8608260292 860813 DR ADOCK 05000373
/s36 p
PDR p
l\\
.~
H. R. Denton August 13, 1986 I
Please direct any questions you may have concerning this matter to this office.
One signed original and fifteen (15) copies of this transmittal and its attachments are provided for your use.
Very truly yours,
- c. M. Allen Nuclear Licensing Administrator 1m Attachment cc: Region III Inspector - LSCS A. Bournia - NRR M. Parker - State of Ill.
1932K
ATTAQ93rf A i
i Q.
Why were the following positions eliminated from your revised Corporate Management Chart?
a.
Site Quality Assurance Superintendent l
b.
Quality Assurance Coordinator (SNED and QAD) c.
Director Training Program Development.
A.
a.
Site OualitY Assurance Superintendent - This position was eliminated at LaSalle when the station changed status from construction to operating unit.
b.
Quality Assurance Coordinator (SNED and OAD) - This position provides support to SNED and OAD to assist in internal paper flow 1
and record retention for their activities. Activities that these organizations perform in support of the station are monitored by the Station Quality Assurance Supervisor or by the Director of Quality Assurance (Engineering / Construction).
c.
Director Training Program Development - This position is obsolete and is no longer filled. The Production Training Manager maintains l
responsibility for accomplishment of this function.
l I
1 l
Q.
Why was the Manager of Electrical Engineering added to the Corporate Management Chart?
A.
This Manager was added to show the organization since it does provide support to the station. The description of the Station Electrical Engineering Department from the QA Topical Report (following) indicates that they support Station activities through the Station Nuclear l
Engineering Department.
"The Station Riectrical Engineering Department will provide electrical engineering technical assistance to the Station Nuclear Engineering Department, as requested, or assigned 1
(
by the Station Nuclear Engineering Department."
i i
i l
1932K i
f l
i i