A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2

From kanterella
(Redirected from ML20203K360)
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2
ML20203K360
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/30/1997
From: Cygan J, Starkey R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, ZRA97076, NUDOCS 9712220334
Download: ML20203K360 (8)


Text

o.mnionwisa i am.n ouin,.in,

/ ton (irm reung Atatkus misnoonion,k w a hun. !! (n rn tv I

u \\ m~ et, m 4

ZRA97076 December,151997 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Document Control Desk i

Subject:

Zion Station Units 1 and 2 Monthly Operating Report NRC Docket No.s 50 295 and 50 304 Attached is the November Operating Status Report. This report is submitted in accordance with NRC Generic Letter 97 02 and as required by the Administrative Controls Section of the Zion Unit I and 2 Technical Specifications.

R. S. Starkey Plant General Manager Zion Station ec:

NRC Document Control Desk NRC Regional Administrator Rlli NRC Zion Station Project Manager - NRR NRC Senior Resident inspector - Zion Station omce of Nuclear Facility Safety - IDNS j[h j

IDNS Resident inspector Zion Station NLA Zion Site Vice President SRB INPO Lake County Div. of Enforcement !!calth F Yost Zion Station Operations Dept, M. Kramer (FAC)

Regulatory Assurance File Master File 9712220334 971130-PDR ADOCK 05000295 llLI,11,111111Ill OVel1 RKOPRPIIl.lW 3

c A 4 nwont L nmju;.3

4 OPERATING DATA REPORT i

Docket Number:

50 295 Unit Name:

Zion Unit 1 Date:

12/15/97 I

Completed fly:

L Cygan Telephone:

- (847) 746 2084, ext. 3169 i

Reporting period:

Novernber 1997 t

Design Electrical Rating (MWe Net):

1040 Maximum Dependable Capacity (MWe Net):

1040 I

this Year to Month Date Cumulative i

llours Reactor was Critical 0.0 1238.3 13,741.3 llours Generator was On Line 0.0 1238.3 134,804.2 l

Unit Resene Shutdown llours 0.0 0.0 0.0 Net Electrical Energy (MWil) 0.0 1,079,324 123,571,046 a vet.! RKOPRPT11100 l

t L

OPERATING DATA REPORT Docket Ntimber:

50-304 Unit Name:

Zion Unit 2 Date:

12/15/97 Completed By:

J. Cygan Telephone:

(847) 746 2084, ext. 3169 Reporting Period:

November 1997 Phsign Electrical Rating (MWe Ne'):

1040 Maximum Dependable Capacity (MWe Net):

1040 Year to Tins Date Month Cumulative 0.0 0.0

.138,378.7 llours Reactor was Critical 0.0 0.0 135,098.8 flours Generato. was On Line 0.0 0.0 0.0 Unit Reserve Shutdown ilours 0,0 0.0 124,095,088 Net Electrical Energy (MWil) o G \\ZCLIRKOPRFTli DOC 2

UNIT SHUTDOWNS AND POWER. REDUCTIONS :

Docket Number: 52 295 Unit Name:

Unit I Date-12/15/1997 Completed By: J.Cygan Telephone-(847)-746-2084, ext. 3169 '

REPORT MONTH November 1997-No.

Date Type Duration Reason Method of Cause & Correctne (I)

('Ifours)

(2)

Shutting Action to Prevent Down Recurrence Reactor 4

2/21/97 S

720.0 B

1

'Jnit 1 :rmained Off-Line for the Entire Month for Maintenance Outage z1MM Summary: The Unit remained shutdown for the entire reporting period. This shutdown is a continuation of the shutdown that occurred in February,1997, In respoase to an inoperable train of containment spray. The tinit has remained shutdown to complete an extensive restart plan.

(1) Tvpe-(2) Reason:

(3) Method-F: Forced A-Equipment Failure (Explain) 1-Manual S: Scheduled B-Maintenance or Test 2-Manual Trip C-Refueling 3-Auto Trip D-Regulatory Restriction 4-Continued E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative G-Operational Error (Explain)

II-Other(Explain)

\\ZCLERKW)PRPTI1.IXX' 3

J.

UNIT SHUTDOWNS AND POWER REDUCTIONS Docket Number-50-304

' Unit Name:.

Unit 2 Date:

12/15/97

~ Completed By-J.Cygan Telephone:

(847)-746-2084, ext 3169 REPORT MONTH November 1997 No.

Date Type Duration Reason Method of Cause & Corrective (1)

(Ilours)

(2)

Sisutting Action to Prevent Down Recurrence Reactor 7

9/19/96 S

720.0 C

1 Unit 2 remained oft-Line for the Entire Month for the (for Continuatum of Refueling Outage Z2R14 1996)

Summary: Unit 2 remained Off-Line for the Entire Month for the Continuation of Refueling Outage Z2R14 (1) Type:

(2) Reason:

(3) Method-F: forced A-Equipment Failure (Explain) 1-Manual S: Scheduled B-Maintenance or Test 2-Manual Trip C-Refueling 3-Auto Trip D-Regulatory Restriction 4-Continued E-Operator Training & Licensee Examination 5-Reduced Load 1

F-AdnJnistrative G-Operational Error (Explain)

II-Other (Explain)

VCLERKOPRPil1. DOC 4

l f?

.4-

.n

~

AVERAGE DAILY-UNIT POWER LEVEL -

- Dockel Number: 50 i95 --

. Unit Name:

Unit i Date:

12/15/97 Completed By:.J.Cygan-Telephone:

- (847) 746-2084, ext. 3169

' Month:

November,1997.

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 1.

-6 17.

-6

- 2..

-6 18.

-6

- 3.

-6 19,

-6 '

4.

-6 20.

-6 5.

-6 21.

-6

. 6.

-6 22.

5

7. -

-6 23.

-5

. 8.-

6 24.

5 9.

-(t -

25.

-6 10.

-6 26.

-5

^ l 1.-

-6 27.

-5 12,

-6 28.

-5 2

13.

-6 25.

-5

14.

'6'

- 30.

5 15.

~6

. 31,

16;

-6

- GVCIIRK\\0PRPTl1. DOC '

____m_._.

0 AVERAGE DAILY UNIT POWER LEVEL Docket Number: 50-304 Unit Name:

Unit 2 Date:

12/15/97 Completed Dy: J Cygan Telephone:

(847) 746-2084, ext. 3169 Month:

November,1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY IOWER I.EVEL 1.

-6 17.

-6 2.

-6 18.

-6 3.

-6 19.

-6 3

4.

-6 20.

-6 5.

-5 21,

-5 2

6.

-6 22.

-5 3

7.

-6 23.

-5,

8,

-6 24.

-5 9.

-6 25.

-5 10.

-6 26.

-5 11.

-6 27.

-5 12.

-6 28.

-5 13.

6 29.

-5 14.

-6 30.

-5 e

15.

-6 31.

16.

-6 GVCI.I.RK\\0PRI'il I [KX'

.6

,~

-4,<

NOVEMBF R -

/

f NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE

. UNIT 1.

Unit I began November off line for a continuation of Maintenance Outage ClM06) and remained off line for the entire reporting period. Major maintenance was conduued on the 1 A and IB Chargir3 Pumps in the Chemical Volume and Control System.

UNIT 2 Unit 2 began November off line for a continuation of Refueling Outage (Z2R14) and remained off line for l the entire reporting period, Major maintenance was conducted on the 2B Diesel Generator.

032C11RK\\OPRPTil. DOC 7

=