ML20203K263
| ML20203K263 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 02/09/1998 |
| From: | Carey J ELECTRIC POWER RESEARCH INSTITUTE |
| To: | Kuo P NRC (Affiliation Not Assigned) |
| Shared Package | |
| ML20203K266 | List: |
| References | |
| NUDOCS 9803050035 | |
| Download: ML20203K263 (1) | |
Text
- - _ _ _ - __-_-_-_ - _-_--_____---_____-
Electre Power nesearch \\nst;tute Powering Progress througn Innos ative Solutions l
February 9,1998 Mr. P. T. Kuo License Renewal Project Directorate Office of Nuclear Reactor Regulation U.S. Nuckar Regulatory Commission Washington, DC 20555 0001
Subject:
EPRI Reports on Fatigue
Dear Mr. Kuo:
Enclosed are six (6) copies of the following two EPRI Reports:
1.
EPRI TR-107515, " Evaluation of Thermal Fatigue Effects on Systems Requiring Aging Management Review for License Renewal for the Calvert Cliffs Nuclear Power Plant", (Submitted for EPRI publication, December i
1997),and 2.
EPRI TR-105759,"An Environmental Factor Approach to Account for Reactor Water Effects in Light Water Reactor Pressure Vessel and Piping i
Fatigue Evaluations", December,1995.
These reports are being provided for information prior to our meeting in mid-March, 1998.
Sin rely p
\\
\\
g f-y/
I Jorg J. Carey Manager, Life Cycle Management Program i
f DIO 027L_JC vvd 2v c.
B. Doroshuk BG&E c)
<b D. Walters, NEl
,b; Q
'b,,,'j l Chron 9 0303o023,&mo,'
Y.Ylfffllll{$$
POR ADOCK 03000317 P
PDR.
i HeddQUdrters 3412 Htv,ew A enue. Post Othee Box 10-112 Pafo Alto CA 94303 USA = f 415) 855 2000
- www epn com v
Vashington Orrice 2000 L Street NW Suite 805 Wastvgten DC 20036 USA
- 42021872 9222
- Fax (202; 293-269'