Text
,
m_
1
)
Pcrconn31 Expo:uro end Monitoring R port, 1997
{
Annual Op3 rating Riport Reg. Guido 1.16 Number of Personnel (>100 mrem)
Total Man Rem Station Utility Contract Station Utility Contract WORK & JOB FUNCTION Employees Employees d
......................................................................+..................
REACTOR OPERATIONS Maintenance Personnel 7
0 6
0.923 0.000 1.001 Operations Personnel 11 0
0 1.413 0.000 0.000 Health Physics Personnel 36 0
29 7.796 0.000 5.299 Supervisory Personnel 0
0 1
0.000 0.000 0.136 Engineering Personnel 1
0 0
0.201 0.000 0.000 ROUTINE MAINTENANCE Maintenance Personnel 18 2
9 2.811 0.329 1.139 Operations Personnel 0
0 1
0.000 0.000 0.383 Health Physics Personnel 0
0 2
0.000 0.000 0.560 i
Supervisory Personnel C
0 0
0.000 0.000 0.000 Engineering Personnel 0
0 0.251 0.0C0 0.000 s
INSERVICE INSPECTION Maintenance Personnel 2
0 42 0.552 0.000 17.919 4
Operations Personnel 0
0 0
0.000 0.000 0.000 4
Health Physics Personnel 4
0 3-0.577 0.000 0.850 Supervisory Personnel 3
0 1
0.510 0.000
- 301 Engineering Personnel 4
1 9
0.743 0.105 4.074 iPECIAL MAINTENANCE 4
Maintenance Pevsonnel 5
1 14 0.796 0.142 1.939 1
Operations Personnel 0
0 0
0.000 0.000 0.000 Health Physica Personnel 1
0 0
0.101 0.000 0.000 2
Supervisory Personnel 0
0 0
0.000 0.000 0.000 Engineering Personnel 0
0 1
0.000 0.000 0.103 WASTE PROCESSING Maintenance Personnel 0
0 0
0.000 J.000 0.000 Operations Personnel 0
0 0
0.000 0.000 0.000 Hemith Physics Personnel 2
0 1
0.279 0.000 0.125 Oupervisory Personnel 0
0 0
0.000 0.000 0.000 Engineering Personnel 0
0 0
0.000 0.030 0.000 REFUELING Maintenance Personnel 11 0
13 3.614 0.000 2.492 Operations Personnel 10 0
1 3.345 0.000 0.369 Health Physics Personnel 6
0 0
1.235 0.000 0.000 Supervisory Personnel 4
0 0
1.540 0.000 0.000 Engineering Personnel 1
0 2
0.253 0.000 0.574
-TOTALS Main-tance Personnel 43 3
84 8.696 0.471 24.546 Operations Personnel 21 0
2 4.759 0.000 0.752 Health Physics Personnel 49 0
35 9.-
0.000 6.834
-Supervisory Personnel 7
0 1
2.
0.t ^0 0.437 Engineering Personnel 7
1 12 2.48 0.205 4.751 GRAND TOTAL 127 4-135 26.940 0.676 37.320 9003050234 990226 PDR ADOCK 05000313-R PDR-
o o
o.
i PERSONNEL EXPOSURE AND MONITORING REPORT,1997 (Annual Operating Report Reg. Guide 1.16)
Individual doses are included only in those categories in which the dose was received. T% total actual collective dose for personnel working at ANO during 1997 was 117.175 rem.
Unit I special maintenance resulting in significant personnel dose included the following:
l
- Decay heat system outage Relocate clean waste valve (CZ-16) to overhead e
Control valve (CV-1816) power entry for repairs l
Unit 2 special maintenance resulting in significant personnel dose included the following:
Loose parts vibration monitor (reactor vessel citannel) cable replacement Reactor coolant pump (2P32-B) motor replacement e
Code compliance piping modification for isometric update project Refueling canal drain modification Service water piping replacement Steam generator templating for steam generator replacement i