ML20203L411
| ML20203L411 | |
| Person / Time | |
|---|---|
| Site: | Paducah Gaseous Diffusion Plant |
| Issue date: | 02/26/1998 |
| From: | Pierson R NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | John Miller UNITED STATES ENRICHMENT CORP. (USEC) |
| References | |
| TAC-L32057, NUDOCS 9803060029 | |
| Download: ML20203L411 (3) | |
Text
February 26,1998 Mr. James H. Miller Vice President, Production U. S. Enrichment Corporation 2 Democracy Center 6903 Rockledge Drive Bethesda, MD 20817
SUBJECT:
PADUCAH REQUEST FOR ENFORCEMENT DISCRETION SAFETY
{
ANALYSIS REPORT- (TAC NO. L32057)
Dear Mr. Miller:
This refers tc your Request for Enforcement D:scretion dated February 25,1998. Our review of your submittal has resulted in additional questions which should be provided by close of business February 27,1998. Please reference the above TAC No. in future correspondence related to this requer,t.
If you have any questions, I can be reached at (301) 415 7192.
Sincerely, 1
@gifinl GOM N x
Robert C. Pierson, Chief Special Projects Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-7001 Certificate GDP-1
Enclosure:
As stated cc: Mr. Randall DeVault, DOE Mr. Steve Polston, PGDP 9803060029 980226 PDR ADOCK 07007001 go jd;;p efgyf fg'e {,,
_,_,,N e-C PDR i
DISTRIBUTION: w/ encl.(Control No. 350s)
Docket 70-7001 FNMC" Fife Coriter
- PUBLIC Rill JJacobson, Rill k
f' NMSS r/f FCSS r/f SPB r/f PHiland, Rlli
/
'See previous concurrence OFC
'SPB n
'SPB E
SPB C
SPB C
SPB NAME CCox:ij PPatel DHoadley DMartin RPierson DATE 2/26/98 2/26/98
//98 2/26/98 2/26/98 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY I.1.11.11.11111. I.lil.i I.
February 26, 1998 James H. Miller Vice resident, Production U. S.
richment Corporation 2 Demo cy Center 6903 Rockled e Drive Bethesda, MD 0817
SUBJECT:
PADU H CERTIFICATE AMENDMENT REQUEST -UPDATE OF THE APPLICA ON SAFETY ANALYSIS REPORT- (TAC NO. L32043)
Dear Mr. Miller i
This refers to your Request for forcement Discretion dated February 25,1998 Our review of your submittal has result in additional questions which should be prc,ided by close of business February 27,1998.
lease reference the above TAC No. in future correspondence related to this request.
If you have any questions. I can be reache t (301) 415-7192.
Sincerely, OriginalSigned Robert C. Pierson, C f
Special Projects Branch Division of Fuel Cycle Safe and Safeguards, NMSS Docket 70-7001 Certificate GDP-1
Enclosure:
As stated cc: Mr. Randall DeVault, DOE Mr. Steve Polston, PGDP DISTRIBUTION: w/ encl.(Control No. 300S)
Docket 70-7ool NRC Fila Center PUBLIC Rlli JJacobson, Rlli NMSS r/f FCSS r/f SPBr/f PHiland, Rill OFC SPB SPB E
SPB b
SPB SPB NAME C
ij PPotelk DHoadley D
RPierson,
DATE N[/98 2 f$8
/ /98 kb/[,/98
/
/98 C = COVER E = COVER & ENCLOSURE /
N = NO COPY OFFICIAL RECORD COPY
l 4
e Request for Additional Information Paducah Request for Enforcement Discretion United States Enrichment Corporation Paducah Gaseous Diffusion Plant Docket 70-7001 Please provide the following infsrmation:
(1)
Proposed Commitments do not include a i.ummitment to control and minimize at all times the UF6 inventory in the C-315 online accumulator. As proposed the limit is effectively the full volume of one accumulator.
(2)
No compensatory actions are proposed for limiting accumulator inventory in Building C-310/C310-A (purge and product withdrawal building). This is supposedly based on low probability of having inventory present. That is an unacceptable basis given the supporting information in the JCO. Must propose limits and a mechanism to ensure that these limits are adhered to.
(3)
Provide information about the habitability of C-300.
(4) of the JCO states that the accumulators fail at less than 0.05g. JCO assumes that they fail al 0.05g. Please clarify which is correct, i
e en